SDR1996-00006 VOIDED SDR96 - 00006 SUMMERCREEK VILLAGE - BOWEN NOTICE OF DECISION SITE DEVELOPMENT REVIEW (SDR) 96-0006 SUMMER CREEK VILLAGE/BOWEN SECTION I: SUMMARY OF THE REQUEST CASES: FILE NAME: SUMMERCREEK VILLAGE/BOWEN Site Development Review SDR 96-0006 PROPOSAL: A request for Site Development Review approval to allow the construction of a 19 building, 150 unit multi-family residential development, with a community building and swimming pool. APPLICANT/ OWNER: Bowen Real Estate Group 2260 US Bancorp Tower 111 SW 5th Ave. Portland, OR 97204 COMPREHENSIVE PLAN DESIGNATION: High Density. ZONING DESIGNATION: R-25 (Residential, 25 units per acre). LOCATION: (WCTM 1S1 33DB, tax lot 4300). East of SW 135th Avenue, south of SW Hawk's Beard Street and west of SW 131st Place. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.56, 18.92, 18.96, 18.100, 18.102, 18.106, 18.108, 18.116, 18.120, 18.150 and 18.164. SECTION II: DECISION: Notice is hereby given that the City of Tigard Community Development Director's designee has APPROVED the above request subject to the following conditions. The findings and conclusions on which the decision is based are noted in Section IV. NOTICE OF DECISION SCR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 1 CONDITIONS OF APPROVAL THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO THE ISSUANCE OF BUILDING PERMITS: UNLESS OTHERWISE NOTED, THE STAFF CONTACT SHALL BE BRIAN RACER OF THE ENGINEERING DEPARTMENT. 1 . Prior to issuance of a building permit, right-of-way shall be dedicated to the public along the frontage of SW Hawk's Beard Street at the easterly edge of the site to increase the centerline tangent between the reversing 200 foot curves to 50 feet. The minimum centerline radius is 167 feet. The legal description shall be tied to the proposed right-of-way centerline as approved by the Engineering Department. 2. Prior to issuance of the building permit, the applicant shall dedicate additional Right- of-way (ROW) in SW 131st Court to increase the ROW from its present 35-foot width, to a total of 42 feet. In addition, ROW shall be dedicated to complete the bulb section of the street to provide a ROW radius of 52 feet to match the existing dedication. 3. Prior to issuance of the building permit, the applicant shall submit a revised site plan that aligns the proposed driveway on SW 135th Avenue with the opposing existing driveway on the west side of the street. 4. Five (5) sets of detailed public improvement plans and profile construction drawings shall be submitted for preliminary review to the Engineering Department. A striping plan for the left-turn refuge in 135th Avenue shall also be included. Once redline comments are addressed and the plans are revised, the design engineer shall then submit eight (8) sets of revised drawings and one (1) itemized construction cost estimate for final review and approval (NOTE: these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements). Public improvement plans shall conform to City of Tigard Public Improvement Design Standards, which are available at Tigard City Hall. 5. Building permits will not be issued, and construction of proposed public improvements shall not commence until after the Engineering Department has reviewed and approved the public improvement plans, and a street opening permit or construction compliance agreement has been executed. A 100-percent performance assurance or letter of commitment, a developer-engineer agreement, the payment of a permit fee, and a sign installation/streetlight fee are required. 6. The applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer. All construction vehicle parking shall be provided on- site or within the SW Hawk's Beard Street right-of-way adjacent to the site. No construction vehicles or equipment will be permitted to park on the adjoining residential public streets. Construction vehicles include the vehicles of any contractor or subcontractor involved in the construction of the site improvements or buildings proposed by this application, and shall include the vehicles of al suppliers and employees associated with the project. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvipmt. Page 2 7. Washington County has established and the City has agreed to collect Traffic Impact Fees in accordance with Resolution No. 90-65. The applicant shall pay the fee established for the proposed use prior to issuance of the building permit. 8. The applicant shall make an appointment for a pre-construction meeting with the City of Tigard Engineering Department after approval of the public improvement plans, but before starting work on the site. The applicant, the applicant's engineer, and contractor shall be required to attend this meeting prior to receiving the approved plans and permits. 9. The proposed privately operated and maintained sanitary sewer and storm drainage system plan-profile details shall be provided as part of the public improvement plans. 10. The applicant shall provide an on-site water quality facility as required by Unified Sewerage Agency Resolution and Order No. 91-47. Final plans and calculations shall be submitted to the Engineering Department for review and approval prior to issuance of the building permit. In addition, a proposed maintenance plan shall be submitted along with the plans and calculations. 11. An erosion control plan shall be provided as part of the public improvement drawings. The plan shall conform to "Erosion Prevention and Sediment Control Plans - Technical Guidance Handbook, February 1994". 12. The applicant shall obtain a 1200-C General Permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. 13. Engineered Grading Permit Required. The applicant shall submit a Soils Engineering Report and Engineered Geology Report. Staff Contact: Jim Funk, Building Division (639-4171). 14. Swimming pools shall be enclosed as required by Chapter 14.20 of the Tigard Municipal Code. The enclosure shall be provided by a fence or wall with a minimum height of 4-feet with a self-latching door or gate. 15. The water plan shall provide for the westerly extension of the existing 12-inch water line from SW 131st Place to the existing 16-inch water main in SW 135th Avenue. Staff Contact: Mike Miller, City of Tigard Water Department (639-4171). 16. Revised site and landscaping plans shall be submitted for review by the Planning Division, Staff Contact: Will D'Andrea, Planning Department (639-4171). The revised plans shall include the following: A. Grading plan detailing work to be conducted within the wetland buffer. B. Detailed buffer area plantings, including number, type, and size at planting. C. Twenty (20) bicycle parking spaces. NOTICE OF DECISION SDR 96-0006-Sumner Creek Village/Bowen Dvlpmt. Page 3 D. A plan which shows compliance with Community Development Code Chapter 18.116, Mixed Solid Waste and Recyclable Storage. The applicant shall choose one of the following four methods to demonstrate compliance: Minimum Standard, Waste Assessment, Comprehensive Recycling Plan, or Franchised Hauler Review and Sign-off. Regardless of which method chosen, the applicant shall submit a letter from the franchise disposal company related to facility design and compatibility. 17. An exterior lighting plan and kiosk plan shall be submitted to the Police Department for review and approval. Staff Contact: Kelly Jennings, Police Department (639- 4171). THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO THE ISSUANCE OF OCCUPANCY PERMITS: 18. Prior to issuance of a Certificate of Occupancy, the applicant shall construct standard half-street improvements along the frontage of SW Hawk's Beard Street. The improvements adjacent to this site shall include: A. Pavement from curb to centerline equal to 16-feet, plus an additional 8-foot wide lane on the opposite side of centerline to provide a total pavement width of 24 feet. B. Curb. C. Storm drainage, including any off-site storm drainage necessary to convey subsurface run-off. D. Five-foot concrete sidewalk. E. Street striping. F. Streetlights as determined by the City Engineer. G. Underground utilities (NOTE: the applicant may be eligible to pay a fee in-lieu of undergrounding existing overhead utilities). H. Street signs (if applicable). Driveway apron (if applicable). J. Adjustments in vertical and/or horizontal alignment to construct SW Hawk's Beard Street in a safe manner, as approved by the Engineering Department. 19. Prior to issuance of a Certificate of Occupancy, the applicant shall construct standard half-street improvements along the frontage of SW 131st Court. The improvements adjacent to this site shall include: NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 4 A. Completion of the bulb section to provide a 45-foot curb radius and 52-foot ROW radius. B. Replacement of the temporary extruded curb with a new full-depth PCC curb per City standards, plus any pavement replacement necessary to accommodate the curb installation. C. Storm drainage, including any off-site storm drainage necessary to convey subsurface run-off. D. Five-foot concrete sidewalk. E. Street striping. F. Streetlights as determined by the City Engineer. G. Underground utilities (NOTE: the applicant may be eligible to pay a fee in-lieu of undergrounding existing overhead utilities). H. Street signs (if applicable). Driveway apron (if applicable). J. Adjustments in vertical and/or horizontal alignment to construct SW 131st Avenue in a safe manner, as approved by the Engineering Department. 20. Prior to issuance of a Certificate of Occupancy, the applicant shall complete the striping of the left-turn refuge in 135th Avenue for the new driveway. 21. All site improvements shall be installed as approved per the revised site plan. THIS APPROVAL SHALL BE VALID FOR EIGHTEEN 18 MONTHS FROM THE EFFECTIVE DATE OF THIS DECISION. SECTION III: SITE AND VICINITY INFORMATION Site History:. The property was annexed into the City of Tigard in 1987. The property was involved in a local improvement district to improve SW 135th Avenue. A Site Development Review, Minor Land Partition, and Variance (SDR 88-25/MLP 88-16N 88-39), was approved for a partition and development of a 266 unit apartment complex in 1988. Land that was identified as sensitive lands was dedicated to the City of Tigard. Since the partition was never recorded, the approximately 13 acre property is essentially divided in half by the dedicated greenway NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 5 in the middle of the property. The land under consideration for development with the current application is the land north of the greenway. A Site Development Review, and Minor Land Partition (SDR 94-0026/MLP 94-0022), was approved for a partition and development of a 160 unit apartment complex subdivision on the property north of the greenway in 1994. A Subdivision (SUB 95-0005) was approved for a 52 lot, townhouse subdivision on the property south of the greenway in 1995. No other development applications have been reviewed by the City relating to this property. Vicinity Information: SW Scholls Ferry Road and the City of Beaverton lie north of the subject property. A church and the Summerlake subdivision are to the northeast and these properties are zoned R-7 (Residential, 7 units per acre). Adjacent property to the north and south are currently vacant, with the southern property owned by the City of Tigard for open space. Adjacent property to the east is developed with Castles at Brittany subdivision and is zoned R-12 (Residential, 12 units per acre). Property to the west is zoned R-25 (Residential, 25 units per acre). The surrounding area is predominantly developed with single-family residential development. Site Information and Proposal Description: The site is zoned R-25, (Residential, 25 units per acre). The approximately 13 acre site has a dedicated greenway in the middle of the site. Summer Creek runs in an east-west direction and contains both floodplain and wetland area. The proposed development is located on the land north of the dedicated greenway. The applicant is proposing to construct a 19 building, 150 unit multi-family residential development, with a community building and swimming pool_ The project will have two access drives onto SW Hawk's Beard Street and one onto SW 135th Avenue. SECTION IV: APPLICABLE REVIEW CRITERIA AND FINDINGS COMPLIANCE WITH COMMUNITY DEVELOPMENT CODE SECTIONS: Use Classification: The applicant is proposing to build a 19 building, 150 unit apartment complex. This proposal is classified in Code Section 18.42 (Use Classifications) as Multiple- Family Residential Units. Code Section 18.56.030 allows Multiple-Family dwellings as a permitted use in the R-25 zoning district. Minimum Lot Area: Section 18.56.050 states that the minimum lot area for each multi- family unit in the R-25 zoning district is 1,480 square feet. There is no minimum lot width requirement in the R-25 zone. The proposed 150 units require a site size of 222.000 square feet. The net site area is approximately 294,726 square feet, thereby, meeting this standard. Developments within the R-25 zone are required to provide a minimum of 20% landscaping. The plan indicates that approximately 117,894 square feet (34%) of the site has been provided as landscaping, thereby, satisfying this criteria. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 6 Setbacks: Section 18.56.050 states that for multi-family dwellings the setbacks are as follows: front yard - 20 feet; side yard - 10 feet; side yard which abuts a more restrictive zone - 30 feet; rear yard - 20 feet. As indicated on the site plan, the proposal meets the setback requirements. The maximum building height is 45 feet. As shown on the exterior elevation plans (A7.1 - A7.6), the proposed buildings are approximately 34-36 feet in height, well under the maximum allowed. Section 18.120.180(A)(1) (Site Development Revi ..w - Approval Standards) Squires tF a development proposal be found to be consistent with the various standards of other Community Development Code Chapters. The applicable criteria in this case are Chapters 18.92, 18.96, 18.100, 18.102, 18.106, 18.108, 18.114, 18.120, 18.134, 18.150, and 18.164. The proposal's consistency with these Code Chapters is reviewed in the following sections. The proposal contains no elements related to the provisions of Code Chapters 18.94 (Manufactured/ Mobile Home Regulations), 18.98 (Building Height Limitations: Exceptions), or 18.144 (Accessory Use and Structures) which are also listed under section 18.120.180.A.1. These Chapters are, therefore, found to be inapplicable as approval standards. Code Section 18.120.180.A.2 provides other Site Development Review approval standards not necessarily covered by the provisions of the previously listed sections. These other standards are addressed immediately below. Relationship to the Natural and Physical Environment: Section 18.120.180.2 states that buildings shall be located to preserve existing trees and that trees having a six- inch caliper or greater shall be preserved or replaced by new plantings of equal character. This parcel had previously been used as agricultural land and, as such, does not contain trees which would require preservation. Exterior Elevations: Section 18.120.108.3 states that along the vertical face of multiple-family structures, offsets shall occur at a minimum of every 30 feet by providing any two of the following: a) Recesses (decks, patios, etc.); b) Extensions (decks, patios, etc.); or c) Offsets or breaks in roof elevations. As indicated on the preliminary building elevations plans (sheets A7.1 - A7.6) the design shows both recesses and roof elevation offsets, in accordance with this section. Buffering, Screening and Compatibility between adjoining uses: Section 18.120.108.4(A) states that buffering shall be provided between different types of land uses. This criteria shall be satisfied as addressed in the Buffer Matrix (18.100.130) section below. Section 18.120.108.4(B) states that on-site screening from view of adjoining properties of such things as service and storage areas, parking lots, and mechanical devices on roof tops: shall be provided. This criteria is satisfied as the landscape plan indicates screening within the required buffer area. NOTICE OF C ECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 7 Privacy and Noise: Section 18.120.108.5 requires that structures which include residential dwelling units shall provide private outdoor areas for each ground floor unit which is screened from view by adjoining units, that the buildings shall be oriented in a manner which protects private spaces on adjoining properties from view and noise, and on-site uses which create noise, lights, or glare shall be buffered from adjoining residential uses. Only one parcel directly adjoins the proposed development site. This parcel is on the south end of SW 131st Place. The remaining lots on SW 131st Place are buffered from the proposed development by a 30-foot buffer, as well as the SW 131st Place right-of-way. The proposed buildings H and J have been situated so as to screen the existing houses across SW 131st Place from the building entrances, driveways and parking areas. On-site private space has been satisfied as there is building separation between each ground floor patio. The building design also provides for an off-setting of the patios so that a direct line of site of other patios is not provided. Landscaping has also been provided to further screen the private outdoor areas. Private Outdoor Areas: Section 18.120.108.6. requires that private open space such as a patio or balcony shall be provided and shall be designed for the exclusive use of individual units and shall be at least 48 square feet in size with a minimum width dimension of 4 feet. Required open space may include roofed or enclosed structures such as a recreation center. This criteria is satisfied as the applicant is proposing both balconies and a recreation center. Shared Outdoor Recreation Areas: Section 18.120.108.7 states that in addition to subsections 5 and 6 above, usable outdoor recreation space shall be provided in residential developments for the shared or common use of all the residents in the amount of 200 square feet per unit for studio up to and including two-bedroom units and 300 square feet per unit for three or more bedroom units. The required recreation space may be provided as follows: 1) all outdoor space; 2) part outdoor and part indoor space; 3) all public or common space; 4) part common and part private, for example, it could be an outdoor tennis court, indoor recreation room and balconies on each unit; 5) where balconies are added to units, the balconies shall not be less than 48 square feet. Shared outdoor recreation space shall be readily observable for reasons of crime prevention and safety. This development requires 21,600 square feet of shared outdoor recreation area (135 units @ 134 s.f. and 15 units @ 234 s.f.). A swimming pool and community building are provided on-site for shared recreation purposes, as well as open space area. The applicant's project data indicates that approximately 31,835 square feet of shared outdoor recreation area, thereby, satisfying this criteria. Demarcation of Spaces: Crime Prevention: Section 18.120.108.9 states that structures and site improvements shall be designed so that public areas, semipublic areas and private outdoor areas are clearly defined in order to establish persons having a right to be in the space, in order to provide for crime prevention and to establish maintenance responsibility. The Tigard Police Department has requested, in similar developments, that appropriate signage be placed at entrances to apartment complexes and that adequate addressing be placed on unit entrances so that emergency service providers can locate units quickly. The developer should, therefore, be required to contact the Police Department prior to obtaining occupancy permits for the complex for review and approval of the address signage of this development. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 8 Crime Prevention and Safety: Section 18.120.108.10 requires that windows be located so that areas vulnerable to crime can be surveyed by the occupants; interior laundry and service areas shall be located in a way that can be observed by others; mail boxes located in lighted areas having vehicular or pedestrian traffic; exterior lighting levels selected and angles shall be oriented towards areas vulnerable to crime; and light fixtures shall be provided in areas having pedestrian or vehicular traffic and in potentially dangerous areas. As noted by the Police Department, a lighting plan shall be submitted. The developer should therefore be required to contact the Police Department prior to obtaining building permits for the complex for review and approval of the exterior lighting plan for this development. Density Computation: Section 18.92 establishes the criteria for determining the number of dwelling units permitted. In determining the net acreage, the following are subtracted from the gross acreage: sensitive land area; park dedication; dedicated public right-of-way and private streets. To calculate the net units per acre, it is necessary to divide the net acreage by the minimum number of square feet required for each lot by the applicable zoning district. The subject site contains approximately 7.96 acres or approximately 346,737 square feet. Section 18.92.020(3)(b) requires the subtraction of 15% of the gross area for public facilities, or 52,010 square feet. The resulting net acreage is 294,726 square feet. Dividing the net acreage by 1,480 square feet per unit results in 199 net units. The applicant is proposing 150 units, thereby, satisfying this criteria. (gross v. net acres). Sensitive Lands: Wetlands. Section 18.84. The preliminary site plan indicates that the property line is the same as the delineated wetland boundary. As drawn on the preliminary pia1, the buildings are outside of wetlands and the required 25-foot wetland buffer area. This plan is based upon the expectation that a proposed mitigation plan will be approved. In 1995 3 wetland delineation was conducted in conjunction with a Subdivision application for the land south of the City greenway. This delineation showed that the wetland boundary had shifted slightly to the south, since the earlier 1988 study. The effect on the proposed plan is that the shown property boundary is not the wetland boundary. Technically speaking, the subject application would not be required to provide a 25-foot buffer the entire length of the southern boundary. As a condition of the subdivision approval (SUB 95-0005), the applicant has applied for, and received a DSL fill/mitigation permit. A large portion of the mitigation area is located on the City owned greenway, just south of the property line shown on the current application's site plan. The mitigation area will effectively re-create wetland such that, the property line will once again, also be the wetland boundary. The preliminary plans reflect the expectation that the mitigation plan will be implemented. Since the mitigation area is City owned, the applicant for the subdivision must acquire City approval to use City property for mitigation purposes. That applicant has not yet received City approval. The grading plan (sheet C2) shows that the property elevation at the property line is approximately 175-feet and the finished floor elevation of the apartment unit at approximately 183-184 feet. This represents a grade change of approximately 8-9 feet. The grading plan does not show how the 25-foot buffer area will be sloped. No details were provided as to what this area will look like. For example, will a retaining wall be constructed, or will there be a slope with a 9-foot slope differential? The applicant shall provide revised plans that shows how this buffer area will be developed and graded. If grading is allowed, NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 9 the area must be landscaped using native reparian plant materials. The buffer is required to be an undisturbed corridor. The applicant shall provide details as to how this area will be maintained as an undisturbed corridor. Additional Yard Setback Requirements: Section 18.96.020 requires that the building setback on SW 135th Avenue (a collector street) shall be the setback distance required by the zoning district plus 30 feet measured from the centerline of the street. The side yard, corner setback of the R-25 zone is 10 feet. As indicated on the site plan, these setback standards are satisfied. Distance Between Multiple-Family Structures: Section 18.96.030 states that buildings with windowed walls facing buildings with windowed walls shall have a 25 foot separation, buildings with windowed walls facing buildings with a blank wall shall have a 15 foot separation, buildings with opposing blank walls shall have a 10 foot separation. Where buildings exceed a horizontal dimension of 60 feet or exceed 30 feet in height, the minimum wall separation shall be one foot for each 15 feet of building length over 50 feet and two feet for each 10 feet of building height over 30 feet. This section is applicable to buildings C, D, E, F, G, H, J, K, L, N, P, Q, R, S, and T. The proposed building lengths for buildings C, F, P, T, J, G, and S are approximately 115-feet; buildings Q, N, R, and D are approximately 130-feet; buildings E, K, and L are approximately 150-feet; and building H is approximately 170 feet. The proposed heights range from approximately 34-36 feet. The building elevation plans (sheets A7.1 - A7.6) show that the proposed buildings have windowed walls facing windowed walls, blank walls facing windowed walls, and blank walls facing blank walls. The required separations, therefore, range between 10-25 feet. There is an additional separation ranging from 4-8 feet required because the building lengths are greater than 60-feet long. The total building separation required for building, therefore, ranges from 14-30 feet. The proposed plan is designed such that all buildings are in compliance with the required distances, thereby, satisfying this criteria. In addition, driveways, parking lots and walkways shall maintain the following separation for dwelling units within eight feet of the ground level: 1) driveways and parking lots shall be separated from windowed walls by at least eight feet; walkways running parallel to the face of the structures shall be separated by at least five feet; and 2) driveways and parking lots shall be separated from living room windows by at least 10 feet; walkways running parallel to the face of the structure shall be separated by at least 7 feet. As indicated on the site plan, all buildings satisfy the parking lot and L 3lkway separation requirements. Landscaping Plan: Section 18.100.015 requires that the applicant submit a landscaping plan. This requirement has been satisfied as the applicant has submitted a plan indicating the type and location of trees and shrubs. NOTICE OF DECISION SOR 96-0006-Summer Creek VillageiBowen Dvlpmt. Page 10 Street Trees: Section 18.100.033 states that all development projects fronting on a public street shall be required to plant street trees in accordance with section 18.100.035. Section 18.100.035 requires that street trees be spaced between 20 and 40 feet apart depending on the size classification of the tree at maturity (small, medium or large). The landscape plan shows street trees along both frontages, in accordance with the provisions of this section. S1:.-eening: Special Provisions: Section 18.100.110(A) states that trees shall be planted in landscaped islands in all parking areas and shall be equally distributed and on the basis of one tree for each seven parking spaces in order to provide a canopy effect. The minimum dimension of the landscape islands shall be three feet and the landscaping shall be protected from vehicular damage by some form of wheel guard or curb. Landscaped parking areas shall include special design features which effectively screen the parking lot areas from view. As indicated on the site plan, parking lot `-ees and screening have been provided in accordance with this section. Screening of Swimming Pools: Section 18.100.110(C) states that all swimming pools shall be enclosed as required by Chapter 14.20 of the Tigard Municipal Code. The enclosure shall be provided by a fence or wall with a minimum height of 4 feet with a self-latching door or gate. A revised plan shall be submitted which provides the specifications showing compliance with this section. Screening of Refuse Containers: Section 18.100.110(D) states that any refuse container or disposal area shall be screened from view by placement of a solid wood fence, masonry wall or evergreen hedge between five and eight feet in height. All refuse materials shall be contained within the screened area. The plans show the provision of a 6-foot high, solid wood fence to provide screening of the trash enclosure, thereby, satisfying this criteria. Buffer Matrix: Section 18.100.130 contains the buffer matrix to be used in calculating widths of buffering and screening to be installed between proposed uses. The Matrix indicates that where a multi-family development abuts a residential zone with a single-family use, the required buffer and screening width shall be 10 feet. Section 18.100.080.D contains the minimum improvement standards for the buffering area. The minimum improvements within a buffer area shall consist of the following: 1) At least one row of trees shall be planted. They shall be not less than 10 feet high for deciduous trees and 5 feet high for evergreen trees at the time of planting. Spacing of the trees depends on the size of the tree at maturity; 2) In addition, at least 10 five gallon shrubs or 20 one gallon shrubs shall be planted for each 1000 square feet of required buffer area; 3) The remaining area shall be planted in lawn, groundcover or spread with bark mulch. The east buffer area contains approximately 3,800 square feet. Therefore, this buffer shall contain 30, five-gallon or 60, one-gallon shrubs, in addition to the one row of trees. The landscape plan shows the provision of a continuous five-foot high hedge, a row of trees, and assorted lower lying vegetation. However, it is not clearly defined what the number of plants to be planted are, nor the height at the time of planting. Therefore, the applicant shall provide a more detailed list of what will be provided in the buffer area, such that, it complies with this section. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen DvIpmt. Page 11 Section 18.100.080.E states that where screening is required the following standards shall apply in addition to those required for buffering; 1) a hedge of narrow or broadleaf evergreen shrubs which will form a 4 foot continuous screen within 2 years of planting, or; 2) an earthen berm planted with evergreen plant materials which will form a continuous screen 6 feet in height within 2 years. The unplanted portion of the berm shall be planted in lawn, ground cover or bark mulch, or; 3) a 5 foot or taller fence or wall shall be constructed to provide a continuous sight obscuring screen. The plans show the provision of a continuous five-foot high hedge, satisfying this criteria. Visual Clearance Areas: Section 18.102 requires that a clear vision area shall be maintained on the corners of all property adjacent to intersecting right-of-ways or the intersection of a public street and a private driveway. A clear vision area shall contain no vehicle, hedge, planting, fence, wall structure, or temporary or permanent obstruction exceeding three feet in height. The code provides that obstructions which may be located in this area shall be visually clear between three and eight feet in height (trees may be placed within this area provided all branches below eight feet are removed). A visual clearance area is the triangular area formed by measuring a 30 foot distance along the street right-of-way and the driveway and then connecting these two 30 foot distance points with a straight line. As indicated on the site plan, this section is satisfied. Minimum Off-Street Parking: Section 18.106.030(A)(3) requires a minimum of 1.5 parking spaces for 1 bedroom units and 2 spaces for units with more than 1 bedroom. In addition, section 18.106.020(G) states that multi-dwelling units with more than 10 required parking spaces shall provide shared parking for the use of all of the guests of all of the residents of the complex. The shared parking shall consist of 15 percent of the total required parking spaces and be centrally located within the development. The applicant is proposing 68, one-bedroom units and 82, one-plus bedrooms; thereby requiring 266 parking spaces. The required number of shared parking spaces is 40. The total number of required parking spaces is, therefore, 306. This requirement is satisfied as the proposed site plan shows the provision of 347 parking spaces. The Americans with Disabilities Act (ADA) requires 8 disabled parking spaces if 301 to 400 parking spaces are provided. The proposed site plan shows the provision of eight disabled person parking spaces distributed throughout the site, thereby, satisfying this criteria. Bicycle Parking: Section 18.106.020(0) requires one bicycle parking rack space for each 15 required vehicular parking spaces in any development. Bicycle parking areas shall not be located within parking aisles, landscape areas, or pedestrian ways. Based on the requirement of 306 parking spaces, 20 bicycle parking spaces will be required for this development. The site plan does not show the provision of bicycle racks. A revised plan shall be submitted which shows the location of the required 20 bicycle parking spaces. Access: Section 18.108.070(F) requires that multiple-family residential uses provide a minimum of two driveways plus one additional driveway to a public street for every 200 units or portion thereof in excess of 100 units. The minimum access width shall be 30 feet, with 24 feet of pavement, curbs and a 5 foot sidewalk. The site plan NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 12 indicates the provision of 150 units, therefore, three accesses shall be required for this development. This section is satisfied as the site plan shows the provision of three access drives with pavement widths of 24-feet, and sidewalks which lead into the development. Walkways: Section 18.108.050(B) requires that within multi-family developments each residential dwelling shall be connected to the vehicular parking area, and common open space and recreation facilities shall be connected by a walkway system having a minimum width of four feet and constructed of an all weather material. As indicated c� he site plan, walkways are satisfactorily provided. Signs: Section 18.114.130 (B) lists the type of allowable signs and sign area permitted in the R-25 zone. All signs shall be approved through the Sign Permit process as administered by the Planning Division. Mixed Solid Waste and Recyclables Storage: Section 18.116 requires that new construction incorporates functional and adequate space for on-site storage and efficient collection of mixed solid waste and source separated recyclables prior to pick-up and removal by haulers. The applicant shall choose one of the following four methods to demonstrate compliance: Minimum standard, Waste assessment, Comprehensive recycling plan, or Franchised hauler review and sign-off. The applicant will need to submit evidence or a plan that indicates compliance with this section. The applicant shall also obtain from the disposal hauler a written sign-off on the location of and the compatibility of facilities. Tree Removal: Section 18.150.025 requires that a tree plan for the planting, removal and protection of trees prepared by a certified arborist shall be provided with a site development review application. The tree plan shall include identification of all existing trees, identification of a program to save existing trees or mitigate tree removal over 12 inches in caliper, which trees are to be removed, protection program defining standards and methods that will be used by the applicant to protect trees during and after construction. The plans do not show the existence of trees on the property. The applicant shall verify that there are no trees on the property that would require preservation or mitigation. PUBLIC FACILITY CONCERNS: Sections 18.164.030(E)(1)(a) (Streets), 18.164.090 (Sanitary Sewer), and 18.1 6'4.100 (Storm Drains) shall be satisfied as specified below: Traffic Impacts: As a part of the SDR 94-26 approval, the applicant submitted a traffic access report entitled "Palomino Point Apartments", as prepared by David Evans and Associates, Inc. (DEA), dater' October 20, 1994. For this current review, the applicant has submitted an addendum to that report, dated January 1996, also prepared by DEA. The report and addendum addresses the traffic impact of the proposed apartment project as it relates to the surrounding street systems. The 1994 report concluded that the traffic generated by the proposed project will not unduly affect any of the adjacent streets or intersections, existing NOTICE CF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 13 and proposed. The traffic report indicates that a southbound left-turn refuge on 135th Avenue at the site driveway may be required. The 1996 addendum states that since the number of units to be constructed is less than what was assumed for the 1994 report, the findings of the 1994 report are still valid. The addendum indicates that all three access locations will operate at acceptable levels of service. It also states that a left turn lane in 135th Avenue is still warranted. Therefore, the applicant will be required to stripe a left turn refuge as a part of this project. Streets- As noted, the site is located at the southeast corner of SW 135th Avenue and proposed SW Hawk's Beard Street. SW 135th Avenue is classified as a Minor Collector on the Comprehensive Plan and SW Hawk's Beard Street is a local street that would extend from SW 135th Avenue on the west to SW Summer Lake Drive on the east. The construction of SW 135th Avenue was completed by a Local Improvement District in 1989. No further improvements are required. Staff has a concern with the location of the proposed driveway on 135th Avenue. The plan shows the proposed driveway placed 55 feet north of an existing driveway on the west side of the street. This offset configuration will create turning movement conflicts which are a public safety issue. It is the City's policy to require new driveways to align with other driveways on the opposite side of streets, especially on collector and arterial streets where traffic is heavier. Therefore, the proposed driveway should align with the driveway on the west side of SW 135th Avenue. The right-of-way (ROW) for SW Hawk's Beard Street was established by deed in 1989 at 50 feet. The applicant should be required to construct the standard half street improvements plus an additional 8-foot wide lane on the opposite site of the street to provide a total minimum pavement width of 24 feet to accommodate two lanes of traffic and the proposed driveways to the site. The plan submittal shows a proposed pavement width of 26 feet, which is acceptab The site is bounded on the east by the existing ROW for SW 131st Court which was improved with a 26 foot wide roadway within a 35 foot ROW in the Castles at Brittany subdivision. In addition, half of the cul-de-sac bulb was constructed as a part of that project. The curb radius is 45 feet and the ROW radius is 52 feet, according to City as-built drawings, and according to current City standards. The applicant should dedicate additional ROW to provide for the completion of the bulb section in the cul-de-sac and the additional pavement on the west side of the street along the apartment site frontage. Because this site will not directly access onto SW 131st Court, and because the cul-de-sac serves only five existing homes, this street qualifies for a narrower street standard. The City will allow the street width to remain at 26 feet, but will require the applicant to complete the bulb section to City standards. It appears that the half-bulb shown as "existing" on the plans does not match the City's as- built drawings, and the bulb completion depicted on the plans will not meet current City standards. The applicant should revise their plans to properly show the existing cul-de-sac dimensions and a plan to complete the cul-de-sac that will meet City standards. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 14 There is also an existing temporary extruded curb along the west side of 131st Court to help accommodate street storm runoff. When this site is developed and the west side of the street is completed, the existing extruded curb should be replaced with a standard full depth PCC curb. Any pavement replacement needed to accomplish the curb installation shall be done at the applicant's expense. The street connection to the existing pavement in SW Hawk's Beard Street, at the easterly edge of the site, adjacent to the intersection with SW 131st Court, should be redesigned to provide for a 50 foot tangent between the reversing 200 foot centerline curves. The new standards for local streets allow a reduction in the centerline radius to 167 feet. The applicant should show the additional street dedication for SW Hawk's Beard Street and SW 131st Court on the plat for the Minor Land Partition. However, if the applicant does not follow through with the MLP, then these ROW dedications shall be completed on standard City forms. Sanitary Sewer: The site is served by the existing 8" public sewer located within SW 131st Court and the sewer has sufficient capacity for the new development. The preliminary utility plan shows a connection to this sewer by placement of a new manhole over the existing line. Storm Drainage: The site slopes in a southerly direction to the contiguous Summer Creek. The proposed plan will convey the storm drainage to the southeast corner of the site where the low-flow summer runoff will be treated in two biofiltration swales; all flows in excess of summer run-off will overflow into the wetlands. Storm Water Quality: The City has agreed to enforce Surface Water Management (SWM) regulations established by the Unified Sewerage Agency (USA) (Resolution and Order No. 91-47, as amended by R&O 91-75) which require the construction of on-site water quality facilities. The facilities shall be designed to remove 65 percent of the phosphorus contained in 100 percent of the storm water runoff generated from newly created impervious surfaces. In addition, a maintenance plan is required to be submitted indicating the frequency and method to be used in keeping the facility maintained through the year. Prior to issuance of a building permit, the applicant shall submit plans and calculations for a water quality facility that will meet the intent of R&O 91-47. In addition, the applicant shall submit a maintenance plan for the facility that must be reviewed and approved by the City prior to issuance of the building permit. As stated above, two on-site biofiltration swales will be used to treat the hard-surface run- off from this project. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 15 Erosion Control: USA R&O 91-47 also regulates erosion control to reduce the amount of sediment and other pollutants reaching the public storm and surface water system resulting from development, construction, grading, excavating, clearing, and any other activity which accelerates erosion. Per R&O 91-47, the applicant is required to submit an erosion control plan for City review and approval prior to issuance of City permits. The Federal Clean Water Act requires that a National Pollutant Discharge Elimination System (NPDES) erosion control permit (1200-C General Permit) be issued for any development that will disturb five or more acres of land. Since this site is over five acres, the developer will be required to obtain an NPDES permit from the City prior to construction. This permit will be issued along with the site and/or building permit. SECTION VII: STAFF ,AGENCY & CIT COMMENTS The City of Tigard Police Department has reviewed this proposal and has offered the following comments: The applicant shall submit an exterior lighting plan and kiosk plan. The City of Tigard Water Department has reviewed this proposal and has offered the following comments: Fire hydrant locations have been reviewed by TVF&R. Two additional fire hydrants are necessary and placements adjusted. In addition, the water main needs to be extended to the existing 16 inch main at the south entrance. Please note that water meters must be installed within landscape areas and that backflow protection is required (minimum of double check valve assemblies). Staff Contact: Mike Miller (639-4171). The City of Tigard Building Division has reviewed this proposal and has offered the following comments: A soils investigative report for the entire site shall be required. This is due to soft spots from massive tree and stump removal and back fill of stump cavity without compression. Tualatin Valley Water District has reviewed this proposal and has offered the following comments: Plans are not approved as drawn. Please meet the following requirements: Hydrants shall be placed so that all portions of exterior walls of buildings, measured along the outside and along access roadways, are no more than 500-feet for private residences or 250-feet for all commercial buildings. Location of hydrants and supply piping to said hydrants for water supply, shall be approved by this office. Additional fire hydrants are needed with approved locations for access and distance. The Unified Sewerage Agency has reviewed this proposal and has offered the following comments: Preliminary review indicates that the applicant has taken into consideration all of the minimum requirements of R&O 91-47 / 91-75. Note: The grading plan indicates that the first floor eleva'Eon of buildings L, N, P, and R varies from four feet to eight feet above the existing ground. The buildings and their patios abut a wetland buffer. The applicant should remember that grading in the buffer is restricted, and if grading is allowed the area must be landscaped using native reparian plant materials. NOTICE OF DECISION SDR 96-0006-Summer Creek VillageiBowen Dvlpmt. Page 16 The City of Tigard Public Works Department, PGE, and GTE have reviewed this application and have offered no comments or objections. No other comments have been received. SECTION VIII: PROCEDURE AND APPEAL INFORMATION Notice: Notice was posted at City Hall and mailed to: X The applicant and owners X Owner of record within the required distance X Affected government agencies Final Decision: THE DECISION SHALL BE FINAL ON April 22, 1996 UNLESS AN APPEAL IS FILED. Appeal: Any party to the decision may appeal this decision in accordance with Section 18.32.290(A) and Section 18.32.370 of the Community Development Code which provides that written appeal must be filed with the City Recorder within 10 days after notice is give and sent. The appeal fee schedule and forms are available from the Planning Division of Tigard City Hall, 13125 SW Hall Boulevard, Tigard, Oregon 97223. The deadline for filing of an appeal is 3:30 p.m. on April 22, 1996. Questions: If you have question, please call the City of Tigard Planning Department, Tigard City Hall, 13125 SW Hall Boulevard, Tigard, Oregon at (503)639-4171. ( - 1Lr, April 12. 1996 PREPARED BY: Will D'Andrea DATE Assistant Planner April�G- �r �.:��.��✓ ti; � �� rll 12. 1996 APPROVED BY: Richard Bewersdarff DATE Senior Planner NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 17 i� p, g 1 / 1; 0 'lo ism 'M'S 9 .- ' // ...._.. 1.1uor ,,,, \ 1 - Aim ‘,. t I lifl ,:. - Jr i 6 — _ L mil J _ _ ..1. • 1 : 3 •• �, - - - .•. _ - it/1`� 11 , 1 111111 1 i d. 11 ii :I t i . w ,1 I ,.i • - - IN Iv. I _ \ i . , , n.....„,..11 i 1 a 1 i 1 ti, lia i t 1 W I , ' W II LU CC x illiiii : a.1 11 ma.:*; I At 1 < ii I: 1) IC.TO id., lab °MALI I I ail....1 I am cc! am , 1 a 1 e 1■ I API I 0 I ■��I :ql��q I 14 I z CC I.. 1 1-' 7/ W a. a J. -`, , 7:71:111111 "� %0 O l p *) a,• ron„, I �� MAUI 1 ” ; 11■ II �� = _ 1 =m iI ,.3 = � 0 ii ; . I 1 I �. , I' » 3 s.1 s.s ms _Y 1- / ` i ], • 1 i 1 _--- `1—'-- ------ - �1:mrmm' --- -,', �"s_ ----------.......__________71z7Z 0 3f1N3AY H1SCl 'M'S 1 il it H PLOT PLAN 4 CASE NO. SDR96-0006 EXHIBIT MAP SUMMER OEM VILLAGE APARTMENTS SW 'Ems HEARD ROAD North TIGARD, OREGON mum DOM au ur.is aI,ur I ■..,ammo TOM Itl RNA••'!Ills. ..•I411..MOM.1fa ** (')<III• t1] tatrEpAILII -0*cow ` 4SWP V110 / OW ■01 IP°Tcr : a) 1 =. a" av jp ato--VA• r\c°5 rillt E .. ,I es, • wirf -t , ) $ . . ,44; co i .0 Or/ % a ..op 4 .. , . . M in :ral I W HAV�4C'S .. 1"� ', Pr ,' BEARD, ST �T 0)a LI I !': Pall. ‘ . iiial 0 •440- gra . *; c ► / 1 12 ` AP :� a- 111 I 4,11 •• 1. -2 * e - m pipm-o. _Or cm 1-7- ....;:- voliglea .7... tug to -,. aITT• A . ' : . , SHBUR �e , s w - A■ ■■. Q R is !I'!! Imo , :11111.. , • ■ HI 1 1 ! o.- Vicinity Map A SDR 96-0006 Summercreek Village Apts. Note: Map is not to scale N REQUEST FOR COMMENTS MEMORANDUM CITY OF TIGARD, OREGON DATE: April 11, 1996 TO: Will D'Andrea FROM: Brian Rager, Development Review Engineer RE: SDR 96-0006 SUMMER CREEK VILLAGE APARTMENTS Description: The applicant requests SDR approval to allow construction of a 19 building, 150 unit multi-family residential development, with a community building and swimming pool, at the southeast corner of SW Hawks Beard Street (proposed) and SW 135th Avenue (Tax Map 1 S 1 33DB, Tax Lot 4300). This site is currently undeveloped and is approximately 8 acres in size. The applicant has also received SDR and MLP approval for a 160-unit project (SDR 94- 26 and MLP 94-22) to be called Palomino Pointe Apartments, but has not acted on either approval at this time. Findings: 1. Traffic Impacts: As a part of the SDR 94-26 approval, the applicant submitted a traffic access report entitled "Palomino Point Apartments", as prepared by David Evans and Associates, Inc. (DEA), dated October 20, 1994. For this current review, the applicant has submitted an addendum to that report, dated January 1996, also prepared by DEA. The report and addendum addresses the traffic impact of the proposed apartment project as it relates to the surrounding street systems. The 1994 report concluded that the traffic generated by the proposed project will not unduly affect any of the adjacent streets or intersections, existing and proposed. The traffic report indicates that a southbound left-turn refuge on 135th Avenue at the site driveway may be required. The 1996 addendum states that since the number of units to be constructed is less than what was assumed for the 1994 report, the fmdings of the 1994 report are still valid. The addendum indicates that all three access locations will operate at acceptable levels of service. It also states that a left turn lane in 135th Avenue is still warranted. Therefore, the applicant will be required to stripe a left turn refuge as a part of this project. ENGINEERING COMMENTS SDR 96-06 Summer Creek Village PAGE 1 2. Streets: As noted, the site is located at the southeast corner of SW 135th Avenue and proposed SW Hawk's Beard Street. SW 135th Avenue is classified as a Minor Collector on the Comprehensive Plan and SW Hawk's Beard Street is a local street that would extend from SW 135th Avenue on the west to SW Summer Lake Drive on the east. The construction of SW 135th Avenue was completed by a Local Improvement District in 1989. No further improvements are required. Staff has a concern with the location of the proposed driveway on 135th Avenue. The plan shows the proposed driveway placed 55 feet north of an existing driveway on the west side of the street. This offset configuration will create turning movement conflicts which are a public safety issue. It is the City's policy to require new driveways to align with other driveways on the opposite side of streets, especially on collector and arterial streets where traffic is heavier. Therefore, the proposed driveway should align with the driveway on the west side of SW 135th Avenue. The right-of-way (ROW) for SW Hawk's Beard Street was established by deed in 1989 at 50 feet. The applicant should be required to construct the standard half street improvements plus an additional 8-foot wide lane on the opposite site of the street to provide a total minimum pavement width of 24 feet to accommodate two lanes of traffic and the proposed driveways to the site. The plan submittal shows a proposed pavement width of 26 feet, which is acceptable. The site is bounded on the east by the existing ROW for SW 131st Court which was improved with a 26 foot wide roadway within a 35 foot ROW in the Castles at Brittany subdivision. In addition, half of the cul-de-sac bulb was constructed as a part of that project. The curb radius is 45 feet and the ROW radius is 52 feet, according to City as-built drawings, and according to current City standards. The applicant should dedicate additional ROW to provide for the completion of the bulb section in the cul-de-sac and the additional pavement on the west side of the street along the apartment site frontage. Because this site will not directly access onto SW 131st Court, and because the cul-de-sac serves only five existing homes, this street qualifies for a narrower street standard. The City will allow the street width to remain at 26 feet, but will require the applicant to complete the bulb section to City standards. It appears that the half-bulb shown as "existing" on the plans does not match the City's as-built drawings, and the bulb completion depicted on the plans will not meet current City standards. The applicant should revise their plans to properly show the existing cul-de-sac dimensions and a plan to complete the cul-de-sac that will meet City standards. ENGINEERING COMMENTS SDR 96-06 Summer Creek Village PAGE 2 There is also an existing temporary extruded curb along the west side of 131st Court to help accommodate street storm runoff. When this site is developed and the west side of the street is completed, the existing extruded curb should be replaced with a standard full depth PCC curb. Any pavement replacement needed to accomplish the curb installation shall be done at the applicant's expense. The street connection to the existing pavement in SW Hawk's Beard Street, at the easterly edge of the site, adjacent to the intersection with SW 131st Court, should be redesigned to provide for a 50 foot tangent between the reversing 200 foot centerline curves. The new standards for local streets allow a reduction in the centerline radius to 167 feet. The applicant should show the additional street dedication for SW Hawk's Beard Street and SW 131st Court on the plat for the Minor Land Partition. However, if the applicant does not follow through with the MLP, then these ROW dedications shall be completed on standard City forms. 3. Sanitary Sewer: The site is served by the existing 8" public sewer located within SW 131st Court and the sewer has sufficient capacity for the new development. The preliminary utility plan shows a connection to this sewer by placement of a new manhole over the existing line. 4. Storm Drainage: The site slopes in a southerly direction to the contiguous Summer Creek. The proposed plan will convey the storm drainage to the southeast corner of the site where the low-flow summer runoff will be treated in two biofiltration swales; all flows in excess of summer runoff will overflow into the wetlands. 5. Storm Water Quality: The City has agreed to enforce Surface Water Management(SWM) regulations established by the Unified Sewerage Agency (USA)(Resolution and Order No. 91-47, as amended by R&O 91-75) which require the construction of on-site water quality facilities. The facilities shall be designed to remove 65 percent of the phosphorus contained in 100 percent of the storm water runoff generated from newly created impervious surfaces. In addition, a maintenance plan is required to be submitted indicating the frequency and method to be used in keeping the facility maintained through the year. Prior to issuance of a building permit, the applicant shall submit plans and calculations for a water quality facility that will meet the intent of R&O 91-47. In addition, the applicant shall submit a maintenance plan for the facility that must be reviewed and approved by the City prior to issuance of the building permit. ENGINEERING COMMENTS SDR 96-06 Summer Creek Village PAGE 3 As stated above, two on-site biofiltration swales will be used to treat the hard- surface runoff from this project. 6. Erosion Control: USA R&O 91-47 also regulates erosion control to reduce the amount of sediment and other pollutants reaching the public storm and surface water system resulting from development, construction, grading, excavating, clearing, and any other activity which accelerates erosion. Per R&O 91-47, the applicant is required to submit an erosion control plan for City review and approval prior to issuance of City permits. The Federal Clean Water Act requires that a National Pollutant Discharge Elimination System (NPDES)erosion control permit(1200-C General Permit)be issued for any development that will disturb five or more acres of land. Since this site is over five acres, the developer will be required to obtain an NPDES permit from the City prior to construction. This permit will be issued along with the site and/or building permit. Recommendations: THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO ISSUANCE OF THE BUILDING PERMIT: Note: Unless otherwise noted, the staff contact for the following conditions will be Brian Rager, Engineering Department (639-4171). 1. Prior to issuance of a building permit, right-of-way shall be dedicated to the public along the frontage of SW Hawk's Beard Street at the easterly edge of the site to increase the centerline tangent between the reversing 200 foot curves to 50 feet. The minimum centerline radius is 167 feet. The legal description shall be tied to the proposed right-of-way centerline as approved by the Engineering Department. 2. Prior to issuance of the building permit, the applicant shall dedicate additional ROW in SW 131st Court to increase the ROW from its present 35-foot width to a total of 42 feet. In addition, ROW shall be dedicated to complete the bulb section of the street to provide a ROW radius of 52 feet to match the existing dedication. 3. Prior to issuance of a building permit, right-of-way shall be dedicated to the public along the frontage of SW Hawk's Beard Street at the easterly edge of the site to increase the centerline tangent between the reversing 200 foot curves to 50 ENGINEERING COMMENTS SDR 96-06 Summer Creek Village PAGE 4 • feet. The minimum centerline radius is 167 feet. The legal description shall be tied to the proposed right-of-way centerline as approved by the Engineering Department. 4. Prior to issuance of the building permit, the applicant shall submit a revised site plan that aligns the proposed driveway on SW 135th Avenue with the opposing existing driveway on the west side of the street. 5. Five(5) sets of detailed public improvement plans and profile construction drawings shall be submitted for preliminary review to the Engineering Department. A striping plan for the left-turn refuge in 135th Avenue shall also be included. Once redline comments are addressed and the plans are revised, the design engineer shall then submit eight(8) sets of revised drawings and one (1) itemized construction cost estimate for final review and approval (NOTE: these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements. Public improvement plans shall conform to City of Tigard Public Improvement Design Standards,which are available at City Hall. 6. Building permits will not be issued and construction of proposed public improvements shall not commence until after the Engineering Department has reviewed and approved the public improvement plans and a street opening permit or construction compliance agreement has been executed. A 100 percent performance assurance or letter of commitment, a developer-engineer agreement, the payment of a permit fee and a sign installation/streetlight fee are required. 7. The applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer. All construction vehicle parking shall be provided on-site or within the SW Hawk's Beard Street right-of-way adjacent to the site. No construction vehicles or equipment will be permitted to park on the adjoining residential public streets. Construction vehicles include the vehicles of any contractor or subcontractor involved in the construction of the site improvements or buildings proposed by this application, and shall include the vehicles of all suppliers and employees associated with the project. 8. Washington County has established and the City has agreed to collect Traffic Impact Fees in accordance with Resolution No. 90-65. The applicant shall pay the fee established for the proposed use prior to issuance of the building permit. 9. The applicant shall make an appointment for a pre-construction meeting with the City of Tigard Engineering Department after approval of the public improvement plans but before starting work on the site. The applicant, the applicant's engineer and contractor shall be required to attend this meeting prior to receiving the approved plans and permits. ENGINEERING COMMENTS SDR 96-06 Summer Creek Village PAGE 5 10. The proposed privately operated and maintained sanitary sewer and storm drainage system plan-profile details shall be provided as part of the public improvement plans. 11. The applicant shall provide an on-site water quality facility as required by Unified Sewerage Agency Resolution and Order No. 91-47. Final plans and calculations shall be submitted to the Engineering Department for review and approval prior to issuance of the building permit. In addition,a proposed maintenance plan shall be submitted along with the plans and calculations. 12. An erosion control plan shall be provided as part of the public improvement drawings. The plan shall conform to "Erosion Prevention and Sediment Control Plans-Technical Guidance Handbook,February 1994. 13. The applicant shall obtain a 1200-C General Permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY: 14. Prior to issuance of a CO, the applicant shall construct standard half-street improvements along the frontage of SW Hawk's Beard Street. The improvements adjacent to this site shall include: a. Pavement from curb to centerline equal to 16 feet, plus an additional 8-foot wide lane on the opposite side of centerline to provide a total pavement width of 24 feet. b. curb c. storm drainage, including any off-site storm drainage necessary to convey subsurface runoff d. 5 foot concrete sidewalk e. street striping f. streetlights as determined by the City Engineer g. underground utilities (NOTE: the applicant may be eligible to pay a fee in- lieu of undergrounding existing overhead utilities) h. street signs (if applicable) i. driveway apron(if applicable) j. adjustments in vertical and/or horizontal alignment to construct SW Hawk's Beard Street in a safe manner,as approved by the Engineering Department. ENGINEERING COMMENTS SDR 96-06 Summer Creek Village PAGE 6 15. Prior to issuance of a CO, the applicant shall construct standard half-street improvements along the frontage of SW 131st Court. The improvements adjacent to this site shall include: a. Completion of the bulb section to provide a 45-foot curb radius and 52-foot ROW radius b. replacement of the temporary extruded curb with a new full-depth PCC curb per City standards, plus any pavement replacement necessary to accommodate the curb installation c. storm drainage, including any off-site storm drainage necessary to convey subsurface runoff d. 5 foot concrete sidewalk e. street striping f. streetlights as determined by the City Engineer g. underground utilities (NOTE: the applicant may be eligible to pay a fee in- lieu of undergrounding existing overhead utilities) h. street signs(if applicable) i. driveway apron(if applicable) j. adjustments in vertical and/or horizontal alignment to construct SW 131st Avenue in a safe manner, as approved by the Engineering Department. 16. Prior to issuance of a CO, the applicant shall complete the striping of the left-turn refuge in 135th Avenue for the new driveway. APPROVED: Greg Berry, Acting City Engineer i:\eng\brianr\sdr96-06.bdr ENGINEERING COMMENTS SDR 96-06 Summer Creek Village PAGE 7 �p�1N frA Js?. n TUALATIN VALLEY FIRE & RESCUE AND BEAVERTON FIRE DEPARTMENT r GJ� 4755 S.W. Griffith Drive• P.O. Box 4755 • Beaverton, OR 97076• (503) 526-2469• FAX 526-2538 RF&RES March 27, 1996 Will D'Andrea City of Tigard Planning Department 13125 S.W. Hall Blvd. Tigard, Oregon 97223 Re; Summer Creek Village Apartments S.W. Hawks Beard Road File Number: 668-96 Dear Will: This is a Fire and Life Safety Plan Review and is based on the 1991 editions of the Uniform Fire Code (UFC) and those sections of the Uniform Building Code (UBC) and Uniform Mechanical Code (UMC) specifically referencing the fire department, and other local ordinances and regulations. This plan review shall become a part of the approved plans and attached thereto. Plans are not approved as drawn. Please meet the following requirements: Hydrants shall be placed so that all portions of exterior walls of buildings, measured along the outside and along access roadways, are no more than 500 feet away for private residences or 250 feet for all commercial buildings (up to 500 feet for commercially sprinklered buildings). Location of hydrants and supply piping to said hydrants for water supply, shall be approved by this office. Additional fire hydrants are needed with approved locations for access and distance. "Working"Smoke Detectors Save Lives Will D'Andrea March 27, 1996 Page 2 If you have questions or need additional information, please contact me at 526-2469 referring to the above noted file number. Sincerely, 4 Jerry L. Renfro(DFM Plans Examiner JLR:kw t�'lll alstiar CITY OF TIGARD REQUEST FOR COMMENTS DATE: February 28. 1996 ----r_y_ TO: Washington County Fire Marshall cM.AR - 6 1996 FROM: City of Tigard Planning Department STAFF CON'f� .7r'Atlt rig 8 • ea (x315) Phone: (503)639-4171 Fax: (503 •:• 7297 RE: SITE DEVELOPMENT REVIEW (SDR) 96-0006 ➢ SUMMER CREEK VILLAGE APARTMENTS I A request for Site Development Review approval to allow the construction of a 19 building, 150 unit mufti-family residential development, with a community building and swimming pool. LOCATION: East of SW 135th Avenue, south of SW Hawk's Beard Street and west of SW 131st Place (WCTM 1S1 33DB, tax lot 4300). ZONE: R-25 (Residential, 25 Units per acre). The R-25 zone allows single-family attached, single-family detached, duplex residential units, multiple-family residential units, residential care facilities, mobile home parks and subdivision, public support services, family day care, home occupation, temporary use, and accessory structures. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.56. 18.92, 18.100, 18.102, 18.106, 18.108, 18.150, 18.160 and 18.164. Attached is the Site Plan, Vicinity Map and Applicant's Statement for your review. From information supplied by various departments and agencies and from other information available to our staff, a report and recommendation will be prepared and a decision will be rendered on the proposal in the near future. If you wish to comment on this application, WE NEED YOUR COMMENTS BACK BY: Monday - March 11, 1996. You may use the space provided below or attach a separate letter to return your comments. If you are unable to respond by the above date, please phone the staff contact noted above with your comments and confirm your comments in writing as soon as possible. If you have any questions, contact the Tigard Planning Department, 13125 SW Hall Boulevard, Tigard, OR 97223. PLEASE CHECK THE FOLLOWING ITEMS THAT APPLY: We have reviewed the proposal and have no objections to it. Please contact of our office. xPlease refer to the enclosed letter. Written comments provided below: ('lease provide tkefolTouning information) Name of Person(s) Commenting: Phone Number(s): SDR 96-0006 SUMMER CREEK VILLAGE APARTMENTS/BOWEN PROPOSAL/REQUEST FOR COMMENTS RECEIVED PLANNING FEB 281996 CITY OF TIGARD REQUEST FOR COMMENTS DATE: February 28, 1996 TO: Kelley Jennings, Tigard Police Dept. Crime Prevention Officer FROM: City of Tigard Planning Department STAFF CONTACT: William D'Andrea (x315) Phone: (503)639-4171 Fax: (503) 684-7297 RE: SITE DEVELOPMENT REVIEW (SDR) 96-0006 ➢ SUMMER CREEK VILLAGE APARTMENTS A request for Site Development Review approval to allow the construction of a 19 building, 150 unit multi-family residential development, with a community building and swimming pool. LOCATION: East of SW 135th Avenue, south of SW Hawk's Beard Street and west of SW 131st Place (WCTM 1S1 33DB, tax lot 4300). ZONE: R-25 (Residential, 25 Units per acre). The R-25 zone allows single-family attached, single-family detached, duplex residential units, multiple-family residential units, residential care facilities, mobile home parks and subdivision, public support services, family day care, home occupation, temporary use, and accessory structures. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.56, 18.92, 18.100, 18.102, 18.106, 18.108, 18.150, 18.160 and 18.164. Attached is the Site Plan, Vicinity Map and Applicant's Statement for your review. From information supplied by various departments and agencies and from other information available to our staff, a report and recommendation will be prepared and a decision will be rendered on the proposal in the near future. If you wish to comment on this application, WE NEED YOUR COMMENTS BACK BY: Monday - March 11, 1996. You may use the space provided below or attach a separate letter to return your comments. If you are unable to respond by the above date, please phone the staff contact noted above with your comments and confirm your comments in writing as soon as possible. If you have any questions, contact the Tigard Planning Department, 13125 SW Hall Boulevard, Tigard, OR 97223. PLEASE CHECK THE FOLLOWING ITEMS THAT APPLY: We have reviewed the proposal and have no objections to it. Please contact of our office. Please refer to the enclosed letter. Written comments provided below: /at 1 r LL 's�'- S . 11 • //i_ �e aika4 OYease provide the foaming information) Name of Person(s) Commenting: olOtk .1.41e) Phone Number(s): , 11 SDR 96-0006 SUMMER CREEK VILLAGE APARTMENTS/BOWEN PROPOSAL/REQUEST FOR COMMENTS RECEIVED PLANNING feq, 4 MAR 0 81996 UNIFIED SEWERAGE AGENCY OF WASHINGTON COUNTY March 6 , 1996 William D'Andrea Planning Dept . City of Tigard 13125 S .W. Hall Blvd. Tigard, Oregon 97223 Dear Will : Subject: Summer Creek Village Apartments Thank you for the chance to review the above named project . Preliminary review indicates that the applicant has taken into consideration all of the minimum requirements of R&O 91-47/91-75 . Note: The grading plan indicates that the first floor elevation of buildings L, N, P, and R varies from 4 to 8 feet above the existing ground. The buildings and their patios abut the wetland buffer. Applicant should remember that grading in the buffer is restricted, and if grading is allowed the area must be landscaped using native riparian plant materials . I hope this letter is of assistance in writing your conditions of approval for this project. Since ely, Lee Walker Design and Plan Review Supervisor /eb 155 North First Avenue, Suite 270, MS 10 Phone:503/648-8621 Hillsboro,Oregon 97124 FAX:503/640-3525 RECEIVED PLANNING MAR 1 199 , L 4.1111 CITY OF TIGARD REQUEST FOR COMMENTS DATE: February 28, 1996 TO: Michael Miller, Operations Water Department Manager FROM: City of Tigard Planning Department STAFF CONTACT: William D'Andrea (x315) Phone: (503) 639-4171 Fax: (503) 684-7297 RE: SITE DEVELOPMENT REVIEW (SDR) 96-0006 SUMMER CREEK VILLAGE APARTMENTS A request for Site Development Review approval to allow the construction of a 19 building, 150 unit multi-family residential development, with a community building and swimming pool. LOCATION: East of SW 135th Avenue, south of SW Hawk's Beard Street and west of SW 131st Place (WCTM 1S1 33DB, tax lot 4300). ZONE: R-25 (Residential, 25 Units per acre). The R-25 zone allows single-family attached, single-family detached, duplex residential units, multiple-family residential units, residential care facilities, mobile home parks and subdivision, public support services, family day care, home occupation, temporary use, and accessory structures. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.56, 18.92, 18.100, 18.102, 18.106, 18.108, 18.150, 18.160 and 18.164. Attached is the Site Plan, Vicinity Map and Applicant's Statement for your review. From information supplied by various departments and agencies and from other information available to our staff, a report and recommendation will be prepared and a decision will be rendered on the proposal in the near future. If you wish to comment on this application, WE NEED YOUR COMMENTS BACK BY: Monday - March 11, 1996. You may use the space provided below or attach a separate letter to return your comments. If you are unable to respond by the above date, please phone the staff contact noted above with your comments and confirm your comments in writing as soon as possible. If you have any questions, contact the Tigard Planning Department, 13125 SW Hall Boulevard, Tigard, OR 97223. PLEASE CHECK THE FOLLOWING ITEMS THAT APPLY: We have reviewed the proposal and have no objections to it. Please contact of our office. Please refer to the enclosed letter. Written comments provided below: ra /1-yDQA3Jr Loc*r,c&Sl Loo oer10 3 14 •1 E RE ii 4.LED Id( 7vP f‘g. . 2 Al)o MI D N A — F 2.E 1 119■04 A-C-E AlEGEgiS 001 _o PlAcz-maAin At jce-S rsto. • 1.v_/ ✓ . . .7:10 ■ :.__ 4. K .. i . y.• b ;• a.�. i. BE MIS M.4-€0 Tow■N LdwoicA.PCO A4246,34 Q74O Tharr is4GkrGDI✓ / 7 -/ J I IQe&uta.,o. (i44 iv. or Dou.64g C M6cic VAz-v4 AKEA 48u64) SEE C4 Foti # 'o. fG EiteT 44 (Please provide the follbwing information) Name of Person(s) Commenting: Mike A•liu.6-l1--- Phone Number(s): 7- 4 SDR 96-0006 SUMMER CREEK VILLAGE APARTMENTS/BOWEN PROPOSAL/REQUEST FOR COMMENTS V RECEIVE `CANNING VL\R 0 5 1996 mla CITY OF TIGARD REQUEST FOR COMMENTS DATE: February 28, 1996 TO: David Scott, Building Official. FROM: City of Tigard Planning Department STAFF CONTACT: William D'Andrea (x315) Phone: (503) 639-4171 Fax: (503) 684-7297 RE: SITE DEVELOPMENT REVIEW (SDR) 96-0006 r SUMMER CREEK VILLAGE APARTMENTS A request for Site Development Review approval to allow the construction of a 19 building, 150 unit multi-family residential development, with a community building and swimming pool. LOCATION: East of SW 135th Avenue, south of SW Hawk's Beard Street and west of SW 131st Place (WCTM 1S1 33DB, tax lot 4300). ZONE: R-25 (Residential, 25 Units per acre). The R-25 zone allows single-family attached, single-family detached, duplex residential units, multiple-family residential units, residential care facilities, mobile home parks and subdivision, public support services, family day care, home occupation, temporary use, and accessory structures. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.56, 18.92, 18.100. 18.102, 18.106, 18.108, 18.150, 18.160 and 18.164. Attached is the Site Plan, Vicinity Map and Applicant's Statement for your review. From information supplied by various departments and agencies and from other information available to our staff, a report and recommendation will be prepared and a decision will be rendered on the proposal in the near future. If you wish to comment on this application, WE NEED YOUR COMMENTS BACK BY: Monday - March 11. 1996. You may use the space provided below or attach a separate letter to return your comments. If you are unable to respond by the above date, please phone the staff contact noted above with your comments and confirm your comments in writing as soon as possible. If you have any questions, contact the Tigard Planning Department, 13125 SW Hall Boulevard, Tigard, OR 97223. PLEASE CHECK THE FOLLOWING ITEMS THAT APPLY: We have reviewed the proposal and have no objections to it. Please contact of our office. Please refer to the enclosed letter. Written comments provided below: s0, ll /1 K r., 7vr ✓ t'ht1Y (114t . fd Lf 160v r D? si PI .r t/i ✓c tin f t A ti D S>♦-ti„ X..m o va / 4 Jl"vs. G ,rJ a1 e 13.4.e 14 /( ( f f�`i)1.'.-, r ct v I ) "Ye')e'1 `el , n.r r ..t y� (Please provide the foltawing information) Name of Person(s) Commenting: c--,47- )r7 X Phone Number(s): 2 SDR 9E-0006 SUMMER CREEK VILLAGE APARTMENTS/BOWEN PROPOSAL/REQUEST FOR COMMENTS .