2014-020009 Washington County,Oregon 201 4-020009
A 04/09/201410:55:34 AM L 6
D-E Cnt=1 Stn=9 D MOON
$30.00$5.00$11.00$20.00-Total=$66.00
111111110111 11111111111111111111111111111 11
Exhibit D 01929771201400200090060061
I,Richard Hobernicht,Director of Assessment and .,,rro r
Temporary Construction Easement , Taxation entl Ex-Officio County Clerk for we9hlnpton �i'
County,Oregon,do hereby certify that the within ;•• � ' 1
AFTER RECORDING RETURN TO: Instrument or writing was received eqd re S ortled In the
book of records of said couply. . (� /y J- „y
(.4c�a,<X ewvvnti G`
Richard Hobernlcht,Director of Assessment and ,=;v;•t,:R
CITY OF TIGARD Taxation,Ex-Officio County Clerk
Attn: City Manager
City Hall
13125 SW Hall Blvd.
Tigard, OR 97223
UNTIL A CHANGE IS REQUESTED
SEND TAX STATEMENTS TO:
(NO CHANGE)
1
This space is reserved for recorder's use.
1
TEMPORARY CONSTRUCTION EASEMENT
Main Street,LLC,an Oregon limited liability company and Michael Dudunakis,
and individual (collectively"Grantor") hereby conveys to the City of Tigard, Oregon a
municipal corporation("Grantee"), and its successors and assigns,a temporary
construction easement for the purposes of constructing a public storm and sewer line,
including such other improvements thereto that are reasonably necessary and accessory to
such utilities, under,over and across the following described real property:
That tract of land described in Exhibit"A"and depicted graphically in Exhibit`B,"
both exhibits being incorporated herein.
The consideration paid for this temporary construction easement("Easement") is
the sum of$1.00,together with other valuable consideration,which is the whole thereof.
TO HAVE AND TO HOLD said easement to said Grantee, for the use and
purpose herein described for a period not to exceed forty-five(45)days from the date
Grantee initiates construction of the of the public storm and sewer line on the Grantor
property. The Easement hereby granted includes all reasonably related activities
including without limitation parking,access and circulation control and staging and,
further is subject to the terms and conditions set forth in the Purchase and Sale
Agreement entered into by the parties hereto and dated March 27, 2014, the terms of
which are incorporated herein.
BEFORE SIGNING OR ACCEPTING THIS INSTRUMENT,THE PERSON
TRANSFERRING FEE TITLE SHOULD INQUIRE ABOUT THE PERSON'S RIGHTS, IF
ANY,UNDER ORS 195.300, 195.301 AND 195.305 TO 195.336 AND SECTIONS 5 TO
11, CHAPTER 424, OREGON LAWS 2007, SECTIONS 2 TO 9 AND 17,CHAPTER 855,
Exhibit D,Page 1 of 6 30014-71291 Rc.f,JPard,ase 4recaleon.decx DRl J 20 201!
OREGON LAWS 2009, AND SECTIONS 2 TO 7, CHAPTER 8, OREGON LAWS 2010.
THIS INSTRUMENT DOES NOT ALLOW USE OF THE PROPERTY DESCRIBED IN
THIS INSTRUMENT IN VIOLATION OF APPLICABLE LAND USE LAWS AND
REGULATIONS. BEFORE SIGNING OR ACCEPTING THIS INSTRUMENT, THE
PERSON ACQUIRING FEE TITLE TO THE PROPERTY SHOULD CHECK WITH THE
APPROPRIATE CITY OR COUNTY PLANNING DEPARTMENT TO VERIFY THAT
THE UNIT OF LAND BEING TRANSFERRED IS A LAWFULLY ESTABLISHED LOT
OR PARCEL, AS DEFINED IN ORS 92.010 OR 215.010, TO VERIFY THE APPROVED
USES OF THE LOT OR PARCEL, TO DETERMINE ANY LIMITS ON LAWSUITS
AGAINST FARMING OR FOREST PRACTICES, AS DEFINED IN ORS 30.930, AND TO
INQUIRE ABOUT THE RIGHTS OF NEIGHBORING PROPERTY OWNERS, IF ANY,
UNDER ORS 195.300, 195.301 AND 195.305 TO 195.336 AND SECTIONS 5 TO 11,
CHAPTER 424, OREGON LAWS 2007, SECTIONS 2 TO 9 AND 17, CHAPTER 855,
OREGON LAWS 2009, AND SECTIONS 2 TO 7, CHAPTER 8, OREGON LAWS 2010.
