Loading...
Specifications (2) 11029 SW Beavertoeatilladale Hwy Beaverton. oft 97006 Yet 5067 Fax: 5034444330 vAvw.bvweyes.conn RECERIFD MAR 2 2 2007 CITY OFTIGARD BUILDING DIVISION T« 5yi (Ac Film 503 5'r 11 t'U Phessec CamemaHatial T'd E2S6- 89L -EOS From Res car Detec 3 _72 -o-4 1 ?Li,414-e_ kw Rk ? &GfPc ? o &t:7. yisseW eTTewe1 - Ja LuPZoo`f CO 16/mtit i f ❑ Urgent ❑ Fer Review ❑ nesse Comment 0 Please Reply 0 Please Recycle Attention: The contents of this fax, and any accompanying pages may be privileged and confidential, and are intended only for the use of the addressee indicated. The dissemination, copying, review, or use of this message by any persons other than the addressee, is strictly prohibited_ if this fax has been received in error, please notify us immediately by telephone or fax. Thank you. WdbS =TT L002 az JeW MUTUAL R 4.S& Massih LLC and Kamelia Mass& (collectively, "Owner") are the owners of certain property and improvements known as Pacific Park Plaza located at 13000 SW Pacific Highway, Tigard, Oregon 97223 (the `Project"). Welkin Engineering, P.C. (" Welkin") provided certain work on the Project, including, without limitation, surveying services, engineering plans and analysis, and landscape plans (collectively, the "Work"). Welkin claims that it is entitled to additional compensation for Work performed for the Owner on the Project ( the "Welkin Claims"). Owner claims that Welkin has been fully paid for any work performed for Owner or for the Project, and that Owner has claims against Welkin for incomplete work and for delays caused on the Project (the "Owner Claims"). The Welkin Claims and Owner Claims are hereinafter collectively referred to as the "Claims" In consideration of the mutual covenants contained herein and other valuable consideration, Owner and Welkin, fbr themselves and their respective successors, hears and assigns, each flrlly release and discharge each other, and their respective members, shareholders, directors, offices, employees, successors, heirs and assigns, each fully from the Claims. Contemporaneously with the execution of this Release, Welkin acknowledges receipt from Owner of a check in the amount of $2,677.95 in consideration of this Release. In consideration of this Release, Welkin hereby (a) provides its release on the Project as of the date of this Release so that Owner's replacement engineer may proceed with engineering on the Project; and (b) authorizes Owner and its replacement engineer to utilize Welkin's prior submittals, surveys, engineering plans and analysis, and landscape plans. MASSIH LLC /✓ BY r' K LIA MAS • H ITS 77rprt.e� L - - Dated: Marcha`Z , 2007 Dated: March , 2007 WELKIN ENGINEERING, P.C. BY iiTS ' Dated: March j , 2007 a• d EaS6- 89L -EOS yisseW eiTaweN JU l-JU =TT LOOZ as Jew ,. ,f) oe:) LI- ou 9 7 ."-- ,-,,,-- , Form 2a Project Name :1 .;74.... , 4 • ift ----4.-0 1 Page:1 1 " ii" ( 4 v # 7,3.6/ r 1 StJ , Project 1. Project Name 2. Project A d d r e s s ,,, I "if _ , i 3. City/Town -774/ 5. County I j yl&f",,,,,,, Lzi 4. Building, Gross Area (ft2) C // 1';'---''' 6. No. of Floors 7. Construction Site Elevation Above 2,000 ft? EYES jIte Attached Chapter Type ID Description Attach Forms and Building Envelope Form 3a Building Envelope - General 3b Prescriptive Path - All Climate Zones . „.0 Worksheets CodeComp Report for Simplified Trade-off 0 Floppy disc with .occ CodeComp file ED Check boxes to Worksheet 3a Wall U-factor indicate attached 3b Roof U-factor forms and 3c Floor U-factor worksheets 3d Window/Skylight Schedule Systems Form 4a Systems - General 0 4b Complex Systems 0 ECEIVED Worksheet 4a Unitary Air Conditioners - Air Cooled 0 Niff:' 4b Unitary Air Cond. - Water & Evap Cooled 0 /1 / 4c Unitary Heat Pump - Air Cooled DEC 22 200 4d Unitary Heat Pump - Water Cooled 0 0 4e Packaged Terminal A.C. - Air Cooled 0 CITY OF TIGARD 4f Packaged Terminal Heat Pump - Air Cooled 0 4g Water Chilling Pkgs - Water & Air Cooled 0 B JILDING DIVISION 4h Heat Rejection Equipment 0 4i Boiler - Gas-Fired and Oil-Fired 0 4j Furnace & Unit Heaters - Gas and Oil-Fired 0 4k Simultaneous