Loading...
Permit CITY OF TIGARD BUILDING PERMIT I COMMUNITY DEVELOPMENT Permit#: BUP2014-00046 -11111 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 04!07/2014 Parcel: 2S 101 AA03800 Jurisdiction: Tigard Site address: 12259 SW 69TH AVE Project: Capital One-Building B Subdivision: WEST PORTLAND HEIGHTS Lot: B Project Description: TI for new interior partition walls,sinks,casework,power/signal,finishes. Contractor: BALFOUR BEATTY CONSTRUCTION LLC Owner: TIGARD CORPORATE CENTER LP 3100 MCKINNON STREET 15325 SW BEAVERTON CREEK CT 6TH FLOOR BEAVERTON, OR 97006 DALLAS,TX 75201 PHONE: 214-451-1000 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 04/07/2014 $1,498.55 Demolition Occupancy Grp: B Occupancy Load: 12%State Surcharge-Building 04/07/2014 $179.83 Dwelling Units: 0 Plan Review 03/03/2014 $974.06 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 03/03/2014 $599.42 Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 04/07/2014 $278.00 Value: $165,000 DC Provision Review,COM TI-LRP 04/07/2014 $41.00 Info Process/Archiving-Lg$2.00(over 04/07/2014 $32.00 11x17) Floor Areas: Metro Const.Excise Tax-Commercial 04/07/2014 $198.00 Use Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $3,800.86 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by callin 503.2322..1 or 1 800.3 .2344. Issued By: -er ee Signature: Jj(Jj Cal 175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. lildtna Permit Application '" cmcn Commercial ri � FOR OFFICE USE ONLY City of Tigard MAR - 3 2014 Received 3 /y %/ Permit N / •1111 I 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review ,�� 11.42dif y b r0 y- Phone: 503.718.2439 Fax: 503.598 OF FIGARD Date/B : '�f�� �� Other Permit: Inspection Line: 503.639.4175 Date Ready :y: 1 � See Page for T I G A R D 7UILDING DIVISIOs Notifed/Method: � G/ 0 Internet: www.tigard-or.gov f� S upplemental Information TYPE OF WORK REQUIRHB DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ El Accessory building El Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION t Total number of floors: Job site address:12259 SW 69TH AVE New dwelling area: square feet City/State/ZIP:TIGARD,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:BLDG.B Project name:CAPITAL ONE-BUILDING B Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST 5 Subdivision: rLot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: 2 SIDI o i,,-,4; Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. NEW INTERIOR PARTITION WALLS,SINKS,CASEWORK, Valuation: $165,000.00 POWER/SIGNAL,FINISHES Existing building area: 10958 square feet New building area: square feet ® PROPERTY OWNER ❑ TENANT Number of stories: 2 Name:TIGARD CORPORATE CENTER LIMITED PARTNERSHIP Type of construction: VB,SPRINKLED Address:15400 SW MILLIKAN WAY Occupancy groups: City/State/ZIP:BEAVERTON,OR 97006 Existing: B Phone:(503)646-2202 Fax:(503)626-8903 New: B 14 ® APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* Business name:ANKROM MOISAN ARCHITECTS,INC. (Please refer to fee schedule C Structural plan review fee(or deposit): 1 AContact name:ELIZA ALLEN Address:6720 SW MACADAM AVE.SUITE 100 FLS plan review fee(if applicable): Total fees due upon application: City/State/ZIP:PORTLAND,OR 97219 Amount received: 45-7_J L, I/OP Phone:(503)245-7100 Fax::(503)245-7710 / E-mail:elizaa @ankrommoisan.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name:TO BE DETERMINED Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: Solar Installation Specialty Code checklist. City/State/ZIP: Permit fee(includes plan review $180.00 and administrative fees): Phone:( ) Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lie.: Total fee due upon application: $201.60 Authorized signature: �- � - ,/ / This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:ELIZA ALLEN Date:03-03-2014 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02t24/2011 440-4613T(I 1/02/COM/WEB) i .j... 7111 ■ Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking L L., 1*� $ (b) An accessible entrance: fic.CC. — r $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL (shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 Building Permit Number: �izA2p/y—e9, y6, IIP .. 4 i I Building Permit Review Commercial Project —No Associated Land Use Case f IGARD Site Address: I 1-2-S9 SA/ t ltri A\te, Verify site address is valid. Project Name : AVl M MOicSlii kzh t+Cc$ Planning Review Proposal: I ftfY remc e 6(iislt C, C.p m& R'Z ning: M U�j P. �, miitted Use Nk es CI CI Spec Space L►i'Land Use Required El Yes IWNo Notes: x&fi it he .'IcVla vt+ Approved by: kir gatel Date: ?)q 14 Revisions (after Building Submittal only) Reviewer Date Revision 1 Approved ❑ Not Approved ❑ Revision 2 Approved ❑ Not Approved ❑ Revision 3 Approved ❑ Not Approved ❑ Building Permit Submittal Original Plan Submittal: Date: 3/SMi By: Site Plans: # Building Plans: # .2 Create Case Record#: D"-"Enter case# above for Building Permit Number. Workflow Routing: CSI lanning ❑ Engineering ❑ Permit Coordinator B'F3uilding Workflow Sign-off: Sign-off for Planning staff,including notes from planning review(page 1) Route Application Documents: R'Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Reviewed By: Date: 3/07 Notes: 1:\Building\Forms\Bl dgPerm itRvw_COM_NoLandUse_123013.docx Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 12259 SW 69TH AVE, TIGARD, OR, 97223 Commercial - Building 299 Final inspection PASS - No C of O BUP2014-00046 Chip Barnett Violation Summary: Inspector Contractor