IN WITNESS WHEp.E0F, the parties have executed this document on this 20 day of
M42 C14 , 20 I
"Main Street, LLC" "City of Tigard"
By: By: 1��1�
Printed Name: a,WID Printed N. •bbl-E
6e e � �l �
Title: M em be-r Title:G111'
Date: 3 - 2 Y - Z 01 Li' Date: tiL}1 N¢
Address:2 '3 . Secol4 Address:
-Tor -la- J, De 47)..D / 1312.5— SW 1-141\'Ivd
liy.ca , . ct9-Z23
By: 7,e.:,„19
Michael Dudunakis
Date: 3 - O y
Address: C' 'S 7 i9O f e y [��
l7ellCL L° rSQvj /tie--6)e)-4"c(-
9 7L
[Acknowledgements Follow on Next Page]
Exhibit D, Page 2 of 6 50014.71791 Rnv,ed/'mchnx 4greeme,n,hxr UR/ 3 20 2014
STATE OF Oreara )
) s.s.
County of lb;11,l116Yy i, )
This instrument was acknowledged before me this'day of J1v,V(q ,'D1L, by
&,LOV L 1A.1)OM61,4on behalf of Main Street, LLC.
OFFICIAL STAMP
ALUSON VERVILLE
�•40.),4 NOTARY PUBLIC-OREGON �,� .ems,,Ito
t, COMMISSION NO.924028
MY COMMISSION EXPIRES JANUARY 22,2018 Notary Public for Oregon
My Commission expires • ' 1'
STATE OF AN )
) s.s.
County of CLQ-R )
This instrument was acknowledged before me this 20 day of M4ECt4 , 20/V, by
Michael Dudunakis.
anti o rti� Patrick Marshall
41°
Notary Public �-
I � State of Nevada No ary Public for Oregorr N/
AS Commission Expires:08-16.16 My Commission expires 08//00i
Certificate No:12-8806-1
STATE OF 0
) s.s.
County of UUr nGJ-11-0(N. )
This instrument was acknowledged before me this a l day of N l\Q r e 1. ,2 0 0, by
Mi Or eL. 5ktoe. on behalf of City of Tigard.
- c
Notary Public for Oregon
My Commission expires 3 l Zt b
v,� OFFICIAL STAMP
BETSY GALICIA
NOTARY PUBLIC OREGON
COMMISSION NO.925741
MY COMMISSION EXPIRES MARCH 09,2018
Exhibit D, Page 3 of 6 500/4-7/29/Rerned Pun/,ne Agreemem doer DR! 3 20 20/4
EXHIBIT"D-1"
City of Tigard
Main Street Temporary Construction Access
February 25,2014
Project No.0330-012
A tract of land,situated in the NE 1/4,Section 2,T.2 S.,R. 1 W.,W.M.,in the City of Tigard,
Washington County,Oregon;being a portion of that property conveyed to Main Street 1,1,C,at al.,by
Deed recorded September 30,2002 as document number 2002-113691,being more particularly
described as follows:
Commencing at a 5/8 inch rod set with a yellow plastic cap inscribed"City of Tigard"at the southerly
corner of said Main Street LLC Tract;
Thence,along the southwesterly line of said document,North 45°22'59"West,385.74 feet,to a 5,'8
inch iron rod on the southerly right of way of SW Main Street;
Thence,along said southerly right of way line,North 57°05'52"East, 15.36 feet to the Point of
Beginning;
Thence,continuing along said southerly right of way line,North 57°05'52"East, 14.90 feet;
Thence,South 21°02'11"East,24.48 feet;
Thence,along a 28.00 foot radius curve to the left,through a central angle of 24°17'49'',(chord bears
South 33`11'06"East, 11.79 feet)an arc distance of 11.87 feet;
Thence,South 45°20'00"Fast, 126.86 feet;
Thence,along a 28.00 foot radius curve to the left,through a central angle of 89°30'55",(chord bears
North 89°54'37"East,39.43 feet)an arc distance of 43.74 feet;
Thence,North 45'06'23"East,38.12 feet,to the southwesterly line of that property conveyed to
12562 Main Street LLC by Deed recorded June 26,2012 as document number 2012-051865(12562
Tract);
Thence,along southwesterly line of said 12562 Tract,South 45°21'21"East,20.00 feet;
Thence,South 45°06'23"West,67,70 feet;
Thence,along a line parallel with and 15.00 feet northeasterly of the southwest line of said Main
Street LLC Tract,North 45°22'59"West,211.67 feet to the Point of Beginning.
2 5-(t27)1 A
Containing 2,080 square feet,more or less.
