Report f
��\\ Office Bend Office
Carlson Testing Inc. �� � f OR9730 ,NE 630250BRleyRdB!l
Bend OR 97701
A�Y1 `� Tgv�( OR 97123 4060 od 9730!
Phone. (50316813160 Phone (503) S89 -I23Z Phone (54/) 330 -9155
F : 15031 684-0954 F . 15031 58 9 -1309 Far /5411330.9!63
Construction Materials Testing & Inspection
Special Inspection
.`
FINAL SUMMARY LETTER
July 10, 2008
T0508178
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Terex Utilities West — Shop Addition
12805 SW 77 Place — Tigard, OR
Permit# BUP2005 -00089
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Adhesive Anchors
Structural Masonry
NOTE: CTI is certifying the above - mentioned items as it pertains to the attached field reports.
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any r rther questions regarding this matter, please do not hesitate to contact this office.
Respectf ly / bmitted,
CARLS cy STING, INC.
41/ Hiet as
p P
. ect Manager
(
cc: GFC Construction — Geoff Fale
VLMK — Kevin Kaplan
Case Design Group
,
_ f
Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
T • Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson g e S t 1 n In. Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155
FAX FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163
May 23, 2005
T0508178
Permit No. BUP2005 -00089
P.O. No.
FIELD INSPECTION REPORT
DATES COVERED: May 13, 2005
PROJECT: Terex Utilities West — Shop Addition
ADDRESS: 12805 SW 77 Place — Tigard, OR
INSPECTOR: M. Larson — COP #625, WABO #LAR664944, OBOA #240, ICBO #1060595 -84
fl 05 -13 -05 - Rebar / Concrete Ii
As requested, CTI representative was on site and checked rebar in footing for new masonry wall
along "A" line from 1 to 5. Rebar was per detail SK9 from VLMK, with 3 feet of lap out of footing
and into what will be a masonry wall.
Rebar was per plan. Cast one set of cylinders from Morse Brother's 3500 -psi mix 35N17200
tailgated into place and mechanically vibrated. Approximately 33 Yds of concrete were poured.
*" CHECK ONE BOX ONLY *** YES NO
1. This is a preliminary inspection only. — OR —
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are clearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as Z 0
conforming.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectfu y submitted,
CARLSiiN TESTING, INC.
'lm-s F. Hietpas
operations Manager
Muck
cc: GFC Construction — Geoff Fale
City of Tigard Building Dept
VLMK — Kevin Kaplan
Case Design Group — Carter Case
05 -13 -05 fr.dcc
Main Office •• Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Carls Testing, Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
n Phone (503) 684-3460
FAX (503) 684-0954 Phone ( 50) 589-1309 Phone (4 9155
AX (5 41) 330 -9163
May 26, 2005
T0508178.CTI
Permit No. BUP2005 -00089
FIELD INSPECTION REPORT
DATES COVERED: May 17, 2005
PROJECT: Terex Utilities West — Shop Addition
ADDRESS: 12805 SW 77 Place — Tigard, OR
INSPECTOR: C. Mangino
J. Hietpas, COP #343; WABO #HIE522831; ICBO #0873046- 88,- 86, -84; OBOA #205
05 -17 -05 Epoxy_l
As requested by Terex Utilities, CTI representative was on site for epoxy inspection with the
following results:
Epoxy used was Unitex Pro -Poxy 300 Fast with an expiration date of 04/07. #5 Grade 60 rebar
was installed in clean 3 /4" 0 holes at an embedment depth of 5 ' /z ". Holes were cleaned with
compressed air and brush. Drill bit complies with ANSI B212.
Epoxy was applied using a manual applicator. Installation appears to comply with ICBO report
ER -5000 and manufacturers instructions.
*** CHECK ONE BOX ONLY *** YES NO
1. This is a preliminary inspection only. — OR — 0
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are clearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as ® 0
conforming.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
/
Respectfull, submitted,
CARLSO TESTING, INC.
- F. Hietpas
• aerations Manager
M/J H /ck
cc: GFC Construction — Geoff Fale
City of Tigard Building Dept
VLMK — Kevin Kaplan
Case Design Group — Carter Case
05-17-05 fr.doc
Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
C y Testing Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
a r l S o r1 Inc. Phone (503) 684 -3460 Phone (503) 589-1252 Phone (541) 330 9155
9 FAX (503) 684 -0954 FAX (503) 589 1309 FAX (541) 330 - 9163
+ May 31, 2005
T0508178.CTI
Permit No. BUP2005 -00089
FIELD INSPECTION REPORT
DATES COVERED: May 23, 2005
PROJECT: Terex Utilities West - Shop Addition
ADDRESS: 12805 SW 77 Place - Tigard, OR
INSPECTOR: C. Lingel, COP #787, ACI #0104812
05 -23 -05 - Masonry Rebar / Grouting:
As requested, CTI representative was on site for inspection of reinforcement for 8" MW CMU
wall (south wall) for shop addition. Rebar size, grade, and placement conform to plan. CMU
grade and mortar type also are in compliance.
