Correspondence if [il Westlake consultants, inc I PLANNING I ENGINEERING I SURVEYING 6a/002.0//-003g (,2 30 E ) OCT 9 2003 BY: IP' October 28, 2003 Hap Watkins CITY OF TIGARD 13125 SW Hall Blvd. Tigard, OR 97223 FILE C Fax: (503) 624 -0752 Re: St. Anthony's School Project Number 1095 -09 K 1 Water Quality Facility I 1 Dear Mr. Watkins; Based on periodic inspections and observation, the water quality facility at St. Anthony's School was constructed and installed per design, and meets with the design criteria for this type of facility. Please consider this letter the Engineer's acceptance of the water quality facility as constructed. Sincerely, WESTLAKE CONSULTANTS, INC. k■ r „.„ - Berr.ard R. Smith, P.E., P.I.S. Director of Engineering BRS /cdl Cc: Drew Rocker Ankrom Moison Architects Fax: (503) 245 -7710 1 H \ ADMIN\ 90950901 \ St Anthony's School\ Corresp\ It 102803 tgard doc Pacific Corporate Center 15115 sw sequoia parkway, suite 150, tigard, oregon 97224 www.westlakeconsultants.com 1 PH 503.684.0652 1 FX 503.624.0157 City of Tigard Building Department 13125 SW Hall Blvd. Tigard, OR 97223 Attn: Gary Lampella, Brian Blalock Re: New Storage Building at 12630 SW Grant 3UP2004 -00233 Following is in Response to Plan Review dated June 2, 2004 Item 1 & 2: Site Permit and Site Utilities Permit Applications are enclosed with 2 sets of Site Drawings. A P.F.I. Permit will be applied for when the Contractor is determined. Item 3: Under the Provisions of 104.2.8, Alternate Materials, Design and Methods — We propose to discharge the roof drainage from this small building thru downspouts onto hard surfaced existing paving, which is sloped to drain to existing catch basin. Note that with this project there is less impervious surface draining to the catch basin than we now have. Please call with any questions. Bob Klas, 503 -644 -4222 or 503 - 590 -7160.