Loading...
Report (2) 6 o p 2_06q— 6C) 2 i .. .� p Alain Office Salem Office Bend Office Carlson Testing, �'Q /1 c ® 8430 SW HunciAer 4060 Hudson SL, NE OB Ri Rd N l I Bend, 1 ®J YN lWl Tigard OR 97]?3 Salem, OR 9i30! Bend, OR 977070 1 Phone :(503) 684 -3460 Phone 15031 589-1252 Phone (540 330 -9155 Fat: /503)684 -0954 Fat. (5031589.1309 Fat x5411330 -9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER February 24, 2010 T1001755 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Aarons Sales & Leasing — Interior Improvements 11745 SW Pacific Highway — Tigard, OR Permit No.: BUP2009 -00213 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Structural Welding- Shop Only All inspections and tests were performed and reported according to the requirements of Project Documents and, to the - - - best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON T STIN , INC. 4 d / / Neil S. Shan on Project Manager NSS /rb cc: Robert Todd Construction — Amy Rolph Fax / 503 653 -5729 City of Tigard Building Division Parkin Engineering Inc — Britt Killian britt @johnwparkin.com Timberland Framing Contractors — Brett Egdorf brett @timberlandframing.com Carlson o 11''LL pig Y c Main Office Salem Office Bend Office Testing, W /S O 8430 Sit' {{un_iArr 4060 Hudson Sc. NE 630 25 OB Riley RA ul l Tigard. OR 97 ? ?3 Salem. OR 97301 BenA, OR 97702 Phone: (503)684 -3460 Phone: (503) 589 -125? Phone: (541) 330 -9155 Fax 65031684 -0954 Far: /5031589 -1309 Far 134/1330 -9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER February 24, 2010 T1001755.A City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Aarons Sales & Leasing — Exterior Improvements 11745 SW Pacific Highway — Tigard, OR Permit No.: BUP2010 -00006 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Screw Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the - - best knowledge, the work was with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Neil S. Shannon Project Manager NSS /rb cc: Robert Todd Construction — Amy Rolph Fax / 503 653 -5729 City of Tigard Building Division Parkin Engineering Inc — Britt Killian britt @johnwparkin.com Timberland Framing Contractors — Brett Egdorf brett @timberlandframing.com Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carls g� ° Eugene Office (541) 345 -0289 `��l �� ®H>1 Testing, Inc. Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client ROBERT TODD CONSTRUCTION - AMY ROLPH Project: AARONS SALES & LEASING - INTERIOR IMPROVEMENTS CTI Job #: T1001755. Address: 11745 SW PACIFIC HIGHWAY TIGARD OR Jurisdiction: TIGARD CTI representative J. PILAND OBOA 282 was on site this date Jan. 29, 2010 to perform Special Inspection for: Permit BUP2009 -00213 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: I. Checked in with superintendent, client or shop rep. Name: LOUIS THE FOLLOWING ITEMS WERE COMPLETED: CHANNEL BEAMS Company: TIMBERLINE D, 5, F - COLUMNS A, B, C 2. Inspection was "IBC" 1=1 Continuous ® Periodic (NOTED SOME POROSITY WHICH WAS REPAIRED BY 3. Work performed: fl In the field ® At fab shop GRINDING AND WELDING) TIMBERLINE SHOP DRAWING STAMPED BY PARKIN ENGINEER 1 -26 -10 4. If shop inspection do they have fabrication and QC APPROVED procedures? ® Yes E No E N/A INSPECTION _ Yes NoN /A 1. Reviewed previous inspection reports? y 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports. steel ID X markings or other documentation. 3. Verified weld filler materials conform. 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. X 1. Work inspected was: ® Completed In progress 7. Verified the quality of welds produced by welders, welding operators. and tackers conform. 