Project: PGE
Project Description: Adjacent to 9365 SW Martha Street. Replace B/O UG primary cable in new 2"conduit. SEG 2450
Owner: FEES
Description Date Amount
ROW Permit Fee 01/29/2014 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
HASSEN AMAN
2213 SW 133RD DRIVE
BEAVERTON, OR 97006
PHONE: 503-672-5595
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant 1 �,y� ` �,�, cal
Signature: , r 1 ` Wv/
Issued By: _ V
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for ROW2014-00008
Type: Condition Name:, Status: Severity:
ROW 20-TRENCH-PATCH/SAFETY/LBILITY Applied Notice
A temporary hard-surface patch(Cold mix A.C. or Hot mix A.C. base paving) shall be placed on trenches within roadways
at the end of each day's work. No trench, on site or off site,shall be left at any time in an unsafe condition.The permit
holder is responsible for and is liable for hazards or damage resulting from the work.
ROW 21-REPAIRS REQ-INSPTR OPINION Applied Notice
Work provided for under the permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, in the
City Inspectors opinion,to overcome deterioration or damage which occurred in conjunction with the work authorized by the
permit. Corrective work shall be done at the permit holders expense.
ROW 22-AS-BUILT/ENGR CERTIF REQ Applied Notice
At the end of each year, or an a mutually agreeable yearly date,any entity making changes to its facilities in the public
right-of-way shall submit complete"as-built"drawings showing all new public improvements, including any revision made to
the previously approved construction plans and,also, any improvement which may impact an existing public system or
facility, shall be provided to the City by a registered civil engineer along with an engineers certification of installation
compliance(form attached).
ROW 23-DAILY INSP REPORTS REQ Applied Notice
The permit holders Engineer/Inspector shall submit daily inspection reports, on a weekly basis,to the City's Inspector. (see
Developer-Engineer Agreement note#5).
ROW 24-TESTS/REPTS TO VALIDT CLMS Applied Notice
The City's Inspector may, at their discretion, require provision of tests and or reports from the permit holder, permit holder's
engineer or contractor to validate claims of material or construction adequacy/compliance. Such tests/reports shall be
provided at the permit holder's expense.
ROW 25-RELEASE-WAIVER REQ Applied Notice
The permit holder shall provide a copy of a properly executed Release&Waiver document to the City for each ownership
disturbed by construction activity, as evidence of disturbance resolution and owner satisfaction.
ROW 26-MONUMENT PROTECTION REQ Applied Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holders
expense.
ROW 27-PROB SOLVING-RESPON PARTY Applied Notice
The permit holder shall provide to the City Inspector, in writing,the names and 24-hour emergency telephone number of two
(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of an
emergency. The permit holder shall notify the City Inspector, in writing,of any/all assignment changes.
ROW 28-CONSTR SAFETY-RESPON PARTY Applied Notice
The permit holder shall cause his contractor to provide to the City Inspector, in writing,the name and 24 hr emergency
telephone number of a designated"Competent Person"responsible for construction safety as per OR-OSHA, Chap. 437,
Div. 3 Construction, Subdivision P-Excavations. The contractor shall notify the City Inspector of any/all assignment
changes.
ROW 29-ESMT/RT OF ENTRY-RESPON Applied Notice
It is the sole responsibility of the permit holder to provide for proper right-of-entry and/or easements prior to starting work.
Proof of right-of-entry,or properly executed easements,shall be provided to the City. The City shall in no way be construed
to be liable for the permit holder's failure to obtain or provide for proof of right-of-entry or easements.
ROW 01-CUSTOM CONDITION Applied Notice
<Custom Condition goes here>
ROW 02-PERMIT&PLAN REQ ON SITE Applied Notice
A copy of the permit and all attachments,and a copy of the approved construction plan and all amendments shall be
available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved
permit plans, and approved plan amendments and to the City's Standards and Specifications and to these General
Conditions. Changes to any of the aforesaid must be approved by the City, in advance of work performance.
ROW 03-TRAF CTRL-SPECIF(CITY) Applied Notice
The City's standard specification for traffic control is"Manual on Uniform Traffic Control Devices for Streets and Highways",
U.S. Dept. of Transportation, F.H.A., 1988 Ed.
