Loading...
12/04/2013 - Packet Completeness Review for Boards, Commissions and Committee Records CITY OF TIGARD TTAC Tigard Transportation Advisory Committee Name of Board, Commission or Committee December 4,2013 Date of Meeting Signat re C.L. Wiley, Meeting Secr 2/12/2014 Date '' City of Tigard Transportation Advisory Committee Agenda MEETING DATE/TIME: December 4, 2013 -- 6:30 to 8:30 p.m. MEETING LOCATION: Tigard Library, 2nd Floor Conference Room 1. Call to order Steve 6:30 Roll Call Chris Approval of Nov 6 Meeting Summary Steve Visitor Comment Steve 2. Presentation of Final CIP Project Prioritizations Carissa 6:40 3. FY 2015 Budget Update Carissa 7:00 4. 99W/Gaarde/McDonald Project Update Mike 7:05 5. SW Corridor Update Judith 7:15 6. Paving Report (if time allows) Mike 7:45 7. Other Updates All 8:00 Update on the Recruiting Process 8.January Meeting? All 8:10 9. Adjourn Steve 8:15 Supporting materials/handouts 11.06.13 Meeting Summary Paving report and maps (distributed at November meeting) TRANSPORTATION ADVISORY COMMITTEE AGENDA— December 4, 2013 City of Tigard 1 13125 SW Hall Blvd.,Tigard,OR 97223 1 503-639-4171 1 www.tigard-or.gov I Page 1 of 1 City of Tigard TIGARD Transportation Advisory Committee [TTAC] Meeting Summary Wednesday, December 4, 2013, 6:30 PM— 8:30 PNT Tigard Library,2""Floor Con£ Room- 13500 SW Hall Blvd,Tigard, Oregon MEMBERS PRESENT (5): Steven Bass (Chair), Mark Bogert,Mike Stevenson, Evelyn Murphy, Don Schmidt (arrived at 6:50 p.m.) MEMBERS ABSENT (3): Karen Hughart, Dennis Mitchell,Jennifer Stanfield OTHERS PRESENT: (0) STAFF PRESENT: 1\1ike McCarthy, Streets and Transportation Sr Project Engineer; Carissa Collins, Sr Management Analyst; Chris Wiley, Sr Administrative Specialist 1. Call to Order 6:30 pm— Chair Steven Bass called the meeting to order at 6:34 p.m. Roll Call— Chris Approval of November 6 Meeting Summary— as there was no quorum present at the opening of the meeting, Chair Bass directed staff to contact the members present at the November meeting by email, to obtain approval for the November minutes. Visitor Comment—None 2. Presentation of Final CIP Project Prioritizations — Carissa On January 21, there is a city council work session. Staff is asking to have at least one member from each committee; TTAC for transportation, CCAC for downtown and PRAB for parks, to be at the meeting to talk about the comments that were included with your committee's ratings. Of course, all committee members are encouraged to attend this important meeting. Staff will present the rankings. Council will consider the list and the testimony from the different committees and then make their decision. TRANSPORTATION ADVISORY COMMITTEE SUMMARY—December 4,2013 City of Ti gazd 113125 S IF Hall Blvd, Tigard OR 97223 50343911171 I nww.gzard-or. I Page 1 oft I/Tran.portationAdvisog Committee/2013/12-Decl 12 04 13 Meeting Summa, 3. FY 2015 Budget Update —Toby Toby told the TTAC members prioritizing the projects on the Capital Improvement Plan (CIP) kicks off the budget process. The city then works on the operating budgets and financial resources available to match up with the priorities on the CIP. At the end of next week city departments will start putting together their operating budgets and engineering will start costing out the top projects to match with available funding sources. At the end of March, beginning of April, the Finance staff starts doing the technical part, assembling the data for review to begin at the end of April. 4. 99W/Gaarde/McDonald Project Update—Mike The right-of-way acquisition costs came in higher than anticipated. The project plan has been modified to keep the project costs more in line with the original budget. The revised project should happen in 2015. 