Heating and Cooling 0 41 Air Transport Energy 0 4m Natural Ventilation 0 Lighting Form 5a Lighting - General 0 5b Interior Lighting Power - Tenant Method 0 5c Int. Ltng. Power - Space-by-Space Method 0 ' ' • Worksheet 5a Lighting Schedule 0 ./ 5b Interior Lighting Power El , .1 0. t A Applicant 7. Name 4/ / Pi.. . frr Ai i fki -, .1410Telephone 8. Company ' /Keil' ° /7 ,.." ,5 -:' ',' ' 11. Date f l' 9. Signature Attached No. of Pages Description of Documentation Document- i ation Summary040104b-ToPDF.xls Form 3a Project Name:I 1 Page: BUILDING ENVELOPE - GENERAL Check all boxes 1. Exceptions (Section 1312) that apply. ❑ No Envelope Components. The building plans do not call for new or altered building envelope components, e.g., walls, floors or roof /ceilings. ❑ A Non- conditioned Building. The proposed structure has no spaces heated or cooled by an HVAC system. Exceptions ❑ Exception. All new or altered building envelope components do not comply with the Discussion of qualifying requirements, Section 1312, but qualify for Exception 1 ❑ . 2 ❑ 30 4 ❑ 5 ❑ exceptions In I Port of the building that qualify: Instructions section. The plans /specs show compliance in the following locations: 1 1 2. Air Leakage (Section 1312.1.1) Plans /Specs ❑ Complies. Plans require that penetrations in the building envelope are sealed and that Show compliance by windows and doors are caulked, gasketed or weatherstripped. sheet, a g d sheet, detail The plans /specs show compliance in the following locations: il num number, specification section and/or subparagraph. I s heet 1.1 1 i 3. Suspended Ceiling (Section 1312.1.2.1) O Complies. Building plans do not show suspended ceilings used to separate conditioned space from unconditioned space. No exceptions permitted. 4. Recessed Light Fixtures (Section 1312.1.2.2) O Complies. The building plans do not show recessed Tight fixtures installed in ceilings separating conditioned spaces from unconditioned spaces. ❑ Exception. The building plans require that fixtures installed in direct contact with insulation be insulation coverage (IC) rated. The plans /specs show compliance in the following locations: 1 5. Moisture Control (Section 1312.1.4) O Complies. A one -perm vapor retarder is installed on the warm side (in winter) of all exterior floors, walls and ceilings, and a ground cover is installed in the crawl space for both new and existing buildings where insulation is installed. The plans /specs show compliance in the following locations: I sheets 12, 13 1 ❑ Exception. All new or altered building envelope components do not comply with the vapor retarder requirements of the code, but qualify for an exception. Note applicable exception. Section 1312.1.4 Exception 1 0 . 20 Portions of the building that comply: 1 1 Climate 6. Climate Zones Zones 0 Zone 1 - A building site is in Climate Zone 1 if its elevation is less than 3000 feet above sea level and it is in one of the following counties: Benton, Columbia, Clackamas, Clatsop, r Coos, Curry, Douglas, Jackson, Josephine, Lane, Lincoln, Linn, Marion, Multnomah, Polk, ( Tillamook, Yamhill, or Washington ❑ Zone 2 - Building sites not in Zone 1, or where construction site elevation is 3000 feet or ,;'f higher in Zone 1, are in Zone 2. 3.1 u t #0 7,1)(4 -60 L-- 7 Form 3b Project Name: I 1Page: PRESCRIPTIVE PATH Part 1 of 4 CLIMATE ZONE ZONE 1 Window Area Exterior Wall (total rough frame ft2) Area Glazing Maximum Glazing (gross ft2) °!o Fraction Complies Glazing Space Conditioned 3,551 + 12,324 X 100 = 28.8% Yes Percent Calculation Semi- See instruction Conditioned + X 100 = 0.0% section fora Space Yes discussion of glazing percent calculation. Conditioned Mechanical + X 100 = 0.0% Penthouse Yes Windows From Worksheet 3d, Window Minimum Window Shading Minimum place the highest (from Worksheet 3d) U- Value Assembly (from worksheet 3d) Coefficient Assembly Overall Window U- factor and highest N/A NIA p N/A N/A p Center -of -Glass SC. Or check minimum SC Complies N/A assembly and U -Value Compiles N/A Identify window. Double- glazed with 0.5 Inch Required Minimum airspace, low emissivity