REGISTERED
Bearings per Survey Number 28,308 of Washington County Surveys. PROFESSIONAL
LAND SURVEYOR
J10130-012 131Surr Di
arCAWORKI°GTempCoostEsn cc
1 Rev t o .r l __,,—'
OREGON
JULY 13,2004
TOBY G. BOLDEN
60377LS
RENEWS: ( 15
Exhibit D, Page 4 of 6 50014-71291 Revised Purchase Agreement docrlDRF/3/27/2014
EXHIBIT"D-2"
City of Tigard
Main Street Temporary Construction Access and Storage
February 25,2014
Project No.0330-012
A tract of land,situated in the NE 1/4,Section 2,T.2 S,R. 1 W.,W.M.,in the City of Tigard,
Washington County,Oregon;being a portion of that property conveyed to Main Street LLC,et al-,
by Deed recorded September 30,2002 as document number 2002-113691,being more particularly
described as follows:
Commencing at a 5/8 inch rod set with a yellow plastic cap inscribed"City of Tigard"at
the southerly corner of said Main Street LLC Tract;
Thence,along the southwesterly line of said document,North 45'22'59"West,385.74 feet,
to a 518 inch iron rod on the southerly right of way of SW Main Street;
Thence,along said southerly right of way line,North 57°05'52"East, 15.36 feet:
Thence,along a line parallel with and 15.00 feet northeasterly of the southwest line of said
Main Street LLC Tract.South 45°22'59"East,211.67 to the Point of Beginning;
Thence,North 45'06'23"East,67.70 feet,to the southwesterly line of that property
conveyed to 12562 Main Street L1.0 by Deed recorded June 26,2012 as document number
2012-051865(12562 Tract);
Thence,along the southwest line of said 12562 Tract and continuing along the west line of
that property conveyed to the City of Tigard by deed recorded August 1,2000 as document
number 2000.061534,South 45°21'21"East,83.04 feet;
Thence,along the west line of said City of Tigard Tract,South 44°22'55"West,2.00 feet;
'Thence,continuing along the west line of said City of Tigard Tract,South 45'22'13"East,
10.82 feet;
Thence,continuing along the west line of said City of Tigard Tract,South 3°19'55"West,
34.98 feet;
Thence,continuing along the west line of said City of Tigard Tract,South 23°12'38"West,
36.97 feet:
Thence,South 18°43'33"East, 11.03 feet;
Thence,along said line parallel with and 15.00 feet northeasterly of the southwest line of
said Main Street LLC Tract,North 45°22'59"West, 140.87 to the Point of Beginning; ZSFel; 4
Containing 7,886 square feet,more or less.
REGISTERED
• PROFESSIONAL
ESSSIONION
AL
Bearings per Survey Number 28,308 of Washington County Surveys. LAND SURVEYOR
OREGON --_
3��, tt,31so„e cAO:nOa_�ewarRmoeone= t2 ae,,ax. ,'`' JULY f3,200$
, .
=4s,Tow a BOLDEN(
`''.---- 603TILS 4,7<
RENEWS:31 Q2 r5
Exhibit D, Page 5 of 6 500/4-71291 Reused Purchase Agreement docrlDRF/3/27/2014
c.'s . N
4 POINT OF • �I/ "90+'x.
BEGINNING (D-1) O�1 ST/JO 6'
dj
/ ` EXISTING JOINT 1 1
ACCESS EASEMENT I 1
DOC. 2009-033174 I 1
i>c
i\ i \
\ ?SS i \i„...... --
\ OO�FO/�%y y / SOUTHWESTERLY UNE
SOUTHWESTERLY LINE '&, " Q„710•6f(0), 0O `c>, V 4� DOC. 201,2-051865
DOC. 2002-113691 - ` \\ •
,<. i I
ti�i �/
?' 4 /
11 ,9-1":14,
s9e �'
O I
4 i `I, - S9 �� pF�c �Sj f \>>.
gas f V•
�� itt 1r' "9s0"9A i
�
111 �' O0 'E II g ? O F� / z`-1
L`,sl O7.. i< ./,I \ • o�SCALE: 1"=50' 92,,,..1‘
ND
9.cS f / 00
k`∎ 3 TEMPORARY CONSTRUCTION f oo\
1 .�`� ACCESS (D-1) POINT OF mao
I�ktk.∎1. AREA: 2,080 SQ. FT. BEGINNING (D-2) / w
/ +* I
TEMPORARY CONSTRUCTION ,,,A
, ACCESS Se AREA: 7,886 STORAGE FT(D 2) \ 4
,..,:-'1; ///////,l / i/f SANITARY SEWER LINE AREA: POINT OF
.5 5,537 SO. FT. COMMENCMENT - \
E
e' .
MAIN STREET TEMPORARY CONSTRUCTION EASEMENTS
Z DATE
WESTLAKE EXHIBIT "D-3" �Y'25/14
) ,,.,., d MDS/DPR
CONSULTANTS se
t ENGINEERING • SURVEYING • PLANNING
NE 1/4 SECTION 2, c'1E"BV TGB
' T. 2 S., R. 1 W., W.M., REVISION'S 1
isiia ap. r• suns .ao =sat WASHINGTON CO., OREGON N4
Mb cr®. ars>Ea sas X330-012
Exhibit D, Page 6 of 6 50014-71291 Revised Purchase Agreement docxlORF/3127/1014