5. SW Corridor Update—Mike A. The SW corridor Technical Advisory Committee (TAC) is looking at actual routes that could be served by either light rail or bus rapid transit. Tigard Senior Transportation Planner Judith Gray will bring the TAC's study results to the February TTAC meeting. Staff will be looking for some feedback from TTAC members. Once the most viable alternatives have been identified, the next step is to do a Draft Environmental Impact Statement (DEIS). B. Tom Mills from TriMet will also be attending the February TTAC meeting to talk about the SW Service Enhancement Plan which purpose is to look at bus service in this area and where it can be improved. 6. Paving Report - Mike (Attachment 1) The maps show what was done in 2012 and what was done in 2013. Since 2009, the city has paved or slurry sealed more than half the streets in the city. The expectation is slurry seal will last approximately eight years. All the streets in the city that are candidates for slurry seal have been completed. Charts on pages 3, 4 and 5 are indicators of road conditions and the impacts of paving activity. Revenues for street maintenance have come in at about where staff thought they would. The city has accomplished everything it can with slurry seal and needs to move on to some larger, more challenging, more costly road improvements. New guidance form the federal government about road standards that comply with the Americans with Disability Act (ADA), require the city to replace ramps to ADA standards on future road improvements. This requirement could increase costs for road improvements as much as 15%. TRANSPORTATION ADVISORY COMMITTEE SUMMARY—December 4,2013 City of Tigard 113125 SIHaII Blvd,Tigard OR 97223 503-6391171 1 www.hard-orgov I Page 1 of 2 I/TranrportationAdvisory Committee/2013/12-Dec/12 04 13 Meeting Summary 7. Other Updates - All A. Update on the Recruiting Process -Nlike Stevenson will be leaving at the end of his term this month. T\4ike has become very active in the recently formed Tigard Downtown Association. He will continue to participate in Tigard development in that capacity. Karen Hughart will serve another term on TTAC. New members selected are Karen Mohling, Elise Shearer who is moving from the City Center Advisory Commission Chair where her term is ending this month to her new appointment on the TTAC, Kevin Watkins who will serve a three-year term and Tanya Firemoon who has been appointed to a one-year term. With all the vacant seats on TTAC filled for the coming year, the city is fortunate that this committee will also have Erik Halstead and Mark Carlton serving as alternates. B. On February 14, Tigard will hold an event called, "Tigard Loves its Parks". The city will celebrate the completion of recent park projects including completing the 92nd Avenue sidewalk, the East Butte Heritage Park by the Tigard House,Jack Park, and a new stretch of Fanno Creek Trail (from l\lain St to Grant Ave). 8. January Meeting -All As TTAC's meeting day is scheduled for the first Wednesday of each month and the first Wednesday in January 2014 will be January 1, New Year holiday, the committee cancelled the January meeting and will meet again on Wednesday, February 5. 9. Adjourn - Steve Steve adjourned the meeting at 8:37 pm. c CL"Chris"Wiley,TT eeting Secretary ATTEST: Steven Bass, Chairman Recording Secretary's Note:To requests copies of the attachments to these minutes,please email:christinew@tigard-orgov The next TTAC meeting will be held on Wednesday,February S, at the Tigard Library 2nd Floor Conference Room, 13500 SW Hall Blvd.from 6.30pm - 8.30pm. TRANSPORTATION ADVISORY COMMITTEE SUMMARY-December 4,2013 City of Tigard 113125 SWCHall Blvd,Tigard OR 97223 503-639-4171 1 www.gZard-orgov I Pagel of2 Il TransportationAdvixoDD Commiltee/2013/12-Decl 12 04 13 Afeefing Summary Paving Report For 2013 m This report outlines the paving and pavement preservation work completed in 2012 and 2013 and lists