� gJlJi CITY OF TIGARD REQUEST FOR COMMENTS DATE: February 28, 1996 TO: Per Attached FROM: City of Tigard Planning Department STAFF CONTACT: William D'Andrea (x315) Phone: (503)639-4171 Fax: (503)684-7297 RE: SITE DEVELOPMENT REVIEW (SDR) 96-0006 ➢ SUMMER CREEK VILLAGE APARTMENTS A request for Site Development Review approval to allow the construction of a 19 building, 150 unit multi-family residential development, with a community building and swimming pool. LOCATION: East of SW 135th Avenue, south of SW Hawk's Beard Street and west of SW 131st Place (WCTM 1S1 33DB, tax lot 4300). ZONE: R-25 (Residential, 25 Units per acre). The R-25 zone allows single-family attached, single-family detached, duplex residential units, multiple-family residential units, residential care facilities, mobile home parks and subdivision, public support services, family day care, home occupation, temporary use, and accessory structures. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.56, 18.92, 18.100, 18.102, 18.106, 18.108, 18.150, 18.160 and 18.164. Attached is the Site Plan, Vicinity Map and Applicant's Statement for your review. From information supplied by various departments and agencies and from other information available to our staff, a report and recommendation will be prepared and a decision will be rendered on the proposal in the near future. If you wish to comment on this application, WE NEED YOUR COMMENTS BACK BY: Monday - March 11, 1996. You may use the space provided below or attach a separate letter to return your comments. If you are unable to respond by the above date, please phone the staff contact noted above with your comments and confirm your comments in writing as soon as possible. If you have any questions, contact the Tigard Planning Department, 13125 SW Hall Boulevard, Tigard, OR 97223. PLEASE CHECK THE FOLLOWING ITEMS THAT APPLY: We have reviewed the proposal and have no objections to it. Please contact of our office. Please refer to the enclosed letter. Written comments provided below: 44. �► (Please provide thefotowinginformation) Name of Person(s) Commenting: Phone Number(s): SDR 96-0006 SUMMER CREEK VILLAGE APARTMENTS/BOWEN PROPOSAL/REQUEST FOR COMMENTS *QUEST FOR COMME1 _.� Sb�' ��-�� NOTIFICATION LIST FOR LAND USE&DEVELOPMENT APPLICATIONS CITIZEN INVOLVEMENT TEAMS j/, / fir {circle one} _CIT Area: (wl (S) (E) (C) IA Placed for review in Library CIT Book Li CITY DEPARTMENTS ✓BLDG.DEPT./David Scott,Bluiiding Official ./POLICE DEPT./Kelley Jennings,Crime Prevention onion OPERATIONS/John Acker,Moi,t.so.,_CITY ADMIN./Cathy Wheatley,City Recorder I LNG.DEPT./Brian Roger,Development Review Engineer _COM.DEV.DEPT./D.S.T.'S ADV.PLNG./Nadine Smith, Planning Supervna rz4ATER DEPT./Michael Miller,Operations Mgr./operations Moil Box SPECIAL DISTRICTS FIRE MARSHALL �NIFIED SEWERAGE AGENCY _TUALATIN VALLEY WATER DIST. Gene Birchell SWM Program/Lee Walker PO Box 745 Wa.County Fire District 155 N.First Street Beaverton,OR 97075 (pick-up box) Hillsboro,OR 97124 AFFECTED JURISDICTIONS WA.CO.DEPT.OF LAND USE&TRANSP. _METRO AREA BOUNDARY COMMISSION _METRO-GREENSPACES 150 N.First Avenue 800 NE Oregon St.#16,Suite 540 Mel Huie (CPA's/ZOA's) Hillsboro,OR 97124 Portland,OR 97232-2109 600 NE Grand Avenue Portland,OR 97232-2736 _Brent Curtis(CPA's) _STATE HIGHWAY DIVISION Jim Tice(IGA'S) Sam Hunaidi _ODOT/REGION 1 _Mike Borreson(Engineer) PO Box 25412 Laurie Nicholson/Trans.Planning _Scott King(CPA's) Portland,OR 97225-0412 123 N.W.Flanders _Tom Harry(Current Planning App's) Portland,OR 97209-4037 _Lynn Bailey(Current Planning App's) _OREGON DLCD(CPA's/ZOA's) 1 175 Court Street,N.E. _ODOT/REGION 1,DISTRICT 2-A _CITY OF BEAVERTON Salem,OR 97310-0590 Bob Schmidt/Engineering Coord. Larry Conrad,Senior Planner 2131 SW Scholls/PO Box 25412 PO Box 4755 _CITY OF PORTLAND Portland,OR 97225 Beaverton,OR 97076 Planning Director 1 120 SW 5th _CITY OF LAKE OSWEGO CITY OF BEAVERTON Portland,OR 97204 City Manager Mike Matteucci,Neighborhood Coordinator PO Box 369 PO Box 4755 _CITY OF DURHAM Lake Oswego,OR 97034 Beaverton,OR 97076 City Manager PO Box 23483 _CITY OF KING CITY CITY OF TUALATIN Tigard,OR 97281-3483 City Manager PO Box 369 15300 SW 1 16th Tualatin,OR 97062 _OTHER King City,OR 97224 SPECIAL AGENCIES GENERAL TELEPHONE ELECTRIC _PORTLAND GENERAL ELECTRIC _COLUMBIA CABLE CO. Elaine Self,Engineering Brian Moore Craig Eyestone PO Box 23416 14655 SW Old Scholls Ferry Rd. 14200 SW Brigadoon Court Tigard,OR 97281-3416 Beaverton,OR 97007 Beaverton,OR 97005 _NW NATURAL GAS CO. Phone:(503)721-taw _METRO AREA COMMUNICATIONS _TRI-MET TRANSIT DEVELOPMENT Scott Palmer Fox:(303)121.2502 Jason Hewitt Kim Knox,Project Planner 220 NW Second Avenue Twin Oaks Technology Center 710 NE Holladay Street Portland,OR 97209-3991 1815 NW 169th Place S-6020 Portland,OR 97232 Beaverton,OR 97006-4886 _TCI CABLEVISION OF OREGON _US WEST COMMUNICATIONS _SOUTHERN PACIFIC TRANS.CO. Linda Peterson Pete Nelson Duane M.Forney,PLS-Project Eng. 3500 SW Bond Street 421 SW Oak Street 800 NW 6th Ave.,Room 324 Portland,OR 97201 Portland,OR 97204 Union Station Portland,OR 97209 STATE AGENCIES FEDERAL AGENCIES _AERONAUTICS DIVISION(ODOT) _DIVISION OF STATE LANDS _US POSTAL SERVICE COMMERCE DEPT.-M.H.PARK _FISH b WILDLIFE Randy Hammock,Growth Cord. _PUC _DOGAMI Cedar Mill Station DEPT.OF ENVIRONMENTAL QUALITY Portland,OR 97229-9998 _OTHER _U.S.ARMY CORPS.OF ENGINEERS h:\bgin\patty\masters\rfcnotic.mst MAILING RECORDS I A City of Tigard,Oregon AFFIDAVIT OF MAILING STATE OF OREGON ) County of Washington )ss. City of Tigard ) I, Patricia L. Lunsford, being first duly sworn/affirm, on oath depose and say: that I am an Administrative Specialist II for The City of Tigard, Oregon. ❑ That I served NOTICE OF (AMENDED ❑) PUBLIC HEARING FOR: (Check box above,if applicable} {check appropriate box below} (Enter Public Hearing Date above) City of Tigard Planning Director C Tigard Planning Commission ❑ Tigard Hearings Officer ❑ Tigard City Council NIt/ That I served NOTICE OF (AMENDED ❑) DECISION FOR: {Check boo above,if applicable) City of Tigard Planning Director ❑ That I served NOTICE OF (AMENDED ❑) FINAL ORDER FOR: {Check box above,if applicable) {check appropriate box below) r 1 City of Tigard Planning Director C' Tigard Planning Commission Tigard Hearings Officer Tigard City Council ❑ That I served OTHER NOTICE OF FOR: A copy of the PUBLIC HEARING NOTICE/NOTICE OF DECISION/NOTICE OF FINAL ORDER/OTHER NOTICE(S) of whit - ttached, marked Exhibit "A", was ajlpd to each na •:d person(s) at the addres s) shown on the attach d lis s), marked Exhibit ' B", an t ` 5N' •-y of , i i 199 , and deposited in the Unit States Mail o - •1 /day of ,.•• , , . 199 - , postage prepaid. Pre red Notice P or Subscribed and sworn/affirmed before me on the day of .. :' . .� . , 19 i ,,, /i71,.,_ OFFICIAL SEAL DIANE M JELDERKS NOTARY PUBLIC OREGON 11/14 . �" i_i d..._ ,,,- „,;; COMMISSION NO 046142 NOTARY PUBLI.0 ORE NN MY COMMISSION EXPIRES SEPTEMBER 07.1999 My Commission Expires: y 7y AMPIL NPO.:G°i L/JN2 ,e l� �/61� �✓�� � NAME(S): ‘ern/rt1 Q in/1, 7 *. CASE NO.(S): R q.V /�D p 40 TYPE OF NOTICE&DATE: v `L EX'TIPIT A NOTICE OF DECISION SITE DEVELOPMENT REVIEW (SDR) 96-0006 SUMMER CREEK VILLAGE/BOWEN SECTION I: SUMMARY OF THE REQUEST CASES: FILE NAME: SUMMERCREEK VILLAGE/BOWEN Site Development Review SDR 96-0006 PROPOSAL: A request for Site Development Review approval to allow the construction of a 19 building, 150 unit multi-family residential development, with a community building and swimming pool. APPLICANT/ OWNER: Bowen Real Estate Group 2260 US Bancorp Tower 111 SW 5th Ave. Portland, OR 97204 COMPREHENSIVE PLAN DESIGNATION: High Density. ZONING DESIGNATION: R-25 (Residential, 25 units per acre). LOCATION: (WCTM 1S1 33DB, tax lot 4300). East of SW 135th Avenue, south of SW Hawk's Beard Street and west of SW 131st Place. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.56, 18.92, 18.96, 18.100, 18.102, 18.106, 18.108, 18.116, 18.120, 18.150 and 18.164. SECTION II: DECISION: Notice is hereby given that the City of Tigard Community Development Director's designee has APPROVED the above request subject to the following conditions. The findings and conclusions on which the decision is based are noted in Section IV. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 1 CONDITIONS OF APPROVAL THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO THE ISSUANCE OF BUILDING PERMITS: UNLESS OTHERWISE NOTED, THE STAFF CONTACT SHALL BE BRIAN RACER OF THE ENGINEERING DEPARTMENT. 1. Prior to issuance of a building permit, right-of-way shall be dedicated to the public along the frontage of SW Hawk's Beard Street at the easterly edge of the site to increase the centerline tangent between the reversing 200 foot curves to 50 feet. The minimum centerline radius is 167 feet. The legal description shall be tied to the proposed right-of-way centerline as approved by the Engineering Department. 2. Prior to issuance of the building permit, the applicant shall dedicate additional Right- of-way (ROW) in SW 131st Court to increase the ROW from its present 35-foot width, to a total of 42 feet. In addition, ROW shall be dedicated to complete the bulb section of the street to provide a ROW radius of 52 feet to match the existing dedication. 3. Prior to issuance of the building permit, the applicant shall submit a revised site plan that aligns the proposed driveway on SW 135th Avenue with the opposing existing driveway on the west side of the street. 4. Five (5) sets of detailed public improvement plans and profile construction drawings shall be submitted for preliminary review to the Engineering Department. A striping plan for the left-turn refuge in 135th Avenue shall also be included. Once redline comments are addressed and the plans are revised, the design engineer shall then submit eight (8) sets of revised drawings and one (1) itemized construction cost estimate for final review and approval (NOTE: these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements). Public improvement plans shall conform to City of Tigard Public Improvement Design Standards, which are available at Tigard City Hall. 5. Building permits will not be issued, and construction of proposed public improvements shall not commence until after the Engineering Department has reviewed and approved the public improvement plans, and a street opening permit or construction compliance agreement has been executed. A 100-percent performance assurance or letter of commitment, a developer-engineer agreement, the payment of a permit fee, and a sign installation/streetlight fee are required. 6. The applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer. All construction vehicle parking shall be provided on- site or within the SW Hawk's Beard Street right-of-way adjacent to the site. No construction vehicles or equipment will be permitted to park on the adjoining residential public streets. Construction vehicles include the vehicles of any contractor or subcontractor involved in the construction of the site improvements or buildings proposed by this application, and shall include the vehicles of all suppliers and employees associated with the project. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 2 7. Washington County has established and the City has agreed to collect Traffic Impact Fees in accordance with Resolution No. 90-65. The applicant shall pay the fee established for the proposed use prior to issuance of the building permit. 8. The applicant shall make an appointment for a pre-construction meeting with the City of Tigard Engineering Department after approval of the public improvement plans, but before starting work on the site. The applicant, the applicant's engineer, and contractor shall be required to attend this meeting prior to receiving the approved plans and permits. 9. The proposed privately operated and maintained sanitary sewer and storm drainage system plan-profile details shall be provided as part of the public improvement plans. 10. The applicant shall provide an on-site water quality facility as required by Unified Sewerage Agency Resolution and Order No. 91-47. Final plans and calculations shall be submitted to the Engineering Department for review and approval prior to issuance of the building permit. In addition, a proposed maintenance plan shall be submitted along with the plans and calculations. 11. An erosion control plan shall be provided as part of the public improvement drawings. The plan shall conform to "Erosion Prevention and Sediment Control Plans - Technical Guidance Handbook, February 1994". 12. The applicant shall obtain a 1200-C General Permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. 13. Engineered Grading Permit Required. The applicant shall submit a Soils Engineering Report and Engineered Geology Report. Staff Contact: Jim Funk, Building Division (639-4171). 14. Swimming pools shall be enclosed as required by Chapter 14.20 of the Tigard Municipal Code. The enclosure shall be provided by a fence or wall with a minimum height of 4-feet with a self-latching door or gate. 15. The water plan shall provide for the westerly extension of the existing 12-inch water line from SW 131st Place to the existing 16-inch water main in SW 135th Avenue. Staff Contact: Mike Miller, City of Tigard Water Department (639-4171). 16. Revised site and landscaping plans shall be submitted for review by the Planning Division, Staff Contact: Will D'Andrea, Planning Department (639-4171). The revised plans shall include the following: A. Grading plan detailing work to be conducted within the wetland buffer. B. Detailed buffer area plantings, including number, type, and size at planting. C. Twenty (20) bicycle parking spaces. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 3 D. A plan which shows compliance with Community Development Code Chapter 18.116, Mixed Solid Waste and Recyclable Storage. The applicant shall choose one of the following four methods to demonstrate compliance: Minimum Standard, Waste Assessment, Comprehensive Recycling Plan, or Franchised Hauler Review and Sign-off. Regardless of which method chosen, the applicant shall submit a letter from the franchise disposal company related to facility design and compatibility. 17. An exterior lighting plan and kiosk plan shall be submitted to the Police Department for review and approval. Staff Contact: Kelly Jennings, Police Department (639- 4171). THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO THE ISSUANCE OF OCCUPANCY PERMITS: 18. Prior to issuance of a Certificate of Occupancy, the applicant shall construct standard half-street improvements along the frontage of SW Hawk's Beard Street. The improvements adjacent to this site shall include: A. Pavement from curb to centerline equal to 16-feet, plus an additional 8-foot wide lane on the opposite side of centerline to provide a total pavement width of 24 feet. B. Curb. C. Storm drainage, including any off-site storm drainage necessary to convey subsurface run-off. D. Five-foot concrete sidewalk. E. Street striping. F. Streetlights as determined by the City Engineer. G. Underground utilities (NOTE: the applicant may be eligible to pay a fee in-lieu of undergrounding existing overhead utilities). H. Street signs (if applicable). Driveway apron (if applicable). J. Adjustments in vertical and/or horizontal alignment to construct SW Hawk's Beard Street in a safe manner, as approved by the Engineering Department. 19. Prior to issuance of a Certificate of Occupancy, the applicant shall construct standard half-street improvements along the frontage of SW 131st Court. The improvements adjacent to this site shall include: NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 4 A. Completion of the bulb section to provide a 45-foot curb radius and 52-foot ROW radius. B. Replacement of the temporary extruded curb with a new full-depth PCC curb per City standards, plus any pavement replacement necessary to accommodate the curb installation. C. Storm drainage, including any off-site storm drainage necessary to convey subsurface run-off. D. Five-foot concrete sidewalk. E. Street striping. F. Streetlights as determined by the City Engineer. G. Underground utilities (NOTE: the applicant may be eligible to pay a fee in-lieu of undergrounding existing overhead utilities). H. Street signs (if applicable). I. Driveway apron (if applicable). J. Adjustments in vertical and/or horizontal alignment to construct SW 131st Avenue in a safe manner, as approved by the Engineering Department. 20. Prior to issuance of a Certificate of Occupancy, the applicant shall complete the striping of the left-turn refuge in 135th Avenue for the new driveway. 21. All site improvements shall be installed as approved per the revised site plan. THIS APPROVAL SHALL BE VALID FOR EIGHTEEN 18 MONTHS FROM THE EFFECTIVE DATE OF THIS DECISION. SECTION III: SITE AND VICINITY INFORMATION Site History: The property was annexed into the City of Tigard in 1987. The property was involved in a local improvement district to improve SW 135th Avenue. A Site Development Review, Minor Land Partition, and Variance (SDR 88-25/MLP 88-16N 88-39), was approved for a partition and development of a 266 unit apartment complex in 1988. Land that was identified as sensitive lands was dedicated to the City of Tigard. Since the partition was never recorded, the approximately 13 acre property is essentially divided in half by the dedicated greenway NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 5 in the middle of the property. The land under consideration for development with the current application is the land north of the greenway. A Site Development Review, and Minor Land Partition (SDR 94-0026/MLP 94-0022), was approved for a partition and development of a 160 unit apartment complex subdivision on the property north of the greenway in 1994. A Subdivision (SUB 95-0005) was approved for a 52 lot, townhouse subdivision on the property south of the greenway in 1995. No other development applications have been reviewed by the City relating to this property. Vicinity Information: SW Scholls Ferry Road and the City of Beaverton lie north of the subject property. A church and the Summerlake subdivision are to the northeast and these properties are zoned R-7 (Residential, 7 units per acre). Adjacent property to the north and south are currently vacant, with the southern property owned by the City of Tigard for open space. Adjacent property to the east is developed with Castles at Brittany subdivision and is zoned R-12 (Residential, 12 units per acre). Property to the west is zoned R-25 (Residential, 25 units per acre). The surrounding area is predominantly developed with single-family residential development. Site Information and Proposal Description: The site is zoned R-25, (Residential, 25 units per acre). The approximately 13 acre site has a dedicated greenway in the middle of the site. Summer Creek runs in an east-west direction and contains both floodplain and wetland area. The proposed development is located on the land north of the dedicated greenway. The applicant is proposing to construct a 19 building, 150 unit multi-family residential development, with a community building and swimming pool. The project will have two access drives onto SW Hawk's Beard Street and one onto SW 135th Avenue. SECTION IV: APPLICABLE REVIEW CRITERIA AND FINDINGS COMPLIANCE WITH COMMUNITY DEVELOPMENT CODE SECTIONS: Use Classification: The applicant is proposing to build a 19 building, 150 unit apartment complex. This proposal is classified in Code Section 18.42 (Use Classifications) as Multiple- Family Residential Units. Code Section 18.56.030 allows Multiple-Family dwellings as a permitted use in the R-25 zoning district. Minimum Lot Area: Section 18.56.050 states that the minimum lot area for each multi- family unit in the R-25 zoning district is 1,480 square feet. There is no minimum lot width requirement in the R-25 zone. The proposed 150 units require a site size of 222,000 square feet. The net site area is approximately 294,726 square feet, thereby, meeting this standard. Developments within the R-25 zone are required to provide a minimum of 20% landscaping. The plan indicates that approximately 117,894 square feet (34%) of the site has been provided as landscaping, thereby, satisfying this criteria. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 6 Setbacks: Section 18.56.050 states that for multi-family dwellings the setbacks are as follows: front yard - 20 feet; side yard - 10 feet; side yard which abuts a more restrictive zone - 30 feet; rear yard - 20 feet. As indicated on the site plan, the proposal meets the setback requirements. The maximum building height is 45 feet. As shown on the exterior elevation plans (A7.1 - A7.6), the proposed buildings are approximately 34-36 feet in height, well under the maximum allowed. Section 18.120.180(A)(1) (Site Development Review - Approval Standards) requires that a development proposal be found to be consistent with the various standards of other Community Development Code Chapters. The applicable criteria in this case are Chapters 18.92, 18.96, 18.100, 18.102, 18.106, 18.108, 18.114, 18.120, 18.134, 18.150, and 18.164. The proposal's consistency with these Code Chapters is reviewed in the following sections. The proposal contains no elements related to the provisions of Code Chapters 18.94 (Manufactured/ Mobile Home Regulations), 18.98 (Building Height Limitations: Exceptions), or 18.144 (Accessory Use and Structures) which are also listed under section 18.120.180.A.1. These Chapters are, therefore, found to be inapplicable as approval standards. Code Section 18.120.180.A.2 provides other Site Development Review approval standards not necessarily covered by the provisions of the previously listed sections. These other standards are addressed immediately below. Relationship to the Natural and Physical Environment: Section 18.120.180.2 states that buildings shall be located to preserve existing trees and that trees having a six- inch caliper or greater shall be preserved or replaced by new plantings of equal character. This parcel had previously been used as agricultural land and, as such, does not contain trees which would require preservation. Exterior Elevations: Section 18.120.108.3 states that along the vertical face of multiple-family structures, offsets shall occur at a minimum of every 30 feet by providing any two of the following: a) Recesses (decks, patios, etc.); b) Extensions (decks, patios, etc.); or c) Offsets or breaks in roof elevations. As indicated on the preliminary building elevations plans (sheets A7.1 - A7.6) the design shows both recesses and roof elevation offsets, in accordance with this section. Buffering, Screening and Compatibility between adjoining uses: Section 18.120.108.4(A) states that buffering shall be provided between different types of land uses. This criteria shall be satisfied as addressed in the Buffer Matrix (18.100.130) section below. Section 18.120.108.4(B) states that on-site screening from view of adjoining properties of such things as service and storage areas, parking lots, and mechanical devices on roof tops shall be provided. This criteria is satisfied as the landscape plan indicates screening within the required buffer area. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 7 Privacy and Noise: Section 18.120.108.5 requires that structures which include residential dwelling units shall provide private outdoor areas for each ground floor unit which is screened from view by adjoining units, that the buildings shall be oriented in a manner which protects private spaces on adjoining properties from view and noise, and on-site uses which create noise, lights, or glare shall be buffered from adjoining residential uses. Only one parcel directly adjoins the proposed development site. This parcel is on the south end of SW 131st Place. The remaining lots on SW 131st Place are buffered from the proposed development by a 30-foot buffer, as well as the SW 131st Place right-of-way. The proposed buildings H and J have been situated so as to screen the existing houses across SW 131st Place from the building entrances, driveways and parking areas. On-site private space has been satisfied as there is building separation between each ground floor patio. The building design also provides for an off-setting of the patios so that a direct line of site of other patios is not provided. Landscaping has also been provided to further screen the private outdoor areas. Private Outdoor Areas: Section 18.120.108.6. requires that private open space such as a patio or balcony shall be provided and shall be designed for the exclusive use of individual units and shall be at least 48 square feet in size with a minimum width dimension of 4 feet. Required open space may include roofed or enclosed structures such as a recreation center. This criteria is satisfied as the applicant is proposing both balconies and a recreation center. Shared Outdoor Recreation Areas: Section 18.120.108.7 states that in addition to subsections 5 and 6 above, usable outdoor recreation space shall be provided in residential developments for the shared or common use of all the residents in the amount of 200 square feet per unit for studio up to and including two-bedroom units and 300 square feet per unit for three or more bedroom units. The required recreation space may be provided as follows: 1) all outdoor space; 2) part outdoor and part indoor space; 3) all public or common space; 4) part common and part private, for example, it could be an outdoor tennis court, indoor recreation room and balconies on each unit; 5) where balconies are added to units, the balconies shall not be less than 48 square feet. Shared outdoor recreation space shall be readily observable for reasons of crime prevention and safety. This development requires 21,600 square feet of shared outdoor recreation area (135 units @ 134 s.f. and 15 units @ 234 s.f.). A swimming pool and community building are provided on-site for shared recreation purposes, as well as open space area. The applicant's project data indicates that approximately 31,835 square feet of shared outdoor recreation area, thereby, satisfying this criteria. Demarcation of Spaces: Crime Prevention: Section 18.120.108.9 states that structures and site improvements shall be designed so that public areas, semipublic areas and private outdoor areas are clearly defined in order to establish persons having a right to be in the space, in order to provide for crime prevention and to establish maintenance responsibility. The Tigard Police Department has requested, in similar developments, that appropriate signage be placed at entrances to apartment complexes and that adequate addressing be placed on unit entrances so that emergency service providers can locate units quickly. The developer should, therefore, be required to contact the Police Department prior to obtaining occupancy permits for the complex for review and approval of the address signage of this development. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 8 Crime Prevention and Safety: Section 18.120.108.10 requires that windows be located so that areas vulnerable to crime can be surveyed by the occupants; interior laundry and service areas shall be located in a way that can be observed by others; mail boxes located in lighted areas having vehicular or pedestrian traffic; exterior lighting levels selected and angles shall be oriented towards areas vulnerable to crime; and light fixtures shall be provided in areas having pedestrian or vehicular traffic and in potentially dangerous areas. As noted by the Police Department, a lighting plan shall be submitted. The developer should therefore be required to contact the Police Department prior to obtaining building permits for the complex for review and approval of the exterior lighting plan for this development. Density Computation: Section 18.92 establishes the criteria for determining the number of dwelling units permitted. In determining the net acreage, the following are subtracted from the gross acreage: sensitive land area; park dedication; dedicated public right-of-way and private streets. To calculate the net units per acre, it is necessary to divide the net acreage by the minimum number of square feet required for each lot by the applicable zoning district. The subject site contains approximately 7.96 acres or approximately 346,737 square feet. Section 18.92.020(3)(b) requires the subtraction of 15% of the gross area for public facilities, or 52,010 square feet. The resulting net acreage is 294,726 square feet. Dividing the net acreage by 1,480 square feet per unit results in 199 net units. The applicant is proposing 150 units, thereby, satisfying this criteria. (gross v. net acres). Sensitive Lands: Wetlands. Section 18.84. The preliminary site plan indicates that the property line is the same as the delineated wetland boundary. As drawn on the preliminary plan, the buildings are outside of wetlands and the required 25-foot wetland buffer area. This plan is based upon the expectation that a proposed mitigation plan will be approved. In 1995, a wetland delineation was conducted in conjunction with a Subdivision application for the land south of the City greenway. This delineation showed that the wetland boundary had shifted slightly to the south, since the earlier 1988 study. The effect on the proposed plan is that the shown property boundary is not the wetland boundary. Technically speaking, the subject application would not be required to provide a 25-foot buffer the entire length of the southern boundary. As a condition of the subdivision approval (SUB 95-0005), the applicant has applied for, and received a DSL fill/mitigation permit. A large portion of the mitigation area is located on the City owned greenway, just south of the property line shown on the current application's site plan. The mitigation area will effectively re-create wetland such that, the property line will once again, also be the wetland boundary. The preliminary plans reflect the expectation that the mitigation plan will be implemented. Since the mitigation area is City owned, the applicant for the subdivision must acquire City approval to use City property for mitigation purposes. That applicant has not yet received City approval. The grading plan (sheet C2) shows that the property elevation at the property line is approximately 175-feet and the finished floor elevation of the apartment unit at approximately 183-184 feet. This represents a grade change of approximately 8-9 feet. The grading plan does not show how the 25-foot buffer area will be sloped. No details were provided as to what this area will look like. For example, will a retaining wall be constructed, or will there be a slope with a 9-foot slope differential? The applicant shall provide revised plans that shows how this buffer area will be developed and graded. If grading is allowed, NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 9 the area must be landscaped using native reparian plant materials. The buffer is required to be an undisturbed corridor. The applicant shall provide details as to how this area will be maintained as an undisturbed corridor. Additional Yard Setback Requirements: Section 18.96.020 requires that the building setback on SW 135th Avenue (a collector street) shall be the setback distance required by the zoning district plus 30 feet measured from the centerline of the street. The side yard, corner setback of the R-25 zone is 10 feet. As indicated on the site plan, these setback standards are satisfied. Distance Between Multiple-Family Structures: Section 18.96.030 states that buildings with windowed walls facing buildings with windowed walls shall have a 25 foot separation, buildings with windowed walls facing buildings with a blank wall shall have a 15 foot separation, buildings with opposing blank walls shall have a 10 foot separation. Where buildings exceed a horizontal dimension of 60 feet or exceed 30 feet in height, the minimum wall separation shall be one foot for each 15 feet of building length over 50 feet and two feet for each 10 feet of building height over 30 feet. This section is applicable to buildings C, D, E, F, G, H, J, K, L, N, P, Q, R, S, and T. The proposed building lengths for buildings C, F, P, T, J, G, and S are approximately 115-feet; buildings Q, N, R, and D are approximately 130-feet; buildings E, K, and L are approximately 150-feet; and building H is approximately 170 feet. The proposed heights range from approximately 34-36 feet. The building elevation plans (sheets A7.1 - A7.6) show that the proposed buildings have windowed walls facing windowed walls, blank walls facing windowed walls, and blank walls facing blank walls. The required separations, therefore, range between 10-25 feet. There is an additional separation ranging from 4-8 feet required because the building lengths are greater than 60-feet long. The total building separation required for building, therefore, ranges from 14-30 feet. The proposed plan is designed such that all buildings are in compliance with the required distances, thereby, satisfying this criteria. In addition, driveways, parking lots and walkways shall maintain the following separation for dwelling units within eight feet of the ground level: 1) driveways and parking lots shall be separated from windowed walls by at least eight feet; walkways running parallel to the face of the structures shall be separated by at least five feet; and 2) driveways and parking lots shall be separated from living room windows by at least 10 feet; walkways running parallel to the face of the structure shall be separated by at least 7 feet. As indicated on the site plan, all buildings satisfy the parking lot and walkway separation requirements. Landscaping Plan: Section 18.100.015 requires that the applicant submit a landscaping plan. This requirement has been satisfied as the applicant has submitted a plan indicating the type and location of trees and shrubs. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 10 Street Trees: Section 18.100.033 states that all development projects fronting on a public street shall be required to plant street trees in accordance with section 18.100.035. Section 18.100.035 requires that street trees be spaced between 20 and 40 feet apart depending on the size classification of the tree at maturity (small, medium or large). The landscape plan shows street trees along both frontages, in accordance with the provisions of this section. Screening: Special Provisions: Section 18.100.110(A) states that trees shall be planted in landscaped islands in all parking areas and shall be equally distributed and on the basis of one tree for each seven parking spaces in order to provide a canopy effect. The minimum dimension of the landscape islands shall be three feet and the landscaping shall be protected from vehicular damage by some form of wheel guard or curb. Landscaped parking areas shall include special design features which effectively screen the parking lot areas from view. As indicated on the site plan, parking lot trees and screening have been provided in accordance with this section. Screening of Swimming Pools: Section 18.100.110(C) states that all swimming pools shall be enclosed as required by Chapter 14.20 of the Tigard Municipal Code. The enclosure shall be provided by a fence or wall with a minimum height of 4 feet with a self-latching door or gate. A revised plan shall be submitted which provides the specifications showing compliance with this section. Screening of Refuse Containers: Section 18.100.110(D) states that any refuse container or disposal area shall be screened from view by placement of a solid wood fence, masonry wall or evergreen hedge between five and eight feet in height. All refuse materials shall be contained within the screened area. The plans show the provision of a 6-foot high, solid wood fence to provide screening of the trash enclosure, thereby, satisfying this criteria. Buffer Matrix: Section 18.100.130 contains the buffer matrix to be used in calculating widths of buffering and screening to be installed between proposed uses. The Matrix indicates that where a multi-family development abuts a residential zone with a single-family use, the required buffer and screening width shall be 10 feet. Section 18.100.080.D contains the minimum improvement standards for the buffering area. The minimum improvements within a buffer area shall consist of the following: 1) At least one row of trees shall be planted. They shall be not less than 10 feet high for deciduous trees and 5 feet high for evergreen trees at the time of planting. Spacing of the trees depends on the size of the tree at maturity; 2) In addition, at least 10 five gallon shrubs or 20 one gallon shrubs shall be planted for each 1000 square feet of required buffer area; 3) The remaining area shall be planted in lawn, groundcover or spread with bark mulch. The east buffer area contains approximately 3,800 square feet. Therefore, this buffer shall contain 30, five-gallon or 60, one-gallon shrubs, in addition to the one row of trees. The landscape plan shows the provision of a continuous five-foot high hedge, a row of trees, and assorted lower lying vegetation. However, it is not clearly defined what the number of plants to be planted are, nor the height at the time of planting. Therefore, the applicant shall provide a more detailed list of what will be provided in the buffer area, such that, it complies with this section. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 11 Section 18.100.080.E states that where screening is required the following standards shall apply in addition to those required for buffering; 1) a hedge of narrow or broadleaf evergreen shrubs which will form a 4 foot continuous screen within 2 years of planting, or; 2) an earthen berm planted with evergreen plant materials which will form a continuous screen 6 feet in height within 2 years. The unplanted portion of the berm shall be planted in lawn, ground cover or bark mulch, or; 3) a 5 foot or taller fence or wall shall be constructed to provide a continuous sight obscuring screen. The plans show the provision of a continuous five-foot high hedge, satisfying this criteria. Visual Clearance Areas: Section 18.102 requires that a clear vision area shall be maintained on the corners of all property adjacent to intersecting right-of-ways or the intersection of a public street and a private driveway. A clear vision area shall contain no vehicle, hedge, planting, fence, wall structure, or temporary or permanent obstruction exceeding three feet in height. The code provides that obstructions which may be located in this area shall be visually clear between three and eight feet in height (trees may be placed within this area provided all branches below eight feet are removed). A visual clearance area is the triangular area formed by measuring a 30 foot distance along the street right-of-way and the driveway and then connecting these two 30 foot distance points with a straight line. As indicated on the site plan, this section is satisfied. Minimum Off-Street Parking: Section 18.106.030(A)(3) requires a minimum of 1.5 parking spaces for 1 bedroom units and 2 spaces for units with more than 1 bedroom. In addition, section 18.106.020(G) states that multi-dwelling units with more than 10 required parking spaces shall provide shared parking for the use of all of the guests of all of the residents of the complex. The shared parking shall consist of 15 percent of the total required parking spaces and be centrally located within the development. The applicant is proposing 68, one-bedroom units and 82, one-plus bedrooms; thereby requiring 266 parking spaces. The required number of shared parking spaces is 40. The total number of required parking spaces is, therefore, 306. This requirement is satisfied as the proposed site plan shows the provision of 347 parking spaces. The Americans with Disabilities Act (ADA) requires 8 disabled parking spaces if 301 to 400 parking spaces are provided. The proposed site plan shows the provision of eight disabled person parking spaces distributed throughout the site, thereby, satisfying this criteria. Bicycle Parking: Section 18.106.020(0) requires one bicycle parking rack space for each 15 required vehicular parking spaces in any development. Bicycle parking areas shall not be located within parking aisles, landscape areas, or pedestrian ways. Based on the requirement of 306 parking spaces, 20 bicycle parking spaces will be required for this development. The site plan does not show the provision of bicycle racks. A revised plan shall be submitted which shows the location of the required 20 bicycle parking spaces. Access: Section 18.108.070(F) requires that multiple-family residential uses provide a minimum of two driveways plus one additional driveway to a public street for every 200 units or portion thereof in excess of 100 units. The minimum access width shall be 30 feet, with 24 feet of pavement, curbs and a 5 foot sidewalk. The site plan NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 12 indicates the provision of 150 units, therefore, three accesses shall be required for this development. This section is satisfied as the site plan shows the provision of three access drives with pavement widths of 24-feet, and sidewalks which lead into the development. Walkways: Section 18.108.050(B) requires that within multi-family developments each residential dwelling shall be connected to the vehicular parking area, and common open space and recreation facilities shall be connected by a walkway system having a minimum width of four feet and constructed of an all weather material. As indicated on the site plan, walkways are satisfactorily provided. Signs: Section 18.114.130 (B) lists the type of allowable signs and sign area permitted in the R-25 zone. All signs shall be approved through the Sign Permit process as administered by the Planning Division. Mixed Solid Waste and Recyclables Storage: Section 18.116 requires that new construction incorporates functional and adequate space for on-site storage and efficient collection of mixed solid waste and source separated recyclables prior to pick-up and removal by haulers. The applicant shall choose one of the following four methods to demonstrate compliance: Minimum standard, Waste assessment, Comprehensive recycling plan, or Franchised hauler review and sign-off. The applicant will need to submit evidence or a plan that indicates compliance with this section. The applicant shall also obtain from the disposal hauler a written sign-off on the location of and the compatibility of facilities. Tree Removal: Section 18.150.025 requires that a tree plan for the planting, removal and protection of trees prepared by a certified arborist shall be provided with a site development review application. The tree plan shall include identification of all existing trees, identification of a program to save existing trees or mitigate tree removal over 12 inches in caliper, which trees are to be removed, protection program defining standards and methods that will be used by the applicant to protect trees during and after construction. The plans do not show the existence of trees on the property. The applicant shall verify that there are no trees on the property that would require preservation or mitigation. PUBLIC FACILITY CONCERNS: Sections 18.164.030(E)(1)(a) (Streets), 18.164.090 (Sanitary Sewer), and 18.164.100 (Storm Drains) shall be satisfied as specified below: Traffic Impacts: As a part of the SDR 94-26 approval, the applicant submitted a traffic access report entitled "Palomino Point Apartments", as prepared by David Evans and Associates, Inc. (DEA), dated October 20, 1994. For this current review, the applicant has submitted an addendum to that report, dated January 1996, also prepared by DEA. The report and addendum addresses the traffic impact of the proposed apartment project as it relates to the surrounding street systems. The 1994 report concluded that the traffic generated by the proposed project will not unduly affect any of the adjacent streets or intersections, existing NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 13 and proposed. The traffic report indicates that a southbound left-turn refuge on 135th Avenue at the site driveway may be required. The 1996 addendum states that since the number of units to be constructed is less than what was assumed for the 1994 report, the findings of the 1994 report are still valid. The addendum indicates that all three access locations will operate at acceptable levels of service. It also states that a left turn lane in 135th Avenue is still warranted. Therefore, the applicant will be required to stripe a left turn refuge as a part of this project. Streets: As noted, the site is located at the southeast corner of SW 135th Avenue and proposed SW Hawk's Beard Street. SW 135th Avenue is classified as a Minor Collector on the Comprehensive Plan and SW Hawk's Beard Street is a local street that would extend from SW 135th Avenue on the west to SW Summer Lake Drive on the east. The construction of SW 135th Avenue was completed by a Local Improvement District in 1989. No further improvements are required. Staff has a concern with the location of the proposed driveway on 135th Avenue. The plan shows the proposed driveway placed 55 feet north of an existing driveway on the west side of the street. This offset configuration will create turning movement conflicts which are a public safety issue. It is the City's policy to require new driveways to align with other driveways on the opposite side of streets, especially on collector and arterial streets where traffic is heavier. Therefore, the proposed driveway should align with the driveway on the west side of SW 135th Avenue. The right-of-way (ROW) for SW Hawk's Beard Street was established by deed in 1989 at 50 feet. The applicant should be required to construct the standard half street improvements plus an additional 8-foot wide lane on the opposite site of the street to provide a total minimum pavement width of 24 feet to accommodate two lanes of traffic and the proposed driveways to the site. The plan submittal shows a proposed pavement width of 26 feet, which is acceptable. The site is bounded on the east by the existing ROW for SW 131st Court which was improved with a 26 foot wide roadway within a 35 foot ROW in the Castles at Brittany subdivision. In addition, half of the cul-de-sac bulb was constructed as a part of that project. The curb radius is 45 feet and the ROW radius is 52 feet, according to City as-built drawings, and according to current City standards. The applicant should dedicate additional ROW to provide for the completion of the bulb section in the cul-de-sac and the additional pavement on the west side of the street along the apartment site frontage. Because this site will not directly access onto SW 131st Court, and because the cul-de-sac serves only five existing homes, this street qualifies for a narrower street standard. The City will allow the street width to remain at 26 feet, but will require the applicant to complete the bulb section to City standards. It appears that the half-bulb shown as "existing" on the plans does not match the City's as- built drawings, and the bulb completion depicted on the plans will not meet current City standards. The applicant should revise their plans to properly show the existing cul-de-sac dimensions and a plan to complete the cul-de-sac that will meet City standards. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 14 There is also an existing temporary extruded curb along the west side of 131st Court to help accommodate street storm runoff. When this site is developed and the west side of the street is completed, the existing extruded curb should be replaced with a standard full depth PCC curb. Any pavement replacement needed to accomplish the curb installation shall be done at the applicant's expense. The street connection to the existing pavement in SW Hawk's Beard Street, at the easterly edge of the site, adjacent to the intersection with SW 131st Court, should be redesigned to provide for a 50 foot tangent between the reversing 200 foot centerline curves. The new standards for local streets allow a reduction in the centerline radius to 167 feet. The applicant should show the additional street dedication for SW Hawk's Beard Street and SW 131st Court on the plat for the Minor Land Partition. However, if the applicant does not follow through with the MLP, then these ROW dedications shall be completed on standard City forms. Sanitary Sewer: The site is served by the existing 8" public sewer located within SW 131st Court and the sewer has sufficient capacity for the new development. The preliminary utility plan shows a connection to this sewer by placement of a new manhole over the existing line. Storm Drainage: The site slopes in a southerly direction to the contiguous Summer Creek. The proposed plan will convey the storm drainage to the southeast corner of the site where the low-flow summer runoff will be treated in two biofiltration swales; all flows in excess of summer run-off will overflow into the wetlands. Storm Water Quality: The City has agreed to enforce Surface Water Management (SWM) regulations established by the Unified Sewerage Agency (USA) (Resolution and Order No. 91-47, as amended by R&O 91-75) which require the construction of on-site water quality facilities. The facilities shall be designed to remove 65 percent of the phosphorus contained in 100 percent of the storm water runoff generated from newly created impervious surfaces. In addition, a maintenance plan is required to be submitted indicating the frequency and method to be used in keeping the facility maintained through the year. Prior to issuance of a building permit, the applicant shall submit plans and calculations for a water quality facility that will meet the intent of R&O 91-47. In addition, the applicant shall submit a maintenance plan for the facility that must be reviewed and approved by the City prior to issuance of the building permit. As stated above, two on-site biofiltration swales will be used to treat the hard-surface run- off from this project. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 15 Erosion Control: USA R&O 91-47 also regulates erosion control to reduce the amount of sediment and other pollutants reaching the public storm and surface water system resulting from development, construction, grading, excavating, clearing, and any other activity which accelerates erosion. Per R&O 91-47, the applicant is required to submit an erosion control plan for City review and approval prior to issuance of City permits. The Federal Clean Water Act requires that a National Pollutant Discharge Elimination System (NPDES) erosion control permit (1200-C General Permit) be issued for any development that will disturb five or more acres of land. Since this site is over five acres, the developer will be required to obtain an NPDES permit from the City prior to construction. This permit will be issued along with the site and/or building permit. SECTION VII: STAFF ,AGENCY & CIT COMMENTS The City of Tigard Police Department has reviewed this proposal and has offered the following comments: The applicant shall submit an exterior lighting plan and kiosk plan. The City of Tigard Water Department has reviewed this proposal and has offered the following comments: Fire hydrant locations have been reviewed by TVF&R. Two additional fire hydrants are necessary and placements adjusted. In addition, the water main needs to be extended to the existing 16 inch main at the south entrance. Please note that water meters must be installed within landscape areas and that backflow protection is required (minimum of double check valve assemblies). Staff Contact: Mike Miller (639-4171). The City of Tigard Building Division has reviewed this proposal and has offered the following comments: A soils investigative report for the entire site shall be required. This is due to soft spots from massive tree and stump removal and back fill of stump cavity without compression. Tualatin Valley Water District has reviewed this proposal and has offered the following comments: Plans are not approved as drawn. Please meet the following requirements: Hydrants shall be placed so that all portions of exterior walls of buildings, measured along the outside and along access roadways, are no more than 500-feet for private residences or 250-feet for all commercial buildings. Location of hydrants and supply piping to said hydrants for water supply, shall be approved by this office. Additional fire hydrants are needed with approved locations for access and distance. The Unified Sewerage Agency has reviewed this proposal and has offered the following comments: Preliminary review indicates that the applicant has taken into consideration all of the minimum requirements of R&O 91-47 / 91-75. Note: The grading plan indicates that the first floor elevation of buildings L, N, P, and R varies from four feet to eight feet above the existing ground. The buildings and their patios abut a wetland buffer. The applicant should remember that grading in the buffer is restricted, and if grading is allowed the area must be landscaped using native reparian plant materials. NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 16 The City of Tigard Public Works Department, PGE, and GTE have reviewed this application and have offered no comments or objections. No other comments have been received. SECTION VIII: PROCEDURE AND APPEAL INFORMATION Notice: Notice was posted at City Hall and mailed to: X The applicant and owners X Owner of record within the required distance X Affected government agencies Final Decision: THE DECISION SHALL BE FINAL ON April 22, 1996 UNLESS AN APPEAL IS FILED. Appeal: Any party to the decision may appeal this decision in accordance with Section 18.32.290(A) and Section 18.32.370 of the Community Development Code which provides that a written appeal must be filed with the City Recorder within 10 days after notice is given and sent. The appeal fee schedule and forms are available from the Planning Division of Tigard City Hall, 13125 SW Hall Boulevard, Tigard, Oregon 97223. The deadline for filing of an appeal is 3:30 p.m. on April 22, 1996. Questions: If you have question, please call the City of Tigard Planning Department, Tigard City Hall, 13125 SW Hall Boulevard, Tigard, Oregon at (503)639-4171. Cv�t-i/ 'C-- 2 April 12, 1996 PREPARED BY: Will D'Andrea DATE Assistant Planner i J --/de Z— -`,�,'.�ZSd/7 �� April 12. 1996 AP ROVED BY: Richard Bewersdorff DATE Senior Planner NOTICE OF DECISION SDR 96-0006-Summer Creek Village/Bowen Dvlpmt. Page 17 al Y A 7 / a! ! '10 MCI 'M'S i I . 1 1 .... . Lir ..----..\\ \ ii. _jig 3 \x \ NE Al o J 0 _ . \Atii, lau-M■ i I IL w ' L !I EPJI I 1<(-14.--: 1 1116 1 1111111111 ; I i . a en�I� act . ; i I 0)1 "7 s s.1 '1e •I � s ' �`� I■ �i I I I1° IL 1 IP I . J , ir I o . Mel - me Y Z le la fel Orr U3 k "' JJJ WI IIII 1 Mil .. ...,„„ti, Z . , i MI I u, 11.. ..... ,::•mon ,..., a iii i qi : i in ia.r..,, kr. I I sd 1 CI 1 „„ 1 N z CC I', dz LU la ..1 1 I I I - -`� " , 9 �r ilh I r a i1/ '" �41 L.L. y V o If el I _, i ', a. a" ar a.i . a.1 ■m AO l \ I— M. lin limrmm-'�,-- ---x �A U 3f1N3AV HIM 'M'S 11 li PLOT PLAN CASE NO. SDR96-0006 1 C. EXHIBIT MAP SUMMER BEARD C REEH ROAD APARTMENTS North TIGARD, OREGON nu Min GIMP I Ow=ua•w uxrn..n.n n.vra w�u.. ro.rwno,oucon mw 1 4 , 'i, , ■ 1'0.111 Ma"MIMI Niv r • es . IN t� r .. •• ' � ■A,� rim, F♦ I"i;'C) 4 41 0 -� II iii. W HAV1h<'S i _ � m 0.4011 . 4,:: % loilit.i •e; cis , • 4,,,.. ' -.4:: L. limir f a _ II I- .. .:I. 4.0_ ar ..111 11 **A r : _ ,, log go o Ma 01. •• •• LAKE PSH LN �= A, � , lit — sELL 1 i 1 'cL I f.r a iff / ��� i",► )g � . .- �2 Vicinity Map A SDR 96-0006 Summercreek Village Apts. Note:Map is not to scale N SDR 96-0006 SUMMERCREEK VILLAGE APTS./BOWEN (Page 1/2)49 EXHIBIT B 1 S 133DB-06100 1 S 133DB-05000 BENZ,DOUGLAS R AND DEBRA I BREITBARTH,NIKKI A 11025 SW ESCHMAN WAY 13123 SW WINTERLAKE CT TIGARD,OR 97223 TIGARD,OR 97223 1S133CA-00300 1S133DB-05600 COE,GARY R COLLINS,DOUGLAS ALAN 11115 SW 135TH AVENUE 11074 SW 131ST PL PORTLAND,OR 97223 TIGARD,OR 97223 1S133AC-08000 1S133DB-05500 GRABHORN, BURTON E HALLOCK,PETER M AND DEBRA M 11493 SE 82ND 11090 SW 131ST PL PORTLAND,OR 97266 TIGARD,OR 97223 1S133DB-06301 1S133DB-06400 HUGHES, SHARON/STEPHEN P KARLS,MICHAEL J/TRACIE KENYON 11069 SW ESCHMAN WAY 11081 SW ESCHMAN WAY TIGARD,OR 97223 TIGARD,OR 97223 1 S133DB-05700 1 S133DB-04900 KERNER, PATRICK M AND MYNDEE E LEHNOW,JOSEPH E/LESLIE J 11056 SW 131ST PL 13145 SW WINTERLAKE CT TIGARD,OR 97223 TIGARD,OR 97223 1S133CA-00500 1S133CA-00700 NELSON,GARY R PATSY A NELSON,GARY R A 11295 SW 135TH AVE 11295 S H TIGARD,OR 97223 D,OR 97223 1S133DB-05800 1S133DB-04300 RYMAL,CHARLES D&SUSAN K SCHOLLS FERRY ROAD LLC 11038 SW 131ST PL BY BOWEN FINANCIAL ICES CO TIGARD,OR 97223 111 SW FIFTH ATTN: ER C BOWEN TLAND,OR 97204 1S133DB-04300 1S133CA-00200 SCHOLLS FERRY ROAD LLC SHRADER,DALE G E BY BOWEN FINANCIAL SERVICES CO 310 3RD 111 SW FIFTH AVE UAH,WA 98027 ATTN:WALTER C BOWEN PORTLAND,OR 97204 1S133CA-00100 1S133DB-04800 SHRADER, DALE G TRUSTEE SMITH,BRADLEY D&MARI A 310 3RD AVE NE 13156 SW WINTER LAKE CT ISSAQUAH,WA 98027 TIGARD,OR 97223 1S133DB-05900 1S133DB-00101 STASHIN,TIMOTHY M&CARLA M TIGARD,CIT 11012 SW 131ST PLACE 13125 S ALL TIGARD,OR 97223 PO 23397 GARD,OR 97223 SDR 96-0006 SUMMERCREEK VILLAGE APTS./BOWEN (Page 2/2 EXHIY rT3 '1 S 133CA-00400 1 S 133DB-07200 TIGARD, CITY TIGARD,CITY 13125 S LL 13125 S ALL APO 23397 PO B 23397 ARD, OR 97223 j ARD,OR 97223 1 S133DB-06200 VAKIATHANA, NOOTCHANART BOWEN REAL ESTATE GROUP 11047 SW ESCHMAN WAY 2260 US BANCORP TOWER TIGARD, OR 97223 111 SW FIFTH AVENUE PORTLAND OR 97204 RECEIVE ! COMMUNITY NEWSPAPERS, INC. Legal APR 17 199b P.O. BOX 370 PHONE(503)684-0360 Notice TT 8455 BEAVERTON, OREGON 97075 CITY OF TIGAl Legal Notice Advertising *City of Tigard • ❑ Tearsheet Notice 13125 SW Hall Blvd. •Tigard ,Oregon 97223-8199 • ❑ Duplicate Affidavit •Accounts Payable—Terry • SITE DEVELOPMENT REVIEW/SDR)96-0006 SUMMER CREEK VILLAGE APARTMENTS The Director has approved, subject to conditions, a request for Site Development Review approval to allow the construction of a 19 building, 150 unit multi-family residential development,with a community building AFFIDAVIT OF PUBLICATION and swimming pool.LOCATION: East of S.W. 135th Avenue,south of S.W. Hawk's Beard Street and west of S.W. 131st Place(WCTM 1S1 STATE OF OREGON, ) 33DB,tax lot 4300).ZONE: R-25 (Residential, 25 Units per acre). The COUNTY OF WASHINGTON, )SS. R-25 zone allows single-family attached,single-family detached,duplex I, Snyder residential units, multiple-family residential units, residential care being first Kathy thy sworn, depose and say that I am the Advertisin facilities,mobile home parks and subdivision,public support services, Director,first duly principal clerk, ofd say that I a Tualatin ng mes family day care, home occupation, temporary use, and accessory a newspaper of general circulation as defined in ORS 193.010 structures. APPLICABLE REVIEW CRITERIA: Community and newspaper published general Tigard in the Development Code Chapters 18.56, 18.92, 18.100, 18.102, 18.106, 18.108, 18.150, 18.160 and 18.164. aforesaid county and state; that the "nest ■ �_ -� :Will SDR96-0006 Summer Creek Apts . ��; a printed copy of which is hereto annexed, was published in the Allis■ r i�* * a n .- m0 00 entire issue of said newspaper for ONE successive and „ Igtvio-040 riiiii consecutive in the following issues: a April 11, 1996 g° :� `I/ 4 Iii ; Kcfl \ ji�1;� II MO t � :: Subscribed and swor o before me this 11th day of April , 19-g `• rllt:�����; mom NoPublic for Oregon \,,.. mi III - �.' •' My Commission Expires: ,-.,,,-„ AFFIDAVIT III.a I1111.1,4 VIM -l1. 101111. .il 1 114,11) 04401 I lila 1.1.7St4_A-40:147,7, aniu 111/s — = = NO The adopted finding of facts,decision,and statement of conditions can be obtained from the Planning Department,Tigard Civic Center, 13125 S.W. Hall Blvd.,Tigard,Oregon 97223.The decision shall be final on April 22 1996.Any party to the decision may appeal this decision in accordance with Section 18.32.290(A) and Section 18.32.370 of the Community Development Code, which provides that a written appeal may be filed within 10 days after notice is given and sent. The deadline for filing an appeal is 3:30 P.M.,April 22. 1996. TT8455—Publish April 11, 1996. FAX TRANSMITTAL C DATE: March , 1996 TO: Mary White, Legals (fax)624-0338 FROM: Patricia Lunsford, City of Tigard (Ph.)639-4171 PLACE UNDER CITY OF TIGARD LOGO IN THE LEGALS SECTION SITE DEVELOPMENT REVIEW (SDR) 96-0006 ➢ SUMMER CREEK VILLAGE APARTMENTS Q The Director has approved, subject to conditions, a request for Site Development Review approval to allow the construction of a 19 building, 150 unit multi-family residential development, with a community building and swimming pool. LOCATION: East of SW 135th Avenue, south of SW Hawk's Beard Street and west of SW 131st Place (WCTM 1S1 33DB, tax lot 4300). ZONE: R-25 (Residential, 25 Units per acre). The R-25 zone allows single-family attached, single-family detached, duplex residential units, multiple-family residential units, residential care facilities, mobile home parks and subdivision, public support services, family day care, home occupation, temporary use, and accessory structures. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.56, 18.92, 18.100, 18.102, 18.106, 18.108, 18.150, 18.160 and 18.164. (PLACE VICINITY MAP HERE) The adopted finding of facts, decision, and statement of conditions can be obtained from the Planning Department, Tigard Civic Center, 13125 SW Hall Boulevard, Tigard, Oregon 97223. The decision shall be final on Any party to the decision may appeal this decision in accordance with Section 18.32.290(A) and Section 18.32.370 of the Community Development Code, which provides that a written appeal may be filed within 10 days after notice is given and sent. The deadline for filing of an appeal is 3:30 PM TT PUBLISH DATE: SDR 96-0006 SUMMER CREEK VILLAGE APARTMENTS/BOWEN PROPOSAL/REQUEST FOR COMMENTS --1-4 411 -AvirAv iigji . C• 7)\..0...v5 t V - / li ry,,{/J) ISI33A0600 / f i IS!33CA.00100 2 SW HAWK'S - - ' BEARD C ISISSD B-00900 'I IS IS3CA.00Y0o ' a ISISSD&00000 SI33DB-061•• �� C I33DB-057,, •I33DB-069.• ill - ISIb3D601300 ' ISISSDB-0 • "3D8.. .I M IN I 3DB0.00 $13sDB-o I I33DB-0 00 . Q IS I33CA-00300 CD IS 3008-00IOI IMM ,IkASW Isl3xaa,.00 0 IS 133CA-00300 .USDB-0600 WI. 133D B-OA< IS133C A-00700 IS 13311B-013N3 f 4, c:2 0 73 ,------ )(cxl/A '• LJ Vicinity Map A NOTIFICATION MAP SDR 96-0006/BOWEN N CITY OF TIGARD, OREGON SITE DEVELOPMENT REVIEW APPLICATION CITY OF TIGARD, 13125 SW Hall, PO Box 23397 Tigard, Oregon 97223 - (503) 639-4171 FOR STAFF USE ONLY CASE NO. OTHER CASE NO'S: RECEIPT NO. APPLICATION ACCEPTED BY: DATE: 1. GENERAL INFORMATION Application elements submitted: PROPERTY �AADDRESS/LLO�OCC.A``TII.O�N Gj, 4, I�� mt:14u� (A) Application form (1) W`U/ 4 1✓ l2V 1247. ____(B) Owner' s signature/written TAX MAP AND TAX LOT NO. authorization authorization let✓1 ' �� • P O' 4W I ____(C) Title transfer instrument (1) SITE SIZE 1,4167 pr�z6 (D) Assessor' s map (1) PROPERTY OWNER/DEED HOLDER* iz L.E rAm 6Foor (E) Plot plan (pre-app checklist) ADDRESS 111 ✓ril. Cj A AJ( /jPHONE214 4D (F) Applicant' s statement CITY �PP11464.117 g ZIP 112,0''' (pre-app checklist) APPLICANT* 1.1 _,S6AM zar (G) List of property owners and ADDRESS G. ►'�I Q� �/� PHONE �'' addresses within 250 feet (1) CITY ZIP (H) Filing fee ($ ) *When the owner and the applicant are different (I) Construction Cost Estimate people, the applicant must be the purchaser of record or a leasee in possession with written authorization DATE DETERMINED TO BE COMPLETE: from the owner or an agent of the owner with written authorization. The owner(s) must sign this application in the space provided on page two or FINAL DECISION DEADLINE: submit a written authorization with this application. COMP. PLAN/ZONE DESIGNATION: 2. PROPOSAL SUMMARY The owners of record of the subject property request site development review approval to N.P.O. Number: allow (Dt M)61ldt4 Op ISO MULTI- PAMI� ' t f / , 1 Approval Date: U -,10 1 !'J 1p Final Approval Date: AO/Ay Planning Engineering 0524P/13P Rev'd 5/87 __ 3. List any variance, conditional use, sensitive lands, or other land use actions to be considered as part of this application: 4. Applicants: To have a complete application you will need to submit attachments described in the attached information sheet at the time you submit this application. 5. THE APPLICANT(S) SHALL CERTIFY THAT: A. The above request does not violate any deed restrictions that may be attached to or imposed upon the subject property. B. If the application is granted, the applicant will exercise the rights granted in accordant - with the terms and subject to all the conditions and limitations of the approval. C. All of the above statements and Lhe statements in the plot plan, attachments, and exhibits transmitted herewith, are true; and the applicants so acknowledge that any permit issued, based on this application, may be revoked if it is found that any such statements are false. D. The applicant has read the entire contents of the application, including the policies and criteria, and understands the requirements for approving or denying the application. DATED this day of 19 SIGNATURES of each owner (eg. husband and wife) of the subject property. (KSL:pm/0524P) • CITY OF TIGARD PROPOSAL DESCRIPTION FILE NO: SITE DEVELOPMENT REVIEW (SDR) 96-0006 FILE TITLE: SUMMER CREEK VILLAGE APARTMENTS/BOWEN APPLICANT: Bowen Real Estate Group OWNER: Same 2260 US Bancorp Tower 111 SW 5th Ave. Portland, OR 97204 (503) 274-8400 REQUEST: A request for Site Development Review approval to allow the construction of a 19 building, 150 unit multi-family residential development, with a community building and swimming pool. LOCATION: East of SW 135th Avenue, south of SW Hawk's Beard Street and west of SW 131st Place (WCTM 1S1 33DB, tax lot 4300). ZONE: R-25 (Residential, 25 Units per acre). The R-25 zone allows single-family attached, single-family detached, duplex residential units, multiple-family residential units, residential care facilities, mobile home parks and subdivision, public support services, family day care, home occupation, temporary use, and accessory structures. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.56, 18.92, 18.100, 18.102, 18.106, 18.108, 18.150, 18.160 and 18.164. CIT: West CIT FACILITATOR: List Available Upon Request PHONE NUMBER: (503) DECISION MAKING BODY X STAFF DECISION PLANNING COMMISSION DATE OF HEARING: TIME: 7:30 HEARINGS OFFICER DATE OF HEARING: TIME: 7:00 CITY COUNCIL DATE OF HEARING: TIME: 7:30 RELATIVE COMPONENTS AVAILABLE FOR VIEWING IN THE PLANNING DIVISION X VICINITY MAP LANDSCAPING PLAN X NARRATIVE X ARCHITECTURAL PLAN SITE PLAN X OTHER X STAFF CONTACT: William D'Andrea (503) 639-4171 x315 SDR 96-0006 SUMMER CREEK VILLAGE APARTMENTS/BOWEN PROPOSAL/REQUEST FOR COMMENTS RAR ARCHITECTS INCORPORATED February 9, 1996 Mr. Will D'Andrea Assistant Planner Community Development Department City of Tigard 13125 SW Hall Blvd. Tigard, Oregon 97223 Re: Summer Creek Village Apartments Site Development Review Please find the enclosed application and required documents for the Site Development Review of the Summer Creek Village Apartments. The Citizen involvement process has taken place and a meeting was held on December 6, 1995. There were no significant comments made by the attendees. Documentation of the community meeting has been sent to you under separate cover. Following is a list of materials that are a part of this application: 1. Site Development Review Application 2. 18 sets of drawings 3. Wetland Mitigation Plan 4. Narrative addressing approval criteria 5. Traffic Access Report 6. Addendum to Traffic Access Report 7. Reduced 8-1/2 x 11 Site Plan 8. Application Fee We appreciate your efforts and cooperation in processing this application. If you have any questions or need additional information please contact me. Sincerely, RAR ARCHITECTS INCORPORATED OW tilt 1 Scott A. Reiter Vice President 34 NW FIRST AVENUE, SUITE 206, PORTLAND,OREGON 97209 (503)225-9095 FAX (503)225-9120 /l/arraT ✓e_ ATTACHMENT TO DEVELOPMENT REVIEW APPLICATION Summer Creek Village Apartments Tigard, Oregon The following is brief narrative indicating how the chapter 18.120.180. Approval Standards have been met. Each chapter has been addressed and is as follows: CHAPTER 18.84: SENSITIVE LANDS There is an adjacent dedicated Greenway area to south of the subject site. All proposed development is above the 100 year flood plain elevation and beyond a twenty-five foot setback from the delineated wetland boundary. A Wetland Mitigation Plan prepared for the FieldCrest Court project located on the south side of the Greenway is included with this submittal. CHAPTER 18.94: MANUFACTURED/MOBIL HOME REGULATIONS This does not apply to this proposed development. CHAPTER 18.92: DENSITY COMPUTATION The density calculation for the proposed project is as follows: Gross site Area: 346,995 sf Net site area: 343,807 sf Area per unit: 1,480 sf Total units allowed: 232 The proposed number of units for this development is 150 which is less than that allowed. CHAPTER 18.144: ACCESSORY USE AND STRUCTURES Accessory structures for this project are limited to a mail kiosk. All accessory structures are located with the required setbacks for buildings and do not exceed the allowed area or height.. The garages indicated on the site plan are attached the buildings and are not considered accessory structures. Page 1 CHAPTER 18.96: ADDITIONAL YARD AREA REQUIREMENTS Two additional yard area requirements effect this site. A thirty-foot setback from centerline of 135th avenue is required, and a thirty-foot setback is required along the east property boundary due to the adjacent lower density residential zone (R-12). CHAPTER 18.98: BUILDING HEIGHT LIMITATIONS, EXCEPTIONS The building height of the proposed structures is less than that allowed for the R-25 Zone (45 ft.). None of the limitations or exceptions identified in this chapter apply. CHAPTER 18.100: LANDSCAPING AND SCREENING A detailed landscape plan has been provided with this submittal showing the required street trees, parking lot landscaping, general site landscaping, refuse area screening and swimming pool screening. There are no existing trees or significant vegetation requiring protection. The abutting uses do not require screening. CHAPTER 18.102: VISION CLEARANCE AREAS The required vision clearance area of thirty feet at the intersection of SW 135th Avenue and the proposed SW Hawks Beard Road has been met. The required vision clearance at all driveways has also been met. CHAPTER 18.106: OFFSTREET PARKING AND LOADING Based upon the current requirements of 1.5 spaces for one bedroom units, and 2 spaces for two or more bedroom units, the required number of spaces for the proposed project unit mix is 266 spaces. With the requirement of 15% additional spaces for guest parking, the total required number of parking spaces is 306, which has been provided. The required parking is being provided in several ways. There are 116 units that have an attached garage providing one space, and a private driveway in front of the garage allowing for a seceond space in the same mannor as a single family residence. The remaining 34 units have a normal surface space and a semi-detached garage, providing two spaces per unit. No more than 25%of the required spaces are proposed to be compact. Handicap Accessible parking spaces have been provided as required by chapter 38 of the UBC. Parking stall sizes and drive aisle widths are as required. Page 2 CHAPTER 18.108: ACCESS, EGRESS, AND CIRCULATION • Three ingress/egress are proposed for the Summer Creek Apartments, one on SW 135th Avenue and two on the proposed extension of SW Hawks Beard Road. These access points have been analyzed and documented in the Traffic Access Report included with this submittal. The report concludes that, "this development will not have an impact of service at the proposed site access intersections during either AM or PM peak hours". Internal circulation has been preliminary reviewed and approved by the fire Marshall's office. They were asked to review and comment on turning radii and turn around requirements. CHAPTER 18.114: SIGNS The proposed identity signage for this project will consist of a lawn sign within the size limitations identified for exempt signage. Building identification signage will be mounted directly onto the structure. The size limitations will be well with the guideline identified in this chapter. Final signage designs will be submitted for permitting and approval. CHAPTER 18.150: TREE REMOVAL There are no existing trees that proposed to be removed on the subject property. CHAPTER 18.164: STREET AND UTILITY IMPROVEMENT STANDARDS Adjacent street improvements are not proposed or required for SW 135th Avenue. However,the Traffic Access Report has indicated that a left turn refuge in SW 135th Avenue will be necessary. Sufficient street width exists to accomplish this by striping the existing paved surface. Street and storm drainage improvements are proposed for SW Hawks Beard Road within an existing dedicated right-of-way. This will complete SW Hawks Beard Road from its present terminus at SW 131st Place west to SW 135th Avenue. Also, Half street improvements are proposed for SW 131st Place, which will bring the street up to city standards. Sanitary sewer service will be extended into the project from an existing public main south of the SW 131st Place cul-de-sac. A private internal sanitary sewer system is proposed. A private storm drainage system is proposed to collect and dispose of roof and parking area systems. Bio-filtration facilities will be provided prior to discharge in accordance with City of Tigard and Unified Sewerage Agency requirements. Page 3 Water system improvements will be extended from existing Tigard Water District mains in SW Hawks Beard Road and in SW 135th Avenue. Public mains sized for fire flows and domestic service are proposed within the site. Buildings will be serviced and metered separatley off the public mains. Fire hydrants have been provided at strategic locations within the site. 9557/55723004 Page 4 • ADDENDUM TO 4 ACCESS REPORT Summer Creek Village Apartment Project (Formerly Known As Palomino Pointe) Tigard, Oregon Prepared for: • Bowen Real Estate Group 111 SW 5th Avenue, Suite 2260 Portland, OR 97204 • January, 1996 DAVID EVANS AND ASSOCIATES,INC. A PROFESSIONAL SERVICES CONSULTING FIRM OFFICES IN OREGON,WASHINGTON,CALIFORNIA AND ARIZONA 2828 S.W.CORBETT AVENUE PORTLAND,OREGON 97201-4830 (503)223-6663 FAX(503)223-2701 A A4FRt.1Af'D!\f:CITI All) A TI I,:C I'D I I!f.n n“-t.1•0•-•r-c- BACKGROUND t In October 1994, David Evans and Associates, Inc. (DEA) prepared an access report for the Palomino Pointe development for Bowen Real Estate Group. The Palomino Pointe development was proposed to be located east of SW 135th Avenue and south of the proposed extension of Hawk's Beard Road, and the access report was based upon the development containing a total of 160 apartment units. The access report analyzed the following three traffic conditions: 1. Background traffic condition with the proposed Hawk's Beard Road extension. i&I This included the current traffic, the traffic generated by the approved but not yet completed project(s) within the study vicinity, and the traffic diverted to the study area due to the Hawk's Beard Road extension. At the time of preparation of the 1994 report,only one project had been approved and under construction, which had 150 lots located south of Walnut Street and west of SW 135th Avenue. 2. Background and site traffic condition. This included the above identified background traffic plus the traffic generated by the proposed development. This traffic condition was assessed to identify the impact of the proposed Palomino Pointe development. 3. Total traffic conditions. This condition was evaluated assuming the proposed developments or potential development(s) within the study area will be developed. These developments included (i) a development of 50 apartment units, located east • of SW 135th Avenue between Summer Creek and Brittany Drive; (ii) a shopping center located south of SW Scholls Ferry Road/SW Old Scholls Ferry Road between SW 135th Avenue and SW Scholls Ferry Road; and(iii)a currently vacant parcel bounded by SW Scholls Ferry Road on the north, Hawk's Beard Road on the south, SW 135th Avenue on the west. and SW 130th Avenue on the east. According to the City, this vacant parcel. currently zoned as multifamily, can be developed with a maximum of 380 apartment units. PROPOSED DEVELOPMENT The number of apartment units in this proposed development, now named Summer Creek Village, has been reduced to 150 units. Due to the change in the number of proposed units a reassessment of the traffic impacts on the surrounding street system and any measures which will improve the traffic operations to mitigate any adverse impacts is prepared. 