ROW 04-TRAF CTRL-CONTR RESPON FOR Applied Notice
Traffic control shall be provided for by the contractor in accordance with the City's standard specification and, also, in
accordance with a City(job specific)approved traffic control plan.A copy of the approved traffic control plan shall be
available at the work area.
ROW 05-TRAF CTRL-ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic,at any time,without having first obtained written approval from the City
Engineer. The permit holder is responsible for provision of timely notification of traffic flow disruptions to area wide
Emergency Services(Tigard Police Dept.,Tualatin Fire&Rescue)and to Tri-Met and Tigard School District.
ROW 06-TRAF CTRL-ADVANCE WARNING Applied Notice
Advance warning of imminent traffic disruption shall be provided to the general motoring public by placement of an advance
notification sign at each end of the construction area 72 hours(min.)before initiation of construction work.
ROW 07-TRAF CTRL-PRIV PROP ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service and if not,
shall be cause for work stoppage until effective access is established.
ROW 08-TRAF CTRL-DEVICES IN PLACE Applied Notice
Traffic control devices,flagpersons,etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
ROW 09-TRAF/NOISE CTRL-WORK HRS Applied Notice
No work will be permitted during the hours of darkness, nor between 9:00 p.m.to 7:00 a.m. Monday through Friday, nor
between 9:00 p.m.to 8:00 a.m. Saturday, nor between 9:00 p.m.to 9:00 a.m. Sunday.
ROW 10-TRAF CTRL-MIN LANE WIDTH Applied Notice
Minimum travel lane width shall be eleven(11)feet; pedestrian travel shall also be provided for.
ROW 11-TRAF CTRL-CITY CAN MODIFY Applied Notice
The City reserves the right to add to or modify traffic control requirements as may be necessary to effectively control traffic
and to assure public safety.
ROW 12-INSP 24 HR NOTICE REQUIRED Applied Notice
The permit holder or his contractor shall notify the City's inspector Kenny Fisher at 503-816-6146 or email at
kenny @tigard-or.gov or email at<email address>,twenty-four(24) hours prior to commencing work,twenty-four(24)hours
prior to any staged inspection, and after completing work covered by the permit.
ROW 13-HAZARDS-CERT OF INS Applied Notice
Maintenance of the work area and approach roads is the responsibility of the permit holder. The work area and approach
roads shall be maintained in a clean condition,free from obstructions and hazards.A copy of the permit holders Certificate
of Insurance shall be available at the work area.
ROW 14-DEBRIS-MATERIALS Applied Notice
The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly
prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate
cleanup and stoppage of work to accomplish cleanup.
ROW 15-EROSION CTRL REQ Applied Notice
Effective erosion control is required. Erosion control devices must be installed and maintained meeting D.E.Q.
requirements.The City may at any time order corrective action and stoppage of work to accomplish effective erosion
control.
ROW 16-REPAIRS-LIKE MATERIALS REQ Applied Notice
Property disturbed by construction activity shall be seeded with a standard grass mix; shrubs, flowers, barkdust,existing
signs, pavement markings, mailboxes,etc., shall be reestablished, reinstalled or replaced,with like kind and material.
ROW 17-DRAINAGE CONTROL REQ Applied Notice
Effective drainage control is required. Drainage shall be controlled within the work site and shall be so routed that adjacent
private property,public property and the receiving system is not adversely impacted. The City may,at any time, order
corrective action and stoppage of work to accomplish effective drainage control.
ROW 18-UTILITIES PRELOCATION REQ Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0010 through OAR 952-001-0080. Copies of the rules may be obtained from the Center by calling(503)232-1987.
If you have questions about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holders
expense.
ROW 19-UTILITY LOCATIONAL CONFLICT Applied Notice
Contractor must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the permit holders expense. Changes must be approved by the City in advance of work performance. Contractor shall
coordinate the work with affected utility agencies.