2. Completed work inspected was in compliance with Y. 8. Verified steel frame joint details for bracing, stiffening. Approved plans and specifications ®Shop drawings member locations, and application of joint details at each X connection are in compliance by random sampling. RFI Design change Submittal N/A Document #(s) Dated: WELDER INFORMATION 3. Noncompliance item(s) were noted this date. details on Welders Name: ISMAEL NUNEZ following page(s). El Yes 0 No ® N/A Certification #: FCAW #1112 ACS 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). fl Yes E No ® N/A 1. Verified the contractor's Welding Procedure Conform Remain in progress Specifications are in conformance with X AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were X LOUIS employed during execution of the work. o f TIMBERLINE 3. Verified the weldabilit of reinforcing steel Based on the Code. approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority_ to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of Daily Report of Structural Steel For: 01/29/2010 CTI Job #: T1001755. Project: AARONS SALES & LEASING - INTERIOR IMPROVEMENTS Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in fi without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted. CARLSON TESTING, INC. Reviewed By: Neil Shannon Review Date: 02/10/2010 JP /ARR ROBERT TODD CONSTRUCTION - AMY ROLPH FAX /503 653 - 5729 TO: CITY OF TIGARD BUILDING DIVISION PARKIN ENGINEERING INC - BRITT KILLIAN BRITT @JOHNWPARKIN.COM PARKIN ENGINEERING INC - BRITT KILLIAN ROBERT TODD CONSTRUCTION - AMY ROLPH TIMBERLAND FRAMING CONTRACTORS - BRETT EGDORF BRETT @TIMBERLANDFRAMING.COM Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 CCa�y • Eugene Office (541) 345 -0289 arlson Testing, Inc. Salem Office (503)589 -1252 Tigard Office (503) 684 -3460 Daily Report of Structural Steel Client: LINCOLN CENTER LLC C/O SHORENSTEIN REALTY SERVICES LP Project: ID EXPERTS 570 @ LINCOLN CENTER - TENANT IMPROVEMENT CTI Job #: T1001796. Address: 10300 SW GREENBURG ROAD TIGARD OR Jurisdiction: TIGARD CTI representative R. BATY OBOA 411 was on site this date Feb. 05, 2010 to perform Special Inspection for: Permit BUP2010 -00003 DFS #(s) PO Number: SCOPE OF INSPECTION Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent, client or shop rep. INSPECTED THE FOLLOWING FOR THE FOLDING DOOR Name: ARNIE (PARTITION) SUPPORT PER MACKENZIE AND THE CITY Company: RUSSELL CONSTRUCTION OF TIGARD APPROVED DRAWING 2. Inspection was "IBC" Continuous ® Periodic 3. Work performed: ® In the field 0 At fab shop A) DETAIL 11 & 12/A -8.2 7/8" DIA A325 BOLTING FOR SNUGTIGHT 4. If shop inspection do they have fabrication and QC B) DETAIL 11/A8.2 FOR SHEAR CONNECTION WELDING procedures? ❑ Yes ❑ No ® N/A INSPECTION Yes NoN /A 1. Reviewed previous inspection reports? X 2. Verified steel materials are in compliance by reviewing, random samples of the mill test reports. steel ID v X _ Markings or other documentation. 3. Verified weld filler materials conform. X 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were REPORT SUMMARY installed as required. X 6. Verified high strength bolts and fasteners conform. y 1. Work inspected was: ® Completed fl In progress 7. Verified the quality of welds produced by welders. 2. Completed work inspected was in compliance with welding operators. and tackers conform. X p p p 8. Verified steel frame joint details for bracing. stiffening, 11 Approved plans and specifications Shop drawings member locations, and application of joint details at each X connection are in compliance by random sampling. RFI Design change Submittal N/A Document #(s) RED' • 1 Dated: WELDER INFORMATION 3. Noncompliance item(s) were noted this date, details on Welders Name: MICHAEL A. LIVERMORE following page(s). 0 Yes 1=1 No ® N/A Certification #: W05869 4. Noncompliance item(s) were reinspected this date, details Yes No N/A on following page(s). 0 Yes ❑ No ® N/A 1. Verified the contractor's Welding Procedure Conform Remain in progress Specifications are in conformance with X AWS requirements. 