Required Minimum Tinted outdoor pane Assembly coating not greater than 0.4, Assembly aluminum frame The plans /specs show window compliance In the following locations: sheet 1.1 From worksneet 3a, piece me nignest uveran vvinaow u- tactor or check (Minimum Assembly). see "wtnaow KeguIrements" in table on the Notes following page for specific MA requirements. Excel version will automatically Insert minimum assembly requirements or greatest U -value from Worksheet 3d. "From Worksheet 3d, place the highest "center -ot- glass" shading coetticient (SO) tor glass or check MA (Minimum Assembly). See "Window Requirements" In the following table for specific MA requirements. Excel version will automatically Insert minimum assembly requirements or greatest SC from Worksheet 3d. Shading Coefficient (SC) can be calculated from the Solar Heat Gain Coefficient using the equation: SC = SHGC + 0.87. Manufacturers data may also be used to document SC. Wall 1 Insulation Type R - Value U•Factor Walls Insulation Only See Instruction Frame (wood or metal framing) 18 or section for a discussion of wall Or requirements. or or 1 or or Below -Grade R -Value Walls Below -Grade Walls Insulation Only U-Factor3 (Min. R -7.5) (Max. 0.11) See Instruction N/A section fora or discussion of below grade wall requirements. Net aa 3 Submit Worksheet 3a for each calculated assembly U- factor 3.2 1 Form 3b Project Name: Page: PRESCRIPTIVE PATH Part 2 of 4 Code Requirements - Zone 1 Discussion of these requirements In the Instruction section. . ZONE 1 Wall Requirements Window Requirements Wail / Insulation Type Max.: . Max. Glazing R -Value U- Factor Max. U- Factor Shading Fraction Insulation Only Coefficient Up to 16% CMU'Masonry wlintegral loose fill insulation N/A 0.300 0.540 0.57 Masonry or concrete w /cont. exterior insulation 1.4 or 0.300 CMU Masonry', w /integral rigid fill Insulation N/A = 0.210 Masonry or concrete w /interior Insulation 11 or 0.130 Up to 30% Masonry or concrete w /cont. exterior insulation 2.8 or 0.210 0.540 0.57 Frame (wood or metal framing) 13 or 0.130 Other (provide short description) 13 or 0.130 CMU Masonry wlntegral rigid fill insulation N/A ' 0.210 Masonry or concrete w/iinterior insulation . - 11 or 0.130 Up to 40% Masonry or concrete w /cont. exterior Insulation 2.8 or 0.210 0.37010 0.3510 . Frame (wood or metal framing) 13 or 0.130 Other (provide short description) 13 or 0.130 Code Requirements - Zone 2 Discussion of these requirements In the instruction section. ZONE 2 Wall Requirements Window Requirements Wall / Insulation Type Max. Max. Glazing R -Value U- Factor Max. U- Factor Shading Fraction' Insulation Only Cnefficient Up to 16% CMU'Masonry wlntegral loose fill insulation N/A 0.300 0.500 0.57 Masonry or concrete w /cont. exterior insulation 1.8 0.270 CMU Masonry wlintegral rigid fill insulation N/A 1 0.160 Masonry or concrete w/lnterior Insulation 13 or 0.090 Up to 26% Masonry or concrete w /cont. exterior insulation 4.3 or 0.160 0.500 0.57 Frame (wood or metal framing) 19 or 0.090 Other (provide short description) 19 or 0.090 CMU Masonry rigid fill insulation N/A ! 0.160 Masonry or concrete w /interior insulation 11 or 0.090 Up to 33% Masonry or concrete w /cont. exterior insulation 2.8 or 0.160 0.370 0.43 Frame (wood or metal framing) 13 or 0.090 Other (provide short description) 13 or 0.090 Notes 4 The Simplified Trade -off Approach must be used if glazing fraction exceeds allowable percentages. 5 Minimum weight of masonry and concrete walls = 45 Ib/ft2 of wall face area e All cores to be filled. At least 50% of cores must be filled with vermiculite or equivalent fill insulation. 