Loading...
Report • • • • • • • • • •• • • • • ° Main Office Salem Off i ce , Bend Off • • • • • • • • • P.O. Box 23814 4060 Hudson A NE P.O. Box 7918 • `, • i • ' ' • e • ' • • • Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 CalCa 1 s o1�1 '�'s t I y�9 • 0 • Phone (503) 684 -3460 Phone (503) 589-1252 Phone (541) 330-9155 son A a, i 9 A a i O. FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163 1 • • • • • •• •• • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • ••• ••• ••• ••• • • August 7,1(106; ° • ° ° ' ° ° ° T0602477.tTI ; ••• ••• •• • • Permit No. 'N/R" • P.O. No. WHSE - EWPYARD FIELD INSPECTION REPORT DATES COVERED: July 27, 2006 PROJECT: Huttig Building Products — EWP Yard Expansion ADDRESS: 8100 - SW Hunziker Street — Tigard, OR INSPECTOR: R. Andree — ACI #048632 07- 27 -06: At the request of William Hertford with Huttig Building Products, CTI representative witnessed the installation of %2" diameter all-thread, epoxied into 6" of asphalt & 12" base material with 2% cement. A 5/8" diameter hole was drilled 11" deep into surface material. Simpson ET22 was introduced to hole (epoxy 10, 081846JI with expiration date of March 2008). A %2" diameter all- thread was inserted into hole with a twisting motion. Four random locations on the east side of lumber yard were set. The anchors are to be pulled to failure after they have set. This test is being done to provide information to engineer. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully - bmitted, CARLSO ES T ING, IN" tut Jam - . . Hietpas DEC 12 O• , rations Manager 2006 CD. k JAS 4ja 1:3 Mir T f flq c: Huttig Building Products Inc — William Hertford • • • • • • • • • • • • • Main Office Salem Office Bend Office • • • • • • • • • • • • P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 ' a ; ° ° • • • Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson •� s �1 n g � 1 1 Inc.- Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155 FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163 ti • • • • • 41. SO • • • • • • • • • • • • • • • • • • • •••• August 4 ° #.OQ 'W • S S • °•• ° 0 T0602477. CTI Permit No • • • • • P.O. No. V - ISq- EN erniaL ; • • ••• ••• •• • • • • •••••••• FIELD INSPEM1011 RtFO1?t •• DATES COVERED: July 28, 2006 PROJECT: Huttig Building Products — EWP Yard Expansion ADDRESS: 8100 SW Hunziker Street — Tigard, OR INSPECTOR: R. Andree — ACI #048632 07 -28 -06 — Pull Test: As requested by Brett with Huttig Building Products, CTI representative was on site and did pull tests on %2" 0 all- thread epoxied into asphalt and soil with 2% cement. CTI used a 12 -ton ram (L7) and 5000 psi gauge to load each location to failure. #1 at 14" Glu -Lm rack with end — failed at 7,893 lbs. #2 at 18" Glu -Lam rack with end — failed at 9,321 lbs. #3 at 18" rack, north side — failed at 8,410 lbs. #4 at 16" beam rack, west end — failed at 8,810 lbs. All failures occurred within an uplift in asphalt and cracking at base of embed. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectful) submitted, CARLSO r TESTING, I ► . Ja F. Hietpas o /rations Manager sab c: Huttig Building Products Inc — William Hertford . • MCE Parameters - Conterminous 48 States Zip Code - 97223 Central Latitude = 45.44033 Central Longitude = - 122.776223 Data are based on the 0.10 deg grid set • Period SA (sec) ( %g) 0.2 106.1 Map Value, Soil Factor of 1.0 1.0 037.2 Map Value, Soil Factor of 1.0 MCE Parameters x Specified Soil Factors 0.2 114.6 Soil Factor of 1.08 1.0 061.8 Soil Factor of 1.66 IBC 2003 LOADING SEISMIC: Ss= 106.1 % g S1= 37.2 %g Soil Class D Modified Design spectral response parameters Sms= 114.6 % g Sds= 76.4 % g Sm1= 61.8 % g Sd1= 41.2 % g Seismic Use Group 1 Seismic Design Category D or D le = 1 R = 2.5 R = 5 Cs = 0.3056 W Cs = 0.1528 W Using Working Stress Design V = Cs *W /1.4 V = 0.2183 W V = 0.1091 W • • Tube Section 10/01/06 Depth 4.000 in Fy = 50 ksi Width 3.800 in E = 29 E3 KSI Thickness 0.1350 in R 0.1350 in ARM SECTION Blank = 14.71 in wt = 6.8 plf A = 1.986 in2 Ix = 4.814 in4 Sx = 2.407 in3 Rx = 1.557 in Iy = 4.448 in4 Sy = 2.341 in3 Ry = 1.496 in a 3.4600 Web w/t 25.6296 L = 48 IN a bar 3.8650 Flg w/t 24.1481 L/r = 32 b 3.2600 x bar 1.8325 Fa = 26.89 KSI b bar 3.6650 m 2.3959 Pcap = 53.41 K c 1.7300 x0 - 4.2284 Tcap = 59.58 K c bar 1.9325 J 7.1948 Mcap = 72.21 K -IN u 0.3181 x web 1.9000 gamma 1.0000 x lip 1.9000 R' 0.2025 h/t 27.6296 1.06• fe //t 10 61(44/ z IS a /ad..> Vyr a.sk 7 4_ �I_ r % i . ' 6 144/P li 1,1 0� ' . COLUMN ' A = 5.95 in Fy = 5 0 ksi 28 Ix = 55.44 in4 ly = 14.3 in4 Rx = 3.04 in Ry = 1.55 in . Sx = 11.10 in3 Sy = 7.15 in3 Mcap = 333.0 k -in 1.4 Kips per 48 in Arm 80 in Y -Y braces Ry = 1.55 in Ky = 1 Rx = 3.04 in Kx = 2 18 Ht P M Pcap P/Pcap M/Mcap Combined (feet) (kips) (k -in) KUr (kips) % % ( %) 1 3.2 7.8 224.3 51.6 143.4 5.4% 67.3% 72.8% 2 6.4 6.1 176.0 51.6 143.4 4.2% 52.9% 57.1% 3 9.6 4.5 130.7 75.8 118.1 3.8% 39.2% 43.1% 4 12.8 3.2 92.1 101.1 86.0 3.7% 27.7% 31.4% 5 16.0 1.7 48.2 126.3 55.7 3.0% 14.5% 17.5% 6 0.0 0.0 0.0 51.6 143.4 0.0% 0.0% 0.0% 7 0.0 0.0 0.0 51.6 143.4 0.0% 0.0% 0.0% 8 0.0 0.0 0.0 51.6 143.4 0.0% 0.0% 0.0% Seismic Cs = 0.305 R = 2.5 LF = 1.4 V = Cs *W /(LF) = 0.218 W Ht P M Pcap P /Pcap M/Mcap Combined (feet) (kips) k-in (kips) 1 3.2 7.8 418.4 190.7 4.1% 94.2% 98.3% 2 6.4 6.1 305.3 190.7 3.2% 68.8% 71.9% 3 9.6 4.5 209.1 157.0 2.9% 47.1% 50.0% 4 12.8 3.2 132.7 114.4 2.8% 29.9% 32.7% 5 16.0 1.7 62.2 74.1 2.3% 14.0% 16.3% 6 0.0 0.0 0.0 190.7 0.0% 0.0% 0.0% 7 0.0 0.0 0.0 190.7 0.0% 0.0% 0.0% 8 0.0 0.0 0.0 190.7 0.0% 0.0% 0.0% Seismic Cs = 0.305 R = 2.5 LF = 1.4 V = Cs *W /(LF) = 0.218 W Ht P M Pcap P /Pcap M/Mcap Combined (feet) (kips) (k -in) (kips) 2/ ly al 1 3.2 16.0 401.6 190.6 8.4% 90.4% 98.8% l 6 n 2 6.4 12.8 267.7 190.6 6.7% 60.3% 67.0% / V' t Ge 3 9.6 9.6 160.6 157.0 6.1% 36.2% 42.3% P )4171*- 4 12.8 6.4 80.3 114.4 5.6% 18.1% 23.7% 5 16.0 3.2 26.8 74.0 4.3% 6.0% 10.4% 6 0.0 0.0 0.0 190.6 0.0% 0.0% 0.0% 7 0.0 0.0 0.0 190.6 0.0% 0.0% 0.0% 8 0.0 0.0 0.0 190.6 0.0% 0.0% 0.0% • ' COLUMN "E" • , . A = 5.95 in Fy = 50 ksi 28 lx = 55.44 in4 ly = 14.3 in4 Rx = 3.04 in Ry = 1.55 in • Sx = 11.10 in3 Sy = 7.15 in3 Mcap = 333.0 k -in 1.6 Kips per 48 in Arm 80 in Y -Y braces Ry = 1.55 in Ky = 1 Rx = 3.04 in Kx = 2 18 Ht P M Pcap P /Pcap M/Mcap Combined (feet) (kips) (k -in) KUr (kips) ( %) % (%) 1 3.2 8.0 231.5 51.6 143.4 5.6% 69.5% 75.1% 2 6.4 6.4 185.2 51.6 143.4 4.5% 55.6% 60.1% 3 9.6 4.8 138.9 75.8 118.1 4.1% 41.7% 45.8% 4 12.8 3.2 92.6 101.1 86.0 3.7% 27.8% 31.5% 5 16.0 1.6 46.3 126.3 55.7 2.9% 13.9% 16.8% 6 0.0 0.0 0.0 51.6 143.4 0.0% 0.0% 0.0% 7 0.0 0.0 0.0 51.6 143.4 0.0% 0.0% 0.0% 8 0.0 0.0 0.0 51.6 143.4 0.0% 0.0% 0.0% Seismic Cs = 0.305 R = 2.5 LF = 1.4 V = Cs *W /(LF) = 0.218 W Ht P M Pcap P /Pcap M/Mcap Combined (feet) (kips) (k -in) (kips) Lys). ( %) 1 3.2 8.0 432.3 190.7 4.2% 97.4% 101.6% 2 6.4 6.4 319.1 190.7 3.4% 71.9% 75.2% 3 9.6 4.8 219.2 157.0 3.1% 49.4% 52.4% 4 12.8 3.2 132.8 114.4 2.8% 29.9% 32.7% 5 16.0 1.6 59.7 74.1 2.2% 13.4% 15.6% 6 0.0 0.0 0.0 190.7 0.0% 0.0% 0.0% 7 0.0 0.0 0.0 190.7 0.0% 0.0% 0.0% 8 0.0 0.0 0.0 190.7 0.0% 0.0% 0.0% Seismic Cs = 0.305 R = 2.5 LF = 1.4 V = Cs *W /(LF) = 0.218 W Ht P M Pcap P /Pcap M/Mcap Combined (feet) (kips) k -in thipil % ( %) fr 1 3.2 16.0 401.6 190.6 8.4% 90.4% 98.8% 2 6.4 12.8 267.7 190.6 6.7% 60.3% 67.0% C.Okr 3 9.6 9.6 160.6 157.0 6.1% 36.2% 42.3% -'------ p �jw 4 12.8 6.4 80.3 114.4 5.6% 18.1 % 23.7% 5 16.0 3.2 26.8 74.0 4.3% 6.0% 10.4% 6 0.0 0.0 0.0 190.6 0.0% 0.0% 0.0% 7 0.0 0.0 0.0 190.6 0.0% 0.0% 0.0% 8 0.0 0.0 0.0 190.6 0.0% 0.0% 0.0% ▪ • Cold Formed Channels Back -Back • 10/01/06 y Depth 9.000 in Fy = 50 ksi • Flange 2.250 in • Lip 1.500 in Thickness 0.1350 in Base Section R 0.1350 in Blank = 15.61 inx 2 wt = 14.3 plf A = 4.22 in2 Ix = 47.07 in4 Sx = 10.460 in3 Rx = 3.342 in Iy = 3.16 in4 Sy = 1.976 in3 Ry = 0.866 in a 8.4600 Web w/t 62.6667 a bar 8.8650 Flg w/t 12.6667 b 1.7100 x bar 0.6511 b bar 2.1150 m 1.1633 c 1.2300 x0 - 1.8144 c bar 1.4325 J 0.0128 u 0.3181 x web 0.7186 gamma 1.0000 x lip 1.5314 R' 0.2025 h/t 64.6667 lamda 0.2743 p 0.7217 b 1.71 0 Flange Reduction WEB BENDING 50 ksi Q FLGS 47.00 ksi Q WEB k 4 lamda 1.3157 p 0.6330 be 5.355 37% Web Reduction o -1.125 Ii -0.016 - 0.14214 LOAD CAPACITY I eff= 47.069 in4 S eff= 10.460 in3 313.79 k -in Cap MA'14.10 5 Z - / A - ' 71 4 19e- - /A" bT% _ roe l otic,Y, c t, /.19(1, 2I6j 11V- I3 VI Ai 1 gC4tv let5 /� � ab- free k w/reAf• r /4 (4 '5Z-4t- b .. . , . . • w 4,1 (TV 0/4“A-C. 6 t A 6 lag) 6 4 (z) 1 V "ig _t-- ,634 -r Ilid u -1 zz z;:(b24 7.76*- /0 I 17 «els h-o rce.4& , (1‘,647..(),--7 ale-- ___71X 0 7 , 14= 1,, Ct $zg rr il tiv /7,610,z ziefoo,fr- q