Loading...
Correspondence (2) 17701 Cowan FO STER DESIGN GROUP Suite #230 • Irvine Ca 92614 —�— J CONSULTING ENGINEERS INC. Ph9492539630 Fax 949 253 9628 Ware M lc mb DATE: 11 -20 -12 a a o �' 10 Edelman PROJECT NUMBER: 12 -052 A�'0 Irvine, CA 92618 PROJECT NAME: Orchard Supply � 7 ZO, Z � T r0 Attn: Bryan Walker/Eric Kauffman ObtAij N The following is being sent: ® Prints ❑ Sepias ❑ Originals ® Other ❑ Shop Drawings ❑ Specifications ❑ Submittals Deliver shall be via: ❑ Mail ❑ National Messenger ❑ FedEx ❑ UPS ❑ California Overnight ® WM Share Site ® Hand ® Other No. Of Items Date DESCRIPTION 3 sets 11 -20 -12 Full -size MEP Plans — stamped & signed 1 set 11 -20 -12 Full -size MEP PDF's — WM share site upload 1 copy 11 -20 -12 Transmittal Purpose of transmittal checked below: ® For Approval ❑ For Your Use ® As Requested ❑ For review and Comment ❑ Returning after loan Remarks: Delta 4, Office & Entrance Revisions CC: R. Galaz, M. Pankretz, J. Trevino From: J. Zamora PAGE 1 17701 Cowan FOSTER DESIGN G R E j) Irvine Ca 92614 suie #230 CONSULTING ENGINEERS I Ph9492539630 4 '� 1 20 �2 Fax 949 253 9628 CITY OFTIGARD Ware Malcomb DATE: 11- 1s- 1�UILDINGDIVISION p���h, 10 Edelman PROJECT NUMBER: 12 -069 Irvine, CA 92618 PROJECT NAME: Orchard Supply - Peterkort Attn: Bryan Walker /Luis Ibanez /Eric Kauffman The following is being sent: ® Prints ❑ Sepias ❑ Originals ® Other ❑ Shop Drawings ❑ Specifications ❑ Submittals Deliver shall be via: ❑ Mail ❑ National Messenger ❑ FedEx ❑ UPS ❑ California Overnight ® WM Share Site ® Hand ® Other No. Of Items Date DESCRIPTION 4 sets 11 -15 -12 Full -size /full -set MEP plans — stamped & signed 1 set 11 -15 -12 Full- size /full -set MEP PDFs — WM share site upload 1 copy 11 -15 -12 ME Plan Check Response Letter 1 copy 11 -15 -12 Greenheck — Control Damper Cutsheet 1 copy 11 -15 -12 Transmittal — via email to client Purpose of transmittal checked below: E For Approval ❑ For Your Use ® As Requested ❑ For review and Comment ❑ Returning after loan Remarks: Delta 4, Building Department Submittal CC: R. Galaz, M. Pankretz, 3. Trevino From: 3. Zamora PAGE 1 17701 Cowan (110 J � FOSTER DESIGN GROUP Suite #230 - - - - - - - -- Irvine Ca 92614 CONSULTING ENGINEERS INC. Ph9492539630 Fax 949 253 9628 November 14, 2012 CEIVE Neville Willsmore Ware Malcomb `� 2 7 2012 2400 Camino Ramon Suite 390 CITY OFTIGARD San Ramon, CA 94583 BUILDING DIVISION Reference: Orchard Supply Hardware FDG Job #12 -069 Dear Neville: This letter is in response to Plan Check Corrections, #82012 -3785, dated 11 -09 -12 for the above referenced project. The changes have been clouded with a delta #4 for your reference. Mechanical Comment # Response 2. Corrected Refer to added plan note #10 on sheet M2.3. 3. Corrected Refer to modified general note #1 on sheet M0.1. 4. Corrected Refer to added Duct Pressure Schedule on sheet M0.1. 5. Corrected Refer to added general note #1 on sheets M2.3 & M2.4. 6. Corrected Refer to modified plan notes # 2 & 9 sheet M2.3. Refer to modified plan notes #2 & 6 sheet M2.4. 7. Corrected Refer to added information to mechanical specifications section 2.06 sheet M0.2. 8. Corrected Refer to added remarks in the exhaust fan schedule on sheet M0.1. Refer to modified detail #1 sheet M4.1. Refer to modified wiring diagrams #1 & 2 sheet M4.2. Sincerely, FDG Consulting Engineers PAGE 1 FOST DESIGN G ROUP 17701 Cowan • S uite #230 -- I rvine Ca 92614 CONSULTING ENGINEERS INC. Ph9492539630 Fax 949 253 9628 November 14, 2012 Luis Ibanez Ware Malcomb 2400 Camino Ramon Suite 390 San Ramon, CA 94583 Reference: Orchard Supply Hardware - Peterkort FDG Job#12-069 Dear Luis: This letter is in response to the Life Safety Plan Review, dated 11 -12 -12 for the above referenced project. The changes have been clouded with a delta #4 for your reference. Electrical Comment # Response 24. Corrected Electrical sheets E2.10 through E2.13 have been added indicating footcandle levels along the paths of egress. Minimum 1fc has been provided as required. Sincerely, Mark G. Tankretz Sr. Electrical Engineer FDG Consulting Engineers PAGE 1 17701 Cowan O FOSTER DESIGN GROUP Suite #230 • �— Irvine Ca 92614 J — CONSULTING ENGINEERS INC. Ph9492539630 Fax 949 253 9628 Iv 11 -20 -12 \J`.5k L Ibanez %{� k, O � 1 War alcomb Architects T l �' �� � 10 Ede an Irvine, C \ ,�4( tY V' C � ti V 3 •:\3 Reference: OSH - Tigard \11/J (� FDG Job #12-052 \ 0 t Dear Mr. Ibanez, /4)4.1/1 No c° 0 � r , x s�o This letter is a brief description of revisions made to the MEP drawings as Delta C Bvl Mechanical Sheet # Response MO.1 Added EF -2 for revised restroom layout. Revised ventilation calc for revised floor plan. Added EF -2 wiring diagram. M2.1 Revised demo plan for revised floor plan. M2.2 Revised floor plan for new office layout, etc. M3.2 Revised roof plan to match new office layout. Plumbing Sheet # Response P0.1 • Added electric water heater schedule. • Revised plumbing fixture schedule to include fixtures for new restroom. P1.0 • Revised location and invert elevation of storm drain coming out of building. P2.1 • Noted that existing restroom and plumbing fixtures shall be removed. P2.2 • Revised locations of AD -1 in nursery. • Provided POC to existing water and waste utilities for new restrooms, along with associated notes. P3.1 • Detail #1, provided plumbing for new restrooms and break room sink • Added details #2 and 3. PAGE 1 F D G C O N S U L T I N G E N G I N E E R S I N C . Electrical Sheet # Response E0.3 Fixture types BE & J added to fixture schedule. Type B modified to 2 lamp fixture. E0.4 Modified energy compliance report. E2.1 Revised lighting: Storefront, Nursery and Office areas. E3.1 Revised power for Office areas. E4.1 Revised circuits in Panels B, D and L. Sincerely, FDG Consulting Engineers MEP Design Team PAGE 2