7 Prescriptive MA (Minimum Assembly) Is a double - glazed window with a 0.5 Inch air space, low -e coating (e <= 0.40) and aluminum frame. MA shading coefficient description Is a tinted outboard pane of glass. e All cores except bond beams must contain rigid Insulation Inserts approved for use In reinforced masonry walls ` `' 1�� s Batt insulation Installed In metal or wood frame walls shall be Insulated to the full depth of the cavity, up to 6 Inches In depth. (Minimum Assembly) double-glazed argon space, g 0.05) 10 'Prescriptive MA Minimum Assemb �a a doubt lewd window with a 0.5 Inch ar on filled s ace, low -e coating ( a <= 0.05 and thermal break V" frame. MA shading coefficient description is a 0.25 -inch thick glass with low-e coating (e <= 0.05). Zone 1 Includes a tinted outboard pane.' 3 -3 _ 60, aa E_F 7 Form 3b Project Name: Page: PRESCRIPTIVE Il ATR Part 3 of 4 4 Roofs/ R -Value ,2 Ceilings Roof / Ceiling" Insulation Only U-Factor 12 (Min. R -19) (Max. 0.050) See Instruction section fora lall 25 or dicussion or roofs/ceilings. Notes 11 Write -in a short description for assembly with the lowest Insulation R -value or the highest assembly U- factor. t2 Submit Worksheet 3b for each calculated roof /ceiling assembly U- factor. . Skylight Area Roof Area Skylight Maximum Skylight (total rough frame ft2) (gross ft2) % Fraction Complies Skylights C includes glazed + X 100 = smoke vents. Space N/A See Instruction Semi - ,section for e d • icuaslon of Conditioned + X 100 = skylights. Space N/A Conditioned Mechanical + X 100 = Penthouse N/A Skylight Area Roof /Calling Area Skylight (total rough (gross ft2) Percent' frame ft2) Skylights From Worksheet 3d, place the highest Skylights Shading Mi MndowU ac (from Worksheet 3d) 14 Minimum Skylights C Assembly highest Center -of- #NIA - N/A Glass SC. #NIA • ❑ U -Value Complies Yes SC Complies Yes Required Minimum N/A Required Minimum N/A (must use SC) Assembly Assembly The plans /specs show window compliance in the following locations: N/A Code Compliance Option Thermal Performance Shading Coefficient Requirements Overall Vertical U- Factor Center of Glass SC Performance U -1.230 for overall assembly in overhead plane SC -0.47 center -of -glass Minimum Assembly Double glazed, 0.5 -inch airspace N/A 13 Skylight percentage area is based on total skylight and smoke vent rough frame area divided by total conditioned roof area. Percentage must not Notes exceed 8 percent of total roof /ceiling area in conditioned building space, The Simplified Trade -off Approach must be used If glazing fraction exceeds allowable percentages. 14 From Worksheet 3d, place the highest Overall Vertical U- factor or write -in MA (Minimum Assembly). See "Skylight Requirements" In table above for specific MA requirements. 15 From Worksheet 3d, place the highest "center -of- glass" shading coefficient (SC) for glass. See "Skylight Requirements" in the following table for specific MA requirements. Shading Coefficient (SC) can be calculated from the Solar Heat Gain Coefficient using the equation: SC = SHGC 4. 0.87. Manufacturers data may also be used to document SC. • its, L J . Y VG I ,/ 3-4 Form 3b Project Name: Page: PRESC IPTIVE PATH Part 4 of 4 Floors Floors over Unconditioned Spaces R -Value U- Factor See Instruction Insulation Only section fora dieusslon of floors. 1 or Heated Concrete Slab Edge R -Value Insulation Only All 16 Heated Slab -on -Grade (Section 1312.1.2.4) ❑ Complies. Building plans show insulation extending downward from the top of the slab a minimum distance of 24 inches or downward and under the slab for a combined minimum distance of 24 inches or to the bottom of the thickened edge of the of slabs used as a foundation. The plans /specs show compliance in the following locations: sheet 8 Notes 16 Write -in a short description for assembly with the lowest Insulation R -value or the highest assembly U- factor. 17 Submit Worksheet 3c for each calculated floor assembly U- factor. 18 Write -in a short description for Heated Slab, which has heat, integrated Into slab such as hydronlc heat. If more than one floor type, enter the lowest insulation R -value or the highest component U- factor of any floor. Code Comptlance O tions Component Min. R -Value Max. U- Require- Insulation Only Factor ments Floor over Unconditioned Spaces 11 or 0.070 Component Climate Zone 1 Climate Zone 2 Heated Concrete Slab Edge, Min. R -Value 7.5 I or I 10.0 Doors U- Factor See instruction Doors R -Value section fora with leaf width greater than 4' Center-of-Panel dieussion of doors. Insulation Only (Max. 0,.20) ) (Min. R -5) !all °lass doors exempt or 0.640 Notes 10 Write -In a short description for Doors. If more than one door type, enter the lowest Insulation R -value or the highest center -of -panel U- factor of any door. The following doors are exempt from door and window U- factor and shading coefficient requirements: (1) Entry/Exit doors with a leaf width of 4 feet (1.2 m) or less, and (2) overhead coil doors. 