Observed the placement of approximately (11) cubic yards of Rinker Materials grout mix
#1308336, 3000 psi, placed by pump, then consolidated by mechanical vibration. Today's pour
was in (1) lift from footing to 5' -4 ". One set of (3) cylinders was cast from first load of this grout.
Contractor and I searched through approved plans as well as engineered specs for project and
could not find specific grout mix design for this project. The only thing specified for grout was
that it was to be 2000 psi and the above stated mix delivered was 3000 psi. Mason contractor
was asked to make up a set of prisms for next pour.
*** CHECK ONE BOX ONLY *** YES NO
1. This is a preliminary inspection only. — OR — ❑
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are clearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as ® ❑
conforming.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office. If there are any further
questions re•_rding this matter, please do not hesitate to contact this office.
Respectful submitted,
CARLSO , TESTIN , IC.
Ja ' _. F. Hietpas
• • - -ations Manager
.ab
•. GFC Construction - Geoff Fale
City of Tigard Building Dept
VLMK - Kevin Kaplan
Case Design Group - Carter Case
05 -23-05 fr.doc
i t
Main Office ! Salem Office Bend Office
P.O. Box 23814 - ,do Hudson Ave. NE P.O. Box 7918
Clson Testing, 1-1 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
a Inc. c e Phone (503) 684 -3460 Phone (503) 589-1252 Phone (541) 330 9155
FAX (503) 684 -0954 FAX (503) 589 1309 FAX (541) 330 -9163
May 25, 2005
T0508178.CTI
Permit No. BUP2005 -00089
V
FIELD INSPECTION REPORT
DATES COVERED: May 24, 2005
PROJECT: Terex Utilities West — Shop Addition
ADDRESS: 12805 SW 77 Place — Tigard, OR
INSPECTOR: N. Shannon, COP #655, WABO #SHA965609, OBOA #321
05 -24 -05 - Masonry:
As requested, CTI representative was on site for special inspection of reinforcing steel and grout
placement to ORS and design requirements.
Visually inspected and verified placement of reinforcing steel at east (back) wall of new addition, full
length, from 5'-4" to 10' elevation, to the requirements of SK #9. Noted that actual placement was
#5 at 8" o.c. vertical, not #5 at 16" o.c., per design. Continuously monitored placement of (5) cubic
yards of 7 -sack course grout at locations noted above. Grout placed by pump and consolidated with
vibration. Grouted (1) set of (3) CMU prisms for laboratory testing.
See Incompleted Items List (NCL) attached. The following non - complying item was observed:
A. Grout lift not complete at end of day. Last 5' of north end of wall not grouted.
*** CHECK ONE BOX ONLY*" YES NO
1. This is a preliminary inspection only. — OR — ❑
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are clearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as ❑ El
conforming.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be
reproduced, except in full, without prior authorization from this office.
If there are an urther questions regarding this matter, please do not hesitate to contact this office.
Respectfull 'submitted,
CARLSO .1 ESTING, ■ &.
J , 'e- F. Hietpas
el-rations Manager
S /sab
Attachment
cc: GFC Construction — Geoff Fale
City of Tigard Building Dept
VLMK — Kevin Kaplan
Case Design Group — Carter Case
05 -24 -05 fr.doc
CARLSON TESTING, INC.
INCOMPLETED ITEMS LIST (NCL)
May 25, 2005
T0508178.CTI
•
Project Name: Terex Utilities West — Shop Addition
Project Address: 12805 SW 77 Place — Tigard, OR
Permit No. BUP2005 -00089
DATE
ITEM # INSP. DATE ITEM DESCRIPTION COMPLIANCE CTI SIGN -OFF CORRECTED
1 NS 05 -24 -05 Grout lift not complete at end of day. Last 5' of
•
north end of wall not grouted.
cc: GFC Construction — Geoff Fale
City of Tigard Building Dept
VLMK — Kevin Kaplan
Case Design Group — Carter Case
7 Main Office Salem Office Bend Office
P.O. Box 23814 60 Hudson Ave., NE P.O. Box 7918
1 • Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson Te s ti n1 o 9 Inc. Phone ( 53) 66 0344 PFD (503) 589 -1252 Phone (541) 330 -9155
(503) 589-1309 FAX (541) 330 9163
• -. June 2, 2005
T0508178.CTI
Permit No. BUP2005 -00089
FIELD INSPECTION REPORT
DATES COVERED: May 25, 2005
PROJECT: Terex Utilities West — Shop Addition
ADDRESS: 12805 SW 77 Place — Tigard, OR
INSPECTOR: R. Gouthro, COP #771, ICBO #1041477 -88, -84, WABO #G0U171964, ACI #982297
j105_25 -05 - Masonry]
As requested, •CTI representative was on site for masonry grouting at last 5' of north end of
shop addition wall. Re6ar was verified by CTI representative N. Shannon on 05/24/05.