1 TRIP GENERATION In the October 1994 report, a total of 160 apartment units was expected to generate an • average weekday two-way traffic volume of 1,000 trips, with 82 total trips in the AM peak hour and 99 total trips in the PM peak hour. With the currently proposed 150 unit development a total of 935 daily trips is expected, with 77 total trips during the AM peak hour and 93 total trips during the PM peak hour. Trips to be generated by the currently proposed development were calculated using The Institute of Transportation Engineers' Trip Generation (5th Edition). CAPACITY ANALYSIS Since traffic generated by the currently proposed development will be slightly less, the conclusions and recommendations made in the access report in October 1994 for 160 apartment units are still valid. The capacity and level of service(LOS)calculations were performed for the above three traffic conditions in the October, 1994 `access report'. The results of the LOS calculations indicated that the intersection of the two proposed site access points with SW Hawks Beard Road would operate at LOS A for the `background and site' and the `total' traffic conditions. At the intersection of SW 135th Avenue and the proposed site access, for the `background and site' traffic condition,the left turns from SW 135th Avenue would operate at LOS A and the vehicle movements from the site access approach would operate at LOS B during the AM peak hour and LOS A during the PM peak hour. The `total' traffic condition at the intersection of SW 135th Avenue and the site access would include the approach to a shopping center to be located directly across from the site access approach at its intersection with SW 135th Avenue. For the `total' traffic condition at the site access approach on SW 135th Avenue, the left turns from SW 135th Avenue are estimated to operate at LOS A during the AM and PM peak hours, the site access approach is estimated to operate at LOS C during the AM and PM peak hours, and the shopping center access is estimated to operate at LOS C during the AM peak hour and LOS D during the PM peak hour. With the reduction of the number of apartment units in the Palomino Pointe development from 160 to the currently proposed 150 units, it is estimated that the three site access intersections with SW 135th Avenue and Hawks Beard Road would operate at a LOS D or better for all three traffic conditions. LEFT TURN LANE REQUIREMENT The left turn lane requirement at the proposed site access on SW 135th Avenue was evaluated using the ODOTs traffic volume warrants for left turn refuges. It was found that a southbound 2 • left turn refuge on SW 135th Avenue at the proposed site is required during the PM peak hour. The required vehicle queue length for this left turn refuge is 75 feet. At the other two proposed site access locations, left turn refuges are not warranted based on the traffic volumes. (F)))0 _1(f-i) BLM/MDB\Ish\rara0002\accssrpt.doc 3 • RECEIVED PLANNING NOV 201995 Name of applicant Bowen Real Estate Group • Subjec Property: Tax Map and Lot # 1S1 33DB Tax Lot 4300 'Address cr General L.^catlon East side of SW 135th, south of Scholls Ferry Road AFFIDAVIT OF POSTING NOTICE I. Nancy T. Hubbard , do affirm that I aCrtf (represent) the party Initiating :merest Ina proposed garden apartment complex affecting the land located at SW 135th, south of Scholls Ferry , and did on the 1 t h day of November , 19 95 personally post notice indicating that. the site may be proposed fora Design Review/p l a n n i n g application, and the time, date and place cf a neighborhood meeting to tiles the proposal. Tile sign was posted at Approximately 70 feet north of Summer Creek bri dge. R feet back from side- (smote ictation ort property) walk, facing SW 135th This 17 day cf November , 19 5 —' 2-7 Signature SLfiso+zbed and sworn to, affirmed, before me this 1 7 f� day of 12 e , 19 C/ _" ,"1:11.1\ OFFICIAL SEAL p�,�� 11" ZILDA HEUSINKVELD Notary Public for the State of Oregon NOTARY PUBLIC-OREGON Commission Fires• �(� COMMISSION N0.015334 My MY COMMISSION EXPIRES MAY 13,1:396 WITHIN SEVEN (7) CALENDAR DAYS OF THE SIGN POSTING, RETURN THIS AFFIDAVIT TO: City of Tigard Planning Division 13125 SW Hall Blvd. Tigard, OR 97223 locrt w� • AFFIDAVIT OF MAILING STATE OF OREGON SS CITY OF TICR0 i� Nancy T_ Hubba rd , being duly sworn, depose and say that on November 1 7 , 19 9 5 , I caused to have mailed to each of the persons on the attached list a notice of a meeting to discuss a proposed development at gW 1 , south Qf Ss'halls FQrry Rd , a copy of which notice so mailed is attached hereto and made a part of hereof. I itirther state that said notices were enclosed in envelopes plainly addressed to said persons and were deposited on the date indicated above in the United States Post Office at 5th Ave, Portland , with postage prepaid thereon. Signature _- Subscribed and sworn to before me this / 7'7'`' day of 72O , 19 OFFICIAL SEi.L ZiLDA HEUSINKVELD NOTARY PUBLIC-OREGON Notary Public COMMISSION NO.015334 MY COMMISSION EXPIRES MAY 1:.19'35 My Commission Expires: 5 �3 � h:\Icri n\jo\aifmaii.cit Fl BOWEN Bowen Financial Services Corp. H®l REAL ESTATE Bowen Development Company Bowen Property Management Co. • u❑❑ GROUP Bowen Senior Living Bowen Securities Company November 20, 1995 • TO: Property Owner FROM: Jim Ekberg, Bowen Real Estate Group RE: Proposed 150 unit garden apartment project on the east side of SW 135th, south of SW Scholls Ferry Road Dear Property Owner, We are the owner of the property located along the east side of SW 135th,just south of Scholls Ferry Road in Tigard (Tax Map and Lot# 1 S 1 33DB 4300). We are planning the development of a 150 unit garden apartment complex on the northerly portion of this site. Prior to applying for permits with the City of Tigard, we would like to have the opportunity to discuss our plans and answer any questions that the surrounding property owners may have. You are invited to attend a meeting on: 7:00 p.m. Wednesday, December 6, 1995 City Hall, Red Rock Creek Conference Room 13125 SW Hall Blvd. Tigard, OR 97223 This will be an informal meeting on our preliminary plans. I look forward to the opportunity to discuss the details of our project with you. Please call me or Nancy Hubbard at (503) 274-8400 if you have any questions prior to the meeting. Sincerely, MEETING LOCATI N MAP: 9Ikherg R. } 01; tS ) \\: t hAkt. /\-% • 22b0 C.S. Bancorp Tower • 111 S.W. Fifth Avenue ■ Portland, Oregon 97204 u (503) 274- 400 voice • (503) 274-4685 fax z�� ,� `�I I �r�. FED, 40 x• ift i . iipPit } V•*—• *Apo ��1�� 1- �IlSy�.j9 w iAWK'$ 9�m• S�, wow O C =_= = _= .:-- ____ _ z=_- 1 on CD atticamatitzmi- w vio V • Has===__ mss_=n_5=== t.." s� sa=ssrsassaa_s=s�aasaeemcras�- *tia1� . \ E-_=e=== a__ n°== _-__= 4/re.�,, MiMER LAKE a. ===�_4z-�, �� Cl — T if FMELD ' 4 ,,...:IOW �� • BRIDGEVIEW CT a a I r A"FA —.0 • 4■A■*5:. ITT ANY Ipp•— ... illit V" . :u-- L ti' tuH4 H.—=*1 itiO°. C941 Air ��u�u ► R9 ���� ��� gnu O:it4 J.4 2 —pow ,.., -uuuu :� •.�� r vn QW . LA tj-MONT u- /4W —ALC..N 1 ii C7 I I I I �I 11 1 1 � I I �� U I i 1 I1 l DAVID EVANS AND ASSOCIATES,INC.,. -. 1-..i: ''':vdr . .. .., „,..,.-i,-, . . , ._. s,,.... 7 ‘ ...- ‘:\:,..,..‘,.'„.:..44,,,,::,,,,,..,,..%, ' ... .›...41. 4 Traffic Access Report _ i; Palomino Point Apartments Tigard, Oregon DAVID EVANS AND ASSOCIATES,INC. ( gDa TRAFFIC ACCESS REPORT Palomino Point Apartments Tigard, Oregon PR op c, a1N f ' � 157w • ��,r(,�►.1994 Prepared for: The Bowen Real Estate Group 111 SW 5th Avenue, Suite 2260 Portland, Oregon 97204 October 20, 1994 DAVID EVANS AND ASSOCIATES,INC. A PROFESSIONAL SERVICES CONSULTING FIRM OFFICES IN OREGON,WASHINGTON,CALIFORNIA AND ARIZONA 2828 S.W.CORBETT AVENUE PORTLAND,OREGON 97201.4830 • (503)223-6663 FAX(503)223-2701 TABLE OF CONTENTS Page INTRODUCTION 1 DESCRIPTION OF SITE 2 SURROUNDING ROADWAYS 3 SW 135th Avenue 3 SW Hawk's Beard Road 3 SW 130th Avenue 3 Background Traffic 4 UUIJ Proposed Site Generated Traffic 6 Trip Generation 6 Site Traffic Distribution and Assignment 6 Background and Site Traffic 7 Total Traffic 7 Traffic Operations 7 CONCLUSIONS 11 • i LIST OF TABLES No. Title Page 1. Traffic Generated by Other Approved Development 5 2. Estimated Site Generated Traffic 6 3. Level of Service Criteria for STOP- or YIELD-Sign-Controlled Movements or Movement Groups 8 4. Estimated Levels of Service 9 '71101 LIST OF FIGURES Follows No. Title Page 1. Vicinity Map 2 2. Current Traffic Volumes without Hawk's Beard Road Extension 4 3. Traffic Volumes Generated by Other Approved Development 5 4. Current Traffic Volumes with Proposed Hawk's Beard Road Extension 6 5. Background Traffic Volumes 6 6. Site Traffic Volumes 6 7. Background and Site Traffic Volumes 7 8. Traffic Generated by Other Proposed Developments 7 9. Total Traffic Volumes 7 ii INTRODUCTION This Traffic Access Report addresses the traffic impact of the proposed Palomino Point Apartments. The purpose of this access report is to calculate the amount of traffic generated by the proposed development, to distribute and assign this site traffic to the surrounding street system, to estimate how this site traffic will affect the traffic operations on the surrounding street system and to recommend measures that will improve the traffic operations to mitigate any adverse impacts, if necessary. 1 0:\pe jen\v\w t.000l T.o ..,p, DESCRIPTION OF SITE The proposed Palomino Point Apartments site is located east of SW 135th Avenue and south of the proposed extension of Hawk's Beard Road, as shown in Figure 1. This development will contain 160 apartment units. Access to the site will be provided to SW 135th Avenue and the proposed extension of Hawk's Beard Road, as also shown in Figure 1. 2 o:IptqleaWavim00111"oorespt LEGEND • 4/}. ARTERIAL 0 150 300 450 --- MINOR COLLECTOR FEET LOCAL STREET ----- PROPOSED EXTENSION p-D)g__)c-f:- OF HAWK'S BEARD RD. DAVID Y.V ANS AND ASSOIIO ATVD INC. R°• RR� C1k°L},S FE 5� S I I w > R° I a S RR� I o M Rtiti -'° sc � I o� 4 " AI . El M., .. . .. .AN SW HAW. ' BE;:D RD. 8: " 'Z'� o« � a Z 4. I:I: : .: SIT. : •• - I• „, IdROPOSE. . . • . . - SR .'Acc S.. :i , t•• i i. . i I I FIGURE 1 VICINITY MAP SURROUNDING ROADWAYS In addition to the site access, Figure 1 also displays the surrounding roadways serving the site area. SW 135th Avenue SW 135th Avenue is classified as a minor collector by the City of Tigard. South of SW Scholls Ferry Road, this road has one travel lane in each direction with sidewalks provided on both sides. The roadway width at the proposed site access was measured to be (p)--5 approximately 39 feet with a 6 foot sidewalk on both sides. The posted speed limit on SW 135th Avenue south of SW Scholls Ferry Road is 40 mph. SW 135th Avenue will provide direct access to the proposed site. SW Hawk's Beard Road SW Hawk's Beard Road is classified as a local street by the City of Tigard. This road starts at the intersection with SW Summer Lake on the east, intersects with SW 130th Avenue, and ends approximately 200 feet west of SW 130th Avenue. The roadway width is approximately 30 feet with sidewalks provided on both sides adjacent to the newly developed residential homes. This road is planned to be extended west to connect with SW 135th Avenue by the time the proposed development is completed. The proposed development will have two access points on this road extension (see Figure 1). SW 130th Avenue SW 130th Avenue is classified as a minor collector by the City of Tigard. This road provides access to the residential areas south of SW Scholls Ferry Road between SW 135th Avenue and SW Summer Lake. Currently, this road has a total roadway pavement width of approximately 16 feet and the pavement itself is in very bad condition. According to City staff, this road will be improved in the near future. 3 o:project\a wv,001n. ..apt TRAFFIC ANALYSIS In this report, three traffic conditions were analyzed: (1) background traffic condition with the proposed Hawk's Beard Road extension; (2) background and site traffic condition; and (3) total traffic condition. For this access report, the impact of the proposed site on the traffic operations at the proposed site access intersections was addressed. The background traffic condition with the proposed Hawk's Beard Road extension is the condition with current traffic, the traffic generated by the approved yet uncompleted project(s) within the study vicinity (called "added" background traffic) and the traffic diverted to the study area due to the Hawk's Beard Road extension. Currently, only one project has been approved and is under construction. This particular project will have 150 lots located south of Walnut Street and west of SW 135th Avenue. The traffic condition with the above identified background traffic plus the traffic generated by this proposed development is called background and site traffic condition. This traffic condition was assessed to identify the impact of the proposed Palomino Point Apartments. Finally, total traffic condition was evaluated assuming the proposed development or potential development(s) within the study area will be completed. These developments include (1) 50 apartment units, located east of SW 135th Avenue between Summer Creek and Brittany Drive; (2) a shopping center located south of SW Scholls Ferry Road/SW Old Scholls Ferry Road between SW 135th Avenue and SW Scholls Ferry Road; and (3) a currently vacant parcel bounded by SW Scholls Ferry Road on the north, Hawk's Beard Road on the south, SW 135th Avenue on the west, and SW 130th Avenue on the east. According to the City of Tigard, this vacant parcel that is currently zoned as multifamily can be developed with a maximum of 380 apartment units. Background Traffic Current traffic volumes on SW 135th Avenue south of SW Scholls Ferry Road were provided by the City of Tigard and Washington County. These AM and PM peak hour traffic volumes are summarized in Figure 2. The traffic generated by the 150 lot development currently under construction was estimated using the trip generation information contained in the ITE Trip Generation Report, Fifth Edition. The calculation summary sheets are contained in Appendix A. The following table summarizes the trip generation of this development. 4 o: a\w\wreoorn.coo.apt 0 75 150 225 misim FEET GqR DAVID EVANS AND ASSIX)IATES•INC. I W v :rA=x w SW HAWK'S o ,.¢ BEARD RD. a . w F ,. o 4, 1 SITE • PROPOSED. •. • SITE ACCESS LEGEND FIGURE 2 350 a AM PEAK HOUR VOLUME (525) = PM PEAK HOUR VOLUME CURRENT TRAFFIC VOLUMES WITHOUT HAWK ' S BEARD ROAD EXTENSION TABLE 1 TRAFFIC GENERATED BY OTHER APPROVED DEVELOPMENT AM Peak Hour PM Peak Hour Project 24-Hour In Out In Out 150 Lot Development 1,500 30 85 100 55 �((6,� The distribution of the traffic generated by this housing development was based on the select zone assignment conducted by Washington County using the EMME/2 regional traffic forecasting model. The following summarizes this distribution pattern: • 50 percent to and from SW Scholls Ferry Road east • 20 percent to and from SW Scholls Ferry west • 30 percent to and from SW Walnut Street The assignment of this traffic to the road network within the study area is shown in Figure 3. 5 o:\project\w\wIea001Trocew.Ipt s vti'vuvu(SV c T 'n rnt:CTVTS:rur Tckn1 nc.r r..nccnror r.c Q 0 75 150 225 ■■11 FEET ic= g=)a DAVID EVANS AND ASSOCIATPCINI'. ,C1 rfl ► . w : .w SW HAWK'S rn :� • •. BEARD RD. ' o.' • . : : . •Q • . • o o a 2. H H � ► ► ° SITE . .;,: . . PROPOSED. .. SITE ACCESS LEGEND FIGURE 3 20 - AM PEAK HOUR VOLUME (70) - PM PEAK HOUR VOLUME TRAFFIC VOLUMES GENERATED BY OTHER APPROVED DEVELOPMENT Figure 4 shows the current traffic plus the traffic diverted to the study area due to the proposed Hawk's Beard Road extension. Figure 5 shows the background traffic, which includes the current traffic, the traffic generated by the approved 150 lot development, and the diverted traffic due to the Hawk's Beard Road extension. Proposed Site Generated Traffic Trip Generation The traffic, which would be generated by the proposed Palomino Point Apartments, was estimated using the trip generation information contained in the ITE Trip Generation Report, Fifth Edition. The calculation summary sheet is contained in Appendix A. The following table summarizes this trip generation. TABLE 2 ESTIMATED SITE GENERATED TRAFFIC AM Peak Hour PM Peak Hour Project 24-Hour In Out In Out Palomino Point 1,000 14 68 67 32 As indicated in the above table, the proposed Palomino Point Apartments was estimated to generate 1,000 daily vehicle trips with 82 vehicle trips during AM peak hour (14 in and 68 out) and 99 vehicle trips during PM peak hour (67 in and 32 out) on a typical weekday. Site Traffic Distribution and Assignment The distribution of the proposed Palomino Point Apartments generated traffic was made using the same distribution pattern as identified above. The assignment of the traffic generated by this proposed Palomino Point Apartments was made on the basis of the above identified distribution pattern and shown in Figure 6. 6 a:projea aaAwV0001 ...a cv 0 75 150 225 o � FEET Lc) 10 (10) id,' 10 (5) �VvV DAVID EVANS AND A.450CIATLKINC. ! .' • rn • .cam .w BEARD RD. W ' 0 13 o • • a H . w . H • • : : •SI•T•E . •:: . ::. . . : .:. . .' . ::' . 1 • PROPOSED.• SITS ACGESS. ' . • X "r- C LEGEND FIGURE 4 360 - AM PEAK HOUR VOLUME CURRENT TRAFFIC VOLUMES (530) - PM PEAK HOUR VOLUME WITH PROPOSED HAWK ' S BEARD ROAD EXTENSION '41k 6 _ a' `n 0 75 150 225 �n -4 0 L.0 FEET 7 ---- 10 (10) C J gR to �' (5) DAVID Y.VANS AN A.SSp('IATI:SINI'. f______ SW HAWK'S ' BEARD RD. •.ca in'. : . • ' . w ' ' E-■ v. o : _ . • . . . . . .. , .S.I•T. N', . . . . • • .. • • • • '• .•4 PROPOSED. 4 '•SITE AC' ES;S• .: • ' . '. - d - i 03 E- U) CO LEGEND FIGURE 5 380 = AM PEAK HOUR VOLUME (530)- PM PEAK HOUR VOLUME BACKGROUND T R A F F I C VOLUMES i ^ 0 75 150 225 -;31.. FEET 15 (8) 8) S (2) DAVID EVANS AND ASSDCIAThSINC. "V--1 (8) (12) 3 • • SW HAWK'S BEARD RD. 1 •Q• U to '0 •-� • " : • • : .S.I'T. : .': . .:. : 24 (11) . • • PROPOSED' . . SITE :ACCESS: .• •• : '. ..' • I I LEGEND FIGURE 6 5 - AM PEAK HOUR VOLUME (24) - PM PEAK HOUR VOLUME SITE TRAFFIC VOLUMES Background and Site Traffic The background and site traffic was obtained by adding the above assigned Palomino Point Apartments generated traffic to the background traffic, as shown in Figure 5. Figure 7 shows the background and site peak hour traffic volumes. Total Traffic The traffic generated by the above-proposed developments and the potential development was estimated using the trip generation information contained in the ITE Trip Generation ��� Report, Fifth Edition. The distribution and assignment of the traffic generated by both the 50 unit and estimated 380 unit apartment developments were performed using the above identified distribution pattern. The distribution and assignment of the traffic generated by the proposed shopping center west of SW 135th Avenue were based on the distribution and assignment information contained in the May, 1991 report, titled Traffic Impact Study, 135th Avenue and Scholls Ferry Road, conducted by Carl Buttke Inc. The final total assignment of the traffic generated by these three developments is shown in Figure 8. Finally the total traffic was calculated by adding the traffic generated by these developments to the background and site traffic, as shown in Figure 7. Figure 9 shows the peak hour total traffic volumes. Traffic Operations The capacity and level of service calculations were performed for the three traffic conditions: (1) background traffic condition; (2) background and site traffic condition; and (3) total traffic condition. Level of service is described by grades A through F, with A describing the best level and F describing extreme congestion and failure of the system. Level of service D is generally considered an acceptable condition in urban areas. At a STOP-sign-controlled intersection, level of service is defined in terms of reserve capacity or unutilized capacity. Table 4 describes the level of service criteria contained in the 1985 Highway Capacity Manual (HCM) for STOP- or YIELD-sign-controlled movements or movement groups. 7 cOproject oir.�....a 'o 0 75 150 225 co co rn FEET co \ 25 (18) -f-23 (17) C )� — 10 (5) 0 (0) ��20 (15) DAVID EVANS AND A.S90CIATI�SINC. — �^ - 1 (8) • (12) .3 fi —�23j 10 -� , SW HAWK'S BEARD RD. O co • ' '24' (11) ': • • ' .PROPOSED • • . • . , . S•ITF: ACCE$ LEGEND FIGURE 7 380 = AM PEAK HOUR VOLUME (600) = PM PEAK HOUR VOLUME BACKGROUND A N D SITE TRAFFIC VOLUMES 1O O ED 0 75 150 225 cv�v F�� �24 15 (5) p-)) 1 U�U (10) _•` 45 (20) DAVID EV ANS AND A.SSDCIATY_ti1NC. (65) 5O J/ _ _ — — — - — — — — — — — — — — — — (20) 20 �,, : SW HAWK'S BEARD RD. � • . . .• a .w S:IT • °OI • . • PROPOSED SITE A C) SS.. • . 411 .81731/4 • : . .: . . : xI . HI LEGEND FIGURE 8 20 = AM PEAK HOUR VOLUME (120) = PM PEAK HOUR VOLUME TRAFFIC GENERATED BY OTHER PROPOSED DEVELOPMENTS Alk i Loin in / 0 75 150 225 'no l FEET cn o.--I ;4C 40 (23) §)), g a/L/Ir (5) =-`68 (37) l �--. ---3g ('S) 0 (0) x-65 (3pp5) DAVID EVANS AND ASSOCUTFSINC. (65) 50_21 (73)-28=i.=- -. --. (--70)-2-----,�- ----\, (5) 5 —�- Vu23 .(3) 1 SW HAWK'S (20) 20 . corn . .-a BEARD RD. CV r) - H _ U ' O �I • d • • .. S.7.I. a •E - I:TE •.• : U : . ..p, .E .•.: :.••.• r 21 (10) :PROPOSED , (70) 15� . ( .SITE: ACCESS-.. : ..' : :'.. . (25) 5 ----`4s, o . • w om� x1.. ev F If' I LEGEND FIGURE 9 20 = AM PEAK HOUR VOLUME TOTAL TRAFFIC VOLUMES (120) - PM PEAK HOUR VOLUME TABLE 3 LEVEL OF SERVICE CRITERIA FOR STOP- OR YIELD-SIGN-CONTROLLED MOVEMENTS OR MOVEMENT GROUPS • Level of Reserve Expected Delay to Service Capacity* Sign Controlled Traffic A Over 400 Little or no delay B 300-399 Short traffic delays 200-299 Average traffic delays D 100-199 Long traffic delays E 0-99 Very long traffic delays F less than 0 Extreme traffic delays *Passenger cars per hour Table 5 contains the levels of service calculated using the computer software NCAP, which was based on the procedures contained in the 1985 HCM. The detailed capacity and level of service calculation summary sheets are contained in Appendix B. 8 D:\1fc cd\M\Mlso00I7.c ..ep 111\I T 0 TUC CTDITI:CIC TC 1\II\C I I I ICI\DPC!\I'OCCC TABLE 4 ESTIMATED LEVELS OF SERVICE Background Background Total and Site AM PM AM PM AM PM SW 135th Avenue and Site Access N/A(1) N/A AB(2) A/A A, A/C,C A, A/C,D(3) Hawk's Beard Road and West Site Access N/A N/A A/A A/A A/A A/A Hawk's Beard Road and East Site Access N/A N/A A/A A/A A/A A/A Note: (1) N/A = Not applicable (2) A/B = Level of service A for left turn on main street and level of service B for traffic movements from minor street. (3) A,A/C,D = Level of service A and A for both left turn movements on SW 135th Avenue, level of service C for traffic movements from the proposed site access and level of service D for traffic movements from the proposed shopping center access. As indicated in Table 5, this proposed site will not have an impact on the levels of service at the site access intersections during either the AM or the PM peak hours. With the other proposed or potential developments, traffic movements or movement groups were estimated to operate at level of service D or better during both AM and PM peak hours. At the intersection of SW 135th Avenue and proposed site access/proposed shopping center access, the traffic to and from the proposed site access was estimated to operate at level of service C and A respectively during both the AM and the PM peak hours with the total traffic. 9 O:prric[Y\w\w 01 7.«n...qx 1 11FURFU nc c 1 n - •n..•cmn.m.r.r mr...n.•.......................,, At the other two proposed site access intersections with the proposed Hawk's Beard Road extension, the traffic from and to the proposed site access was estimated to operate at the highest level of service or level of service A during both the AM and the PM peak hours with the total traffic. Left Turn Lane Requirement The left turn lane requirement at the proposed site access on SW 135th Avenue was evaluated using the ODOT's traffic volume warrants for left turn refuges. It was found that a southbound left turn refuge on SW 135th Avenue at the proposed site is required during the PM peak hour. The required vehicle queue length for this left turn refuge is 75 feet. As mentioned earlier, SW 135th Avenue currently has a pavement width of 39 feet, which JH is enought to accommodate a left turn refuge. At the other two proposed site access locations, left turn refuges are not warranted based on the traffic volumes. 10 c:�oj.awwrd10171.om....a IIVAIR1:V T\V TIIF l'TD1TFf.lr TVVit fIE\I t ICi\pvcr wVf CC CONCLUSIONS The proposed Palomino Point Apartments is expected to generate 1,000 daily two-way vehicle trips with 82 vehicle trips during the AM peak hour and 99 vehicle trips during the PM peak hour. This proposed development will not have an impact on the levels of service at the proposed site access intersections during either the AM or the PM peak hours. Traffic from and to the proposed site at all three site access points will operate at level of service C or better during both AM and PM peak hours even with the other proposed or potential developments in the study vicinity. At the proposed site access on SW 135th Avenue, the southbound left turn traffic to the proposed site will warrant a left turn refuge during the PM peak hour. This refuge requires a storage length of 75 feet. Currently, there is enough street width to accommodate this left turn refuge. 11 o:Npmjea r000iT.�...� APPENDIX A TRIP GENERATION CALCULATIONS WLSN0017 SUMMARY OF TRIP GENERATION CALCULATION FOR 150 DWELLING UNITS OF SINGLE FAMILY DWELLINGS 10/10/94 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION FACTOR VOLUME AVG WKDY 2-WAY VOL 10 . 00 0 . 00 1 . 00 1499 7-9 AM PK HR ENTER 0 . 20 0 . 00 1 . 00 30 7-9 AM PK HR EXIT 0 . 57 0 . 00 1 . 00 85 7-9 AM PK HR TOTAL 0 . 76 0 . 00 1 . 00 115 4-6 PM PK HR ENTER 0 . 67 0 . 00 1 . 00 101 4-6 PM PK HR EXIT 0 . 36 0 . 00 1 . 00 54 4-6 PM PK HR TOTAL 1 . 04 0 . 00 1 . 00 156 SATURDAY 2-WAY VOL 10 . 78 0 . 00 1 . 00 1617 PK HR ENTER 0 . 55 0 . 00 1 . 00 82 PK HR EXIT 0 .46 0 . 00 1 . 00 70 PK HR TOTAL 1 . 01 0 . 00 1 . 00 151 SUNDAY 2-WAY VOL 8 . 71 0 . 00 1 . 00 1307 PK HR ENTER 0 .48 0 . 00 1 . 00 72 PK HR EXIT 0 .48 0 . 00 1 . 00 72 PK HR TOTAL 0 . 96 0 . 00 1 . 00 144 Note : A zero rate indicates no rate data available The above rates were calculated from these equations : 24-Hr. 2-Way Volume : LN (T) = . 921LN(X) + 2 . 698 , RA2 = . 96 7-9 AM Peak Hr. Total : LN (T) = . 867LN(X) + . 398 R"2 = . 89 , . 26 Enter, . 74 Exit 4-6 PM Peak Hr. Total : LN (T) = . 902LN(X) + . 528 RA2 = . 92 , . 65 Enter, = . 35 Exit AM Gen Pk Hr. Total : LN(T) = . 858LN(X) + .464 RA2 = . 89 , . 26 Enter, .74 Exit PM Gen Pk Hr. Total : LN(T) = . 892LN(X) + . 59 R&2 = . 91 , . 65 Enter, . 35 Exit Sat . 2-Way Volume: T = 9 . 217 (X) + 234 . 586, RA2 = . 93 Sat . Pk Hr. Total : T = . 871 (X) + 20 . 759 R '2 = . 9 , . 54 Enter, .46 Exit Sun. 2-Way Volume: T = 8 . 881 (X) + -25 . 166, R"2 = . 94 Sun. Pk Hr. Total : T = . 761 (X) + 29 . 705 RA2 = . 88 , . 5 Enter, .5 Exit Source : Institute of Transportation Engineers WLSN0017 SUMMARY OF TRIP GENERATION CALCULATION FOR 102 DWELLING UNITS OF SINGLE FAMILY DWELLINGS 10/13/94 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION FACTOR VOLUME AVG WKDY 2-WAY VOL 10 .30 0 . 00 1 . 00 1051 7-9 AM PK HR ENTER 0 . 21 0 . 00 1 . 00 21 7-9 AM PK HR EXIT 0 . 60 0 . 00 1 . 00 61 7-9 AM PK HR TOTAL 0 . 80 0 . 00 1 . 00 82 4-6 PM PK HR ENTER 0 . 70 0 . 00 1 . 00 71 4-6 PM PK HR EXIT 0 . 38 0 . 00 1 . 00 38 4-6 PM PK HR TOTAL 1 . 08 0 . 00 1 . 00 110 SATURDAY 2-WAY VOL 11 . 52 0 . 00 1 . 00 1175 PK HR ENTER 0 . 58 0 . 00 1 . 00 59 PK HR EXIT 0 .49 0 . 00 1 . 00 50 PK HR TOTAL 1 . 07 0 . 00 1 . 00 110 SUNDAY 2-WAY VOL 8 . 63 0 . 00 1 . 00 881 PK HR ENTER 0 . 53 0 . 00 1 . 00 54 PK HR EXIT 0 . 53 0 . 00 1 . 00 54 PK HR TOTAL 1 . 05 0 . 00 1. 00 107 Note : A zero rate indicates no rate data available The above rates were calculated from these equations : 24-Hr. 2-Way Volume : LN (T) = . 921LN(X) + 2 . 698 , RA2 = . 96 7-9 AM Peak Hr. Total : LN(T) = . 867LN(X) + .398 RA2 = . 89 , . 26 Enter, . 74 Exit 4-6 PM Peak Hr. Total : LN(T) = . 902LN(X) + . 528 RA2 = . 92 , . 65 Enter,' . 35 Exit AM Gen Pk Hr. Total : LN(T) = . 858LN(X) + .464 RA2 = . 89 , . 26 Enter, . 74 Exit PM Gen Pk Hr. Total : LN(T) = . 892LN (X) + . 59 RA2 = . 91 , . 65 Enter, . 35 Exit Sat . 2-Way Volume: T = 9 . 217 (X) + 234 . 586, RA2 = . 93 Sat . Pk Hr. Total : T = . 871 (X) + 20 . 759 RA2 = . 9 , . 54 Enter, .46 Exit Sun. 2-Way Volume: T = 8 . 881 (X) + -25 . 166, RA2 = . 94 Sun. Pk Hr. Total : T = . 761 (X) + 29 . 705 RA2 = . 88 , . 5 Enter, . 5 Exit Source : Institute of Transportation Engineers WLSN0017 SUMMARY OF TRIP GENERATION CALCULATION FOR 160 DWELLING UNITS OF APARTMENT 10/11/94 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION FACTOR VOLUME AVG WKDY 2-WAY VOL 6 . 25 0 . 00 1 . 00 999 7-9 AM PK HR ENTER 0 . 09 0 . 00 1 . 00 14 7-9 AM PK HR EXIT 0 .43 0 . 00 1 . 00 68 7-9 AM PK HR TOTAL 0 .51 0 . 00 1 . 00 82 4-6 PM PK HR ENTER 0 .42 0 . 00 1 . 00 67 4-6 PM PK HR EXIT 0 .20 0 . 00 1 . 00 32 4-6 PM PK HR TOTAL 0 . 62 0 . 00 1 . 00 99 SATURDAY 2-WAY VOL 6 . 09 0 . 00 1 . 00 975 PK HR ENTER 0 . 00 0 . 00 1 . 00 0 PK HR EXIT 0 . 00 0 . 00 1 . 00 0 PK HR TOTAL 0 . 51 0 . 00 1 . 00 82 SUNDAY 2-WAY VOL 5 .43 0 . 00 1 . 00 869 PK HR ENTER 0 . 00 0 . 00 1 . 00 0 PK HR EXIT 0 . 00 0 . 00 1 . 00 0 PK HR TOTAL 0 . 51 0 . 00 1 . 00 82 Note : A zero rate indicates no rate data available The above rates were calculated from these equations : 24-Hr. 2-Way Volume : LN(T) = 1 . 024LN(X) + 1 . 71, RA2 = . 86 7-9 AM Peak Hr. Total : T = .491 (X) + 3 . 391 R"2 = . 83 , . 17 Enter, . 83 Exit 4-6 PM Peak Hr. Total : LN(T) = . 928LN(X) + - . 118 R"2 = .69 , . 68 Enter,' . 32 Exit AM Gen Pk Hr. Total : T = .557 (X) + 1 . 61 R '2 = . 84 , . 34 Enter, . 66 Exit PM Gen Pk Hr. Total : LN(T) = . 986LN(X) + - . 344 RA2 = . 77 , . 58 Enter, .42 Exit Sat . 2-Way Volume: T = 7.462 (X) + -219 .248 , R"2 = . 82 Sat . Pk Hr. Total : LN(T) = . 807LN(X) + . 308 RA2 = . 62 , 0 Enter, 0 Exit Sun. 2-Way Volume : T = 5 . 915 (X) + -77 .409, RA2 = . 76 Sun. Pk Hr. Total : LN(T) = . 67LN(X) + 1 . 004 RA2 = . 29 , 0 Enter, 0 Exit Source : Institute of Transportation Engineers WLSNO017 SUMMARY OF TRIP GENERATION CALCULATION FOR 50 DWELLING UNITS OF APARTMENT 10/10/94 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION FACTOR VOLUME AVG WKDY 2-WAY VOL 6 . 07 0 . 00 1. 00 304 7-9 AM PK HR ENTER 0 . 09 0 . 00 1 . 00 5 7-9 AM PK HR EXIT 0 .46 0 . 00 1 . 00 23 7-9 AM PK HR TOTAL 0 . 56 0 . 00 1 . 00 28 4-6 PM PK HR ENTER 0 .46 0 . 00 1 . 00 23 4-6 PM PK HR EXIT 0 . 21 0 . 00 1 . 00 11 4-6 PM PK HR TOTAL 0 . 67 0 . 00 1 . 00 34 SATURDAY 2-WAY VOL 3 . 08 0 . 00 1 . 00 154 PK HR ENTER 0 . 00 0 . 00 1 . 00 0 PK HR EXIT 0 . 00 0 . 00 1 . 00 0 PK HR TOTAL 0 . 64 0 . 00 1 . 00 32 SUNDAY 2-WAY VOL 4 . 37 0 . 00 1 . 00 218 PK HR ENTER 0 . 00 0 . 00 1 . 00 0 PK HR EXIT 0 . 00 0 . 00 1 . 00 0 PK HR TOTAL 0 . 75 0 . 00 1 . 00 38 Note : A zero rate indicates no rate data available The above rates were calculated from these equations : 24-Hr. 2-Way Volume : LN (T) = 1 . 024LN(X) + 1 . 71, R '2 = . 86 7-9 AM Peak Hr. Total : T = .491 (X) + 3 . 391 R"2 = . 83 , . 17 Enter, . 83 Exit 4-6 PM Peak Hr. Total : LN(T) = . 928LN (X) + - . 118 R '2 = . 69 , . 68 Enter, ' . 32 Exit AM Gen Pk Hr. Total : T = . 557 (X) + 1 . 61 R '2 = . 84 , . 34 Enter, . 66 Exit PM Gen Pk Hr. Total : LN(T) = . 986LN(X) + - . 344 RA2 = . 77 , . 58 Enter, .42 Exit Sat . 2-Way Volume : T = 7.462 (X) + -219 . 248, R"2 = . 82 Sat . Pk Hr. Total : LN (T) = . 807LN(X) + . 308 R"2 = . 62 , 0 Enter, 0 Exit Sun. 2-Way Volume: T = 5 . 915 (X) + -77 .409, RA2 = . 76 Sun. Pk Hr. Total : LN(T) = . 67LN (X) + 1 . 004 RA2 = . 29 , 0 Enter, 0 Exit Source : Institute of Transportation Engineers WLSN0017 SUMMARY OF TRIP GENERATION CALCULATION FOR 380 DWELLING UNITS OF APARTMENT 10/13/94 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION FACTOR VOLUME AVG WKDY 2-WAY VOL 6 .38 0 . 00 1 . 00 2423 7-9 AM PK HR ENTER 0 . 08 0 . 00 1 . 00 32 7-9 AM PK HR EXIT 0 .41 0 . 00 1 . 00 158 7-9 AM PK HR TOTAL 0 . 50 0 . 00 1 . 00 190 4-6 PM PK HR ENTER 0 . 39 0 . 00 1 . 00 150 4-6 PM PK HR EXIT 0 . 19 0 . 00 1 . 00 70 4-6 PM PK HR TOTAL 0 . 58 0 . 00 1 . 00 220 SATURDAY 2-WAY VOL 6 . 89 0 . 00 1 . 00 2616 PK HR ENTER 0 . 00 0 . 00 1 . 00 0 PK HR EXIT 0 . 00 0 . 00 1 . 00 0 PK HR TOTAL 0 . 43 0 . 00 1 . 00 164 SUNDAY 2-WAY VOL 5 . 71 0 . 00 1 . 00 2170 PK HR ENTER 0 . 00 0 . 00 1 . 00 0 PK HR EXIT 0 . 00 0 . 00 1 . 00 0 PK HR TOTAL 0 . 38 0 . 00 1 . 00 146 Note : A zero rate indicates no rate data available The above rates were calculated from these equations : 24-Hr. 2-Way Volume : LN(T) = 1 . 024LN(X) + 1 . 71, R^2 = . 86 7-9 AM Peak Hr. Total : T = . 491 (X) + 3 . 391 R '2 = . 83 , . 17 Enter, . 83 Exit 4-6 PM Peak Hr. Total : LN (T) = . 928LN(X) + - . 118 RA2 = . 69 , . 68 Enter, s . 32 Exit AM Gen Pk Hr. Total : T = . 557 (X) + 1 . 61 RA2 = . 84 , . 34 Enter, . 66 Exit PM Gen Pk Hr. Total : LN(T) = . 986LN(X) + - . 344 R '2 = . 77 , . 58 Enter, .42 Exit Sat . 2-Way Volume : T = 7 .462 (X) + -219.248, RA2 = . 82 Sat . Pk Hr. Total : LN(T) = . 807LN(X) + . 308 R"2 = . 62 , 0 Enter, 0 Exit Sun. 2-Way Volume: T = 5 . 915 (X) + -77 .409, R"2 = . 76 Sun. Pk Hr. Total : LN (T) = . 67LN(X) + 1. 004 RA2 = .29 , 0 Enter, 0 Exit Source : Institute of Transportation Engineers APPENDIX B LEVEL OF SERVICE CALCULATIONS �,.JCATION: 135th Avenue & Site Access INAME:JXZ ------------------------------------------------------------------------------- URLY VOLUMES VOLUMES IN PCPH N> Major street :135th Avenue 1 <---V5--- 380 <---VS--- urade 605---V2---> v---V4--- 5 ---V2---> v---V4--- 5 0% 4---V3---v N= 2 ---V3---v < > < I > _ _ te of Counts: Background + Si V7 V9 X STOP V7 V9 me Period: I I YIELD I I PK HR 21 24 21 24 Approach Speed: Minor Street : Grade . " Site Access 0% :F: 0 . 8 N= 1 ,Jpulation: 500000 ILUME ADJUSTMENTS Movement no. I 2 I 3 I 4 I 5 I 7 I 9 I )fume (vph) I 605 I 4 I 5 I 380 I 21 I 24 I Un1 (pcph) , see Table 10 . 1IXXXXXXXXIXXXXXXXXI 5 IXXXXXXXXI 21 I 24 I 'EP 1 : RT From Minor Street I /-> V9 )nflicting Flows, Vc 1/2 V3+V2= 2 + 605 = 607 vph(Vc9) -itical Gap, Tc Tc= 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp9= 625 pcph (Fig. 10 . 3) " :tual Capacity, Cm Cm9=Cp9= 625 pcph . EP 2 : LT From Major Street I v-- V4 >nflicting Flows, Vc V3+V2= 4 + 605 = 609 vph(Vc4) itical Gap, Tc Tc= 4 . 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp4= 719 pcph (Fig. 10 . 3) of Cp utilized and Impedance Factor (V4/Cp4)x100= . 7% P4= 1 :tual Capacity, Cm (Fig. 10 . 5) Cm4=Cp4= 719 pcph STEP 3 : LT From Minor Street I <-\ V7 )nflicting Flows, Vc 1/2 V3+V2+V5+V4 2 + 605 + 380 + 5 = 992 vph (Vc7) fitical Gap, Tc Tc= 6 secs (Tab. 10 . 2) Dtential Capacity, Cp Cpl= 278 pcph (Fig. 10 . 3) Actual Capacity, Cm Cm7=Cp7xP4= 278 x 1 = 278 pcph -JARED LANE CAPACITY SH = (V7+V9) / ( (V7/Cm7) + (V9/Cm9) ) if lane is shared CR CR LOS LOS DVEMENT V(PCPH) CM (PCPH) CSH (PCPH) (CM-V) (CSH-V) CM CSH 7 21 278 395 257 350 C B 9 24 625 395 601 350 A B 4 s 719 714 A )CATION: 135th Avenue & Site Access NAME:JXZ ------------------------------------------------------------------------------- TTOURLY VOLUMES Grade 0% N = 1 5 V12 0 N> V11 15 V10 N= 2 < v 1 > V6-- 20 ,,made 0% < V5-- 430 N= 2 10 --V1 v V4-- 5 660 --V2 > major road Grade 0% 4 --V3 v < I A > 135th Avenue V7 21 STOP xx V8 YIELD N= 1 0 Date of Counts :Total V9 Time Period:AM PK HR minor road 24 Prevailing Speed:40 Site Access PHF: 0 . 8 Grade 0 % Population: 500000 )LUME ADJUSTMENTS )vement no. I 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 .plume (vph) I 101 6601 41 51 4301 201 211 01 241 151 01 51 )1 (pcph) ,Tab. 10 . 11 10IXXXXIXXXXI 5IXXXXIXXXXI 211 01 241 151 01 51 )LUMES IN PCPH 5 V12 0 V11 � 15 V10 A v 1 > V6-- == V5-- == 10 --V1 A V4-- 5 __ --V2 __ --V3 v < 1 A V7 21 V8 0 V9 24 DCATION: 135th Avenue & Site Access NAME:JXZ ________________ ------------------ ------ ------------- ----------- STEP 1 : RT From Minor Street /-> V9 1 <-/ V12 inflicting Flows, Vc 1/2 V3+V2=Vc9 1/2 V6+V5=Vc12 2+ 660= 662 vph 10+ 430= 440 vph Critical Gap, Tc (Tab. 10 . 2) 5 (secs. ) 5 (secs . ) Dtential Capacity, Cp (Fig10 . 3) Cp9 = 590 pcph Cp12 = 764 pcph of Cp utilized (V9/Cp9)x100= 4 . 1% (V12/Cp12) x100= .7% Impedance Factor, P (Fig. 10 . 5) P9= . 98 P12= 1 - :tual Capacity, Cm Cm9=Cp9= 590 pcph Cm12=Cp12= 764 pcph STEP 2 : LT From Major Street I v-- V4 - Vl Dnflicting Flows, Vc V3+V2=Vc4 V6+V5=Vcl 4+ 660= 664 vph 20+ 430= 450 vph ritical Gap, Tc (Tab. l0 . 2) 4 . 5 (secs . ) 4 . 5 (secs . ) ctential Capacity, Cp (Fig10 . 3) Cp4 = 680 pcph Cpl = 855 pcph rs of Cp utilized (V4/Cp4)x100= .7% (V1/Cpl) x100= 1 . 2% Impedance Factor, P (Fig. 10 . 5) P4= 1 P1= . 99 ctual Capacity, Cm Cm4=Cp4= 680 pcph Cm1=Cpl= 855 pcph TEP 3 : TH From Minor Street A V8 v V11 Conflicting Flows, Vc . 5V3+V2+V1+V6+V5+V4=Vc8 . 5V6+V5+V4+V3+V2+V1=Vc11 2+ 660+ 10+ 20+ 10+ 430+ 5+ 4+ 430+ 5= 1127 vph 660+ 10= 1119 vph critical Gap, Tc (Tab. 10 . 2) 5 . 5 (secs . ) 5 . 5 (secs. ) Potential Capacity, Cp (Fig10 . 3) Cp8 = 277 pcph Cpll = 279 pcph of Cp utilized (V8/Cp8) x100= 0% (V11/Cpll) x100= 0% mpedance Factor, P (Fig. 10 . 5) P8= 1 Pll= 1 Actual Capacity, Cm Cm8=Cp8xPlxP4 Cm1l=Cp11xPlxP4 274= 277x. 99x 1pcph 276= 279x. 99x 1pcph CTEP 4 : LT From Minor Street <-\ V7 \-> V10 onflicting Flows, Vc Vc8 (step3) +V11+V12=Vc7 Vcll (step3) +V8+V9=Vc10 1127+ 0+ 5= 1132vph 1119+ 0+ 24= 1143vph ritical Gap, Tc (Tab. 10 .2) 6 (secs. ) 6 (secs . ) otential Capacity, Cp (Fig10 . 3) Cpl = 225 pcph Cp10 = 222 pcph Actual Capacity, Cm Cm7=Cp7xP1xP4xPllxPl2 Cm10=CplOxP4xPlxP8xP9 = 225x. 99x lx lx 1 = 222x lx. 99x lx. 98 = 223 pcph = 215 pcph JCATION: 135th Avenue & Site Access NAME :JXZ SHARED LANE CAPACITY APPROACH MOVEMENTS 7, 8, 9 CR CR LOS LOS MOVEMENT V(PCPH) CM(PCPH) CSH (PCPH) (CM-V) (CSH-V) CM CSH 7 21 223 334 202 289 C C 8 0 274 334 274 289 C C 9 24 590 334 566 289 A C APPROACH MOVEMENTS 10, 11, 12 CR CR LOS LOS DVEMENT V(PCPH) CM(PCPH) CSH (PCPH) (CM-V) (CSH-V) CM CSH 10 15 215 262 200 242 C C 11 0 276 262 276 242 C C 12 5 764 262 759 242 A C MAJOR STREET LEFT TURNS 1,4 JVEMENT V(PCPH) CM (PCPH) CR(CM-V) LOS 1 10 855 845 A 4 5 680 675 A COMMENTS : LOCATION: 135th Avenue & Site Access INAME :JXZ ------------------------------------------------------------------------------ DURLY VOLUMES VOLUMES IN PCPH N> Major street :135th Avenue = 1 <---V5--- 600 <---VS--- Grade 495---V2---> v---V4--- 24 ---V2---> v---V4--- 24 0% 20---V3---v N= 2 ---V3---v uate of Counts : < I > I > < I I "ackground + Si V7 V9 X STOP V7 V9 ime Period: I I YIELD I I _M PK HR 10 11 10 11 , Approach Speed: Minor Street : Grade 0 Site Access 0% HF : 0 .85 N= 1 Population: 500000 DLUME ADJUSTMENTS Movement no. I 2 I 3 I 4 I 5 I 7 I 9 I Plume (vph) I 495 I 20 I 24 I 600 1 10 I 11 ol (pcph) , see Table 10 . 