3 -6 . ig3 o z (-- oq - 2— ? 7 Worksheet 3a Project Name: Page: Wail U- factors See Tables 3a through 3d for R- Values of building materials Wall Assembly 1 ID i (a) (b) (c) (d) 1 ' Layer Description Detail R -value - Exterior Moving Air 0.17 s A Exterior Finish d Plywood (Douglas Fir) 0.5" J 0.62 ll m EL B 1 Wall Framing and Insulation Wall Wood Framing 2x616" o.c. R -21 J 14.94 ® ` + 1' C Interi Finish Gypsum or plaster board 0.625" A 0.56 1i ®i1 D I 1.1 T, r ®111 E J F; 211 F Interior I Still Air 0.68 "..‘,.`ill r 1. Total column (d) 16.97 2. Assembly U- factor (Invert the amount in line 1) 0.059 Wall Assembly 2 ID `. ' (a) (b) (c) (d) Layer Description Detail R -value • Exterior Moving Air 0.17 J ®..1 B . . J 1. E ' F .__I Mil !')",..1 i r H +' J 1 J s M 1 .: :1.44-- tir' Interior Still Air I 0.68 ( r - 1. Total column (d) 2. Assembly U- factor (Invert the amount in line 1) Add Additional Walls 3 -7 . 60 p `2_e-cc-I- Worksheet 3b Project Name: Page: Roof U- factors See Tables 3a through 3d for R- Values of building materials Roof Assembly 1 ID (a) (b) (c) (d) Layer Description ' Detail R- value . -- •Exterlor Moving Air 0.17 "... ° ' °' ; l—o A Exterior Finish �� Plywood (Douglas Fir) 0.5" d 0.62 m ? - e �t;,� ' ..� ... B Air S pace Air Layer l5 Roof J 0.80 " : • e C Roof/Floor Framing/Insulation Roof/Floor Engineered Wood Comp. I -Beam 24" oz. R -25 J 23.70 .._. D Air Space ,4 Air Layer 3.5" Floor J 1.22 E F '' `t�.,s. ,*" • H s 7 id •---• _ Interior Still Air 0.61 1. Total column (d) 27.12 2. Assembly U- factor (Invert the amount in line 1) 0.037 Roof Assembly 2 - ID (a) (b) (c) (d) Layer Description Detail R -value •--- •Exterior Moving Air 0.17 ' ,s, > A I J J t-s 'a .• � h�AS 0 I� -J J •--. D J J 4.—. d L _J Y. 1 A J A .---.Interior Still Air 0.61 1. Total column (d) 2. Assembly U- factor (Invert the amount in line 1) t : .4 a �w 4 F 3 * Add Additional Roofs Worksheet 3d Project Name: Page: Window Schedule ' Window Properties - List All Wtndow Types in Project ( N) (c) • (d) (e) m (g) (h) m O 00 Confer of Overall Center • Documenfalon Manufacturers Wbdow Frame Grass Glass Window Glass Name - Somca Model / No. Type/Class T .. Glass Tar Thick _ Ottrer .: - ' e6 e . n low , .t.. 11 -factor SC All ASHRAE Debut Table j na. Fired • Akaninow witoul Thermal Break Clear 1W Doable Glaring lir airspace ne ®® 7111111111,1 . --- J - MINIM J r =r M J _ _ __MI MI MI J . - - = � __ A ` -_- =MII - 1.1 j NEM j -- -- _ J MIN _ -- : MINIM Column Instructions . (a) Ester the name of the window product. 11 is recommended that you choose a name that conespads with that used on project plans and specdxWWens - (b) Provide documentation source. • Wrdo n NFRC d window is rated Waugh NFRC 100.97 Procedure la Determining Fenestration Product Thermal Performance. Eider all columns except (R. b l Wrdein 'ASHRAE Default WARN COG' It Center ll - lades and Mackay Coefficient is available from glass manuladara. Erda all wtumes. /^ Columns A and (k) from manufacturer's dale sheet. .. - Willie-in - ASHRAE Derain if only desciptr a parmnetna of window are known. Ester a0 r»krnre. Columns O. O. and (k) from ASHRAE default table. (c) [(Document Source is Wher'NFRC' or ASHRAE Default WAdfg COG. enter the manufacturers model number. - ) (d) Choices are tired. Operable. or Contain Wall. (e) Choices are wood, vinyl, reinlaced vinyl. aluminum dad. Insulated fiberglass, ahnrinam, aluminium wah emud break (see definitions for thermal break regrhemerm.) - , (1) Enter glass tent. Wale - clear if there is no fiat. ^ (g) Enter glass thickness 1 (h) Include vat nday properlies such as argon W. towe coating. insulating spacers. eta _/L� (1) COG 11 -(actor from manufacture's data or I4SW1AE 2001 Fundamentals Handbook Chapter 30, Table 4. For NFRC rated prodo is leave blank. Pi: -+ Q) Overall U -(adar hem NFRC rating orASIUTAE 2001 Fundamentals Handbook Chaps 30. Tabs 4. For skylights value mud be for ho kerdaI posfian. . (k) COG Shading Coefficient from mardectrme's data or ASHRAE 2001 Fundamerdas Handbook, Chapter 30. Table 4. For NFRC rated products SHGC s provided. t To carved SHGC to SC. SC m SHGC1097. 