Loading...
Report M� )PWU ENGINEERING INC. Lk- Email: pwuengineerinq(a�comcast.net Ph: (503) 810-8309 Structural Memo: Job #: MC13180 Date: 3/24/14 Client: Timberland Homes Project: Troy Park Lot 1, Tigard, OR New windows were added to the upper floor bonus room and master bath, and the window in the upper floor bedroom was moved to the rear wall. The shearwall on upper floor Line 1 was checked for the reduced wall length, and the 12.5' long pier is adequate to resist the lateral loads acting on this line. The FTAO shearwall on upper floor Line A was checked for using only the 4' and 9' piers, and is adequate to resist the lateral loads acting on this line. No changes or upgrades to the shearwalls are required at this time as a result of the new window locations. See attached plan and calculations. (,R,E) PR Ore c, c)INFFs�o !' C�_54e_-f9421PE_/9 2 I /, _i - 22 \° 1 I LIP `1 Expires: 06/30/2014