The following previously noted non - complying item has been resolved:
- NCL #1, item "A" report dated 05 -24 -05 — Observed contractor mixing and placing by bucket
sakrete groove concrete. Approximately 1 /4 Yds was placed and mechanically vibrated.
This completes wall and clears NCL item dated 05/24/05.
" CHECK ONE BOX ONLY ' YES NO
1. This is a preliminary inspection only. — OR — 0
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are clearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as ® 0
conforming.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectf submitted,
CARL '-N TESTIN NC.
i lk
es F. Hietpas
es erations Manager
" G /ck
Attachment
cc: GFC Construction — Geoff Fale
City of Tigard Building Dept
VLMK — Kevin Kaplan
Case Design Group — Carter Case
05-25-05 fr.doc
ti
•
CARLSON TESTING, INC. •
INCOMPLETED ITEMS LIST (NCL)
June 2, 2005
T0508178.CTI
Project Name: Terex Utilities West — Shop Addition
Project Address: 12805 SW 77 Place — Tigard, OR
Permit No. BUP2005 - 00089
DATE
ITEM # INSP. DATE ITEM DESCRIPTION COMPLIANCE CTI SIGN -OFF CORRECTED
1 NS 05 -24 -05 Grout lift not complete at end of day. Last 5' of Resolved. R. Gouthro 05 -25 -05 ;'
north end of wall not grouted.
cc: GFC Construction — Geoff Fale
City of Tigard Building Dept
VLMK — Kevin Kaplan
Case Design Group — Carter Case
1
Main Office Salem Office Bend Office P.O. Box 23814 060 Hudson Ave., NE P.O. Box 7918
e �1 7.1 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carts on Testing �
n.c Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155
9 FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163
June 28, 2005
T0508178.CTI
Permit No. BUP2005 -00089
FIELD INSPECTION'REPORT
DATES COVERED: June 16, 2005
PROJECT: Terex Utilities West — Shop Addition
ADDRESS: 12805 SW 77 Place — Tigard, OR
INSPECTOR: L. Wright— COP #641, WABO #WRIO23067, ICBO #0851139, OBOA #383
t06-16-05 - Rebar
As requested, CTI representative was on site for a concrete and rebar inspection, however,
concrete was cancelled.
Inspected the rebar placement, size, laps, and grade for the slab -on -grade with thickened
edges. CTI representative conducted this inspection using the design engineer's (Kevin Kaplan
with VLMK) fax transmittal dated 05/06/05, sheets SK -1 to SK -10. Reinforcement conforms,
except for the following:
✓ Grid 5/A.1 -A.3 detail 2 /SK -7 — missing the 2nd N 4 continuous in thickened slab. Design
engineer said this is acceptable if the wall on top does not exceed 3' -6" max.
✓ Detail note N 5 at 36" on center each way for slab -on -grade — Design engineer said N° 4 at
24" on center each way is acceptable.
✓ Grid 1/A.7 detail 2 /SK -6 — contractor has 10" wide at the bottom. Design engineer said it is
acceptable.
✓ Detail note at 1/A.7 — 2' x 2' x 16" deep footing with (2) N 5 each way is missing. Sub-
contractor said the steel columns are omitted and the existing wall will be removed and the
existing building will frame on through. The "as is" condition is acceptable per design
engineer.
✓ Detail 1 /SK -9 — contractor increased the width of the CMU wall footing 1' -9" before casting
the footing. Total width of the footing is 5' -9 ".
CTI representative spoke with the design engineer via phone at 7:15am ± about the above
noted items.
*** CHECK ONE BOX ONLY *** YES NO
1. This is a preliminary inspection only. — OR — ❑
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are clearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as ® ❑
conforming.
06 -16-05 fr.doc
June 28, 2005
T0508178.CTI
Page2of2
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectfully/ bmitted,
CARLSO TESTING, INC.