3-11 . 6 op l-o - oc; 2�' l 7 ` r J iAwg i , .dk o f \ t January 13, 2005 CI OF T G : OREGO Kamelia Massih Massih LLC PO Box 108 Beaverton, OR 97075 RE: MASSIH OFFICE BUILDING Project Information Site Permit: BUP2004 -00297 Construction Type: 5N Tenant Name: Massih Office Building Occupancy Type: B Address: 13000 SW Pacific Hwy Occupant Load: NA Area: 11,142 Sq Ft Stories: 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The following information is required in order to complete the review. , r a P E A W . Provide cl ication on locations of draft stops and assemblies on plan. OSSC 708.3.1.1.3 and A . Provide fire restive construction location and design on plans. OSSC 106 3. Provide clarification on locations of hold downs and shear walls on plans. OSSC 106 4. Provide clarification on parapet design with counter flashing and coping material and shown on plan. 4&dt,t,5 Please provide an item by item response. • 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 6 0p 20...)(-1--0 Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. Deferred items; • Fire Alarms • Stairways • Suspended Ceiling • Fabricated Joist • Glazing details • HVAC • Electrical • Plumbing • Roof membrane system When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respect 1 , V� nznz Senior Plans Examiner ,.)p 2-( 2 04-00 677 March 10, 2006 '_Ilk -II CITY OF TIGARD OREGON Welkin Engineering, P.0 Harris Hyman 8000 SW Pfaffle St Portland, OR 97223 RE: MASSIH OFFICE BUILDING - REVIEW Project Information Permit: BUP2004 -00297 Construction Type: 5N Tenant Name: Massih Office Building Occupancy Type: B Address: 9975 SW Frewing St Occupant Load: ukn Area: 11,142 Sq Ft Stories: 2 The building permit above was issued in 2005. On December 27, 2005 Mr. Hyman submitted a request to replace 2x6 dug fir #1, wood framing members with 6 inch cold - formed steel stud framing members to be used on the walls of this project. The request was forwarded to Miller Consulting Engineers (MCE) for review. MCE generated a plan review letter on January 10 (see attached). The following is correspondence to date for above permit: 1. Miller Consulting reviewed the requested submittal on 1/06, based on the complexity of the building framing. The review for this change has been based on the 2004 Oregon Structural Specialty Code (OSSC). 2. 1/10/06, MCE requested the submittal of the following information to complete his review; "1) calculation for loads to shear walls as required for the seismic & wind controlled directions as required by sec 1609.1.5 & 1620.4 & table 1616.5.1.1 #2, 2) submit details for load transfer & connections including Omega as required by sec 2211, 3) Submit details for shear walls including fasteners, spacing & method of proper installation as required by sec 2211, 4) Submit details & calculations as required as required by sec 2211" 3. During this review MCE noticed that the building was of irregular shape and that there was no calculation for seismic design based off the shape of the building as required per OSSC 1998, section 1629.5.3. This was brought to City of Tigard Building Department's attention and it was determined that this permit as noted above was issued in error as the plans are incomplete and need to be completed OSSC 106.3.3. "Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations", 4. A request was made by the City of Tigard on 1/11/06 by phone conversation with Mr. Hyman requesting he submit this calculation showing the proposed building design would meet the code 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 requirements of Section 1629.5.3, OSSC. Mr. Hyman agreed to begin working on that immediately to maintain the