1IXXXXXXXXIXXXXXXXXI 24 IXXXXXXXXI 10 I 11 STEP 1 : RT From Minor Street I /-> V9 onflicting Flows, Vc 1/2 V3+V2= 10 + 495 = 505 vph (Vc9) _ritical Gap, Tc Tc= 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp9= 706 pcph (Fig. 10 . 3) ctual Capacity, Cm Cm9=Cp9= 706 pcph STEP 2 : LT From Major Street I v-- V4 onflicting Flows, Vc V3+V2= 20 + 495 = 515 vph (Vc4) ritical Gap, Tc Tc= 4 . 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp4= 797 pcph (Fig. 10 . 3) of Cp utilized and Impedance Factor (V4/Cp4) x100= 3% P4= . 98 ctual Capacity, Cm (Fig. 10 . 5) Cm4=Cp4= 797 pcph TEP 3 : LT From Minor Street I <-\ V7 k_onflicting Flows, Vc 1/2 V3+V2+V5+V4 10 + 495 + 600 + 24 = 1129 vph(Vc7) ritical Gap, Tc Tc= 6 secs (Tab. 10 . 2) otential Capacity, Cp Cp7= 226 pcph (Fig. 10 . 3) Actual Capacity, Cm Cm7=Cp7xP4= 226 x . 98 = 221 pcph 'HARED LANE CAPACITY SH = (V7+V9) / ( (V7/Cm7) + (V9/Cm9) ) if lane is shared CR CR LOS LOS [OVEMENT V(PCPH) CM(PCPH) CSH(PCPH) (CM-V) (CSH-V) CM CSH 7 10 221 345 211 324 C B 9 11 706 345 695 324 A B 4 24 191 773 A} DCATION: 135th Avenue & Site Access NAME:JXZ OURLY VOLUMES Grade 0% N = 1 25 V12 0 N> V11 70 V10 N= 2 < v 1 > A V6-- 120 Grade 0% < V5-- 645 N= 2 35 --Vi v V4-- 24 540 --V2 > major road Grade 0% 20 --V3 v < I A > 135th Avenue V7 10 STOP xx V8 YIELD N= 1 0 Date of Counts :Total V9 Time Period:PM PK HR minor road 11 Prevailing Speed:40 Site Access PHF: 0 . 85 Grade 0 % Population: 500000 OLUME ADJUSTMENTS ovement no. 1 i 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 volume (vph) 1 351 5401 201 241 6451 1201 101 01 111 701 01 251 ol (pcph) ,Tab. 10 . 1I 351XXXXIXXXX1 241XXXXIXXXXI 101 01 111 701 01 251 OLUMES IN PCPH 25 V12 0 V11 70 V10 V I > V6-- __ < V5-- __ 35 --V1 A V4-- 24 == --V2 > == --V3 v < I A V7 10 V8 0 V9 11 3CATION: 135th Avenue & Site Access NAME:JXZ ----------------------------------------------- ----------------------------- STEP 1 : RT From Minor Street /-> V9 1 <-/ V12 onflicting Flows, Vc 1/2 V3+V2=Vc9 1/2 V6+V5=Vc12 10+ 540= 550 vph 60+ 645= 705 vph critical Gap, Tc (Tab. 10 . 2) 5 (secs . ) 5 (secs . ) otential Capacity, Cp (Fig10. 3) Cp9 = 670 pcph Cp12 = 562 pcph of Cp utilized (V9/Cp9) x100= 1 . 6% (V12/Cp12) x100= 4 .4% Impedance Factor, P (Fig. 10 . 5) P9= . 99 P12= . 97 ctual Capacity, Cm Cm9=Cp9= 670 pcph Cm12=Cp12= 562 pcph -TEP 2 : LT From Major Street v-- V4 --^ V1 onflicting Flows, Vc V3+V2=Vc4 V6+V5=Vcl 20+ 540= 560 vph 120+ 645= 765 vph ritical Gap, Tc (Tab. 10 . 2) 4 . 5 (secs . ) 4 . 5 (secs . ) otential Capacity, Cp (Fig10 . 3) Cp4 = 759 pcph Cpl = 610 pcph % of Cp utilized (V4/Cp4) x100= 3 . 2% (V1/Cpl) x100= 5 . 7% mpedance Factor, P (Fig. 10 . 5) P4= . 98 P1= . 97 ctual Capacity, Cm Cm4=Cp4= 759 pcph Cm1=Cp1= 610 pcph TEP 3 : TH From Minor Street A V8 v V11 Conflicting Flows, Vc . 5V3+V2+Vl+V6+V5+V4=Vc8 . 5V6+V5+V4+V3+V2+V1=Vc11 10+ 540+ 35+ 120+ 60+ 645+ 24+ 20+ 645+ 24= 1374 vph 540+ 35= 1324 vph critical Gap, Tc (Tab. 10 . 2) 5 . 5 (secs . ) 5 . 5 (secs . ) 'otential Capacity, Cp (Fig10 . 3) Cp8 = 198 pcph Cpll = 213 pcph of Cp utilized (V8/Cp8)x100= 0% (V11/Cpl1) x100= 0% _mpedance Factor, P (Fig. 10 . 5) P8= 1 P11= 1 Actual Capacity, Cm Cm8=Cp8xP1xP4 Cm11=Cp11xPlxP4 188= 198x. 97x. 98pcph 202= 213x. 97x. 98pcph -TEP 4 : LT From Minor Street <-\ V7 \-> V10 onflicting Flows, Vc Vc8 (step3) +V11+V12=Vc7 Vc11 (step3) +V8+V9=Vcl0 1374+ 0+ 25= 1399vph 1324+ 0+ 11= 1335vph ritical Gap, Tc (Tab. 10 . 2) 6 (secs . ) 6 (secs . ) otential Capacity, Cp (Figl0 . 3) Cpl = 155 pcph CplO = 168 pcph Actual Capacity, Cm Cm7=Cp7xPlxP4xP11xP12 Cm10=Cp10xP4xP1xP8xP9 = 155x. 97x. 98x 1x. 97 = 168x. 98x. 97x 1x. 99 = 143 pcph = 158 pcph )CATION: 135th Avenue & Site Access NAME:JXZ SHARED LANE CAPACITY APPROACH MOVEMENTS 7, 8, 9 CR CR LOS LOS MOVEMENT V(PCPH) CM(PCPH) CSH(PCPH) (CM-V) (CSH-V) CM CSH 7 10 143 243 133 222 D C 8 0 188 243 188 222 D C 9 11 670 243 659 222 A C APPROACH MOVEMENTS 10, 11, 12 CR CR LOS LOS )VEMENT V(PCPH) CM(PCPH) CSH(PCPH) (CM-V) (CSH-V) CM CSH 10 70 158 195 88 100 E D 11 0 202 195 202 100 C D 12 25 562 195 537 100 A D MAJOR STREET LEFT TURNS 1, 4 )VEMENT V(PCPH) CM(PCPH) CR (CM-V) LOS 1 35 610 575 A 4 24 759 735 A COMMENTS: LOCATION:Hawk' s Beard Rd & W Site Acces INAME :JXZ )URLY VOLUMES A VOLUMES IN PCPH N Major street :Hawk' s Beard . 1 <---V5--- 23 <---V5--- Grade 11---V2---> v---V4--- 0 ---V2---> v---V4--- 0 0% 3---V3---v N= 1 ---V3---v - < > > < uate of Counts: 1 1 T'ackground + Si V7 V9 X STOP V7 V9 Lme Period: I I YIELD I I ...4 PK HR 12 0 12 0 Approach Speed: Minor Street : Grade ) W Site Access 0% IF: 0 . 8 N= 1 Population: 500000 FLUME ADJUSTMENTS movement no. 1 2 I 3 I 4 I 5 I 7 I 9 1 plume (vph) I 11 I 3 1 0 I 23 I 12 I 0 I Dl (pcph) , see Table 10 . 1IXXXXXXXXIXXXXXXXXI 0 IXXXXXXXXI 12 I 0 I STEP 1 : RT From Minor Street I /-> V9 Dnflicting Flows, Vc 1/2 V3+V2= 2 + 11 = 13 vph(Vc9) ritical Gap, Tc Tc= 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp9= 1000 pcph (Fig. 10 . 3) ctual Capacity, Cm Cm9=Cp9= 1000 pcph STEP 2 : LT From Major Street I v-- V4 onflicting Flows, Vc V3+V2= 3 + 11 = 14 vph (Vc4) -ritical Gap, Tc Tc= 4 . 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp4= 1000 pcph (Fig. 10 . 3) of Cp utilized and Impedance Factor (V4/Cp4) x100= 0% P4= 1 ctual Capacity, Cm (Fig. 10 . 5) Cm4=Cp4= 1000 pcph TEP 3 : LT From Minor Street I <-\ V7 Lonflicting Flows, Vc 1/2 V3+V2+V5+V4= ' 2 + 11 + 23 + 0 = 36 vph(Vc7) ritical Gap, Tc Tc= 6 secs (Tab. 10 . 2) otential Capacity, Cp Cp7= 970 pcph (Fig. 10 .3) Actual Capacity, Cm Cm7=Cp7xP4= 970 x 1 = 970 pcph HARED LANE CAPACITY SH = (V7+V9) / ( (V7/Cm7) + (V9/Cm9) ) if lane is shared CR CR LOS LOS :OVEMENT V(PCPH) CM(PCPH) CSH (PCPH) (CM-V) (CSH-V) CM CSH 7 12 970 970 958 958 A A 9 0 1000 970 1000 958 A A 4 o 10.0 i co co A LOCATION:Hawk' s Beard Rd & W Site Acces INAME :JXZ )URLY VOLUMES A VOLUMES IN PCPH N Major street :Hawk' s Beard = 1 <---V5--- 68 <---VS--- Grade 26---V2---> v---V4--- 0 ---V2---> v---V4--- 0 0% 3---V3---v N= 1 ---V3---v Late of Counts : < I > < I I > Total V7 V9 X STOP V7 V9 ime Period: I I YIELD I I 4 PK HR 12 0 12 0 Approach Speed: Minor Street : Grade ) W Site Access 0% IF : 0 . 8 N= 1 Population: 500000 )LUME ADJUSTMENTS Movement no. I 2 1 3 I 4 I 5 I 7 1 9 I )lume (vph) I 26 I 3 I 0 I 68 I 12 I 0 "h1 (pcph) , see Table 10 . 1IXXXXXXXXIXXXXXXXXI 0 IXXXXXXXXI 12 I 0 I ,I'EP 1 : RT From Minor Street I /-> V9 inflicting Flows, Vc 1/2 V3+V2= 2 + 26 = 28 vph (Vc9) ritical Gap, Tc Tc= 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp9= 1000 pcph (Fig. 10 . 3) 7,tual Capacity, Cm Cm9=Cp9= 1000 pcph .rEP 2 : LT From Major Street I v-- V4 onflicting Flows, Vc V3+V2= 3 + 26 = 29 vph (Vc4) ritical Gap, Tc Tc= 4 . 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp4= 1000 pcph (Fig. 10 . 3) of Cp utilized and Impedance Factor (V4/Cp4) x100= 0% P4= 1 ctual Capacity, Cm (Fig. 10 . 5) Cm4=Cp4= 1000 pcph "TEP 3 : LT From Minor Street I <-\ V7 -onflicting Flows, Vc 1/2 V3+V2+V5+V4 2 + 26 + 68 + 0 = 96 vph(Vc7) ritical Gap, Tc Tc= 6 secs (Tab. 10 . 2) otential Capacity, Cp Cp7= 904 pcph (Fig. 10 .3) Actual Capacity, Cm Cm7=Cp7xP4= 904 x 1 = 904 pcph HARED LANE CAPACITY SH = (V7+V9) / ( (V7/Cm7) + (V9/Cm9) ) if lane is shared CR CR LOS LOS OVEMENT V(PCPH) CM(PCPH) CSH (PCPH) (CM-V) (CSH-V) CM CSH 7 12 904 904 892 892 A A 9 0 1000 904 1000 892 A A 4 0 /000 10b0 4 LOCATION:Hawk' s Beard Rd & W Site Acces INAME:JXZ -------------------- --------------------------------------------------------- URLY VOLUMES A VOLUMES IN PCPH N Major street :Hawk' s Beard : 1 <---V5--- 17 <---V5--- 3rade 28---V2---> v---V4--- 0 ---V2---> v---V4--- 0 0% 12---V3---v N= 1 ---V3---v :date of Counts : < 1 > < 1 1 > ckground + Si V7 V9 X STOP V7 V9 me Period: I I YIELD I I PK HR 6 0 6 0 Approach Speed: Minor Street : Grade W Site Access 0% :F: 0 . 8 N= 1 Population: 500000 )LUME ADJUSTMENTS Movement no. I 2 I 3 1 4 I 5 I 7 I 9 I plume (vph) I 28 I 12 I 0 I 17 1 6 I 0 I >1 (pcph) , see Table 10 . 1IXXXXXXXXIXXXXXXXXI 0 IXXXXXXXX1 6 I 0 I sJEP 1 : RT From Minor Street I /-> V9 )nflicting Flows, Vc 1/2 V3+V2= 6 + 28 = 34 vph (Vc9) -itical Gap, Tc Tc= 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp9= 1000 pcph (Fig. 10 . 3) :tual Capacity, Cm Cm9=Cp9= 1000 pcph STEP 2 : LT From Major Street I v-- V4 )nflicting Flows, Vc V3+V2= 12 + 28 = 40 vph(Vc4) _ritical Gap, Tc Tc= 4 . 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp4= 1000 pcph (Fig. 10 . 3) of Cp utilized and Impedance Factor (V4/Cp4) x100= 0% P4= 1 :tual Capacity, Cm (Fig. 10 . 5) Cm4=Cp4= 1000 pcph -TEP 3 : LT From Minor Street I <-\ V7 _onflicting Flows, Vc 1/2 V3+V2+V5+V4 6 + 28 + 17 + 0 = 51 vph (Vc7) ritical Gap, Tc Tc= 6 secs (Tab. 10 . 2) ptential Capacity, Cp Cp7= 954 pcph (Fig. 10 . 3) Actual Capacity, Cm Cm7=Cp7xP4= 954 x 1 = 954 pcph HARED LANE CAPACITY SH = (V7+V9) / ( (V7/Cm7) + (V9/Cm9) ) if lane is shared CR CR LOS LOS OVEMENT V(PCPH) CM(PCPH) CSH (PCPH) (CM-V) (CSH-V) CM CSH 7 6 954 954 948 948 A A 9 0 1000 954 1000 948 A A 4 0 /0.. 1 e,00 4 LOCATION:Hawk' s Beard Rd & W Site Acces INAME:JXZ ----------------------------------------------------------------------------- URLY VOLUMES VOLUMES IN PCPH N Major street :Hawk' s Beard 1 <---V5--- 37 <---VS--- Grade 73---V2---> v---V4--- 0 ---V2---> v---V4--- 0 0% 12---V3---v N= 1 ---V3---v • < I > Late of Counts: < I I > metal V7 V9 X STOP V7 V9 .me Period: I I YIELD I I 0 I PKHR 6 0 Approach Speed: Minor Street : Grade W Site Access 0% fF: 0 . 8 N= 1 Population: 500000 • )LUME ADJUSTMENTS Movement no. I 2 I 3 I 4 I 5 I 7 I 9 I )fume (vph) I 73 I 12 I 0 I . 37 I 6 I 0 )1 (pcph) , see Table 10 . 1IXXXXXXXXIXXXXXXXXI 0 IXXXXXXXXI 6 I 0 I sIEP 1 : RT From Minor Street I /-> V9 )nflicting Flows, Vc 1/2 V3+V2= 6 + 73 = 79 vph(Vc9) :-itical Gap, Tc Tc= 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp9= 1000 pcph (Fig. 10 . 3) :tual Capacity, Cm Cm9=Cp9= 1000 pcph STEP 2 : LT From Major Street I v-- V4 )nflicting Flows, Vc V3+V2= 12 + 73 = 85 vph (Vc4) _:itical Gap, Tc Tc= 4 . 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp4= 1000 pcph (Fig. 10 .3) of Cp utilized and Impedance Factor (V4/Cp4) x100= 0% P4= 1 :tual Capacity, Cm (Fig. 10 . 5) Cm4=Cp4= 1000 pcph -TEP 3 : LT From Minor Street I <-\ V7 ,.onflicting Flows, Vc 1/2 V3+V2+V5+V4 6 + 73 + 37 + 0 = 116 vph (Vc7) ritical Gap, Tc Tc= 6 secs (Tab. 10 . 2) Dtential Capacity, Cp Cp7= 883 pcph (Fig. 10 . 3) Actual Capacity, Cm Cm7=Cp7xP4= 883 x 1 = 883 pcph HARED LANE CAPACITY SH = (V7+V9) / ( (V7/Cm7) + (V9/Cm9) ) if lane is shared CR CR LOS LOS OVEMENT V(PCPH) CM(PCPH) CSH (PCPH) (CM-V) (CSH-V) CM CSH 7 6 883 883 877 877 A A 9 0 1000 883 1000 877 A A 4 0 loon /000 LOCATION:Hawk' s Beard Rd & E Site Acces INAME:JXZ ------------------------------------------------------------------------------ DURLY VOLUMES VOLUMES IN PCPH N - Major street :Hawk' s Beard = 1 <---V5--- 20 <---VS--- Grade 10---V2---> v---V4--- 1 ---V2---> v---V4--- 1 096 1---V3---v N= 1 ---V3---v Late of Counts : < I I > < I I > nackground + Si V7 V9 X STOP V7 V9 ime Period: 1 1 YIELD K PK HR 3 9 3 9 Approach Speed: Minor Street : Grade 0 E Site Access 096 HF: 0 . 8 N= 1 Population: 500000 DLUME ADJUSTMENTS Movement no. 1 2 I 3 I 4 I 5 1 7 I 9 1 plume (vph) 1 10 I 1 I 1 I 20 I 3 1 9 1 ol (pcph) , see Table 10 . 1IXXXXXXXXIXXXXXXXXI 1 IXXXXXXXXI 3 I 9 STEP 1 : RT From Minor Street /-> V9 onflicting Flows, Vc 1/2 V3+V2= 1 + 10 = 11 vph (Vc9) ritical Gap, Tc Tc= 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp9= 1000 pcph (Fig. 10 . 3) ctual Capacity, Cm Cm9=Cp9= 1000 pcph STEP 2 : LT From Major Street v-- V4 onflicting Flows, Vc V3+V2= 1 + 10 = 11 vph(Vc4) _ritical Gap, Tc Tc= 4 . 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp4= 1000 pcph (Fig. 10 . 3) of Cp utilized and Impedance Factor (V4/Cp4) x100= . 196 P4= 1 ctual Capacity, Cm (Fig. 10 . 5) Cm4=Cp4= 1000 pcph -TEP 3 : LT From Minor Street <-\ V7 ..onflicting Flows, Vc 1/2 V3+V2+V5+V4 1 + 10 + 20 + 1 = 32 vph(Vc7) :ritical Gap, Tc Tc= 6 secs (Tab. 10 . 2) otential Capacity, Cp Cp7= 975 pcph (Fig. 10 . 3) Actual Capacity, Cm Cm7=Cp7xP4= 975 x 1 = 975 pcph • ;HARED LANE CAPACITY SH = (V7+V9) / ( (V7/Cm7) + (V9/Cm9) ) if lane is shared CR CR LOS LOS IOVEMENT V(PCPH) CM(PCPH) CSH (PCPH) (CM-V) (CSH-V) CM CSH 7 3 975 994 972 982 A A 9 9 1000 994 991 982 A A 4 1 lope, 9 9 9 A LOCATION:Hawk' s Beard Rd & E Site Acces INAME:JXZ -_____________________________________________________________________________ DIMLY VOLUMES VOLUMES IN PCPH N Major street :Hawk' s Beard = 1 <---V5--- 65 <---VS--- Grade 25---V2---> v---V4--- 1 ---V2---> v---V4--- 1 096 1---V3---v N= 1 ---V3---v Late of Counts : < I I > < I > Total V7 V9 X STOP V7 V9 ime Period: I I YIELD I I 4 PK HR 3 9 3 9 Approach Speed: Minor Street : Grade ) E Site Access 096 4F: 0 .8 N= 1 Population: 500000 )LUME ADJUSTMENTS Movement no. I 2 I 3 I 4 I 5 I 7 1 9 I Dlume (vph) I 25 I 1 I 1 I 65 I 3 I 9 I "hl (pcph) , see Table 10 . 11XXXXXXXXIXXXXXXXXI 1 IXXXXXXXXI 3 I 9 I ,JI'EP 1 : RT From Minor Street I /-> V9 Dnflicting Flows, Vc 1/2 V3+V2= 1 + 25 = 26 vph (Vc9) ritical Gap, Tc Tc= 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp9= 1000 pcph (Fig. 10 . 3) ctual Capacity, Cm Cm9=Cp9= 1000 pcph STEP 2 : LT From Major Street I v-- V4 Dnflicting Flows, Vc V3+V2= 1 + 25 = 26 vph (Vc4) _ritical Gap, Tc Tc= 4 . 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp4= 1000 pcph (Fig. 10 . 3) of Cp utilized and Impedance Factor (V4/Cp4) x100= . 196 P4= 1 ctual Capacity, Cm (Fig. 10 . 5) Cm4=Cp4= 1000 pcph "TEP 3 : LT From Minor Street I <-\ V7 -onflicting Flows, Vc 1/2 V3+V2+V5+V4 1 + 25 + 65 + 1 = 92 vph (Vc7) ritical Gap, Tc Tc= 6 secs (Tab. 10 . 2) otential Capacity, Cp Cp7= 909 pcph (Fig. 10 . 3) Actual Capacity, Cm Cm7=Cp7xP4= 909 x 1 = 909 pcph HARED LANE CAPACITY SH = (V7+V9) / ( (V7/Cm7) + (V9/Cm9) ) if lane is shared CR CR LOS LOS OVEMENT V(PCPH) CM(PCPH) CSH (PCPH) (CM-V) (CSH-V) CM CSH 7 3 909 976 906 964 A A 9 9 1000 976 991 964 A A 4 i /000 99 9 A LJCATION:Hawk' s Beard Rd & E Site Acces INAME:JXZ ------------------------------------------------------------------------------- DIMLY VOLUMES A VOLUMES IN PCPH N Major street :Hawk' s Beard = 1 <---V5--- 15 <---VS--- v'rade 25---V2---> v---V4--- 8 ---V2---> v---V4--- 8 0% 3---V3---v N= 1 ---V3---v - < � � > < > _ate of Counts : Background + Si V7 V9 X STOP V7 V9 ime Period: I I YIELD I I 4 PK HR 2 3 2 3 Approach Speed: Minor Street : Grade - ) E Site Access 0% iF: 0 .8 N= 1 copulation: 500000 JLUME ADJUSTMENTS Movement no. I 2 I 3 I 4 I 5 I 7 I 9 I )lume (vph) I 25 I 3 I 8 I 15 I 2 I 3 I ''ol (pcph) , see Table 10 . 1IXXXXXXXXIXXXXXXXXI 8 IXXXXXXXXI 2 I 3 I rEP 1 : RT From Minor Street I /-> V9 Dnflicting Flows, Vc 1/2 V3+V2= 2 + 25 = 27 vph (Vc9) ritical Gap, Tc Tc= 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp9= 1000 pcph (Fig. l0 . 3) ' :'tual Capacity, Cm Cm9=Cp9= 1000 pcph -rEP 2 : LT From Major Street I v-- V4 Dnflicting Flows, Vc V3+V2= 3 + 25 = 28 vph (Vc4) ritical Gap, Tc Tc= 4 . 5 secs (Tab. 10 . 2) Potential Capacity, Cp Cp4= 1000 pcph (Fig. 10 . 3) of Cp utilized and Impedance Factor (V4/Cp4)x100= . 8% P4= 1 ctual Capacity, Cm (Fig. 10 . 5) Cm4=Cp4= 1000 pcph QTEP 3 : LT From Minor Street I <-\ V7 inflicting Flows, Vc 1/2 V3+V2+V5+V4 2 + 25 + 15 + 8 = 50 vph(Vc7) ritical Gap, Tc Tc= 6 secs (Tab. 10 . 2) otential Capacity, Cp Cpl= 955 pcph (Fig. 10 . 3) Actual Capacity, Cm Cm7=Cp7xP4= 955 x 1 = 955 pcph HARED LANE CAPACITY SH = (V7+V9) / ( (V7/Cm7) + (V9/Cm9) ) if lane is shared CR CR LOS LOS OVEMENT V(PCPH) CM(PCPH) CSH (PCPH) (CM-V) (CSH-V) CM CSH 7 2 955 982 953 977 A A 9 3 1000 982 997 977 A A 4- 8 /00c, ertz q _ 2ATION:Hawk' s Beard Rd & E Site Acces INAME:JXZ ------------------------------------------------------------------------------- :JRLY VOLUMES VOLUMES IN PCPH N major street :Hawk' s Beard 1 <---V5--- 35 <---VS--- __ade 70---V2---> v---V4--- 8 ---V2---> v---V4--- 8 0% 3---V3---v N= 1 ---V3---v _ _ < I > < I > _ :e of Counts : Ttal V7 V9 X STOP V7 V9 ne Period: I I YIELD I PK HR 2 3 2 3 �1.,proach Speed: Minor Street : Grade = 0 E Site Access 0% F: 0 . 8 N= 1 oulation: 500000 LUME ADJUSTMENTS :.cvement no. I 2 I 3 I 4 I 5 I 7 I 9 I lume (vph) I 70 I 3 I 8 I 35 I 2 I 3 I ol (pcph) , see Table 10 . 1 IXXXXXXXXIXXXXXXXXI 8 IXXXXXXXXI 2 I 3 I EP 1 : RT From Minor Street I /-> V9 . nflicting Flows, Vc 1/2 V3+V2= 2 + 70 = 72 vph (Vc9) . itical Gap, Tc Tc= 5 secs (Tab. 10 . 2) _ ..tential Capacity, Cp Cp9= 1000 pcph (Fig. 10 . 3) —dual Capacity, Cm Cm9=Cp9= 1000 pcph EP 2 : LT From Major Street I v-- V4 nflicting Flows, Vc V3+V2= 3 + 70 = 73 vph(Vc4) itical Gap, Tc Tc= 4 . 5 secs (Tab.10 . 2) =utential Capacity, Cp Cp4= 1000 pcph (Fig.10 . 3) of Cp utilized and Impedance Factor (V4/Cp4) x100= . 8% P4= 1 _ tual Capacity, Cm (Fig. 10 . 5) Cm4=Cp4= 1000 pcph 2TEP 3 : LT From Minor Street I <-\ V7 nflicting Flows, Vc 1/2 V3+V2+V5+V4= . , 2 + 70 + 35 + 8 = 115 vph(Vc7) "'itical Gap, Tc Tc= 6 secs (Tab. 10 . 2) tential Capacity, Cp Cp7= 884 pcph (Fig. 10 . 3) ___tual Capacity, Cm Cm7=Cp7xP4= 884 x 1 = 884 pcph . ARED LANE CAPACITY SH = (V7+V9) / ( (V7/Cm7) + (V9/Cm9) ) if lane is shared CR CR LOS LOS -""VEMENT V(PCPH) CM (PCPH) CSH(PCPH) (CM-V) (CSH-V) CM CSH 7 2 884 950 882 945 A A 9 3 1000 950 997 945 A A 4 8 /000 Q9z A PY O August 2, 1995 MCMY0001 Mr. Bill Parks Oregon Division of State Lands 775 Summer Street NE Salem, Oregon 97310 Dear Bill: On behalf of Bowen Development Company, David Evans and Associates,Inc. (DEA) submits the enclosed permit application to fill 0.10 acres of jurisdictional wetlands located in the proposed Fieldcrest Court multi-family development in Tigard, Oregon (NW 1/4 SE 1/4 Section 33 of Township 1 South, Range 1 West, Willamette Meridian). The purpose of this activity is to provide needed multi-family housing within the City of Tigard to accommodate current and anticipated affordable housing demands. To support this application, the following documents are submitted for your review: 1. Completed application form, with the signature of the applicant. 2. A project summary. 3. Permit narration with detailed information on the project history, existing conditions, proposed project, project purpose and need, alternatives examined, and a proposed mitigation plan. 4. Supporting graphics: a. Vicinity Map b. Wetland Delineation Map c. Planting Plan d. Grading Plan e. Cross Section A f. Cross Section B g. Monitoring Plan 5. A check payable to DSL for$375 ($375 commercial fill/removal base fee). This application is being submitted concurrently to the US Army Corps of Engineers (ACOE). If you have any questions,please call me directly at DEA(503) 223-6663 extension 224. DAVID EVANS AND ASSOCIATES,INC. A PROFESSIONAL SERVICES CONSULTING FIRM OFFICES IN OREGON,WASHINGTON,CALIFORNIA AND ARIZONA 2828 S.W.CORBETT AVENUE PORTLAND,OREGON 97201-4830 (503)223-6663 FAX(503)223-2701 .(#S PRINTED ON REC,C1P8LE AWER Mr. Bill Parks August 2, 1995 Page 2 Sincerely, DAVID.EVANS AND ASSOCIATES, INC. Larry Devroy, Associate Natural Resources Manager �n Enclosures UUUUUU cc: Dale Haslem,ACOE KRO:jlp\mcmyper.doc DAVID EVANS AND ASSOCIATES, INC. A PROFESSIONAL SERVICES CONSULTING FIRM S.A RdNtEOc RECICIFBLF AV ER August 2, 1995 MCMY0001 Mr. Dale Haslem US Army Corps of Engineers Attn: CENPP-PE-R P.O. Box 2946 Portland, Oregon 97208-2946 — ' Dear Dale: On behalf of Bowen Development Company, David Evans and Associates,Inc. (DEA) submits the enclosed permit application to fill 0.10 acres of jurisdictional wetlands located in the proposed Fieldcrest Court multi-family development in Tigard, Oregon (NW 1/4 SE 1/4 Section 33 of Township 1 South, Range 1 West, Willamette Meridian). The purpose of this activity is to provide needed multi-family housing within the City of Tigard to accommodate current and anticipated affordable housing demands. To support this application, the following documents are submitted for your review: 1. Completed application form, with the signature of the applicant. 2. A project summary. 3. Permit narration with detailed information on the project history, existing conditions, proposed project, project purpose and need, alternatives examined, and a proposed mitigation plan. 4. Supporting graphics: a. Vicinity Map b. Wetland Delineation Map c. Planting Plan d. Grading Plan e. Cross Section A f. Cross Section B g. Monitoring Plan This application is being submitted concurrently to the Oregon Division of State Lands (DSL). If you have any questions,please call me directly at DEA(503)223-6663 extension 224. DAVID EVANS ANDASSOCIATES,INC. A PROFESSIONAL SERVICES CONSULTING FIRM OFFICES IN OREGON,WASHINGTON,CALIFORNIA AND ARIZONA 2828 S.W.CORBETT AVENUE PORTLAND,OREGON 97201-4830 (503)223-6663 FAX(503)223-2701 tz RaN1FD CN PEC1W iFNIR Mr. Dale Haslem August 2, 1995 Page 2 Sincerely, DAVID EVANS AND ASSOCIATES,INC. Larry Devroy Natural Resources Manager ` Enclosures cc: Ken Bierly,DSL KRO:jlp\mcmyper.doc DAVID EVANS AND ASSOCIATES, INC. A PROFESSIONAL SERVICES CONSULTING FIRM L:2) PRIMED ON?ECK]NaE AWE? ; JOINT ,/, ; U S Army corps PERMIT APPLICATION FORM '-"0 • of Engineers Portland District THIS APPLICATION WILL MEET THE REQUIREMENTS OF BOTH AGENCIES ]•_• AGENCIES WILL ASSIGN NUMBERS Corps Action ID Number Oregon Division of State Lands Number SEND ONE SIGNED COPY OF YOUR APPLICATION TO EACH AGENCY District Engineer State of Oregon ATTN: CENPP-PE-RP Division of State Lands P.O. Box 2946 775 Summer Street NE Portland, OR 97208-2946 Salem, OR 97310 503/326-7730 503/378-3805 1. Applicant Name Bowen Development Company business phone# and Address 111 SW 5th Avenue, Suite 2260 home phone# Portland, OR 97204 FAX# Co-Applicant Larry Devroy business phone# 503-223-6663 Authorized Agent David Evans and Associates, Inc. home phone# Contractor FAX# 503-223-2701 Name and Address 2828 SW Corbett Portland, OR 97201 Property Owner business phone# (if different than applicant) home phone# Name and Address FAX# 2. PROJECT LOCATION Street, Road, or other descriptive location Legal Description South of Summer Creek, East of SW 135th Avenue Quarter Section Township Range SE 33 1S 1W In or Near(City or Town) County Tax Map# Tax Lot# Tigard Washington 1S1 W33DD 4300 Waterway River Mile Latitude Longitude Summer Creek Is consent to enter property granted to the Corps and the Division of State Lands ® Yes ❑ No 3- PROPOSED PROJECT INFORMATION Activity Type: ® Fill ❑ Excavation(removal) ❑ In-Water Structure ❑ Maintain/Repair an Existing Structure Brief Description: Wetland fill for multi-family residential development Fill will involve cubic yards annually and/or cubic yards for the total project 400 cubic yards in a wetland or below the ordinary high water or high tide line Fill will be ❑ Riprap ❑ Rock ❑ Gravel ® Sand ® Silt ® Clay ❑ Organics ❑ Other Fill Impact Area is 0.10 Acres; length; width; depth Removal will involve cubic yards annually and/or cubic yards for the total project cubic yards in a wetland or below the ordinary high water or high tide line Removal will be ❑ Riprap ❑ Rock ❑ Gravel ❑ Sand ❑ Silt ❑ Clay ❑ Organics ❑ Other Removal Impact Area is Acres; length; width; depth Estimated Start Date Estimated Completion Date Are you aware of any Endangered Species on the project site? ❑ Yes ® No If Yes, please explain in Are you aware of any Cultural Resources on the project site? ❑ Yes ® No the project description Is the project site near a Wild and Scenic River? El Yes ® No (on page 2, block 4). 4. PROPOSED PROJECT PURPOSE & DESCRIPTION Project Purpose and Need: SEE ATTACHED Project Description: How many project drawing sheets are included with this application? Seven(7) NOTE: A complete application must include drawings and a location map submitted on separate 8 1/2 x 11 sheets. Will any material, construction debris, runoff, etc. enter a wetland or water way? ❑ Yes ® No If yes, describe the type of discharge(above)and show the discharge location on the site plan. Estimated Start Date Sept 15, 1995 Esimated Completion date July 15, 1995 5. PROJECT IMPACTS AND ALTERNATIVES Describe alternative sites and project designs that were considered to avoid impacts to the waterway or wetland. SEE ATTACHED Describe what measures you will use (before and after construction)to minimize impacts to the waterway or wetland. NOTE: If necessary, use additional sheets. 6. MISCELLANEOUS INFORMATION Adjoining Property Owners and Their Addresses and Phone Numbers SEE ATTACHED List all other approvals or certificates received, applied for, or denied that are related to this application. Issuing Agency Type of Approval Identification Number Dates of Application/ Approval/ Denial 7. CITY/ COUNTY PLANNING DEPARTMENT AFFIDAVIT (to be completed by local planning official) ❑ This project is not regulated by the local comprehensive plan and zoning ordinance. ❑ This project has been reviewed and is consistent with the local comprehensive plan and zoning ordinance. ❑ This project has been reviewed and is not consistent with the local comprehensive plan and zoning ordinance ❑ Consistency of this project with the local planning ordinance cannot be determined until the following local approval(s)are obtained: ❑ Conditional Use Approval ❑ Development Permit ❑ Plan Amendment ❑ Zone Change ❑ Other An application ❑ has ❑ has not been made for local approvals checked above. Signature(of local planning official) Title City/County Date 8 COASTAL ZONE CERTIFICATION If the proposed activity described in your permit application is within the Oregon coastal zone, the following certification is required before your application can be processed. A public notice will be issued with the certification statement which will be forwarded to the Oregon Department of Land Conservation and Development(DLCD)for its concurrence or objection. For additional information on the Oregon Coastal Zone Management Program, contact the department at 1175 Court Street NE, Salem, Oregon 97310 or call 503-373-0050. CERTIFICATION STATEMENT I certify that, to the best of my knowledge and belief, the proposed activity described in this application complies with the approved Oregon Coastal Zone Management Program and will be completed in a manner consistent with the program. Print/Type Name (coapplicant) Title Applicant Signature Date 9 SIGNATURE FOR JOINT APPLICATION (REQUIRED) Application is hereby made for the activities described herein. I certify that I am familiar with the information contained in the application, and to the best of my knowledge and belief, this information is true, complete, and accurate. I further certify that I possess the authority, including the necessary requisite property interests to undertake the proposed activities. I understand that the granting of other permits by local, county, state, or federal agencies does not release me from the requirement of obtaining the permits requested before commencing the project. I understand that local permits may be required before the state removal-fill permit is issued. I understand that payment of the required state processing fee does not guarantee permit issuance. Print/Type Name (coapplicant) Title Applicant Signature (coopplicant) Date I certify that I may act as the duly authorized agent of the applicant. Print/Type Name Title Agent Signature Date SUPPLEMENTAL WETLAND IMPACT INFORMATION* (FOR WETLAND FILLS ONLY) Site Conditions of Impact area Impact area is ❑ Ocean ❑ Estuary ❑ River ❑ Lake ❑ Stream ® Freshwater Wetland Note: Estuarian Resource Replacement is required by state law for project involving intertidal or tidal marsh alterations. A separate Wetlands Resource Compensation Plan may be appended to the application. Has a wetland delineation been completed for this site? ® Yes ❑ No If yes, by whom? DAVID EVANS AND ASSOCIATES, INC. Describe the existing Physical and biological character of the wetland/waterway site by area and type of resource (use separate sheets and photos, if necessary) SEE ATTACHED Resource Replacement Mitigation Describe measures to be taken to replace unavoidably impacted wetland resources SEE ATTACHED * Because this information is not necessary for a complete application, you may submit this sheet and other environmental information after submitting your application. DIVISION OF STATE LANDS COMPENSATORY MITIGATION FORM If the permit involves multiple compensatory mitigation projects at different location then use a separate form for each location. 1. Applicant Bowen Development Company Permit No. (if known) MITIGATION SITE LOCATION: Mitigation Site# Adjacent Waterway County Wa. Section 33 Township 1S Range 1W Tax Lot 4300 2. Is the wetland or waterway fill/conversion project AND the compensatory mitigation project EACH smaller than 1/4 acre in size? ❑ Yes- Sign and date the form. No additional information is needed. ® No -Complete the remainder of form. WETLAND IMPACTS: 3. What wetland type or types will be filled or converted by your removal-fill project? (Not the compensatory mitigation project.) List all of the types. The Division uses the Cowardin wetland classification codes found on National Wetland Inventory Maps (1). Below are the most common wetland types. If your wetland type is not listed, use one of the blank spaces and fill in the appropriate code. Also indicate the acreage involved for each wetland type you list. Acreages should be listed to the 1/100 of an acre if possible. Acres Acres Acres Acres • PEM 0.10 ❑ R3RB ❑ E2EM ❑ ❑ PSS ❑ R3UB ❑ E2SS ❑ ❑ PFO ❑ R4SB ❑ E2FO ❑ Fill in the wetland types and acreages for the remaining questions in the same manner. COMPENSATORY MITIGATION 4. Will part or all of the compensatory mitigation project be located in existing wetlands? This does not include wetlands that have been identified as"prior converted" by the Division. ® No-Skip to #7 below. ❑ Yes- Continue filling out the form. 5. List all of the wetland types that currently are found at the site of your proposed compensatory mitigation project. Indicate the acreage that will actually be affected by the mitigation project for each wetland type you list. Acres Acres Acres Acres ❑ PEM ❑ R3RB ❑ E2EM ❑ ❑ PSS ❑ R3UB ❑ E2SS ❑ ❑ PFO 111 R4SB ❑ E2FO ❑ 6. List all of the wetland types that will result from your proposed compensatory mitigation project in existing wetland. Indicate the acreage involved for each wetland type you list.. Acres Acres Acres Acres ❑ PEM ❑ R3RB ❑ E2EM ❑ ❑ PSS ❑ R3UB ❑ E2SS ❑ ❑ PFO ❑ R4SB ❑ E2FO ❑ NOTE: The total acreage for No. 5 and No. 6 should be the same. 7. Is part or all of the compensatory mitigation project site a prior converted wetland or former wetland that is now upland? ® No or Don't Know-Skip to#9 below. ❑ Yes- Continue filling out the form. 8. List all of the wetland types that will result from your proposed compensatory mitigation project on prior converted or former wetlands. Indicate the acreage involved for each wetland type you list. Acres Acres Acres Acres ❑ PEM ❑ R3RB ❑ E2EM ❑ ❑ PSS ❑ R3UB ❑ E2SS ❑ ❑ PFO ❑ R4SB ❑ E2FO ❑ 9. Will part or all of the compensatory mitigation project involve creation of wetland from uplands? ❑ No -Skip to #7 below. ® Yes- Continue filling out the form. 10. List all of the wetland types that will be created from uplands. Also indicate the acreage involved for each wetland type your list. Acres Acres Acres Acres ® PEM .04 ❑ R3RB ❑ E2EM ❑ • PSS .13 ❑ R3UB ❑ E2SS ❑ ® PFO .10 ❑ R4SB ❑ E2FO ❑ 11. Form complete by Date Signature `'' Cowardin, Classification of Wetlands and Deepwater Habitats of the United States, 1979. Oregon Division of State Lands, Wetland Inventory User's Guide, 1990. JOINT REMOVAL/FILL APPLICATION TO OREGON DIVISION OF STATE LANDS AND US ARMY CORPS OF ENGINEERS For FIELDCREST COURT Prepared For: • Bowen Development Company 111 Southwest Fifth Avenue, Suite 2260 Portland, Oregon 97204 Prepared By: DAVID EVANS AND ASSOCIATES, INC. 2828 SW Corbett Ave. Portland, Oregon 97201 August 2, 1995 MCMY0001 A11-.A11311k Of , 1 • R ' -TI III S I k:ATCG1('Tf-.A11((I ALI-ICU RI S(H k('I S PklA III)ON RI('lY I_A13I_f.I'VI I R TABLE OF CONTENTS Page PROJECT SUMMARY 1 SITE DESCRIPTION AND EXISTING CONDITIONS 3 JURISDICTIONAL WETLAND FINDINGS 3 National Wetlands Inventory 3 Washington County Soil Survey 3 FIELD RESULTS 6 Hydrology 6 Soils 6 Vegetation 6 DISCUSSION 10 PROPOSED PROJECT DESCRIPTION 10 PROPOSED PROJECT IMPACTS TO WETLANDS 10 PROJECT ALTERNATIVES 11 EROSION CONTROL PLAN 11 ADJOINING PROPERTY OWNERS 11 MITIGATION PLAN 12 Total Mitigation Area 12 Mitigation Goals 15 Construction Sequence 16 Construction Supervision 16 Monitoring Program 16 Contingency Plan 17 APPENDICES A. USFWS National Wetlands Inventory,Beaverton Quadrangle B. USDA NRCS Washington County Soil Survey, Sheet No.44 C. Wetland Delineation Data Sheets \\II NIRI.R 01 S'I A IZ "'-rUE S(Il:AU GI('TE.AA1 Of -AIIIEI)RES(1C'R(I[S PRINTI D ON RI?CYCI.AIfI k PrAPER LIST OF TABLES Page 1. Disturbed Community Representative Vegetation 7 2. Riparian Community Representative Vegetation 8 3. Floodplain Community Representative Vegetation 9 4. Mitigation Community Representative Vegetation 9 5. Wetland Impacts Associated With Development Fieldcrest Court 11 6. Adjoining Property Owners 12 7. Proposed Wetland Species 14 8. Proposed Upland Buffer Species 15 c LIST OF FIGURES Follows Page 1. Vicinity Map 3 2. Wetland Delineation Map 6 3. Planting Plan 12 4. Grading Plan 12 5. Cross Section A 12 6. Cross Section B 12 7. Monitoring Plan 12 ii \A1I Allil_R UI S I \I: -i 116 STR,AIl[(.l( TI`:All UI -AI.I.II`I)RIfSOt It('I.S. PRIME E I)().A RE(1(I VITl.I.PVPI_R FIELDCREST COURT PROJECT DESCRIPTION AND DRAWINGS PROJECT SUMMARY APPLICANT: Bowen Development Company LOCATION: The property is located in Tigard, Oregon, and is bounded by Summer Creek to the north and SW 135th Avenue to the west. The property is in the east 1/2 of Section 33, Township 1 South, Range 1 West, Willamette Meridian,Washington County. PROJECT DESCRIPTION: 1. The Bowen Development Company would discharge fill into a total of 0.10 acres of jurisdictional palustrine scrub-shrub/emergent, semi- permanently flooded (PSS/EM1Y) wetlands as part of constructing a multi-family residential development. An existing compensatory wetland mitigation site, 3,330 square feet (0.076 acres), located just east of SW 135th Avenue and immediately south of the Summer Creek floodplain, will be filled. An additional 1,085 square feet (0.025 acres) of undisturbed PSS/PEM will also be filled. 2. The proposed mitigation plan for wetland impacts has been developed in accordance with the Oregon Freshwater Compensatory Mitigation Rules (145-85) for Minor Projects. A mitigation ratio of 1.5 of wetland acres created for each acre of undisturbed wetland impacted, and 3.0 wetland acres created for each acre of mitigation wetland impacted applies to the mitigation design proposed under the above mitigation rules. Specifically, Bowen Development Company proposes to create 11,650 square feet(0.27 acres) of PFO/PSS/PEM wetland complex, consisting of enhanced vegetative structure and wildlife habitat. Thus a ratio of 2.64:1 (wetland creation to fill)will be achieved 3. In accordance with the Oregon Freshwater Compensatory Mitigation Rules, a monitoring program for the wetland mitigation area would entail semi-annual visits and annual reports to document the progress of the functional values created, and determine whether the criteria for success have been met. The Bowen Development Company will accept conservatorship for the mitigation areas,including all maintenance and any necessary replacement. PURPOSE: The purpose of the project is to provide needed multi-family housing in the City of Tigard to accommodate current and anticipated housing demands within the Urban Growth Boundary. 1 DRAWINGS: Seven (7) Figures, including: Site Vicinity Map, Wetland Delineation Map, Planting Plan, Grading Plan„ two Typical Cross Sections and Monitoring Plan. ADDITIONAL INFORMATION: Additional information may be obtained from the Bowen Development Company's project manager Nancy Hubbard; 1 l 1 SW Fifth Avenue, Suite 2260, Portland, Oregon 97204, (503) 274-8400. 2 VAiIAIR1_IlOI tiT AII w IIlfiSIR\II(JI('IE\\1OP,AIIIGDRGSOIR(l5 PRIV'III)HI.VRI:('1( I VIII I'VI'IiR SITE DESCRIPTION AND EXISTING CONDITIONS The site is located in the northern portion of the Willamette Valley physiographic region of Oregon. The Willamette Valley is a broad, alluvial plain that drains to the north and lies between the Coast and Cascade Ranges of western Oregon. Topography consists of mostly flat areas or gently rolling hills interspersed with occasional low buttes and hills that rise about 300 feet above the valley floor. Summer Creek forms the northern property border. The subject parcel is located in rolling hills with nearly level to sloping topography. Elevation is 170-200 feet above sea level. Bull, Cooper, and Sexton Mountains, local features of significant relief, are basalt hills rising above the mantle of silt and sands found over most of the valley surface. Summer Creek forms the northern property border and is a ) l�C )( tributary to Fanno Creek which flows into the Tualatin River. Its headwaters occur on % )-u-, Cooper Mountain. Several constructed ponds have been built in the creek, one of which lies east of the property, in Summer Creek Park. The property is located in Tigard, Oregon, and is bounded by Summer Creek to the north and SW 135th Avenue on the west. The property is in the east 1/2 of Section 33, Township 1 South, Range 1 West,Washington County, Willamette Meridian (Figure 1). The natural vegetation of the area has been modified by various land uses. The portion of the site south of Summer Creek has been extensively modified by clearing and grading operations with grouped coniferous, and mixed deciduous-coniferous, stands occupying undisturbed sites. A coniferous woodland is located along the south border. An undisturbed mixed deciduous-coniferous forest occupies the ecotonal region between the uplands and the floodplain on the south side of the creek. JURISDICTIONAL WETLAND FINDINGS National Wetlands Inventory A review of the Beaverton Quadrangle National Wetland Inventory (NWI) map (Appendix A) shows the presence of several mapped wetlands along Summer Creek in the project area. A wetland along the western portion of the creek is identified as a palustrine, forested, broad-leaved deciduous, intermittently flooded(PFO1 W) wetland. Along the eastern portion is a palustrine, scrub-shrub/emergent, semipermanently flooded (PSS/EM1Y) wetland. The slopes on the north and south sides of Summer Creek are shown as uplands. Washington County Soil Survey According to the Washington County Soil Survey, the property is located within one major soil association, the Woodburn-Quatama-Willamette association. These soils are well to 3 \A 1 I V 1 1 t i 1<( I ;A it 1111[',I R_A1I(,I( II AAIto VLLII.I)RI,,()[k( I.