2. Verified the essential variables outlined in the Report(s) findings were discussed and left with Welding Procedure Specifications were . ARNIE employed during execution of the work. of RUSSELL CONSTRUCTION 3. Verified the weldabilit of reinforcing steel Based on the Code, approval is required from the Building Official before the other than ASTM A706. X SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. 0 See additional report page(s). 0 Distribute attachments. Page 1 of- Daily Report of Structural Steel For: 02/05/2010 CTI Job #: T1001796. Project: ID EXPERTS 570 @ LINCOLN CENTER - TENANT IMPROVEMENT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced. except in ft without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Keith Gauvin Review Date: 02/10 /2010 RB /CK LINCOLN CENTER LLC C/O SHORENSTEIN REALTY SERVICES LP SHEGSTAD @SHORENSTEIN.COM TO: CITY OF TIGARD BUILDING DIVISION GROUP MACKENZIE - MORGAN TOTH. MTOTH @GRPMACK.COM RUSSELL CONSTRUCTION INC - DONN STURDIVANT DSTURDIVANT @RUSSELLCONSTRUCTION.COM RUSSELL CONSTRUCTION INC - ARNE WAYRYNEN AWAYRYNEN @RUSSELLCONSTRUCTION.COM ANDERS CERTIFIED WELDING INC - TED OVERHOLT Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carls a Eugene Office (541) 345 -0289 n Testing, Inc. Salem Office (_503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Proprietary Anchors Client: ROBERT TODD CONSTRUCTION - AMY ROLPH Project: AARONS SALES & LEASING - EXTERIOR IMPROVEMENTS CTI Job #: T1001755.A Address: 11745 SW PACIFIC HIGHWAY TIGARD OR Jurisdiction: TIGARD CTI representative G. FLEMING OBOA 814 was on site this date Feb. 03, 2010 to perform Special Inspection for: Permit 3UP2010 -00006 DFS #(s) PO Number: SCOPE OF INSPECTION Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent or client representative. OBSERVED PLACEMENT OF (56) 3/4" DIA CONCRETE Name: JOE SCREW ANCHORS, 6" EMBED TO SOUTH (E) FULLY Company: TIMBERLAND FRAMING CONTRACTORS p GROUTED CMU WALL PER 2/S5.0 "NEW BEAM TO (E) MASONRY WALL." 2. Inspection was "IBC" ® Continuous ❑ Periodic PROPRIETARY ANCHORS Yes NoNiA 1. Reviewed previous inspection reports? ?> 2. Reviewed evaluation report? 7' -- Verified- following- items- meet - manufacturer's - - - -- REPORT SUMMARY - - - published installation instructions. 3. Verified minimum embedment depth of the I. Work inspected was: ® Completed ❑ In progress anchors. x 4.Verified installation of the anchors. 2. Completed work inspected was in compliance with X 5. Verified anchor diameter. ® Approved plans and specifications ❑ Shop drawings X 6. Verified steel grade. X RFI Design change Submittal ❑ N/A 7. Verified hole diameter. X Document #(s) Dated: 8. Verified type of drill bit used. ?. 9. Verified hole cleaning method. 3. Noncompliance item(s) were noted this date, details on following page(s). Yes No L N/A 10. Verified adhesive application. X 11. Verified edge distance. X 4. Noncompliance item(s) were reinspected this date, details 12. Verified spacing. X on following page(s). Yes No • N/A 13. Verified installation torque. y El Conform E Remain in progress Evaluation report number & date: Report(s) findings were discussed and left with ESR -1056 (01/01/08) JOE of TIMBERLAND Name of product being installed SIMPSON TI TEN HD Batch Number N/A Expiration Date Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. fl See additional report page(s). Distribute attachments. Page 1 of 1 Daily Report of Proprietary Anchors For: 02/03/2010 CTI Job #: T1001755.A Project: AARONS SALES & LEASING - EXTERIOR IMPROVEMENTS Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced. except in fi without prior authorization from this office. Under all circumstances. the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Neil Shannon Review Date: 02/15 /2010 GF /CK ROBERT TODD CONSTRUCTION - AMY ROL ?H FAX /503 653 - 5729 TO: CITY OF TIGARD BUILDING DIVISION PARKIN ENGINEERING INC - BRITT KILLIAN BRITT @JOHNWPARKIN.COM PARKIN ENGINEERING INC - BRITT KILLIAN ROBERT TODD CONSTRUCTION - AMY ROLPH TIMBERLAND FRAMING CONTRACTORS - BRITT EGDORF BRETT @TIMBERLANDFRAMING.COM