status of the issued permit without revoking it as this department has the authority to do so as stated per OSSC 105.6 "Suspension or revocation. The building official is authorized to suspend or revoke a permit issued under the provisions of this code wherever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any ordinance or regulation or any of the provisions of this code." 5. On 2/6/06 a phone conversation was held between Brian Blalock of the City of Tigard, Building Division and Mr. Hyman of Welkin Engineering. The discussion was documented with a letter dated 2/8/06 from Mr. Hyman reiterating the conversation informing Brian B. that the proposed construction change to steel studs will not be made at this time. He also explained that he was aware of MCE's concerns regarding seismic effects of the building shape. Mr. Hyman requested that the foundation construction be allowed to continue through the beginning of framing. Brian B agreed to this provided MCE's concerns would be addressed. Brian B. told Mr. Hyman that if MCE did not recommend approval based on a code complying design, Brian would request no work to be done after the foundation and slab were complete. Mr. Hyman stated he would have this analysis to this office by the following week to maintain the approved permit. No design has been received to date. 6. There was a request to change the exterior foundation design. On 2/15/06 this design was approved based on submitted information with special inspection required for soil compaction on the interior footing & foundation system. Brian B informed the contractor that no construction above the foundation and slab was going to be allowed until Mr. Hyman addressed the issues identified in the 1/10/06 plan review letter generated by MCE had been satisfied. 7. Per a conversation with Eric Watson at MCE on 3/9/06, No response has been received. PLEASE provide the requested design so that the project may proceed without interruption. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectful y, 7 7 .---- Val Henzel, ' Senior Plans Examiner JOB NAME: Pacific Park Plaza CITY OF TIGARD JOB ADDRESS: 9975 SW Frewing BUILDING DEPARTMENT DATE: April 18, 2006 13125 HALL BOULEVARD MCE Project No.: 051333 TIGARD, OR 97223 SHEET 1 OF 1 Tigard Building Permit BUP -2004 -00297 REVISED STRUCTURAL PLAN REVIEW #2 Engineering Dated 3/22/06 /4/77. U j ci Corr. Item Page No. Comments Code Section Made No. / ?/7 Q. 1 Calculations Submit calculation for Toads to shear walls as Table 16 -M #2 required for the seismic and wind controlled Section 1612.1 & directions. The analysis still needs to comply with Section 1633.2.9 Section 1612.1 which requires compliance with Sections 1633.2.5 and 1633.2.6. Therefore, submit details for lateral Toad transfer and connections at the reentrant comer. Not 2 Submit details for lateral Toad transfer and Section 2211 Req'd connections including Omega. Not 3 Submit details for shear walls including fasteners, Section 2211 Req'd spacing and method of proper installation. Not 4 Submit details and calculations as required. Section 2211 Req'd 5 Pages 3 thru The overtuming calculations at the shear walls do not Section 1612.1 6 of revised properly account for the application of forces from calculations the diaphragms. Submit calculations to properly account for the application of forces from the diaphragms to the shear walls. 6 Pages 3 thru Submit calculations for the shear walls so as to Section 2315.1 6 of revised comply with Table 2306.4.1. calculations 7 Plans Submit plans and details for the revised shear walls Section 106.3.3.1 per the calculations dated 3/22/06 including fasteners, spacing and method of proper installation. 8 General Submit one set of manufactured floor and roof joist Section 106.3.4.2 shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 9 General Submit one set of stairway shop drawings, which Section 106.3.4.2 have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 10 General Submit one set of suspended ceiling shop drawings, Section 106.3.4.2 which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement.