Permit CITY OF TIGARD MECHANICAL PERMIT
III s COMMUNITY DEVELOPMENT MECHANICAL
MEC2014-00087
13125 SW Hall Blvd.,Ti Date Issued: 02/27/2014
T and OR 97223 503.718.2439&GAKp 9
Parcel: 2S101 D600100
Jurisdiction: Tigard
Site address: 7340 SW HUNZIKER RD 200
Project: Gunness Benefits Subdivision: VARNS ACRES Lot: 3
Project Description: Moving grills for TI.
Contractor: RELIABLE MECHANICAL LLC Owner: HILLTOP BUSINESS CENTER LLC
13215 SE MILL PLAIN BLVD STE C8#537 HUNZIKER LLC
VANCOUVER,WA 98684 9430 NW KAISER RD
PORTLAND, OR 97231
PHONE: 360-334-1598 PHONE:
FAX:
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 02/27/2014 $69.06
Class of Work: ALT Type of Const: Plan Review 02/27/2014 $17.27
Occupancy Grp: Occupancy Load: 12%State Surcharge-Mechanical 02/27/2014 $8.29
Stories:
Project Valuation: $300.00
Fuel Air Handlers
Fuel Types: Units<10000 cfm:
Gas Pressure: Units> 10000 cfm:
Furnaces Boilers&Compressors
Furnaces< 100K BTU: 0-3 HP:
Furnaces>=100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump:
Appliances
Vent Fans: Vent Systems: Total $94.62
Hoods: Comm Incinerators:
Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions)
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc: Moving grills
Duct Work:
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules
or direct questions to OUNC by calling 503.232.1987 or 1.044.
Issued By: ` Permittee Signature: -------_ _
Call 503.6 .4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Mechanical Permit Application FOR OFFICE USE ON t.1
Received
City of Tigard �+���1 Date/By: a 7/t if /� % . Permit No /4-2 tar ^` (L_„, {7
Eril
V 13125 SW Hall Blvd.,Tigard,OR t if Plan Review /-r d[] [ {�.t-u
Phone: 503.718.2439 Fax: 503.5'''. IC_
Date/By: Other Permit:iiti,a- r iti_o() 7
T IGARD Inspection Line: 503.639.4175 2 2-010 Date Ready/By: lo ® See Page 2 for
Internet: www.tigard-or.gov t1 {
Notified/Method: Supplemental Information
-��D D
TYPE OF r it 0 COMMERCIAL FEE* SCHEDULE - USE CHECKLIST
Mechanical permit fees*are based on the value of the work
1:1 New construction P Addition/al 't I':r 4 -'lent performed.Indicate the value(rounded to the nearest dollar)of all
❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit.
Value:$ 20, C-P-6.)
CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES*
❑ 1-and 2-family dwelling C14 Commercial/industrial ❑Accessory building For special information use checklist.
❑Multi-family ❑Master builder ❑Other: Description I Qty. I Ea. I Total
JOB SITE INFORMATION AND LOCATION
Heating/cooling:
. p� Air conditioning 46.75
Job site address: 73yO 3j /'7/(4hZ f. c' f () Furnace 100,000 BTU(ducts/vents) 46.75
City/State/ZIP: ""
rG������ ''J Q 9722 3 Furnace 100,000+BTU(ducts/vents) 54.91
JJ /� Heat pump 61.06
Suite/bldg./apt.no.: 2Q v Project name: G�yvl r S`-7 /✓P e i era; -3 Duct work 23.32
Cross street/directions to job site: Hydronic hot water system 23.32
Residential boiler(radiator or
hydronic) 23.32
Unit heaters(fuel-type,not electric),
in-wall,in-duct,suspended,etc. 46.75
Flue/vent for any of above 23.32
Subdivision: Lot no.: Other: 23.32
Other fuel appliances:
Tax map/parcel no.: Water heater 23.32
DESCRIPTION OF WORK Gas fireplace/insert 33.39
Flue vent for water heater or gas
inaL/Y 5/ti+�/S tip c,��yy ,r fz rjrr� wc.//s, fireplace 23.32
�J Log lighter(gas) 23.32
Wood/pellet stove 33.39
Wood fireplace/insert 23.32
Chimney/liner/flue/vent 23.32
jZisPROPERTY OWNER I ❑ TENANT Other: 23.32
Environmental exhaust and ventilation:
Name: RGh Rd lot's c,�` Range hood/other kitchen
equipment 33.39
Address: 2! A/W h dr Clothes dryer exhaust 33.39
City/State/ZIP: t l/S � �'�Y Single-duct exhaust(bathrooms,
toilet compartments,utility rooms) 23.32
Phone:(9-93) GL 1 ,— F 5--- / Fax:( ) Attic/crawlspace fans 23.32
21,APPLICANT ❑ CONTACT PERSON Other: 23.32
Business name: Fuel piping:
$14.15 for first four;$4.03 for each additional
Contact name: Furnace,etc.
•
Address:
Gas heat pump
Wall/suspended/unit heater
City/State/ZIP: Water heater
Phone:( ) Fax::( ) Fireplace
Range
E-mail:
Barbecue
CONTRACTOR Clothes dryer(gas)
/ Other:
Business name: kt°/t b/z- rnrCr 1G N ir�[T� L MECHANICAL PERMIT FEES*
Address:J3 2/5-G�rn/( P/Ci,^ /34/c/ G)ii.i !�-'3 7 Subtotal
City/State/ZIP: (/G!lne-c.fill/T�— /,9-- eii,6'�C' Minimum permit fee($90.00)
Phone: /'' Plan review(25%of permit fee)
c3�£33'--73 71 Fax:( ) State surcharge(12%of permit fee)
CCB lic.: /397,)‹.-7 TOTAL PERMIT FEE 7 y,(p).
This permit application expires if a permit is not obtained within 180
days after it has been accepted as complete.
Authorized signature: • Fee methodology set by Tri-County Building Industry Service Board
Print name:Pei,..‘ )/ -r_ Date: Z Z 7//L/./-, 1
I:\Building�Permits\MEC_PermitApp_040113.doe 440-4617T(I�COM/WEB) '
Mechanical Permit Application - City of Tigard
Page 2 - Supplemental Information
Commercial & Multi-Family Fee Schedule:
Total Valuation: Permit Fee:
$0.00 to$500.00 Minimum fee$69.06
$500.01 to$5,000.00 $69.06 for the first$500.00 and
$3.07 for each additional$100.00 or
fraction thereof,to and including
$5,000.00.
$5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and
$2.81 for each additional$100.00 or
fraction thereof,to and including
$10,000.00.
$10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and
$2.54 for each additional$100.00 or
fraction thereof,to and including
$50,000.00.
$50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and
$2.49 for each additional$100.00 or
fraction thereof,to and including
$100,000.00.
$100,000.01 and up $2,608.71 for the first$100,000.00 and
$2.92 for each additional$100.00 or
fraction thereof.
Note: All new commercial buildings require 2 sets of plans.
I:\Building\Permits\MEC_PermitApp_040113.doc 2
Location:
Record Type:
Inspection Type:
Comments:
Inspection Date:
Record ID:
Result:
City of Tigard
13125 SW Hal Blvd.
Tigard, OR 97223 Tel: 503.718.2439
7340 SW HUNZIKER RD 200, TIGARD, OR,
97223
Commercial - Mechanical
699 Mechanical final
2014-03-04 00:00:00
MEC2014-00087
PASS - No C of O
Violation Summary:
Inspector Contractor