Correspondence (2) 17701 Cowan
FO STER DESIGN GROUP Suite #230
• Irvine Ca 92614
—�— J CONSULTING ENGINEERS INC. Ph9492539630
Fax 949 253 9628
Ware M lc mb DATE: 11 -20 -12
a a o �'
10 Edelman PROJECT NUMBER: 12 -052 A�'0
Irvine, CA 92618 PROJECT NAME: Orchard Supply � 7 ZO, Z
� T r0
Attn: Bryan Walker/Eric Kauffman ObtAij
N
The following is being sent: ® Prints ❑ Sepias ❑ Originals ® Other
❑ Shop Drawings ❑ Specifications ❑ Submittals
Deliver shall be via: ❑ Mail ❑ National Messenger ❑ FedEx ❑ UPS
❑ California Overnight ® WM Share Site ® Hand ® Other
No. Of Items Date DESCRIPTION
3 sets 11 -20 -12 Full -size MEP Plans — stamped & signed
1 set 11 -20 -12 Full -size MEP PDF's — WM share site upload
1 copy 11 -20 -12 Transmittal
Purpose of transmittal checked below:
® For Approval ❑ For Your Use ® As Requested ❑ For review and Comment ❑ Returning after loan
Remarks:
Delta 4, Office & Entrance Revisions
CC: R. Galaz, M. Pankretz, J. Trevino
From: J. Zamora
PAGE 1
17701 Cowan
FOSTER DESIGN G R E j) Irvine Ca 92614 suie #230
CONSULTING ENGINEERS I Ph9492539630
4 '� 1 20 �2 Fax 949 253 9628
CITY OFTIGARD
Ware Malcomb DATE: 11- 1s- 1�UILDINGDIVISION p���h,
10 Edelman PROJECT NUMBER: 12 -069
Irvine, CA 92618 PROJECT NAME: Orchard Supply - Peterkort
Attn: Bryan Walker /Luis Ibanez /Eric Kauffman
The following is being sent: ® Prints ❑ Sepias ❑ Originals ® Other
❑ Shop Drawings ❑ Specifications ❑ Submittals
Deliver shall be via: ❑ Mail ❑ National Messenger ❑ FedEx ❑ UPS
❑ California Overnight ® WM Share Site ® Hand ® Other
No. Of Items Date DESCRIPTION
4 sets 11 -15 -12 Full -size /full -set MEP plans — stamped & signed
1 set 11 -15 -12 Full- size /full -set MEP PDFs — WM share site upload
1 copy 11 -15 -12 ME Plan Check Response Letter
1 copy 11 -15 -12 Greenheck — Control Damper Cutsheet
1 copy 11 -15 -12 Transmittal — via email to client
Purpose of transmittal checked below:
E For Approval ❑ For Your Use ® As Requested ❑ For review and Comment ❑ Returning after loan
Remarks:
Delta 4, Building Department Submittal
CC: R. Galaz, M. Pankretz, 3. Trevino
From: 3. Zamora
PAGE 1
17701 Cowan
(110 J � FOSTER DESIGN GROUP Suite #230
- - - - - - - -- Irvine Ca 92614
CONSULTING ENGINEERS INC. Ph9492539630
Fax 949 253 9628
November 14, 2012
CEIVE
Neville Willsmore
Ware Malcomb `� 2 7 2012
2400 Camino Ramon Suite 390 CITY OFTIGARD
San Ramon, CA 94583 BUILDING DIVISION
Reference: Orchard Supply Hardware
FDG Job #12 -069
Dear Neville:
This letter is in response to Plan Check Corrections, #82012 -3785, dated 11 -09 -12 for the above
referenced project. The changes have been clouded with a delta #4 for your reference.
Mechanical
Comment # Response
2. Corrected Refer to added plan note #10 on sheet M2.3.
3. Corrected Refer to modified general note #1 on sheet M0.1.
4. Corrected Refer to added Duct Pressure Schedule on sheet M0.1.
5. Corrected Refer to added general note #1 on sheets M2.3 & M2.4.
6. Corrected Refer to modified plan notes # 2 & 9 sheet M2.3. Refer to
modified plan notes #2 & 6 sheet M2.4.
7. Corrected Refer to added information to mechanical specifications section
2.06 sheet M0.2.
8. Corrected Refer to added remarks in the exhaust fan schedule on sheet
M0.1. Refer to modified detail #1 sheet M4.1. Refer to modified
wiring diagrams #1 & 2 sheet M4.2.
Sincerely,
FDG Consulting Engineers
PAGE 1
FOST DESIGN G ROUP 17701 Cowan
• S uite #230
-- I rvine Ca 92614
CONSULTING ENGINEERS INC. Ph9492539630
Fax 949 253 9628
November 14, 2012
Luis Ibanez
Ware Malcomb
2400 Camino Ramon Suite 390
San Ramon, CA 94583
Reference: Orchard Supply Hardware - Peterkort
FDG Job#12-069
Dear Luis:
This letter is in response to the Life Safety Plan Review, dated 11 -12 -12 for the above referenced
project. The changes have been clouded with a delta #4 for your reference.
Electrical
Comment # Response
24. Corrected Electrical sheets E2.10 through E2.13 have been added indicating
footcandle levels along the paths of egress. Minimum 1fc has
been provided as required.
Sincerely,
Mark G. Tankretz
Sr. Electrical Engineer
FDG Consulting Engineers
PAGE 1
17701 Cowan
O FOSTER DESIGN GROUP Suite #230
• �— Irvine Ca 92614
J — CONSULTING ENGINEERS INC. Ph9492539630
Fax 949 253 9628
Iv
11 -20 -12 \J`.5k
L Ibanez %{� k, O � 1
War alcomb Architects T l �' �� �
10 Ede an
Irvine, C \ ,�4( tY V'
C � ti V 3 •:\3
Reference: OSH - Tigard \11/J (�
FDG Job #12-052 \ 0 t
Dear Mr. Ibanez,
/4)4.1/1 No c°
0 � r , x s�o
This letter is a brief description of revisions made to the MEP drawings as Delta C
Bvl
Mechanical
Sheet # Response
MO.1 Added EF -2 for revised restroom layout. Revised ventilation calc
for revised floor plan. Added EF -2 wiring diagram.
M2.1 Revised demo plan for revised floor plan.
M2.2 Revised floor plan for new office layout, etc.
M3.2 Revised roof plan to match new office layout.
Plumbing
Sheet # Response
P0.1 • Added electric water heater schedule.
• Revised plumbing fixture schedule to include fixtures for new
restroom.
P1.0 • Revised location and invert elevation of storm drain coming
out of building.
P2.1 • Noted that existing restroom and plumbing fixtures shall be
removed.
P2.2 • Revised locations of AD -1 in nursery.
• Provided POC to existing water and waste utilities for new
restrooms, along with associated notes.
P3.1 • Detail #1, provided plumbing for new restrooms and break
room sink
• Added details #2 and 3.
PAGE 1
F D G C O N S U L T I N G E N G I N E E R S I N C .
Electrical
Sheet # Response
E0.3 Fixture types BE & J added to fixture schedule. Type B modified to 2 lamp
fixture.
E0.4 Modified energy compliance report.
E2.1 Revised lighting:
Storefront, Nursery and Office areas.
E3.1 Revised power for Office areas.
E4.1 Revised circuits in Panels B, D and L.
Sincerely,
FDG Consulting Engineers
MEP Design Team
PAGE 2