� PRIA I I!)UA Kt( ( I_WI.I PAP[ )1 x i, xF 1 . 4s,„,4�.yy$ 1. t y,Y, -ft,rL`C7.� -� ., .S � #WSNIW S Wu' I .S' c(p zRLS” Si C-"'..'1 /�Y t 6 -.,.r7" t%.%„,1••• y.P. 344, t 1 ) •A'A1- ,,, . .4 7 iFNTFA , `ST -ti C(I CW, ST E _,.--5 v e s� ;3 c k .c1 ...1.9,.....4.,f4-10.�, rS v. ,v 4� cY'//� it 0 U > No L a �9.4 . Si a: ;1„,•-:*' "},,,,_�r W!..SYt kr'. ' tm>kR p' ",c_y.E,rtt' 1 .'�1�4 �O 1.3H4 41 B _'11 Af +E11M000 ..",S ,9 a tf`^f. ,aa t ‘.1'../ {' .' -' .RDERS - -._;.__„__ ,-, .�... r t.', ce[taur .,�: Yu` r : 8H -FiT t" , A' � ,. r a ,yam , A :' X sT :. I �� r 4,N 2 E Sti r +,y--- , i '`., 1 \,,.!, },' 0 T a. d;. a s„ *1".or 1 a .."1.%1> 'Ltd, ,�'' ! 'a i a 3 s R —t § � I Ri • a �' ur� err b, ..--..f' z�- \,,,,,,c,---,'-w,r• , 1..,S'1 sT' *,A.1,,Axrr 1 Fe �J r-� ,,x -p lig -7- Project -._- r... ,c ; w - �, t 1r ( ., ..4,j. "" - I ocation 5 , i.i ,' sv �y ���r ��"".: �CtiOIL -�` : t� � _ �� . �`i'� 1�T � _ M+1�lFtEAF '* °r'"' ''' i .---, i,„,.. „4., C0tom4r, ��, L, �i' n; '� }kx,:f ... i '': ,.,60''' BAR; __.l ST .} -------f-24 a, . 61R r�A ., ca; 3fy. ctrtx 4 ,i, ,s ,,,,,'t .£1tit rs u6tERY4 r,. , ” r✓ ,i~ 34 ,C.. urm _ Iw*t.�C4 I w au 1n a1 _ a., i A__. TJ cy +rara :l ,!A 3; ‘.„.74,,,,x, v t--,' s5 M .iu +-nr 1 rAar '°'' gn[r n !' ,fw 40 : e z r Y t< �a _3f1 i ' a to ..w -� S41 A?21GAR1 Si tS I4 54 PtAtFtE au 'S . a ' a 1 a "t'°+a,.sw""'S°4 7 )I z' 1-300 .1 is w. u y , ,:.,� ,r``. �c1G""•a w rxruv x 'S,*^t, r, t \,,,,,, tt 0, . m ..0-..C., i S . (/1 ' x Sy �S F ,�1 .�^ 44 3 a.} AA t _.r �, t. !f$ n. •9C A ,,r `A. [c. Si i a w �b , .,, 4 SK h11,{, ._C-1 Sd w e '+eht-- I *,.,,r. 1�,, •. .� w ,re y n s �_■ "' a�, -- -r4, qt r ._ t ;r a s J..:Al.44ifi'a-ftgl ';. ,qe .`� I r E r" i' / a ... x y` i1'-1 _ 1. s -w-� O �' ' y ' y .oMcr r_ '6 a a! ,�. --=',.: :z - �. .3 c2 Y itLGA�;• .- w Gan C5-O 1 .._ ..y a .f9 A,, "� t'£r„„„ . a , I k1D Lin a,„>„ 1 ,a �a . 4l Y �x t<. .ct�t ' A �, t I. / V 'I � gv 'p :. y aR ,'S� ate,' cT Sub l'-'7. ',,,,',. ..� c -_.�ttn K,b �,. '"c.,ws,_ +..t++N• '. : Y? '� _. a S T' .; b , '1",,-1. '�,. fS .- fJ,f• .�E A n s'7,:: ke e �t >~ b- .. -r ,.� a' �e� s ,/,•,..,t �ct \f‘ d� ��sk , ryy ct _'' tin .� .� ,% ,\ . ` BrEEnv- c.� - �`' W WALNUT '' ('r i.. .., �- 'S' • �, _J , L :z_ ' cF,,r+CM-•3t ' ,i ., k., �',c ti,,,,,,,,,,,,y,/ L v 't1'� ' i s;1 c '-3 , sit<'LUERIA T i n _ I 1 * ,x <�. ,fiy . fMfA P444 ra ,.t1S... ( �\ F • t-- AP ,rGe2P 4T '!k to S 1 kS Fx / .,� °` Z �._S R I i N rr 7 r, a` 'ra ids ' a 4•*---`' \..,,` ... 4/11__t zN §\` "*"-2-'''' .. 1u tri Ev ` .;• 91 fvA f . Jr,; s 4i rent Nvr t Ari?NOT TO SCALE §)(§66) FIELDCREST COURT DAVID EVANS AND ASSOCIATES,INC. CITY OF TIGARD, OREGON Figure 1 2828 SW CORBETT AVENUE PORTLAND,OREGON 97201 ••• Vicinity Map poorly drained, located on nearly level to moderately steep terraces, and formed in alluvium and old lacustrine material. The Washington County Soil Survey locates three soil series on the site: Woodburn silt loam; 0 to 3, 3 to 7, and 7 to 12 percent slopes (map units 45A, B, and C respectively); Wapato silty clay loam, (map unit 43); and Cornelius and Kinton silt loam, 2 to 7 and 7 to 12 percent slopes (mapping units 11B and 11C respectively). Of these soils, only Wapato silty clay loam is classified as a hydric soil by the Washington County National Resource Conservation Service (NRCS) and the National Technical Committee for Hydric Soils (NTCHS). Woodburn, and Cornelius and Kinton soils have inclusions of hydric soils. Woodburn silt loam, the most common soil on the property, is mapped on the gentle side slopes and terraces north and south of the drainage. Wapato silty clay loam is mapped in the (1 )A drainage bottom. A small area of Cornelius and Kinton silt loam occurs in the northwest �JU corner of the parcel, along SW 135th Avenue. Woodburn Silt Loams; 0 to 3, 3 to 7, and 7 to 12 percent slopes This moderately well-drained soil is located on low, broad, valley terraces (slopes of 0 to 20 percent) and formed in old deposits of alluvium (rock fragments transported and deposited by flowing water). The surface layer in a representative profile is a very dark grayish-brown (10YR 3/2) silt loam about 11 inches thick. The subsoil layer is between depths of about 11 to 41 inches and is a dark brown (10YR 3/3) and dark grayish brown (10YR 4/2) silty clay loam. The substratum is about 19 inches thick and a dark grayish-brown (10YR 4/2) silt loam. Native vegetation is Douglas-fir (Pseudotsuga menziesii), Oregon white oak (Quercus garryana), grasses, and shrubs. Permeability is slow and these soils have low shrink-swell potential, slight to moderate to high susceptibility to sheet and rill erosion, depending on the slope. Woodburn soils are not usually flooded but high water tables (2 to 3 feet deep), associated with perched water bodies, can occur during December through April. Included in this series are areas of Aloha, Amity, Willamette, Helvetia, and Dayton soils which can occupy as much as 15 percent of this mapping unit. Woodburn and its associated inclusions, with the exception of Dayton, are not listed as hydric by the Washington County NRCS or the NTCHS. Cornelius and Kinton Silt Loam; 2 to 7 and 7-12 percent slopes This undifferentiated group consists of about 50 to 65 percent Cornelius soils and 25 to 35 percent Kinton soils. These soils occur in a variable pattern. The Cornelius series is a moderately well-drained soil located on uplands with slopes that vary from 2 to 60 percent. It formed in loess-like (wind blown) sediments deposited over fine-silty alluvium. These alluvial deposits are old and the fragments are from many different kinds of rock. The surface layer in a representative profile is a dark brown (10YR 3/3) silt loam about 6 inches thick. The subsoil layer is divided into two layers. The upper part is located between depths of about 6 to 38 inches and is a brown (10YR 5/3 to 4/3) silt loam. The lower subsoil is a brown (10YR 5/3 to 4/3), mottled silt loam fragipan located between depths of 38 and 58 inches. A fragipan is a dense layer in the soil that prevents root penetration and water 4 A MEMBER OF STAR '-4'-"IHE S"IRAFEGIC IL 1M 01 ALLIED RISOLRCES. ERIN 1 LL)ON RECYCLABLE PAPER passage. Fragipans are often mottled, contain streaks of gray silt, and are found on only a few upland soils in Oregon. Native vegetation is Douglas-fir, big-leaf maple (Acer macrophyllum), shrubs, and grasses. Permeability is slow and these soils have low to moderate shrink-swell potential. Depending on the slope, runoff is slow to rapid and this soil has slight to severe hazard of erosion. Cornelius soils are not usually flooded but high water tables (2.5 to 4 feet deep), associated with perched water bodies, can occur from December through April. The Kinton series, mapped only with the Cornelius soils, is a moderately well-drained soil located on uplands with slopes that vary from 2 to 60 percent. It formed in loess-like sediments deposited over fine-silty alluvium. These alluvial deposits are old and the fragments are from many different kinds of rock. The surface layer in a representative v �1(�� �����i profile is a very dark brown (10YR 2/2) and dark yellowish brown (10YR 4/4 to 3/6) silt J loam about 10 inches thick. The subsoil layer is divided into two layers. The upper part is located between depths of about 10 to 30 inches and is a brown (10YR 5/3 to 4/3) silt loam. The lower subsoil is a brown (10YR 5/3 to 4/3), mottled silt loam fragipan located between depths of 30 and 49 inches. The substratum is brown (10YR 5/3 to 4/3) mottled silt loam fragipan. The fragipan has faint to prominent light brownish gray (10YR 6/2) mottles. Native vegetation is Douglas-fir, big-leaf maple, shrubs, and grasses. Permeability is slow and these soils have low shrink-swell potential. Depending on the slope, runoff is slow to rapid and this soil has slight to severe hazard of erosion. Cornelius soils are not usually flooded but high water tables (2.5 to 4 feet deep), associated with perched water bodies, can occur during December through April. Included in the undifferentiated Cornelius and Kinton group are areas of Cascade, Laurelwood, and Delena soils which can occupy as much as 15 percent of this mapping unit. Cornelius and Kinton, and their associated inclusions, with the exception of Delena, are not listed as hydric by the Washington County NRCS or the NTCHS. Wapato Silty Clay Loam This poorly drained soil is located on nearly level (0 to 3 percent slopes) floodplains along small streams and in low-lying areas next to larger streams. Parent material is recent deposits of alluvium. The surface layer in a representative profile is a very dark grayish- brown (10YR 3/2) silty clay loam about 14 inches thick. The subsoil layer is found between depths of about 14 to 41 inches and is a dark grayish brown (10YR 4/2) silty clay loam. Native vegetation is Oregon ash (Fraxinus latifolia), willow (Salix sp.), rushes, and grasses. Permeability is moderately slow and these soils have low shrink-swell potential and slight to moderate to high susceptibility to sheet and rill erosion, depending on the slope. Wapato soils are frequently flooded for brief intervals from December through April when they also exhibit an apparent high water table (0 to 1 feet deep). Included in this series are areas of Chehalis, Cove, Labish, McBee, and gravelly soils which can occupy as much as 15 percent of this mapping unit. Wapato and the inclusions of Cove and Labish soils are listed as hydric by the Washington County NRCS or the NTCHS. 5 A MEMBER OF SI'I I X It r -I HF STR NI IOI('l 1 AM Of \I.I.III)RESOURCES. PKIN I l l)ON RECYCLABLF;PAPI{R FIELD RESULTS The site was investigated on May 23, 1995. Hydrology, soils, and plant communities were assessed at 7 data sample plots (Figure 2). Data sheets are included as Appendix C. Results of the field investigation are presented below. Hydrology Hydrology of the site appears to be governed primarily by seasonal surface runoff and associated perched water bodies, seeps, and intermittent flooding of Summer Creek. The y(cH��.�I Summer Creek floodplain was found to be saturated to the surface (Plots 3 and 7). Areas near the edge of the floodplain were found to be saturated within the upper 12 inches (Plot 4). Areas of the floodplain, on both sides of the creek, were observed to be inundated. The slopes on the north and south sides of Summer Creek were found to be dry to a depth of 18 inches (Plots 1, 2, 5, and 6). Soils Soils were sampled at each of the investigative plots (Appendix C). Soils located within the floodplain adjacent to Summer Creek approximately matched the Wapato soils mapped by the Washington County NRCS. The soil south of Summer Creek was found to be a very dark gray (10YR 3/1) silty loam with common yellowish-brown (10YR 5/6) mottles (plots 3 and 4). North of Summer Creek the soil was found to be a black (10YR 2/1) silt loam with common 10YR dark yellowish-brown mottles. These descriptions differ from the Wapato description in that they have a somewhat lower chroma, and mottles are not a feature common to Wapato soils. These descriptions are, however, consistent with hydric soils. Soils on the slopes above the floodplain matched the descriptions of Woodburn silt loam, and Cornelius and Kinton soils. Here the soils were generally a brown (10YR 4/3), dark yellowish brown (10YR 4/4), or dark brown (7.5YR 3/3) (plots 1, 2, and 6). These descriptions are found in upland soils. In the riparian forest, between the floodplain and the south hillslope, the soil was found to be a grayish brown (10YR 5/2) with common, large, dark brown 7.5YR 3/3 mottles; somewhat transitory between the Wapato and Woodburn descriptions. This description satisfies the criteria for hydric soils. Vegetation Plant communities and vegetation dominance were assessed at each of the sample plots. Plant species were identified, ascribed to communities, and the community status was determined to be either hydrophytic or non-hydrophytic based on the dominant species. Communities are identified by their location on-site. Communities are described as the 6 \III MBE R OF STAR -THE STRATEGIC TEAM OF ALLIED RESOI;RCIS. PRINTED ON RECYCLABLE:PAPIiR "disturbed" community found in previously cleared areas; the "riparian" community found along the south border of the Summer Creek floodplain; the "floodplain" community, and the "mitigation"community located in the created mitigation wetland. Disturbed Community This community is located on the previously disturbed slopes both north and south of the Summer Creek floodplain. The southern section retains groups of trees and shrubs, while the north section has little or no native vegetation remaining (Plots 1,2, and 5). Table 2 lists species representative of this disturbed community. ��UUU Table 1 uVU Disturbed Community Representative Vegetation Scientific Name Common Name Wetland Indicator Status Trees Populus balsamifera balsam poplar FAC Pseudotsuga menziesii Douglas-fir FACU Shrubs Cytisus scoparius Scot's broom :UPL Holodiscus discolor ocean-spray UPL Rubus discolor ':Himalayan blackberry FACU Herbs d Anaphalis margaritacea pearly-everlasting UPL Bromus mollis soft brome UPL Chrysanthemum leucanthemum ox-eye daisy UPL Holcus lanatus velvetgrass FAC Hypochaeris radicata spotted cats-ear :FACU Lupinus polyphyllus big-leaved lupine FAC+ Parentucellia viscosa yellow-weed ;FAC- Poa pratensis Kentucky bluegrass FAC Rubus ursinus trailing blackberry :FACU Trifolium pratense red clover FACU Vicia sativa common vetch UPL Douglas fir dominates the remnant tree strata. Scot's broom dominates the shrub layer on the north side of the parcel. Various ruderal species dominate the previously cleared herbaceous layer. This community is considered non-hydrophytic based on its dominance by UPL and FACU species. 7 A MPMRFR flP CITI AIR 4*.TI-IP TR ATFC:I 'FIM flP Al I IP l RFCfIIiR!`GC PRlNTFrl(MI RGf Vf 1 A RI G PA PPP cS',) Riparian Community This community is located mainly along the southern edge of the Summer Creek floodplain, though it is also found near the east border north of the floodplain (Plots 3 and 7). Table 3 lists species representative of the riparian community. Table 2 Riparian Community Representative Vegetation Scientific Name Common Name Wetland Indicator Status Trees Pseudotsuga menziesii Douglas-fir FACU Crataegus douglasii black hawthorn FAC Fraxinus latifolia Oregon ash FACW Shrubs • Cornus stolonifera red-osier dogwood FACW Physocarpus capitatus Pacific ninebark FACW- Rubus discolor Himalayan blackberry IFACU Symphoricarpos albus common snowberry FACU Herbs Carex deweyana Dewey's sedge FACU Circaea alpina enchanter's nightshade FAC+ Polystichum munitum sword fern FACU Tolmiea menziesii piggy-back plant FAC This community forms a transition from the disturbed slopes to the southern floodplain edge. Away from the floodplain Douglas-fir, common snowberry, and sword fern are more common, though all species occur together. Near the floodplain edge Oregon ash, Pacific ninebark, piggy-back plant and enchanter's nightshade are more common. This community is generally considered hydrophytic due to the relative dominance of FAC and FACW species over FACU species. Himalayan blackberry forms a near monotypic stand along the majority of the north floodplain edge. Floodplain Community This community is located in the Summer Creek floodplain (Plots 3 and 6). Table 4 lists species representative of this community. 8 A MEMBER OF SITIAI R*-THE STRATEGIC TEAM OF ALLIED RESOURCES. PRINTED ON RECYCLABLE PAPER Table 3 Floodplain Community Representative Vegetation Scientific Name Common Name Wetland Indicator Status Trees Fraxinus latifolia Oregon ash FACW Shrubs Lonicera involucrata black twinberry FAC+ Rosa nutkana Nootka rose FAC Salix sp. willows FACW �( Spiraea douglasii Douglas spirea '•.FACW !Herbs rPhalaris arundinacea reed canarygrass FACW Oregon ash, black twinberry,Douglas spirea, and Nootka rose are located along the southern floodplain edge. Reed canarygrass forms a near monotypic stand from near the southern floodplain edge to the north floodplain edge. Widely scattered willows located near Summer Creek add the only structural diversity. Mitigation Community This community is located in the created compensatory mitigation wetland located just east of SW 135th Ave., immediately south of the floodplain. Table 5 lists species representative of this community. Table 4 Mitigation Community Representative Vegetation Scientific Name Common Name Wetland Indicator Status Trees Crataegus monogyna English hawthorn FACU+ Herbs Holcus lanatus velvetgrass .FAC _µ Juncus effusus soft rush FACW Juncus ensifolius dagger-leaf rush FACW Phalaris arundinacea reed canary-grass FACW Typha latifolia narrow-leaf cattail OBL A few scattered English hawthorn are found around the perimeter of this predominately emergent mitigation wetland. Narrow-leaf cattail is located in the central portion with soft rush and dagger-leaf rush also common. Reed canarygrass has invaded the site. 9 A MEMBER OF SITIAIR -THE STRATEGIC TEAM OF ALLIED RESOURCES. PRINTED ON RECYCLABLE PAPER� Y DISCUSSION Data compiled from the investigative plots were analyzed and resulted in the identification of one 4.70-acre wetland (Figure 2). The wetland bisects the parcel from SW 135th Avenue to the east property line. The wetland delineation was based on the presence of dominant hydrophytic vegetation, hydric soil indicators, and evidence of positive wetland hydrology. Wetland data sheets positive for all three wetland parameters indicate those wetlands subject to regulation from both the ACOE and DSL. Upland/wetland boundaries were determined by the presence or absence of saturated or inundated soils and changes in vegetation. The wetland acreage and location has been professionally land surveyed by DEA in order to provided accurate location and size. vV This wetland encompasses the Summer Creek floodplain, a wetland mitigation site located near the southwest edge of the wetland, and a narrow groundwater seep located approximately 50 feet east of the mitigation site (Plots 3, 4, and 7). Vegetation in these areas is dominated by Reed canary grass in the floodplain and a mix of Oregon ash, Pacific ninebark, Nootka rose, and Douglas spirea near the south wetland edge. Reed canarygrass extends to the northern limit. The soil matches the description of the hydric Wapato soils. These soils occur on floodplains. At the time of the investigation, areas delineated were saturated within 12 inches of the surface. The vast majority of the floodplain wetland was saturated to the surface with pockets on inundation. PROPOSED PROJECT DESCRIPTION The proposed project creates 52 single-family attached residences with amenities. The development encourages single-family home-ownership at multi-family densities in a planned development that is single-family in nature. PROPOSED PROJECT IMPACTS TO WETLANDS Jurisdictional wetlands impacted by the proposed Fieldcrest Court are itemized in Table 6. These impacts are limited to wetlands extending south of the Summer Creek floodplain. These wetlands will only be partially filled. A buffer with an average width of 25 feet, but never less than 15 feet is proposed along the entire width of the project, with the exception of these two fill areas. The buffer will preserve the riparian forest community which borders the floodplain community. 10 A MEMBER OF SITIAIR i'-THE STRATEGIC TEAM OF Al.I.IFI)RFSOI IR(FS MIN ON RF('YY'I.ARI.F PAPER Table 5 Wetland Impacts Associated With Development Fieldcrest Court Wetland Area(Acres) PSS/PEM 0.025 Mitigation Wetland 0.076 Totals 0.101 PROJECT ALTERNATIVES Site planning and project development schemes have attempted to minimize development ((- )A impacts to water quality in Summer Creek, on-site wetlands, and the remnant Douglas-fir woodland. In order to completely avoid all wetland impacts the entire layout would have to be shifted to the south, resulting in the removal of many significant Douglas-fir trees along the south border. The layout selected results in the preservation of this woodland and associated habitat, and the least amount of wetland fill practicable. The proposed layout avoids all impact to the Summer Creek floodplain. EROSION CONTROL PLAN A complete erosion control plan will be prepared along with the civil engineering construction drawings. This plan will show the location of all sediment fences, inlet barriers, gravel construction entrance and other measures deemed necessary to prevent erosion during the course of construction. Furthermore, there shall be clear directions given regarding inspection and maintanence of erosion control facilities during the construction period. Finally, instructions shall be given in the seeding and planting of all ground not receiving hard surface so as to stabilize these areas at the earliest possible time. ADJOINING PROPERTY OWNERS Adjoining property owners are listed in Table 6. 11 A MEMBER OP S EAR 4-THE VI RAF'GIC TEAM 01 ALLIED RESOURCES_ PRINTED ON RF.CYCI.AHLE PAPER Table 6 Adjoining Property Owners Name Address on Russell,John 11595 SW 134th PL Tigard,Or 97223 Hart,Tracy W&Sigrid A 11593 SW 134th PL Tigard,OR 97223 503-524-8852 Lyyski,Dale A 11591 SW 134th PL Tigard,OR 97223 503-524-9727 O'Halloran, Kevin J 11589 SW Sheffield Cir Tigard,OR 97223 503-524-8180 Robertson,Lee H 11587 SW Sheffield Cir Tigard,OR 97223 503-524-5347 Sackley,Wayne&Anne B 11585 SW Sheffield Cir Tigard,OR 97223 '503-524-3210 Hawley,Jeffrey K&Linda K 11583 SW Sheffield Cir Tigard,OR 97223 503-524-4519 U � (`� Rothenberger,Thomas A 11581 SW Sheffield Cir Tigard,OR 97223 503-524-7711 Chang,Yao-Ke 11577 SW Sheffield Cir Tigard,OR 97223 Russo,Sandie 5435 SW Natchez St Tualatin,OR 97062 Dillman,Carolyn J '11575 SW Sheffield Cir Tigard,OR 97223 503-524-0313 Pfeifer,Allen C&Lisa C 11573 SW Sheffield Cir Tigard,OR 97223 503-524-6681 Jenkins,William R&Carol Lee 11405 SW Winter Lake Dr Tigard,OR 97223 503-524-5709 Best,Carol Ann 11381 SW Winter Lake Dr Tigard,OR 97223 503-646-4209 Garbot,David R&Jean E 11369 SW Winter Lake Dr Tigard,OR 97223 Yasumiishi,Ki Kazuo&Kristi L 13134 SW Winter Lake Ct Tigard,OR 97223 503-524-8150 Smith,Bradley D&Mari A 13156 SW Winter Lake Ct Tigard,OR 97223 MITIGATION PLAN Total Mitigation Area The total area of the on-site wetland creation will be 0.27 acres. This area is proposed as offsetting compensation for the filling of 0.10 acres of on-site wetlands and a wetland mitigation site. The proposed mitigation plan for wetland impacts associated with the Fieldcrest Court multi- family residential development has been developed in accordance with the Oregon Freshwater Compensatory Mitigation Rules(145-85)for Minor Projects. A mitigation ratio of 1.5 acres of wetland created for each acre of wetland impacted, applies to the mitigation design proposed herein. Specifically, in order to compensate for loss of 1,085 square feet (0.025 acres) of PSS/PEM wetland and 3,330 square feet (0.076 acres) of existing PEM mitigation wetland, Bowen Development Company proposes to create 11,650 square feet (0.27) acres of PFO/PSS/PEM wetland complex, consisting of enhanced vegetative structure and wildlife habitat. Thus an overall ratio of 2.64:1 (wetland creation to fill) will be achieved. 12 A MEMBER OF SITIAiR - '-THE STRATEGIC TEAM OF ALLIED RESOURCES. PRINTED ON RECYCI.AHLE PAPER ( . N LEGEND- - — — — \W W W W W W W Compensatory ■ W W W W W W W W Upland Areas Mitigation Site O ` W W W W W • W W 10,180. ,V W W W W W W W 1` Y W W W W W W W r W Wetland V W W W W W W W \ Proposed Mitigation Site Y W W W W W W W Y W W W W W W I A Pro posed Fill Are a s\ 2 W Y W W Jr W W ,/, Photo Station* W W V W 4 W W W W W W V W ,W W W W A Y e gatatlon Sample Q uadrat W W W Y W W W W Property Line Q W W W Y (Si W 4, W , 3W W W S W W W O , W W W W W W W W W W W 0 W W W W \ W W W • "S W W W W W `'A W W W W W W *W fA W W W W 4, %� 4 W . W J F Y W W W W ^d) \ ' W W W W I �1\ W W W -13 • W W W W W 1 a\\ W W W * 15 W * W W W W W W O W W W W W Wetland Limit I W W W * X 4, 4, W 4, W. 1 ` W W * W '' W W W W 4, ' d ` I W W W W W W W W W ' W W W W W W W W W W II ( W W W + W ZS i O� W W W W W W W W W W W W W W W W W W W W N I W W, W W W W W W W W W •W W W W " W W W 4, W W W W W W 4, W W W 4. 4. W 4. W U W 4- •Y W W W W W W W W W * 4. W . W W W W W W W W W (I W W W W W W W W W W W 4' Proposed Fi Il Areas W W W W W W W W W W W W W W W W W W W W 4, W W •W W W 7 W W W W W W W W W W W W W W W W W W .11(./ 1 1 4. 4. 4. W W W W W W y T �W W W W W W W W/ ;: W W W W W , W + W y.':: ® \ W W W W ,W W W W J. SCALE:CALE: 111=100' s ` Compensatory Ir. W W W W W W W Miitigation Site W W W W W 810 4) - - W W W le 6.1.11 135th AVE. FIELDCREST COURT Figure 1 CITY OF TIGARD, OREGON i"iONiTOIRING FLAN 111 II II ( • - - .� - - LEGEND N. .... . ,„.. . . W W W W W W W W W W ., r W W W W W W W W U Upland Areas Y W W W W W W W 14.W WJ wetland Y W W W _W W W W Y W W W ' W W W W \\ Proposed Mitigation Site Y W W W W W W W Y W W W W W W • r -J Proposed Fill Areas Compensatory W Y W W W W W W Mitigation Site W W Y W W W W W 4, iO, 800 W W Y W .W W W W W W W Y W W W W wetland Limit W W Property Line W W W 4, 0 . W W W 4, 7 W W W o W W W W 5 , * W W W CO W W W W W W W W 4 W W W W W (` W W W W W W W W W VS W W W W 0:1 W W W W W",CI W W W J r ,. W 4, W W Property Line W W W W �D 'W W W W W W W 4, -13 • W W W W 4, 1 7 : : : � : : : + W W W W O W W W W W wtlnd Limit x W W W W W IW W W W W W W W W I%, W W W W I I u \Y W W W W W W W W W W 1 W W W W W W W W W Y W W W W W W W W W W W W W W W W W W W r W W W W W W. W W W W 7 il W W W W W W W W W V Y W W W W W W W W W W W W 4, W W W W 4, W W W W W W W W W W W W W W W , W * W W 4, W 4. W W ,W 4. W W W W W W W W W W W `4- Proposed Fill Areas W W W W W W W W W I IW W W W W W 4, W I W •Y W W W W W W W Compensatory W W W W W ,W W W Mitigation Site W •Y W W W 4, W W W 8100 W W W W W W W W 4, I ; W •Y W W W W W W 1 :..W, W W W W W W W W/ 4- \ W W 4. W W • W W W W W W W W W W SCALE: iI iOOI W 4. W W W W W --________ ...... t W W W W W W W W W W W W .M...111111 W W - _ S.W. 135th AVE. •Q E FIELDCREST COURT Figure 2 I= CITY OF TIGARD, OREGON WETLAND DELINEATION ( • i ( – – Compensatory Mitigation Site lO,y VOo �v2'e`I$ e W W W W W W W W tl eW W W W W W W W IV W W W 4, W W * W i;a &IE V W W W W W W W A\N\ Y W W W W W W W�\` Y W W W W W W W � V W J, 4, -4,- W W V. Y W W W W W W • '�\ eP W V W W W W W W ;\ W – I LEGEND IS Upland Areas r,21 Wetland PPrroo osed Mitigation rti ation Site I posed Fi l l Area s P. � (1 ' \ Emergent Wetland �, ,1e W W V 4, •W 4, W W i " Upland Forest I W W W • W W W W v. mg I W W W Property Line 4 Wetland Forest 9 6 ,%•f9 W W NV W 0 W W •Y 1%51i Pi W W W W W W I M Wetland Scrub/Shrub aEmergent Wetland I Q Z 1s�6 W * W W : W W W W W W , W W W z W W W W W REFER TO TEXT FOR iQ Wetland Scrub/Shrub ,•kW W W t) Cl W W W W•i, W W W A W W W W W PROPOSED PLANT SPECIES PECIES til tit) W W * /, W W W W LIST. m Wetland Forest ,i W W W Y W W W W � W W W W ^ :W W W W W; 4 I ,I W W W W 13 • W Upland Forest ZiW W W W 6 W W W W i ' W W W 40 0 W 40 4. 4, 4, Wetland Limit / W W W W )( W W W W W I I i>i W W W W W W W W W /d ;14 i W W W W W W W W W I 0.Y W W W W W * W W W W i (D 4I 1 i W W W W W W W W W E; •V W W W W W W W W W 1s W W W W W W W W W W 'Y W W W W W. W W W W W W W W W •W W W W " W W W W W W W W W W W W W U •Y W W W W W W W W W W W W W W W , W W W W W W W W W •W W W W W W W W W I I W W W W W W W W W W W W Proposed Fill Areas W W W W W W W W W W W W W W W W W W W W W W W ,W W W UJetland Scrub/Shrub W W W W W W W W W • W W W W W W W W W I, W W W W W W W W yf Wetland Forest ., j Cr ii W W W W W W * W/ a %, W 4, W W W , W W W W W W W W W W W W W SCALE: 1".1001 ibtiki - t— __ _ Compensatory %, W W W W W W WP Mitigation/.. Site W W W W W BUOY' - - W W / / S.W. 135th AVE. • Figure 3 FIELDCREST COURT F1 g U CITY OF TIGARD, OREGON PLANTING FLAN E . . . \ l8p ��� I, I n~ n6 I _ n6 rTh��_ _ Z ° -_ U m 11/ ..„'-'-'... .-.',. ...,.. ..--.'----'1---....__.--- -- --...../'''*''''''''' rn rn COMPENSATORY MITIGATION SITE I 7 ----j <///:;:jj ,o A, 180 41111111111.°Age 11 411.___ni_L______4___yr .______ %a° -4111111Ii11111111 • z U Q ns n4 1—iii ns �_ n rn ni a COMPENSATORY MITIGATION SITE SCALE: I"n/40' DAND EVAN6 AND A660CIATEO,NC. 7020 6111 CORCETT AVENUE PORTLAND,OREGON 51201 (OOD)723-6663 FIELDCREST COURT Figure 4 CITY OF TIGARD, OREGON 4D INCA FLAN • UPLAND FOREST ..i r� WETLAND FOREST �` • alit 0 � f TMIr heI .i 86 i 1 0 . wwitaii I` ' , , 1 ,40M+ • f.91. rs' ��.+;','+ PROI905ED CONTOUR 81 ' I f, '` EXISTING CONTOUR �ill,., ,I f {I��,.,t , i d i' i�' • ': 1r ��1'+y ,tom... • 701;j111 yj rrI 1019 t t iI WETLAND SCRUB/SHRUB Z7 76 — wit �,- rL� ' v 1� I 'F3�ia'� •��,y ; 43-.1t, .1 . ityP ..% ■. 4• ft:- 70 69 10 20 50 40 50 60 70 80 90 68 WETLAND //��� ELEVATION iil NOT TO SCALE MAD EWIS nNDAS500nTFSWC Fieldcrest Court Figure 6 3S SW meE1T AfilE CITYOF TIGARD,OREGON rowAEUaaECaor+97 1 ,,, CROSS SECTION B mcmy00014I UPLAND FOREST ..1 WETLAND FOREST c' • ice,,.•• , / t i Pik {' ' I 4l 1 vi111'', e 56 i �� ''' }1}, {I. 1, t �• EXISTING CONTOUR ! 1 t,l ,i'.+,.', ter. . �`t�±!�''f` , 11 PR0r05ED CONTOUR 141x 19 114 , + " EMERGENT WETLAND ali:.1 f r!' 711 1 WETLAND SCRUB/SHRUB .4'esi..ipr,,,,, -; . V +-, 4• / ti,--- '! l� ...111119 ''t,:,U'i i? :\‘4 k,•14.1(/a 71 l . 1 h I:1 1 .11, �� :-.i 1_ '� � � w ' ;�''1'_ I. 70 69 10 20 30 40 50 60 70 68 WETLAND //��� ELEVATION iil NOT TO SCALE gigilil ,u�Dp� Fieldcrest Court Figure 5 XS AV Cain MU CITY OF TIGARD.OREGON CR055 SECTION A r.mmo0o1•e ei Planting and Grading Plans for this proposed mitigation are shown on Figures 3 and 4. Species to be planted are listed in Tables 8 and 9. Typical Sections on Figures 5 and 6 show proposed plant community concepts. Planting specifications will be developed with construction drawings. Vegetative monitoring and photographic stations are on Figure 7. The concept behind the proposed mitigation plan is to widen the Summer Creek floodplain to the north by grading the existing Himalayan blackberry (Rubus discolor) dominated bank to wetland elevation, and planting native trees, shrubs, and herbs, creating a broader spectrum of functional values than now present. The bank will be planted to native upland conifers, shrubs, and forbs creating a buffer to the mitigation project. Using the relatively undisturbed wetland along the southern edge of the Summer Creek floodplain as a reference, the created PFO/PSS/PEM wetland complex will restore some of the values and functions lost as a result CD (D of prior clearing and grading activities. Bowen Development accepts all responsibilities for the maintenance and monitoring of the mitigated area. The wetland creation area will consist of a palustrine scrub-shrub/emergent wetland, with a forested-corridor transitioning to uplands (Figure 3). The source of water for these wetlands will be groundwater and seasonal flooding of Summer Creek. We anticipate that there will be no need to divert surface water from Summer Creek at normal stages. The grading plan will create a wetland corridor north of and parallel to Summer Creek (Figure 4). The edge proximal to the floodplain will be graded to at least an 18-inch depth in an attempt to remove the existing reed canarygrass (Phalaris arundinacea) rhizomes and seedbank. The existing bank will be graded down to the wetland elevation. The bank, which approaches a steep 1:1 slope in many areas, will be graded to a more gentle 3:1 slope. The wetland will widen at the east(downstream)end of the project site. Wetland Planting Plait Wetland plantings have been designed to accommodate the different tolerances to depth of standing water for different wetland species, as well as to mimic the zonation of vegetation found in natural riparian corridors. Many of the species selected for use in the mitigation plan are presently found on-site in remnant communities, which are indicative of pre-clearing community patterns. Species planned for this community are found in Table 8. I3 A MEMBER OF STAR THE STRATEGIC TEAM OF ALLIED RESOURCES. PRINTED ON RECYCLABLE PAPER Table 7 Proposed Wetland Species Wetland Indicator Scientific Name Common Name Status Trees Fraxinus latifolia Oregon ash FACW Populus balsamifera balsam poplar FAC Salix lasiandra Pacific willow FACW+ Shrubs Cornus stolonifera red-osier dogwood FACW O) 1( >( (f l l Lonicera involucrata black twinberry FAC+ �UUII UU Rosa pisocarpa clustered wild rose FAC Salix sitchensis Sitka willow FACW Spiraea douglasii Douglas spirea FACW w Grasses Beckmannia syzigachne American sloughgrass OBL Festuca rubra red fescue FAC+ Glyceria elata tall mannagrass FACW+ Hordeum brachyantherum meadow barley FACW- Forbs Athyrium filix femina lady fern FAC Carex obnupta slough sedge OBL Carex stipata sawbeak sedge OBL Juncus effusus common rush :FACW Juncus tenuis slender rush FACW- Scirpus microcarpus small-fruited bulrush OBL The plan is to create a forested corridor along the distal wetland edge, transitioning to a scrub/shrub community along the edge proximal to the floodplain. Oregon ash will dominate the tree strata. The proximal edge will be densely planted with a mixture of scrub/shrub species in an attempt to create an invasion barrier to the relatively shade- intolerant reed canarygrass. Open areas will be heavily planted with a diversity of native rush and sedge species. Each species will be planted in drifts of either 25 or 50 individual plants. Planting in this way reduces the importance of any one plant's survival, thus increasing the chance for establishing the vegetative mosaic planned. Disturbed ground will be seeded with native grasses to serve as both short-term erosion control and add long-term structural diversity. The entire mitigation site will be seeded with the same seed mix, rather than attempt to match specific micro-sites to specific species. This is done to compensate for initial conditions which may be wetter, or drier, than anticipated. A mix of species, able to tolerate a range of environmental conditions, should augment initial vegetative coverage of the site. 14 A MEMBER OF SI77AI R*-THE STRATEGIC TEAM OF ALLIED RESOURCES. PRINTED ON RECYCLABLE PAPER L#` Upland Buffer Planting Plan Species selected for use in the upland buffer are those presently found on-site in remnant forest communities, indicative of pre-clearing community patterns. Species planned for this community are found in Table 9. Table 8 Proposed Upland Buffer Species Wetland Indicator �� Scientific Name Common Name Status Trees Acer macrophyllum big-leaf maple FACU Alnus rubra red alder FAC Crataegus douglasii black hawthorn FAC Pseudotsuga menziesii Douglas-fir FACU Shrubs d Amelanchier alnifolia western serviceberry FACU Berberis nervosa Cascade Oregon-grape UPL Holodiscus discolor ocean-spray UPL Rhamnus purshiana cascara FAC- Symphoricarpos albus common snowberry IFACU Grasses Elymus glaucus blue wildrye FACU Festuca rubra red fescue FAC+ Forbs Polystichum munition swordfern FACU Douglas-fir and big-leaf maple will dominate the tree layer with ocean-spray, western serviceberry, and Cascade Oregon-grape dominating the shrub layer. Red fescue and blue wildrye will be seeded to all exposed sites. Mitigation Goals The goals of the mitigation effort must be designated in order to determine whether or not the project has been successful, and to have criteria which can help in deciding if and when to initiate remedial action in the event of mitigation failure. The goals are as follows: 1. At the end of the first year,the effort will be deemed successful up to that point if at least 50 percent coverage of the planted portion of the mitigation area by desirable and planted species (desirable volunteer species are acceptable), as estimated visually,is achieved; 15 A MEMBER OF SITIAIR '-THE STRATEGIC TEAM OF ALLIED RESOURCES. PRINTED ON RECYCLABLE PAPER 2. At the end of the second year, at least 75 percent coverage by desirable planted and recruited species will constitute success as measured in a similar manner; 3. At the end of year three, the mitigation effort shall be deemed successful if an 75 percent coverage of the mitigation area by desirable species is achieved, when measured as above. Undesirable invasive species are plants that are not native to site vicinity, and have the ability to dominate the vegetation to the exclusion of other native species; examples of undesired invasive species include Himalayan blackberry (Rubus discolor) and reed canarygrass (Phalaris arundinacea). It is expected that these species will be present, but that desirable species will predominate in order to deem the site a success. Construction Sequence Five tasks have been recognized for implementing the proposed mitigation plan. These tasks include: (1) a pre-construction meeting; (2) excavation; (3) inspection of final grades; (4) planting; and a (5) post- construction meeting. A pre-construction meeting would be held on- site with the construction contractor, a wetland ecologist, and a wetland designer. During the pre-construction meeting, the site conditions and mitigation plan would be reviewed. This would allow all parties to understand the intent of the plan and to ensure that all specified materials and conditions would be met. Construction notes on protection of site water quality and erosion control will be supplied to the contractor. A post-construction review of the completed work would be conducted to verify that the plan was properly implemented. Construction Supervision Because plant locations and water regimes are critically interrelated in wetland mitigation projects, and because construction plans are commonly adjusted on-site, a wetland biologist, or other qualified natural resource personnel, would assist with proper implementation of the plan. Functioning as a construction observer, the wetland biologist, or other personnel with wetland mitigation experience, would be responsible for notifying Bowen Development Company whether the intent and specifications of the plan have been met. The biologist would also make modifications to the site plan based on unforeseen site conditions. If specific plant materials are not available, the biologist would authorize planting substitutions. The wetland biologist would work with the construction contractor in providing assistance and guidance for meeting plan specifications. Monitoring Program To ensure the successful completion and viability of the new wetland area, inspections will be conducted semi-annually, with a comprehensive report compiled annually, by a wetland biologist. This program would monitor vegetation parameters and wildlife usage for a period of three years and include recommendations for removal of undesirable invasive species, to preclude dominance of any one species. One meter-square quadrant plots would be 16 A MEMBER OF STAI R :fi-THE STRATEGIC TEAM OF ALLIED RESOURCES. PRINTED ON RECYCLABLE PAPER permanently established in the mitigation area to monitor sedimentation and vegetation. In addition, permanent photographic points would be established to provide further documentation of the changes in wetland vegetation over time. Vitality observations will be used to monitor plant communities in the remainder of the mitigation area. Vegetation sampling would be conducted annually at some time during the summer. Overall wetland observations would be conducted semi-annually. Each of the parameters to be monitored is further described below. Annual monitoring reports would be submitted to DSL. a. Vegetation Monitoring: Vegetation would be monitored semi-annually during the growing season, within two weeks of the same time every year. Monitoring would consist of species list compilation and estimated percent cover of established quadrats along with wildlife observations. Several quadrats, each �- one-meter square, would be established in the created wetland, spaced so as to sample each representative typical community. Once established, quadrats would be monitored throughout the three-year program. To supplement this information,photographs of each quadrant would be taken. In addition, 15 selected trees will be assessed for growth by measurement of diameter and by overall height from grade to end of new growth. These trees will be marked for future reference with tree tags. b. Hydrologic Monitoring: During each monitoring inspection, the mitigation area will be checked for the presence of water and levels measured, if present above the surface. At the same time, soils will be checked for saturation. c. Overview Photographic Sampling: To supplement the sampling measurements described above,permanent overview photographic points would be established sufficient to provide photographic documentation of the entire mitigation area and overall character of the created wetlands. Contingency Plan Should the desired mitigation goal not be achieved, a determination by DSL and ACOE should be made to implement the contingency plan. The contingency plan would provide for replacing plants that have not survived, and for further excavation or adjustment where required to provide the necessary hydrologic regimes. An assessment of the cause of plant mortality would be made by the monitoring biologist, and a recommendation made for species composition changes or other mutually agreeable correction measures. 