the actual,anticipated,and budgeted expenses for fiscal years `12-13, `13-14. The Tigard Public Works Department is responsible for the maintenance of 152 miles of paved streets. The maintenance strategy for each street varies depending on the adjoining land use,age, average daily volume,heavy vehicle traffic,and character of that street. Accomplishments for 2012 and 2013 Pavement projects completed in 2012 and 2013 are summarized in the following table and are shown on the attached maps (Attachments A and B). Project 2012 Pavement 2012 Slurry and 2013 Pavement 2013 Slurry and Overlays Crack Seals Overlays Crack Seals Length Completed 3.1 miles 16 miles 3.9 Miles 14 Miles Area 540,000 2,700,000 650,000 2,300,000 Completed s Cost (Includes Design and $1,020,000 $530,000 $1,220,000 $480,000 Inspection) Cost Per Mile $329,000 $33,000 $316,000 $34,000 Cost Per Square Foot $1.89 20 cents $1.88 21 cents In addition to the recently completed citywide pavement overlay project, the Street Maintenance Fee will also fund a pavement overlay of 92 d Avenue (from Waverley Dr to Cook Park) in conjunction with a sidewalk project being constructed in fall 2013,and an overlay of a small portion of Barrows Road in coordination with the City of Beaverton. The remaining funds each year are spent sealing cracks in street pavement,and on pavement inspections and inventory (the source of the Pavement Condition Index or PCI). The Pavement Condition Index (PCI) Pavement condition is measured by the PCI,with zero being the poorest condition (total pavement failure) and 100 being the best condition (just constructed pavement). PCI factors include pavement condition, cracking,pavement distress,weathering, structural strength,and smoothness of ride. Tigard Street Network Condition 2012 and 2013 have seen the average PCI of Tigard's city streets increased from 68.9 at the end of 2011 to 69.3 at the end of 2012 to and 70.0 at the end of 2013. This was better than our projected PCI of 68.7 at the end of 2012 and `holding the line' to keep the 68.7 PCI at the end of 2013. Two factors were significant contributors this improvement: Fall 2013 Paving Report 12/04/13 TTAC Meeting Minutes Attachment 1 (10 s/s pages) 1. Successful completion of large slurry seal projects in southern Tigard in 2012 and central Tigard in 2013. The 2012 slurry seal project was the largest in Tigard's history. 2. City street crews completed many `digout'repairs of small areas of failed pavement around valve boxes and in the wheel paths etc. This was coordinated with the work of the private contractor to slurry seal some streets that would otherwise have been in too poor condition to do so effectively. Previous Council Action and the Street Maintenance Fee Pavement maintenance is primarily funded through the City's Street Maintenance Fee,a monthly user fee dedicated to the maintenance of existing roadways in Tigard.The fee was recommended by a citizen task force and established by Ordinance No. 03-10 in November 2003. Council revisited the Street Maintenance Fee in 2009 and 2010. Recognizing funding constraints and the difficulties of raising revenue in a recession,Council adopted Resolution No. 10-01 which: 1. Established a long-term Pavement Condition Index (PCI) goal of 72 to 75. Based on cost estimates, the Council quickly recognized that the level of adopted funding would not be adequate to get to a PCI of 75 and set an interim goal to "hold the line" by maintaining an average PCI of at least 67. Beyond this point, streets require more extensive reconstruction prior to paving,which results in substantially higher street maintenance costs. 2. The ordinance also directs that the fee be adjusted for inflation. Fee amounts are adjusted based on the methodology originally adopted in Ordinance 10-01,updated in Ordinance 13- 06 to a composite of 85%of the Engineering News Record (ENR) Construction Cost Index for Seattle,which measures general construction and labor cost,and 15%of the Oregon Monthly Asphalt Cement Material Price,which measures asphalt prices and parallels fuel prices. These percentages approximate the percentage cost of a typical project that matches the labor or material price measured by the index. This inflation adjustment will increase the fee by 4.9% on January 1,2014. Current street maintenance fees,as they appear in the City's 2013-2014 Master Fees and Charges Schedule,are as follows: Effective Dates 2012 2013 2014 Residential (Per House or Unit) $5.45 $5.56 $5.83 Commercial and Industrial (Per Required Parking Space) $1.23 $1.25 $1.31 Note that the fee for commercial and industrial properties is calculated based on the number of parking spaces that would be required by TMC 18.765 if that building were constructed today (as an approximation of the traffic generation of the site),which is often different from the number of spaces in the existing parking lot. Fall 2013 Paving Report Page 2 Recent Paving History Attachment C is a map showing the paving projects that have been completed in the past five years, which illustrates that more than half of Tigard's City Street network have been paved or slurry sealed (pavement overlays on 16 miles of streets,and slurry seals on 64 miles of streets). In order to maintain the overall street network in the best possible overall condition,street maintenance work has focused on three main priorities: 1. Pavement overlays on major corridors. Approximately$2.24 million (including staff costs) is being spent in fiscal years 12-13 and 13-14 constructing pavement overlays on 7 miles of important through routes. 2. Crack seals and slurry seals on residential streets. Approximately$1 million has been spent in fiscal years 12-13 and 13-14 placing slurry seals on 30 miles of residential streets. All of the Tigard City Streets that are good candidates for slurry seal projects have been slurry sealed. 3. Crack sealing along arterials and collector streets. Approximately$90,000 is spent in the spring each year sealing cracks along major streets to preserve the existing pavement. These priorities are reflected in the following Graph: Pavement Condition Index by Functional Class 80.0 x 75.0 --— --- --- - —--- - — -- a -a c ' cc 70.0 '--- - --- --------- - - Citywide Pavement Condition by Year 85.0 - - I 80.0 75.0 70.0 -— ---- --------------.. ------ 65.0 -- - _---- _ _- ---- 60.0 55.0 2006 2007 2008 2009 2010 2011 2012 2013 J Forecast PCI for Fee Levels Adopted 1/5/10 Actual Through 2013 The PCI at the end of the 2013 paving season is 70.0,which is better than the forecast of 67.1. Paving Backlog There are many local streets (both residential and commercial) in Tigard on which the pavement condition has deteriorated beyond the level at which most preventive maintenance treatments can be effective. These streets need more extensive repairs such as pavement overlay and rehabilitation. In pavement management terms,these are called `backlog' streets. The table below shows how this backlog has grown in recent years: Fall 2013 Paving Report Page 4 Mileage of Poor Pavement (PCI < 50) 25.0 _ _ i I 20.0 15.0 __. _.. ----.....__. —.....-- , 10.0 __._..__.._. ............. I ; 5.0 0.0 -j_._.. 2008 2009 2010 2011 2012 2013 Mileage of Poor Pavement(PCI<50) There are approximately 21 miles of these `backlog'streets on the Tigard city street system that need paving. This is approximately 14%of our total street mileage. The cost to pave these streets would be approximately$10 million. The graph below shows the current backlog of streets in poor pavement condition,and the additional miles that would be in poor condition if the last five years of paving had not been completed. Effect of Recent Paving on Backlog Mileage 40.0 35.0 f 30.0 — - 25.0 i 20.0 - - 15.0 -- I C 10.0 5.0 0.0 2008 2009 2010 2011 2012 2013 i 6 Backlog Mileage of Poor Pavement(PCI<50) Additional Backlog if No Paving after 2008 Fall 2013 Paving Report Page 5 It is anticipated that the amount of this backlog will remain at about this level now that Street Maintenance Fee revenue is fully phased in,assuming that revenues and asphalt prices remain relatively consistent. Additional funding would be necessary to restore these streets to good pavement condition. Finance Director's Findings The Finance Director has reviewed this report and future pavement maintenance funding requirements as identified in the Pavement Management Program (PMP). Data has not changed significantly from what the Council considered after the 2009 paving season. Actual revenue collections for fiscal year 2012 and 2013 were analyzed and they were sufficient to meet the annual funding level set from the street maintenance plan along with the FY 2011-2012 and FY 2012-2013 Adopted Budgets. Completion of the street maintenance fee phase-in, along with an inflationary adjustment(s),is expected to generate sufficient revenue to fund the PMP in the coming years.The 2014-2018 CIP PMP approved budget is as follows: Fiscal Year 1 2014 1 2015 1 2016 1 2017 2018 PMP 1 $1,660,000 1 1,800,000 1 1,800,000 1 1,800,000 1,800,000 Additionally,the split between customer types was analyzed to determine if costs were equitably split when compared to revenues collected. The allocation of the costs of the five-year plan is set in TMC 15.20.050 and is summarized as follows: Road Type Percentage of Residential Percentage of Non- Allocation Residential Allocation Arterial 62% 38% Local Commercial/Industrial 0% 100% Collector 50% 50% Neighborhood/Local 100% 0% It is important to realize the fee is based on a five-year plan and that there will be variance from one year to the next where one customer group may subsidize another in any given year; the important thing is that the program costs reflect the revenues collected by customer type over the five-year period. If they do not,the TMC instructs the Finance Director to make recommendations based on this review. The following tables summarize my findings: Total 2012 PMP Percentage Expense Related of Total Percentage Share of to Street 2012 of Expenses Based Maintenance Expense Revenue on Revenue Customer Class Fee per TMC Collection Collected Variance Residential $623,829 62% 65% $654,014 $30,185 Non- Residential $382,347 38% 35% $352,162 $30,185 Total $1,006,176 $1,006,176 Fall 2013 Paving Report Page 6 Total 2013 PNIP Percentage Expense Related of Total Percentage Share of to Street 2013 of Expenses Based Maintenance Expense Revenue on Revenue Customer Class Fee per TMC Collection Collected Variance Residential $1,240,855 75% 67% $1,108,457 $82,720 Non- Residential $413,560 25% 33% $545,957 $82,720 Total $1,654,414 $1,654,414 Tigard incurred$1,006,176 in FY 2011-12 in the PMP expenses related to the street maintenance fee. Based on the types of roads, (arterial,collector,etc.),that received pavement maintenance through the PMP,$623,829 (62 percent) of the PMP expenses should have been born by residential customers and $382,347 (38 percent) of the PMP expenses should have been born by non- residential customers. The actual revenues collected in FY 2012 have a slightly different split. Sixty-five percent of the revenues came from the residential sector and 35 percent of the revenues came from the non- residential sector. Based on the size of the PMP and the way revenues were collected,a more equitable split would have been for$623,829 to come from the residential sector and for$382,347 to come from the non-residential sector. During the last year,the residential sector subsidized the non- residential sector by$30,185,or three percent of the total PMP. The actual revenues collected in FY 2013 reversed the trend of residential customers subsidizing non-residential. Sixty-seven percent of the revenues came from the residential sector and 33 percent of the revenues came from the non-residential sector. Based on the size of the PMP and the way revenues were collected,a more equitable split would have been for$1,025,737 to come from the residential sector and for$628,677 to come from the non-residential sector. During the last year, the non-residential sector subsidized the residential sector by$82,720,or five percent of the total PMP. When the reports for FY 2010 and FY 2011 are taken into account to provide a four year picture,non-residential customers have subsidized residential customers by 4%. The Finance Director does not find this difference to be material enough to necessitate a recalculation.. In the long term,engineering staff estimates that the actual paving expenses will be consistent with the residential/non-residential revenue split. Fall 2013 Paving Report Page 7 2012 Pav" Projects Sa.'IdYG HS - -t CGmGtery � � fi— v Pavement Overlay Slurry Seal ve 79 )p N ... .+ 95TH AVE r-T- a eD T1312SW ff Blvd igard,Oregon,97223 03MAPS www.tigard-o.gov P-1 Date taarzols JI m o I KE Rp KWy r - R11 RA AL-NUT+� '- � T F MELROSE ST � \ rJ reneo oak -.� ti... �'Sr I 5ES FCOLONY �S GS CREEK CT �4 ,?vIQ } KRUSE WAY N THCT S�''i,o C tMEADOWS ---.I -BULL MOUNTAIN% r� Y--- - wEWC ' WEARER m Qy RD f / -O..} CORYLUS CTL � TER_ - �I CREEK CT ESE LP m J BON ITA R �, :�RA CT -.._ — �'.� �_._ • 'MU OCK jQ 1l OVA EL CT qRTiHEW GPO 7 1DnH K ST O �- �1) I R .. S LN SA T-r DR y I OR D AVE (. ELN `9 C \ I GREENLE AR EENLEAF CT T E 94TH VE N TREE ST� 1 .(. y U M ELD IN Q CHURCHILL CT �G1 1\ A. ``C)A o NT U- cT .t! \1.1 Alp OQ EEF BEND RD Io RRAM RD Hlcn ND •oaTH. OU HARD y. aisr c B 'AVE. �y�C •�„ OOa = �.. ''-- j- � y� ! ! 0 f ff z �� L_.I_!�J Tualatin Rivei 0-..� funk y� m O y2 —k W 2 Tualatin Rive �„ y ! Y JEAN RD File Local nVf lPJ._.�..ISFnn neer nL,Ar area\P•�.ac1�i212P'.nnPfc ec+s\2012_Pa' /+' CL - F'1 ) 9 1 vfn�Prolecls_ttxl7.m 20131- vementG2-Y rk Gerent Gmve SouMrM9e H5 w Cemelery Q p Management Projects a LOCUST ST w 217 2 o Q Asphalt Overlay ao W wnnk sr ST ONA ST aee POLu m ,Tot.Hwy Slurry Seal&Crack Seal SGNp��SFE�RY ir Ach C.eek PINES F �. Q WE ST �•�state < NORTH DAKOTA ST w ¢ Questions?Contact: > ~ 1� to � TM Senior Project Engineer _ LAGS Q 1 < Mike McCarthy P.E. N Fb.k DPA �P- s•'' ATLANTAST z GARD APs 503.718.2462 APS mikem@tigard-or.gov = RI t�0 99W o> �> KATHE I E Print Date 101312013 - a ST ; uTHIANNES ry �,� N¢ ¢ '� NN ST DARTMOUTH ST .D F� . W MS • ST -a - ✓ z S �k > Ir. N-Q PRROLSTa..�PP�' S✓' N 1 � NNEf�ST� 2 W LNUT SS _ OE RD LL FON ERS o OS O r r; MELROSE ST W HOLLOW 02 2 N �QQ4 OQ' y�P Q a P S o { o n NON a. o jf GA,RD p F , F zw 'oa - GAARDE ST^C "'JAG{E-C'AARDE ST o o MCDONALD ST KRUSE Wqy MEADOWS RD BULL MOUNTAIN RD SER m :Q ¢c __ w BONITA RD BONITA RD m VIEWCRES �a = o MURDo T T t- o �KSr r� In . PSP # Ir w - N OIL GC w RSO f < y GP�yN,P o �. < �P�Tt o°snTTLERS p ���OOP-`O OR_SUMMERFIELD OR� 3j}1J a �9,F��OR In S'D BEEF ND .. _ A BE 9Jt3� DURHAM RD DURHAM RD DURHAM # ALO O ❑ J y. O Z "g- HS UVJ O ✓ Z a. O a� a. QO r I K 2�� afatin River /J ' p 0 - rU Cook r IL j < O Tualatin River Pork - IL J 3 = JEgN RD Z Y _J q Lu o. -R=DL z ) - 2013 _ _ Pavement G 217 Overlay >1 L - Ash Creek -A a - Slurry Seal �I W Projects 99W — 2013 Projects SlurrySeat H-S+� Pavement Overlay ii II • 2012 Projects +�f .�.slung sear Pavement Overlay 2011 Projects " aQ Slurry Seal �T— Pavement Overlay 4G'A' M C D,OIN At D-S T B C r 2010 Projects -low . W Slurry Seal _ Pavement Overlay BONIF, RED _ B{ Federal Stimulus Pavement Overlay 2009 Projects _ ✓ = a -- -SlurrySeal Pavement Overlay F�BEND-RBo 05 BEE n • � .. A., > g1cA��rAAPs m -- tr <!/� ualatimRive Tualatin River I - • W —