RECEIVED
JAN 2 g 2014
CITY OF TIGARD
City of Tigard PLANNING/ENGINEERING
A Ecation For Work. In The Right-Of-Way
pp g
ROW Permit
Property Address/Location(s): q 3 65 Sw M&I-1 0, FOR STAFF USE ONLY
Right-of-Wa
Case No. 7 -OWDS
*Applicant's Name: Application Accepted: ( By:r�
Z
address: 2Z IS �� f � S& w Application Reviewed:/-
v:.4.214
Cita/Mtate: eckyl,f r—-o A zip: Application Fee Due: ,30 V
AY—
Prinnlry Contact 4 .5:;* + Applicant Notified: 1 12MIl
photic: 50-S- 6?6 3- bq2G Fax: _-4 G-7 � Receipt No.:
t?maii: 74 D S u �A con,,_- REQUIRED SUBMITTAL
INFORMATION
Contractor'sName: ""' w f • Application form,completed and signed
(:'C13 Expiration: • Submit one(1) copy of scaled sketch of
the proposed work to be done
Adclress: • Submit one (1) copy of traffic control
Cih%State: Zip: plan
Phone: Fax: Professional Engineered Plans are required
h.mail: for:
• Street Widening
Platys By: t�'t • Subdivision Infrastructure
• Main utility line extension
Address:
Deliver application to you permitsru tip.nd-t�r.ciw or to
Ci[V/State: Zip: City ofTigard Planning/1ngincering,13125 SW Hall
Phone: Fax: Blvd.Tigard,OR 97223.
_ RmU/10/2013
1,IIIaI I:\CURPI.N\Alasters\Land Use Applications\Right-of-way Permit
i'i
t Applicadon.doas
Description of work: 1) lot✓e j� �� t'+m G w CCS le 1 r7 aet.7 «a2 `Y t!/S c4 t c "
Estimated value of work(within the public right-of-way): $
Is work related to a LAND-USE DECISION? YES El NO
If so, please specify(MLP,SDR,SUB,etc.)case#:
Is the work related to a BUILDING PERMIT? YES El NOLAJ
If so, please specify(BUILDING PERMIT)case#:
/
,,y� i 1
a f (
Sib !`
Signature of Applicant/Permittee: 4 .� � 5 a.r4 Ar tett Dater
Print Name: Title: �o "l'roce5, tar
City of Tigard 1 13125 SW Hall Blvd.,Tigard,OR 97223 1 503-718-2464 1 www.tigard-ongov
I —
LEGEND
NEW PGE FACILITIES TO BE INSTALLED
(UNLESS OTHERWISE SPECIFIED)
FACILITIES TO BE INSTALLED
RIGHT-OF-WAY PERMIT NOTICE: CONTACT SERVICE COORDINATOR 111111011 XACDITIFE To Br ABANDONED
A PERMIT FROM THE LOCAL JURISDICTION IS REOUIRED BEFORE ANY
WORK IN ME RIGM-OF-WqY MAY BE PERFORMED. ONLY PGE APPROVED EP=XFLLL.PDE wlullrvoi lulsTN: 50.-PGF SWITCH vAULi,wIT ]II-
H 55-] PGf TOP
CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL UL SERVICE COORDINATOR° PROVIDED 6 INsiutED eY PGE-MWOVED CONTRACTOR
VT 00018 DI BSB- AGREEMENTS WIM POE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT. wJ-7J6-0430 PGE TO INSTALL I.-WAY LATERAL iAP
.1.1 ME CONTRACTOR MUST NOTIFY ME LOCAL JURISDICTION 18 NO—
PLwJ55BEFORE WORK IS TO BEGIN.A COPY OF ME PERMIT MUST BE ON SITE. _______ INSTALL L.2 AL- P JRT PRIMARY IN Y'WC CONDUIT
2009-z0
B /BONDED Sr INSTALLED BY PGF-APPROVED COMRACIOP
4 ABAv00N .'MA"—Dl c_
00150/ weo -
8 50 75330 ni 9wei�020 d .0 cDNBLRT To RE wALLm,u aa1Ra IMM eeLow PIIAt;BADE
ieD ALL FOE COIouclolD TO N RaTAUeD IN our saaouu.o,eLEOMc.L eRADe.
rSe coIDLRr wnH nmol PULL STRNXOS Bbo us.}NTI.Toe To OneRMWE
rHt Sm Arm NLweeR w COFmIRTs ReLz Im.MAMA..tE veRTlrx RICHES AND
ROUTE EXISTING DIRECT BURIED Io u-Dx }.MM1wMu RKIRe CIfARAMCE E[IRYLlN W AND DIMER UIKORR ALL ELFDWL
PRIMARY(NORTH AND SOUTH OF vT o001> nICII a SMALLER To u u RAI RABIw.AU Berms AI N rA MADE.