17 A MEMBER OF SITIAI R .!t'-THE STRATEGIC TEAM OF ALLIED RESOURCES. PRINTED ON RECYCLABLE PAPER L APPENDIX A USFWS NATIONAL WETLANDS INVENTORY Beaverton Quadrangle A MEMBER OFSITIAIR 4'-THE STRATEGIC TEAM OF ALLIED RESOURCE S. PRINTF-I)ON RI?('1('L:\BI E I'.-\I'hk 1\46.0. `:„" e is / _ Project �„ L ocation "" `' of 4, , °'' ,7,..s MIN b -- RW POWK,Zh .....t7 FOi PErvi � Y nI. PFO1W Palustrine,forested,broad-leaved deciduous,intermittently flooded PEM IY Palustrine,scrub/shrub-emergent,semipermanently flooded POWz Palustrine,open water,artifically flooded,intermittently exposed/permanent l I NOT TO SCALE §)C§a FIELDCREST COURT Appendix A DAVID EVANS ANDASSOCIATFS,INC. CITY OF T I G A R D, OREGON 2828 PORTLAND.OREGON 9V9 201 ••• National Wetlands Inventory Beaverton Quadrangle APPENDIX B USDA NRCS WASHINGTON COUNTY SOIL SERIES MAP Sheet No. 44 ( 1) (1 -)C-ftH A MEMBER OF SITIAIR 4*-THE STRATEGIC TEAM OF ALLIED RESOURCES. PRINTED ON RECYCLABLE PAPER , d } 11 . t 1 Project t 11B 3 3 - ,_, 7 45B . „ ily -------- c ,, ''1" ' ‘. - '4 4 ' w v F s ' e1 q.. 11B- Cornelius and Kinton 2 to 7 percent slope 11 C- Cornelius and Kinton 7 to 12 percent slopes 43 - Wapato silty clay loam 45B- Woodburn silt loam 3 to 7 percent slopes 45C- Woodburn silt loam 7 to 12 percent slopes `L NOT TO SCALE FIELDCREST COURT Appendix B DAVID EVANS AND ASSOCIATES,INC. CITY OF TIGARD, OREGON 2828 SW CORBETT AVENUE PORTLAND.OREGON 97201 •■• NRCS Washington County Soil Survey Sheet 44 APPENDIX C WETLAND DELINEATION DATA SHEETS "UUU A MEMBER OFSITIAIR 44'-THE STRATEGIC TEAM OF ALLIED RESOURCES. PRINTED ON RECYCLABLE PAPER :6 Wetland Routine Onsite Determination Data Sheet Project Location: Southeast corner of SW 135th and Scholls Ferry Road,in Tigard(E 1/2,Section 33,T1 S,RI W) Field Investigator(s): Larry Devroy and Kevin O'Hara Plot or Pit No. 1 Applicant/Owner: Bowen Development Company Date: 5/23/95 County: Washington County State: Oregon Plot or pit location: 100 feet north of SW 133 Ave,in apparent abandoned borrow pit Prevailing Weather Conditions: Sunny,temperature in mid 60s F. General Site Conditions: Cleared,graded ground bisected by Summer Creek. Summer Creek drainage cleared in past,now dominated by Phalaris arundinacea Is there noticeable disturbance of this site's native vegetation,soils,and/or hydrology? Areas north and south of Summer Creek drainage have been cleared in past,though some large trees remain on south side of parcel Vegetation: Indicator Dominant Plant Species: Status Stratum %Cover 1 Salix sitchensis FACW S 30* 2 Populus balsamifera FAC S 5 3 Holcus lanatus FAC H 60* 4 Hypochaeris radicata FACU H 20 5 Daucus carota UPL H 5 6 Trifolium pretense FACU H 5 7 Epilobium angustifolium FACU+ H 5 8 Poa pratensis FAC H _ 5 9 Rubus ursinus FACU H 2 10 Vcia sativa UPL H 2 =dominant Percent of dominant species that are OBL,FACW,and/or FAC? 100% Soils: Series/Phase: Woodburn silt loam Is the soil on the hydric soils list? Y/N No Soil profile: 0-18"10YR 4/3,4/4 blocky,silt sloam;no mottles Other hydric soil indicators: None Hydrology: Visual observation of inundation. Y/N No Visual observation of soil saturation. YIN No Depth to saturated soil: >18" Depth to free standing water: >18" Drift lines. Y/N No Sediment deposits. Y/N No Drainage patterns. Y/N No DEA Wetland Determination: Is the hydrophytic vegetation criterion met? Y/N Yes Is the hydric soil criterion met? Y/N No Is the specific hydrology criterion met? Y/N No Is this plant community a wetland? Y/N No Comments: Soil is dry and surface is cracked David Evans and Associates,Inc. 2828 SW Corbett Avenue Portland,Oregon 97201 (503)223-6663 FAX(503)223-2701 Wetland Routine Onsite Determination Data Sheet Project Location: Southeast corner of SW 135th and Scholls Ferry Road,in Tigard(E 1/2,Section 33,T1S,R1 W) Field Investigator(s): Larry Devroy and Kevin O'Hara Plot or Pit No. 2 Applicant/Owner: Bowen Development Company Date: 5/23/95 County: Washington County State: Oregon Plot or pit location: Cleared terrace immediately south of Summer Creek corridor,150 feet west of east property line Prevailing Weather Conditions: Sunny,temperature in mid 60s F. General Site Conditions: Cleared,graded ground bisected by Summer Creek. Summer Creek drainage cleared in past,now dominated by Phalaris arundinacea Is there noticeable disturbance of this site's native vegetation,soils,and/or hydrology? Areas north and south of Summer Creek drainage have been cleared in past,though some large trees remain on south side of parcel Vegetation: Indicator Dominant Plant Species: Status Stratum %Cover 1 Populus balsamifera FAC S 20* 2 Pseudotsuga menziesll FACU S 5* 3 Holcus lanatus FAC H 60* 4 Hypochaerfs radicata FACU H 60• 5 Anaphalis margarltacea UPL H 5 6 Phalaris arundinacea FACW H 5 7 Poa pratensis FAC H 5 8 Rubus discolor FACU H 5 9 Trtentalls latlfolia FAC- H 2 10 Juncus effusus FACW H 2 •=dominant Percent of dominant species that are OBL,FACW,and/or FAC? 50% Soils: Series/Phase: Woodburn silt loam Is the soil on the hydric soils list? Y/N No Soil profile: 0-18"10YR 4/3,4/4 silt loam Other hydric soil indicators: None Hydrology: Visual observation of inundation. YIN No Visual observation of soil saturation. YIN No Depth to saturated soil: >18" Depth to free standing water: >18" Drift lines. YIN No Sediment deposits. Y/N No Drainage patterns. Y/N No DEA Wetland Determination: Is the hydrophytic vegetation criterion met? Y/N No Is the hydric soil criterion met? Y/N No Is the specific hydrology criterion met? Y/N No Is this plant community a wetland? Y/N No Comments: David Evans and Associates,Inc. 2828 SW Corbett Avenue Portland,Oregon 97201 (503)223-6663 FAX(503)223-2701 Wetland Routine Onsite Determination Data Sheet Project Location: Southeast corner of SW 135th and Scholls Ferry Road,in Tigard(E 1/2,Section 33,T1S,R1W) Field Investigator(s): Larry Devroy and Kevin O'Hara Plot or Pit No. 3 Applicant/Owner: Bowen Development Company Date: 5/23/95 County: Washington County State: Oregon Plot or pit location: 70 feet north of plot#2 Prevailing Weather Conditions: Sunny,temperature in mid 60s F. General Site Conditions: Cleared,graded ground bisected by Summer Creek. Summer Creek drainage cleared in past,now dominated by Phalaris arundinacea Is there noticeable disturbance of this site's native vegetation,soils,and/or hydrology? Areas north and south of Summer Creek drainage have been cleared in past,though some large trees remain on south side of parcel Vegetation: Indicator Dominant Plant Species: Status Stratum %Cover 1 Fraxinus latifolia FACW T 25* 2 Fraxinus latifolia FACW S 15* 3 Lonicera involucrata FAC+ S 15* 4 Spiraea douglasii FACW S 5 5 Rosa nutkana FAC S 5 6 Phalaris arundinacea FACW H 100* 7 8 9 10 =dominant Percent of dominant species that are OBL,FACW,and/or FAC? 100% SOUS: Series/Phase: Wapato silty clay loam Is the soil on the hydric soils list? Y/N No Soil profile: 0-18"10YR 3/1 with common 10YR 4/6 mottles Other hydric soil indicators: None Hydrology: Visual observation of inundation. Y/N No Visual observation of soil saturation. Y/N Yes Depth to saturated soil: Surface Depth to free standing water: 12" Drift lines. Y/N No Sediment deposits. Y/N No Drainage patterns. YIN No DEA Wetland Determination: Is the hydrophytic vegetation criterion met? Y/N Yes Is the hydric soil criterion met? Y/N Yes Is the specific hydrology criterion met? Y/N Yes Is this plant community a wetland? YIN Yes Comments: Oxidized rhizosphere common in upper part of soil David Evans and Associates,Inc. 2828 SW Corbctt Avenue Portland,Oregon 97201 (503)223-6663 FAX(503)223-2701 Wetland Routine Onsite Determination Data Sheet Project Location: Southeast corner of SW 135th and Scholls Ferry Road,in Tigard(E 1/2,Section 33,T1S,R1W) Field Investigator(s): Larry Devroy and Kevin O'Hara Plot or Pit No. 4 Applicant/Owner: Bowen Development Company Date: 5/23/95 County: Washington County State: Oregon Plot or pit location: In remnant forested area between cleared area and south edge of Summer Creek corridor. Prevailing Weather Conditions: Sunny,temperature in mid 60s F. General Site Conditions: Cleared,graded ground bisected by Summer Creek. Summer Creek drainage cleared in past,now dominated by Phalaris arundinacea Is there noticeable disturbance of this site's native vegetation,soils,and/or hydrology? Areas north and south of Summer Creek drainage have been cleared in past,though some large trees remain on south side of parcel Vegetation: Indicator Dominant Plant Species: Status Stratum %Cover 1 Pseudotsuga menziesil FACU T 30* 2 Crataegus douglasii FAC T 25* 3 Fraxinus latifolia FACW T 20* 4 Symphorlcarpos albus FACU S 20' 5 Physocarpus capitatus FACW- S 10* 6 Holodiscus discolor UPL S 10• 7 Polystichum munitum FACU H 20* 8 Tolmlea menzles!i FAC H 20' 9 Clrcaea alpine FAC+ H 20' 10 Carex deweyana FACU H 5 =dominant Percent of dominant species that are OBL,FACW,and/or FAC? 56% Soils: Series/Phase: Wapato silty clay loam Is the soil on the hydric soils list? Y/N No Soil profile: 0-18"10YR 3/1 with common 10YR 5/6 mottles Other hydric soil indicators: None Hydrology: Visual observation of inundation. Y/N No Visual observation of soil saturation. Y/N Yes Depth to saturated soil: 8" Depth to free standing water: >18" Drift lines. Y/N No Sediment deposits. Y/N No Drainage patterns. Y/N No DEA Wetland Determination: Is the hydrophytic vegetation criterion met? YIN Yes Is the hydric soil criterion met? YIN Yes Is the specific hydrology criterion met? Y/N Yes Is this plant community a wetland? Y/N Yes Comments: David Evans and Associates,Inc. 2828 SW Corbett Avenue Portland,Oregon 97201 (503)223-6663 FAX(503)223-2701 Wetland Routine Onsite Determination Data Sheet Project Location: Southeast corner of SW 135th and Scholls Ferry Road,in Tigard(E 1/2,Section 33,T1S,R1 W) Field Investigator(s): Larry Devroy and Kevin O'Hara Plot or Pit No. 5 Applicant/Owner: Bowen Development Company Date: 5/23/95 County: Washington County State: Oregon Plot or pit location: In cleared area 50 feet south of Summer Creek corridor,—500 feet east of SW 135th Prevailing Weather Conditions: Sunny,temperature in mid 60s F. General Site Conditions: Cleared,graded ground bisected by Summer Creek. Summer Creek drainage cleared in past,now dominated by Phalaris arundinacea Is there noticeable disturbance of this site's native vegetation,soils,and/or hydrology? Areas north and south of Summer Creek drainage have been cleared in past,though some large trees remain on south side of parcel Vegetation: Indicator Dominant Plant Species: Status Stratum %Cover 1 Ranunculus occidentalis FAC H 30* 2 Juncus tenuis FACW- H 20* 3 Hypochaeris radicata FACU H 20' 4 Parentucellia viscosa FAC- H 20' 5 Bromus mollis UPL H 20* 6 Poa pratensis FAC H 15 7 Juncus effusus FACW H 10 8 Chrysanthemum leucanthemum UPL H 10 9 Vicia sativa UPL H 10 10 Lupinus polyphyllus FAC+ H 5 •=dominant Percent of dominant species that are OBL,FACW,and/or FAC? 40% Soils: Series/Phase: Woodburn silt loam Is the soil on the hydric soils list? Y/N No Soil profile: 0-18"10YR 5/2 with common,large 7.5YR 3/3 mottles Other hydric soil indicators: None Hydrology: Visual observation of inundation. Y/N No Visual observation of soil saturation. Y/N No Depth to saturated soil: >18" Depth to free standing water: >18" Drift lines. Y/N No Sediment deposits. Y/N No Drainage patterns. Y/N No DEA Wetland Determination: Is the hydrophytic vegetation criterion met? Y/N No Is the hydric soil criterion met? YIN Yes Is the specific hydrology criterion met? Y/N No Is this plant community a wetland? Y/N No Comments: Soil is dry to 18-inch depth David Evans and Associates,Inc. 2828 SW Corbett Avenue Portland,Oregon 97201 (503)223-6663 FAX(503)223-2701 Wetland Routine Onsite Determination Data Sheet Project Location: Southeast corner of SW 135th and Scholls Ferry Road,in Tigard(E 1/2,Section 33,T1S,R1W) Field Investigator(s): Larry Devroy and Kevin O'Hara Plot or Pit No. 6 Applicant/Owner: Bowen Development Company Date: 5/23/95 County: Washington County State: Oregon Plot or pit location: In forested area north of Summer Creek corridor,—100 feet east of west propery line Prevailing Weather Conditions: Sunny,temperature in mid 60s F. General Site Conditions: Cleared,graded ground bisected by Summer Creek. Summer Creek drainage cleared in past,now dominated by Phalaris arundinacea Is there noticeable disturbance of this site's native vegetation,soils,and/or hydrology? Areas north and south of Summer Creek drainage have been cleared in past,though some large trees remain on south side of parcel Vegetation: Indicator Dominant Plant Species: Status Stratum %Cover 1 Fraxinus latifolia FACW T 80* 2 Rhamnus purshiana FAC- T 10 3 Rubus discolor FACU S 90* 4 Comus stolonlfera FACW S 30* 5 Corylus comuta FACU S 10 6 Phalaris arundinacea FACW H 40' 7 Carex deweyana FACU H 10 8 Poe pratensis FAC H 5 9 Festuca arundinacea FAC- H 2 10 =dominant Percent of dominant species that are OBL,FACW,and/or FAC? 75% SOUS: Series/Phase: Woodbum silt loam Is the soil on the hydric soils list? Y/N No Soil profile: 0-18"7.5YR 3/3 Other hydric soil indicators: None Hydrology: Visual observation of inundation. Y/N No Visual observation of soil saturation. YIN No Depth to saturated soil: >15" Depth to free standing water: >18" Drift lines. Y/N No Sediment deposits. YIN No Drainage patterns. YIN No DEA Wetland Determination: Is the hydrophytic vegetation criterion met? Y/N Yes Is the hydric soil criterion met? Y/N No Is the specific hydrology criterion met? Y/N No Is this plant community a wetland? Y/N No Comments: Plot is located immediately outside wetland limit David Evans and Associates,Inc. 2828 SW Corbett Avenue Portland,Oregon 97201 (503)223-6663 FAX(503)223-2701 Wetland Routine Onsite Determination Data Sheet Project Location: Southeast corner of SW 135th and Scholls Ferry Road,in Tigard(E 1/2,Section 33,T1S,R1W) Field Investigator(s): Larry Devroy and Kevin O'Hara Plot or Pit No. 7 Applicant/Owner: Bowen Development Company Date: 5/23/95 County: Washington County State: Oregon Plot or pit location: In Summer Creek corridor,-75 feet east of west propery line,-75 feet southeast of plot#6 Prevailing Weather Conditions: Sunny,temperature in mid 60s F. General Site Conditions: Cleared,graded ground bisected by Summer Creek. Summer Creek drainage cleared in past,now dominated by Phalaris arundinacea Is there noticeable disturbance of this site's native vegetation,soils,and/or hydrology? Areas north and south of Summer Creek drainage have been cleared in past,though some large trees remain on south side of parcel Vegetation: Indicator Dominant Plant Species: Status Stratum %Cover 1 Phalaris arundinacea FACW H 100* 2 -- 3 4 5 6 7 8 9 10 •=dominant Percent of dominant species that are OBL,FACW,and/or FAC? 100% Soils: Series/Phase: Wapato silty clay loam Is the soil on the hydric soils list? YIN No Soil profile: 0-18"10YR 2/1 with common 10YR 3/6 mottles Other hydric soil indicators: None Hydrology: Visual observation of inundation. Y/N No Visual observation of soil saturation. Y/N Yes Depth to saturated soil: Surface Depth to free standing water: 12" Drift lines. YIN No Sediment deposits. Y/N No Drainage patterns. Y/N No DEA Wetland Determination: Is the hydrophytic vegetation criterion met? Y/N Yes Is the hydric soil criterion met? YIN Yes Is the specific hydrology criterion met? Y/N Yes Is this plant community a wetland? Y/N Yes Comments: David Evans and Associates,Inc. 2828 SW Corbett Avenue Portland,Oregon 97201 (503)223-6663 FAX(503)223-2701 1, LJ G l_. October 12, 1995 ( E0001 Mr. Bill Parks • Oregon Division of State Lands 775 Summer Street NE Salem,Oregon 97310 Dear Bill: -)cUUU SUBJECT: AMMENDED PROJECT IMPACTS AND MITIGATION PLAN FOR FIELDCREST COURT: OREGON DIVISION OF STATE LANDS PERMIT APPLICATION NUMBER FP 10153. On behalf of Bowen Development Company,David Evans and Associates,Inc. (DEA) submits the following modifications to the Oregon Division of State Lands permit application number FP 10153. These modifications are being submitted concurrently to the US Army Corps of Engineers. PROPOSED PROJECT IMPACTS TO WETLANDS Jurisdictional wetlands impacted by the proposed Fieldcrest Court are itemized in Table 1. These impacts are limited to wetlands extending south of the Summer Creek floodplain. Originally, a variable width buffer was proposed along the entire length of the project. This buffer was to maintain an average width of 25 feet, but never less than 15 feet. The Unified Sewerage Agency (USA) is now requiring that the buffer never be less than 25 feet wide. The additional wetland fill is necessary in order to maintain this 25-foot wide buffer. The buffer, as proposed, will preserve the riparian forest community which borders the floodplain community. Table 1 Wetland Impacts Associated With Development Fieldcrest Court Wetland Original Additional I Total Area(Acres) Area(Acres) Area(Acres)' PSS/PEM 0.025 0.029 0.054 Mitigation Wetland i 0.076 ' 0.044 0.120 Totals 0.101 0.073 0.174 No net increase in fill amounts is anticipated from this modification. DAVID EVANS AND ASSOCIATES,INC. A PROFESSIONAL SERVICES CONSULTING FIRM OFFICES IN OREGON,WASHINGTON,CALIFORNIA AND ARIZONA 2828 S.W.CORBETT AVENUE PORTLAND,OREGON 97201-4830 (503)223-6663 FAX(503)223-2701 MITIGATION PLAN Total Mitigation Area The total area of the on-site wetland creation and enhancement will be 0.618 acres. This area is proposed as off-setting compensation for the filling of 0.174 acres of wetlands, of which 0.120 acres is an existing wetland mitigation site. The proposed mitigation plan for wetland impacts associated with the Fieldcrest Court multi-family residential development has been developed in accordance with the Oregon Freshwater Compensatory Mitigation Rules (145-85) for Minor Projects. The original mitigation plan proposed to compensate for loss of 1,085 square feet(0.025 acres) of PSS/PEM wetland and 3,330 square feet (0.076 acres) of existing PEM mitigation wetland by creating 11,650 square feet(0.27 acres)of PFO/PSS/PEM wetland complex. Due to the additional fill requirements, Bowen Development proposes to compensate for the additional loss of 1,263 square feet (0.029 acres) of PSS/PEM wetland and 1,917 square feet (0.044 acres) of existing PEM mitigation wetland, by enhancing 15,290 square feet (0.351 acres) of the existing PEM wetland which presently supports a reed canarygrass (Phalaris arundinacea)monoculture. Taken in its entirety, creation of 11,650 square feet (0.27 acres) and enhancement of 15,290 square feet(0.351 acres), for an overall total of 26,940 square feet(0.618 acres) is proposed to mitigate for 7,595 square feet(0.174 acres)of impact. Thus an overall ratio of 3.55:1 (wetland creation/enhancement to fill)would be achieved. Wetland Planting Plan The concept behind the proposed enhancement is to grade to a 24-inch depth in order to excise the existing reed canarygrass (Phalaris arundinacea) rhizomes and seedbank, removing all graded material from the site, and planting native hydrophytic grasses, herbs, and shrubs. The enhanced portion of the wetland will be adjacent to the created wetland, along the north end of the Summer Creek floodplain. Completion of this mitigation plan will provide greater species and structural diversity than presently exists on-site. Wetland plantings have been designed to accommodate the different tolerances to depth of standing water for different wetland species, as well as to mimic the zonation of vegetation found in natural riparian corridors. Many of the species selected for use in the mitigation plan are presently found on-site in remnant communities, which are indicative of pre-clearing community patterns. Species planned for the enhanced wetland are found in Table 2. DAVID EVANS AND ASSOCIATES, INC. 2 A PROFESSIONAL SERVICES CONSULTING FIRM Table 2 Proposed Wetland Species Wetland Indicator Scientific Name ;Common Name Status !Trees Fraxinus latifolia Oregon ash FACW alix lasiandra Pacific willow :FACW+ Shrubs Cornus stolonifera red-osier dogwood FACW 1)) Aonicera involucrata black twinberry FAC+ UIJU ,Grasses • • Beckmannia syzigachne American sloughgrass jOBL Festuca rubra red fescue FAC+ 1Glyceria elata tall mannagrass FACW+ IHordeum brachyantherum 'meadow barley :FACW- i Forbs Carex obnupta slough sedge OBL Carex stipata sawbeak sedge OBL uncus effusus common rush 1FACW uncus patens spreading rush FACW cirpus microcarpus small-fruited bulrush OBL The plan is to enhance the existing PEM wetland by replacing reed canarygrass with a more diverse, native emergent community. A few Oregon ash will be planted in the enhanced area to provide greater structural diversity. The edge proximal to Summer Creek will be densely planted with a mixture of scrub/shrub species in an attempt to create an invasion barrier to the relatively shade-intolerant reed canarygrass. Open areas will be heavily planted with a diversity of native rush and sedge species. Each species will be planted in drifts of either 25 or 50 individual plants. Planting in this way reduces the importance of any one plant's survival, thus increasing the chance for establishing the planned vegetative mosaic. Disturbed ground will be seeded with native grasses to serve as both short-term erosion control and add long-term diversity. The entire mitigation site will be seeded with the same seed mix, rather than attempt to match specific micro-sites to specific species. This is done to compensate for initial conditions which may be wetter, or drier, than anticipated. A mix of species,able to tolerate a range of environmental conditions, should augment initial vegetative coverage of the site. DAVID EVANS AND ASSOCIATES, INC. 3 A PROFESSIONAL SERVICES CONSULTING FIRM ;i_i aan Mitigation Goals, Construction Sequence, Monitoring, and Contingency Plan No changes are proposed to the mitigation goals, construction sequence, monitoring requirements and contingency plans from those detailed in the original permit application. If you have any questions, please call me directly at DEA(503) 223-6663 extension 224. Sincerely, DAVID EVANS AND ASSOCIATES, INC. e0 Larry D-/ oy Natural Resources Manager Enclosures: Planting Plan Cross Sections o;\in\jlpinr\mcmyper3.doc DAVID EVANS AND ASSOCIATES, INC. 4 A PROFESSIONAL SERVICES CONSULTING FIRM 'ED d+,FC a/aLE.PER 7 . — — mow: — — LEGEND 1 1 -Y * •Y Y 1 Proposed 1 W Y 1 1 * 1 U Upland Areas Wetland Creation `�:+�-- Y 1 Y 1 1 1 p Q / V W 10,�800 cc ,Y' 1 1 1 1 y y y � Wetland �� OA�����' W 1 1 L 1 1 1 Proposed /1 IA'^ 1 1 • 1 W 1 1 Proposed Mitigation Site Wetland Enhancement ` / 'W 1 1 1 1 1 1 Proposed Fill Areas I 13,2904 A v `. y,W 1 1 1 1 1 1 + 1 1 1 1 Y 1 W �������� Additional Fill 1 * W 1 1 1 1 l ° Emergent Wetland \ 1 W 1 1 1 4 1 1 A I V Au ,4.' 1 1 W W 1 1 Property Line I Upland Forest B / W�:-, W. 1 1 C J 1 1 4 ;,; 1 1 ,3 9 1 1 V. Wetland Forest IY Emergent Wetland ` ti : W 1 1 1 W3° y 1 1 1 1 1 y W 1 ff .: :I Wet land Scrub/Shrub L y W 1 1 � 1 1 1 W IY Wetland Scrub/Shrub /..,I x yi. y 1 W 1 1 W 1 1 1 'F• s , cu REFER TO TEXT FOR ►� J 1 1 Y 1 1 W 1 1 W 1 1 9 1 W 1 1 1 PROPOSED PLANT SPECIES I m Wetland Forest ��� I W , + i 1 W 1 LIST. II �' i 1 1 1 W t 1 W 4 9 1 1 s 1 W 1 1 1 1 W 1 W Upland Forest 1 p1 , 1 1 1 1 Wetland Limit \/j .:.• W 1 W +X 1 • 9 * W 4 ii/ 1 1 i �-1 W 1 1 1 Y I I , ,,, J 1 1 L 1 1 1 W i di :f /t 1 * W 1 W 1 i 1 1 1 U 41 W 1 1 1 Y 1 W 1 lil ` 1 1 1 W 1 W W 1 1 1 O , j,, 1 1 1 1 1 1 1 W 1 1A1,111111 (' a_ 1 1 1 W 1 W 1 1 1 40,UI� 7 0 ' 1 W 1 1 4 1 1 1 1 11 v OL � f1 4. 4 W W 1 9 W 1 a._ Y 9 W 1 9 Jr 1 1 4 9 J 1 1 9 1 1 9 9 4 1 Y ! W 9 W i 1 1 * L * 9 1 4 1 1 W 4, 4, 9 • 1 * * W 1' 1 L * 1 •Y 1 �' 1 J 1 i W 1 1 1 1 /01(1 I Proposed Fill Areas IY W 1' 1 a 1 1 i i l I 1 1 1 1 1 W 1 1 1 'I'II�II 1 <- W 1 W 1 1 1 1 1 Wetland Scrub/Shrub 1 1 1 1 4 1 1 1 f ie � 1 W 1 J 1 1 1 y 1 1 III) 1 1 1 1 1 1 J Wetland Forest oi; 4. 1 4 1 i 1 1 1 111L J , 1 + 9 1 1 * * J '�1 * h W 1 4 'Y 1 1 J 1 * SCALE: 1".100' Compensatory X41'1 9 i 1 1 J 1 /l 1 � W 1 W 1 1 1 1 Mitigation Site * W 1 y ,��ll li 870 - - Y 1 1 ' 1 - - S.W. I3bth AVE- FIELDCREST COURT Figure 3 F CITY OF TIGARD, OREGON PL ANT INCA PLAN ■ ar UPLAND FOREST oilla 6 ;' WETLAND FOREST• ifi°114.1.11 • .iimo- kt :. . BUFFER CREATED WETLAND ENHANCED WETLAND. . 1 A bitilitr.i ii;.t 1.:1: ,�1 4 86 '' `� I +� I �• EXISTING CONTOUR + 11 , le A' +' E PROPOSED CONTOUR 81 EMERGENT WETLAND M!, �t� ' , �' f WETLAND !1i1V s ; t, SCRUB/SHRUB r < °tit 76 , tti ,j / ' ' '#\„4 70 11 1.4A / 69 .1 10 20 30 40 50 60 • 68 WETLAND //��J ELEVATION ;Zj Morro VA/F: Fieldcrest Court Figure 5 11YmEVMbANDASSOCIA7T:TINC CITY OF TIGARD,OREGON CR055 SECTION A I AV OREGON bBJ1E ••• 70RIIM11 OREGON 9YA1 Itc•ry0001-s1 UPLAND FOREST Oa �" WETLAND FOREST ` • • + ^•„gesso .i•V,.P,V. . .BUFFER .,•01.4.er ;r. .1: CREATED ENHANCED 86 - .. 4 ,:r, 0. 1 i'., WETLAND WETLAND ,0�+ • f4;1,14 ,.41'' ����A'i PROPOSED CONTOUR EXISTING CONTOUR 81 pl}iiI 11111,11; SRI' ,II) ill "�ijkl�i:,_,.... ... 7 ?li.11 jj� ,ri 1111,11 t i t ra WETLAND SCRUB/SHRUB 76 — + �.,+ ., V i. EMERGENT WETLAND *�; tltyev ii �1, j1 y 1 i. • olf./..., .4,,,cir:,!..,\, ,_, , , \ Th.t,. ... -4io i vfii i/Nt. 2.„ - . 6.yitih,_t , 13 400 ,A.%11...riAt l'' Viao;!k : ; %, , . 70 — • re ,o, ....:. A.„) 1,,iy, , iter6z, -./--.., .• , (.:4,4•,-„i-:,,ii,31, • „. , p_ _.... , ,,,,,v •-r 69 20 50 40 50 60 70 80 90 65 WETLAND //.�, ELEVATION ',L 441710 ALAI F.' ••OARI Fieldcrest Court Figure 6 ❑e IDEWNWitLf SOOA7T�WC CITY OFTIGARD.OREGON CK055SECTIONB i1A AY 0OREG N 9737 ••• PCA1WII OREGON 97aJ1 `. • • r rncm10001-0 The City Recorder read the resolution by number and title. Resolution No. 96-31, a resolution creating the FEMA disaster fund and approving a supplemental budget for 95/96. The motion was approved by unanimous voice vote of Council present. (Mayor Nicoll, Councilors Moore, Rohlf, and Scheckla voted "Yes".) 941/2f 9. CONSIDER WETLANDS MITIGATION 9�— .�A O. CITE PROPERTY' - BOWEN DEVELOPMENT COMPANY S gG X01 a. Staff report �" .04, 9 - Mr. Bewersdorff presented the staff report. He directed attention to the staff memo distributed at the April work session which explained this request from the Bowen Development Company to use City property for wetlands mitigation. He reviewed the situation. In 1988, a development company dedicated the wetlands portion of its property to the City for a development that never happened. Now the Bowen company wanted to develop the remainder of that property only to find that the wetlands have moved onto their property. They were asking to fill in .17 acres of wetland with an offset of .618 acres of mitigation. Mr. Bewersdorff noted that this was an isolated case, and that the City might not be able to get a similar dedication of wetlands today. He said that he thought this would be good for the City. Mr. Bewersdorff pointed out the attached draft policy relative to wetlands mitigation. Mr. Monahan reiterated that this was a unique case with some obligation on the part of the City to assist in allowing mitigation on City property because the particular • City property under discussion originally came from the land owned by Bowen. He said that the draft policies would protect the City in the event of future requests; staff has already turned down one request to allow mitigation on other City land for a development outside the city. b. Council Discussion/Questions Councilor Scheckla asked if a bike path was planned for the area. Mr. Bewersdorff said that the development north of the wetlands precluded a pathway. He reported that staff did consider asking-or u pathway but that the developer of the apartment complex did not want to dedicate the area and staff would have a difficult rime proving rough proportionality. — -- Councilor Scheckla asked if they would be opening themselves up in the future to other similar requests. Mr. Bewersdorff said that to prevent similar requests was the purpose of the draft policy. It could be used to guide the Council regarding future cases of wetlands mitigation. Councilor Scheckla asked if legally they could make this a one time instance. Mr. Ramis said that he thought they could, given the unique set of facts. He said that CITY COUNCIL MEETING MINUTES - MAY 14, 1996 - PAGE 15 Councilor Scheckla asked if legally they could make this a one time instance. Mr. Ramis said that he thought they could, given the unique set of facts. He said that they could emphasize its uniqueness in their decision and then develop a policy to preclude this sort of thing. Councilor Scheckla expressed concern that moving the wetlands could create more problems. Mr. Ramis commented that they could not draft a law to protect themselves from Mother Nature. However they could make sure that they had policies that required improvements of wetlands. Mr. Bewersdorff pointed out that enhanced wetlands were a better storage for flooding and a benefit to the City. c. Council Consideration: Resolution No. 96-32 Mayor Nicoli said that he didn't have any problem with this resolution. He concurred that the City owed it to a property owner to work with them when the owner had dedicated land for wetlands in the past only to have a hardship created • because of natural changes. He noted that this was a gift to the City that they probably couldn't get today. Councilor Scheckla stated that he did not see this as a gift to the City because they did it in order to get what they wanted. Mayor Nicoli noted that they could no longer place a condition on a developer to give them land because of Dolan. He reiterated that he was comfortable with working with the owners on this. Mr. Monahan pointed out that usually land was not dedicated until construction of a project began; the applicant in 1988 dedicated the land and then decided not to develop. He suggested an amendment to the resolution to add a third "whereas" to read "Whereas the City owned land was dedicated in conjunction with the 1988 site development review that was not developed on the same property as shown Fir Road LLC" and to add under "Resolved" a statement "that the City finds that the unique circumstances of this application make it appropriate to grant the mitigation in recognition of the 1988 dedication." He said that this would record that this was a very unique situation. Councilor Scheckla stated that he liked the amendment. Councilor Rohlf concurred with confining this unique circumstances. He also agreed with the staff recommendation to develop a policy to deal with this issue, citing the trend towards more infill. Mr. Monahan reviewed the six items listed in the staff draft policy: benefit, physical enhancement of existing wetland, compensation to the City, no additional costs to the City for maintenance, location of developed property within the UGB, and no potential onsite mitigation possible. Mayor Nicoli suggested setting over the discussion on the policy to a future agenda and dealing tonight with the resolution. CITY COUNCIL MEETING MINUTES - MAY 14. 1996 - PAGE 16 Motion by Councilor Rohlf, seconded by Councilor Moore, to adopt Resolution No. 96-32 as amended. The City Recorder read the resolution by title and number. Resolution No. 96-32, a resolution to allow Scholls Ferry Road LLC and/or affiliates to create and/or enhance wetlands on cit.' owned greenway, TIS, R1 R', East 112 of Section 23, Tigard. Oregon. The motion was approved by unanimous voice vote of Council present. (Mayor Nicoli. Councilors Moore, Rohlf, and Scheckla voted "yes".) 10. NON AGENDA ITEMS > Mayor Nicoli asked the Council to give staff direction to proceed with developing a recommendation on how they wanted to proceed with architect services on the addition to City Hall. He noted that the process would take anywhere from 4 - 8 weeks but that getting an early start would allow staff to begin as soon as possible after the July 1 budget began. Mr. Monahan noted that it was a lengthy process with the new purchasing rules. He said that they would not be back with a recommendation before July 1 but that they could do a lot of the up front work and hopefully get better prices and a quicker beginning to the process. The Council agreed by consensus to direct staff to proceed as discussed. 11. ADJOURNMENT: 9:32 p.m. -',(.7f.1)(..)il.i_s 4AC a-Dil-lajte-1:--1-g-- Attest: / atherine Wheatley, City Recorder (/ xr, Ci • of Tigard Date: J f:Vecaoenccm∎ccmR514 96 CITY COUNCIL MEETING MINUTES - MAY 14, 1996 - PAGE 17 CONDITIONS : View Add Mult-case Ins-before Change Delete Renumber Print Esc Change highlighted condition OaSITE DEVELOPMENT REVIEWaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaG o : SDR96-0006 : PROJECT: SUMMER CREEK APTS : STATUS : P : UPD : 04/03/96 : :TMP: ° o APPLICANT:BOWEN REAL ESTATE GROUP PRIM. . : SDR94-0026 : ° o SITE ADDRESS : 00000 SW **NO ADDRESS** ° uaOaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaGac o ° CONDITIONS o 0 O 0 #- - - Code Title Stat Date---- By- 0 0 o o 11) 0001 PRVD ERSN CONTRL PLAN W/P . I . P. ' S / / BR 0 0 o ° 12) 0001 OBTN GNRL PRMT PER CLEAN H2O ACT. / / BR 0 0 ad. 13) 0001 SBMT SOILS RPT & GEOL. RPT. / / JF °ac o o 14) 0001 ENCLOSE SMG POOLS W/FNCE-3R--WALL:---_ ____ / BR 0 0 o o 15) 000 1_-P-ROVIDE 4 EXTENSION OF H2O LINE. / / MM 0 0 o o _ - 0001 SBMT RVSD SIT/LNSCP PLNS 4 RVW. / / WD > 0 0 ° 17) 0001 SBMT EXTR LGTG PLAN TO PD 4 APRVL DONE 09/09/96 ° ° u"o 18) 0001 CNSTRCT STD 1/2 ST IMPVMTS/HWKSBD / / BR °dc o ST IMPVMTS/131ST.0001 CNSTRCT STD 1/2 SMS/131ST. / / BR 0 0 o o 20 _ 0-0-41_COMPLETE STRIPING AT 135TH AVE . / f/__ BR 0 0 o ° 21) 0001 INSTL SITE IMPVMTS -PER RVSD PLAN. / / BR 0 0 uaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaiac O 0 aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaai (k)PdY Ry-I\__ SD SD?-96 - 00D6 RAR Ti ANSM ITI'AL ARCHITECTS INCORPORATED • PROJECT: SU Mm, TER CREEK APT. PROJECT NO. �3 TO: ...se-AN 1` 6l't'6c I4 M tm— FILE NO. CCaMMUN 11-•1 OEVELoPMEN r DEP DATE: C1-rq OF - 1(2,AR4 FAX NO. PAGES SENT: WE TRANSMIT VIA: FAX MESSENGER T- UNDER SEPARATE COVER XUS MAIL HOVERNIGI EXPRESS PICK UP AT OUR OFFICE FOR YOUR: APPROVAUSIGNATURE USE RECORD REVIEW AND COMMENT DISTRIDUTTON INFORMATION 1 TIIE FOLLOWING: / DRAWINcS/SPECIFICATIONS — AGREEMENT — SHOP DRAWINGS '� COMPUTER DISKETTES CHANGE ORDER PRODUCT LITERATURE MISCELLANEOUS APPLICATION FOR PAYMENT' PRODUCT SAMPLES COPIES DATE DESCRIPTION 5 rrE S4r /Ac um ?LA REMARKS: ,EA,N — —` As REQursTEO , Loc./1,1101Q OF "DI im..ilt tAL 5lr. lAC,et` HAS tSE� IOEN,IFIEb.. RED- 1 /i''4O To -F LIGe• ()EP?, — BY. 1>A4 r MAT14iSONi DISTRIBUTION 34 NW FIRST AVENUE, SUITE 206, PORTLAND,OREGON 97209 (503)225-9095 FAX (503)225-9120 t + • IAA TRANSMITTAL ARCHITECTS INCORPORATED PROJECT: 6u MME'R asst. Art,, PROJECT NO. 9400 TO: JEAN 4E I T J4N' WT FILE No. `/'�`� CoMret M IT`1 OS LLPrntat Deft DATE: C titv OF 1 AGAR ) FAX NO. PAGES SENT: WE TRANSMIT VIA: FAX MESSENGER UNDER SEPARATE COVER XIS MAIL OVERNIGIIT EXPRESS • PICK UP AT OUR OFFICE FOR YOUR: APPROVAL/SIGNATURE USE RECORD EVIEW AND COMMENT DISTRIBUTION INFORMATION I TILE FOLLOWING: DRAWINOS/SPECIFICATIONS AGREEMENT SIIOP DRAWINGS COMPUTER DISKETTES CHANGE ORDER PRODUCT LITERATURE MISCELLANEOUS APPLICATION FOR PAYMENT PRODUCT SAMPLES < COPIES DATE DESCRIPTION / ADRISS AMD MAS s16�►�s,�b�'�rr �t�F�Gl4tK311/41 I L r ettit adi FLAW i . ( A 1 , 'j F-1 1 Alr Alf A 0I " M M . 4 1,1 ' w■imivi REMARKS: ' it JEN.% I Ccut,) ` ou ftsaAss rogwpto TAM 'FLANS To 'ME iittPiR 1NQMOU L IN "Mt MAC' 4:14, ?HAT HArJOL&S New pLAN\I Review BY: Q.4,'E Mpa 4 t . DISTRIBUTION 34 NW FIRST AVENUE, SUITE 206, PORTLAND,OREGON 97209 (503)225-9095 FAX (503)225-9120 10(1 Post-It-routing request pad 7664 ROUTING — REQUEST Please - f I I READ To I I HANDLE -0006, SUMMEI I I APPROVE I f $ :� rpv 1.'E and r�y�-� ! T Yl n�(�� FORWARD '1 tJ�/1 ?' At"`= I I RETURN ' ( 0 4- A -€ f KEEP OR DISCARD AckiN.&PCt,NE1L J REVIEW WITH ME Date From (;),/,1( ULIQ, LCAd te> L Ct--ti .( , Y