1
J. ••s ' . Hietpas
O... rati. ns Manager
/ck
cc: GFC Construction — Geoff Fale
City of Tigard Building Dept
VLMK — Kevin Kaplan
Case Design Group — Carter Case
_- -- -- 06 -16 -05 fr.doc
( Main Office Salem Office Bend Office
P.O. Box 23814 ,0 Hudson Ave., NE P.O. Box 7918
G �o 1 t Testing, gard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
alls ®i A 1 e s ¢ i n Inc. I Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155
b 9 FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163
June 30, 2005
T0508178. CTI
Permit No. BUP2005 -00089
FIELD INSPECTION REPORT
DATES COVERED: June 20, 2005
PROJECT: Terex Utilities West — Shop Addition
ADDRESS: 12805 SW 77 Place — Tigard, OR
INSPECTOR: R. Gouthro, COP #771, ICBO #1041477 -88, -84, WABO #G0U171964, ACI #982297
1L 06 -20 -05 - Concrete
As requested, CTI representative was on site for concrete special inspection of addition slab -on-
grade and thickened footing (slab edge).
Cast 2 sets of 4 cylinders on approximately 162 Yds of Morse Brother's 3500 -psi, 3 /4"
aggregate, mix N° 35N1H2M0, placed by pump and mechanically vibrated at thickened edge,
and manually screeded for slab -on- grade. Monitored slump and time on concrete. Slump was
6" — average on all trucks.
*** CHECK ONE BOX ONLY*" YES NO
1. This is a preliminary inspection only. — OR — ❑
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are clearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as ® ❑
conforming.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office. /
Respe ' fully submitted,
CA' SON TESTING, INC.
/V
I James F.
Operations Manager
RG /ck
cc: GFC Construction — Geoff Fale
City of Tigard Building Dept
VLMK — Kevin Kaplan
Case Design Group — Carter Case
06 -20-05 fr.doc
( Main Office Salem Office Bend Office
P.O. Box 23814 ,060 Hudson Ave., NE P.O. Box 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
C a r 1 s o Y1 i Testing Inc • Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155
FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163
• • July 15, 2005
T0508178.CTI
Permit No. BUP2005 -00089
FIELD INSPECTION REPORT
DATES COVERED: June 29, 2005
PROJECT: Terex Utilities West - Shop Addition
ADDRESS: 12805 SW 77 Place - Tigard, OR
INSPECTOR: C. Mangino
J. Hietpas, COP #343; WABO #HIE522831; ICBO#0873046- 88,- 86, -84; OBOA #205
06 -29 -05 - Epoxy:
As requested by Geoff with GFC Construction, CTI representative was on site for epoxy
inspection. Epoxy used was Hilti HIT HY -150 (expiration 12- 2005). Gr. 60 #5 rebar was
installed into 3 /4" 0 holes at an embedment depth of 6" into grouted CMU. Drill bit complies with
ANSI B212. Holes were cleaned using compressed air and nylon brush. Epoxy was applied
using a manual applicator.
Installation appears to comply with ICBO ER -5193 and manufacturer's instructions.
*** CHECK ONE BOX ONLY *** YES NO
1. This is a preliminary inspection only. — OR — ❑
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are clearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as ® ❑
conforming.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectfull / submitted,
CARLS• , TE G, INC.
J.' . Hietpas
• • -re ons Manager
• M /sab
\ cc: GFC Construction - Geoff Fale
City of Tigard Building Dept
VLMK - Kevin Kaplan
Case Design Group - Carter Case
06 -29-05 fr.doc
' Main .Office Salem Office
Cii .
Bend Office
P. 23814 "4060 Hudson Ave., NE P.O. Box 7918
rl O n Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
1 A Te s gi Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155
FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163
July 22, 2005
T0508178.CTI
Permit No. BUP2005 -00089
FIELD INSPECTION REPORT
DATES COVERED: July 6, 2005
PROJECT: Terex Utilities West - Shop Addition
ADDRESS: 12805 SW 77` Place - Tigard, OR
INSPECTOR: N. Shannon, COP #655, WABO #SHA965609, OBOA #321
07 -06 -05 - Masonry:
As requested, CTI representative was on site for special inspection of reinforcing steel and grout
placement at west wall (full length) from foundation to top of wall (8' lift). Visually inspected and
verified placement of reinforcing steel at wall noted above. Verified placement of cleanouts and
vertical bar positioners.
Continuously monitored placement of (5.5) cubic yards of 6 -sack course grout at location noted
above. Grout placed by pump and consolidated with vibration. Sampled grout and cast (1) set
of (3) construction prisms for laboratory testing.
*** CHECK ONE BOX ONLY *** YES NO
1. This is a preliminary inspection only. — OR — ❑
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are clearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as ® ❑
conforming.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectfully /emitted,
CARLSON STI ' , INC.
James" Hietpas
()per: • s Manager
N' :b
• GFC Construction - Geoff Fale
\ City of Tigard Building Dept
VLMK - Kevin Kaplan
Case Design Group - Carter Case
07 -06 -05 fr.doc