PAD 8834)FROM PAD 8834 INTO '� 08833 AA"'O'�SD Flee�Ios�:pAKObPOR Mi,gl�°rEers�et R
NEW 504-PGE VAULT(VAULT 49) V -- o1 BST- O—A Tai w n'D Nile MRvS«-AwMToTuo�
PGE TO INSTALL 1 4-WAY LATERAL
CUT 8 CAP DB 0051 S/5 IEFmf M AM COIOar RUrI a aro oe1Mm.
TAP IN VAULT 49 PRIMARY (A TO 8)SO 719 DRING REOaREMfNrs.BucK H r N/Doti
Dlese ro 1M511 nimroN�E m o rl�,v,uiERT"Ntll eoO1EFIN�Cn We II., a�z,f_HM,ICN
2oJ.e/ ;OR
PC SPECnoN solivuL.°PFBU ON ouESR aoM v
I STALL yyy LwS.s sAFpry REASONSH11 DICT SHALL BE Bucx—N E —1 ii CECT
OPEN 7 R �aED oulxiu nE_iExHiNsiuF-IFI wI�NPCE.9siEcioP 9"'T
DEREI TEst of
00049 IVB.-2D PROPOSE -1a W-oX
h � REMOVE eRNcµRNORLD AW RpPECT ALL COrmVRroVAUt Jbm PAD R4TALLATpFB
RI OPEN ) IFCus QNFR RivxfsF6rrr.mE. F
PDO6327 <
8 30 75674 \ DO NO CLOSE HO a SFewKuou rcAe'Lim.luwRRRYlrougmEMeHSS e°°R FDA nRITIeR°etas
o cu-ox
TEN ION: 91# DESIGN 4 aA5[D ON nANDARD Ih.DERDROIEm APf xxRMeNr AaXPS1ANDARD
LI umeRewu+°eDLRrAaHr AMr r AH wTrol ADDm1PHL con To
69' TEN ION: 65 2p05:2p THE cusraARel.
PD,088 stv MARTHA sr
A_2 AL-DB
00049 5 DI zo _ __-- - wS°° (A TO 8}2 AL-DB ANY DEVIATION FROM THIS DESIGN MUST
1985-2l1
P00i'w' D `` a 4 0. IDA-p i BE APPROVED BY PGE PROJECT MANAGER
-lD cu-ox 0832 Z
dM1� .ioD18ST- O' 2
a
I-ID cu -Io -ox TO 8)50 TART wzaox S SW THA ST F
OI BSB- IA582D I ID W.o. -IoCD 351 cu-ox
0 CU-OX
o185,PL wLJS 50 216u (Aro 8}7 AL-0B .°0°01 S1
w�oB/ zD zau ao
PL wSw O o1 BST. -1 AL-ix
08330 P00 eozT 111x- ole -
a wns aBO. D0z s/ DI I%,
IVes-w PL wzls n ozes ro 0 329 001'°. owls
�n/ $ ro 328 e°eS vt wz° 7 % 199A-SD /CNE 02407
-Io cu-ox L B To 191-20 lae5�2o h + TRANSFER'A'PHASE UG DIP
01858- eo2To e m y TO 'B'PHASE VIA DROP 6
0o3ZE/ 19Bs-E _ n PICK
PL BD325 sw/ipA n 11115 - F
zs 1925-2o TO )50 275 S A 25 36681
zD
TO B) 0 212 1 0Y T 6 25 39550
C 25 39548
O
DIe5T-
-Io OIL— A- AL-DE J4"2-81 omlo/
1-119 P,m3
f10T I—
I-ID cu-x 20 SIs PL 7102 es x
olese-
-z0 A 30 24 31 08331 -ID cu-ox <❑ -1
ao5zo/ °lase
PL eo wsls/ ..LL
PL eoS1
I-lo CU-x 5620 x0360/
8D2w
PD 833 THINK
SAFETY
8 50 25625 CUT& CAP DB FIRST!
PRIMARY
I-Io c-D. WR CHECKLIST
ITEM YES COMMENT
BORE Y BACKR
Of SIDWALK
SW troll
ICA imlwRAWING
IL` (i , Ir )�r AS-BUILT VERIFICATION & NESC VIOLATIONS CORRECTED
MAY REQUIRE CONCRETE SIDEWALK _ Imo-- _" lam Th,,,dx..M amlTm.I,rep Fft FIELD CODnn,r,
REPAIR d LANDSCAPING ). s\� �, .,) sDc>ti S Fommon: Dote:
Gerwrol Forenpn: pale:
I.T INW c-W—NOM
/ - HRrvrs SDIMENG RENEW: A58lRLT 8Y DESIGNER:
DATE. wu: Accowr: AWE. No
l_'j ORIMWtsb S I ` — k I S' nlHc nPx NlI4 1':80' p70001 000004628 '66M
SPA,A.NnG ',,rya w n.w 700 PINES-REPLACE 60 UG PRIMARY CANE
kJ / DATpyR /` DIMNAm-sATTLER 17.22
AT ATRNTION cul an BEFORE rou DIG Ipg l 'I � �. pC,�
OREDI LAW REQUIRES YOU TO ROLL RULES ADOPTETHOU D
L93-65—SW AIMTNA sr,rRARD
THE OREGON VTKnY NOTI6GgiON CEMER. I 1� - €I <ankT
MITES ARE SET FORM M OM 952-MIMV - _ ,1 Et
�i
�: R[HACE b UG PRWARY CAKE IN NEW Y CONDUIT
9CAL INX 0 YOU AIRY DRAM COPIES Of
THE RULES BY
CALLMG THE OREGON NRlTY `TI ,'/ WVATwX WASHINGTON CI IIA WCAK w1r11 I DI r
NU11pN ttwrER ADMIq,STMT101V® t5°J-IJE-roan —'' � � - _ I /; LRI cRew aNIe1
TO REQUEST UTILITY iQ TES GUL ME OREGON K—e%W.YR18W. HOMAs Gul - J 11ASSAN AMAN 9676976 JJ ARFRAS
2 BUS NOTIFICATION SSDAYSM CEPITRTO CAT IEA9, CIO�e r.#* 685—E1 - VICINITY mAPL�
1 BUSINESS DAYS PRIOR TO .811 RATION. r�R1CXa—.1 IORA O IORTMm D[NERAI ElECOBC CO.-ALL Rg1R5 RESERVED
CITY OF TIGARD RECEIPT
13125 SW Hall Blvd.,Tigard OR 97223
503.639.4171
Receipt Number: 194718 - 01/29/2014
CASE NO. FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID
ROW2014-00008 ROW Permit Fee 100-0000-43114 $300.00
Total: $300.00
PAYMENT METHOD CHECK# CC AUTH.CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT
Credit Card 011948 TLEHRBACH 01/29/2014 $300.00
Payor: Bert Kephart, Portland General Electric
Total Payments: $300.00
Balance Due: $0.00
CITY OF TIGARO PERMIT5
13125 SW HALL BLVD
TIGARD, OR. 97223
TERMINAL I.D.; 0017340000800313065801
MERCHANT q: 8883138658
VISA PCARD
i�t1:ilJktt;iuli9226 >K
SALE
RECORD N: 3 INV: 080883
DATE: JAN 29, 14 TIME: 17:21
BATCH: 264
AUTH: 811948
CUS1 CODE: 1111
AVS RESPONSE: Y
CUV2 RESPONSE: P
ADDRESS AND 5 DIGIT ZIP MATCH
TOTAL $300.00
I AGREE TO PAY ABOVE TOTAL AMOUNT
ACCORDING TO CARD ISSUER AGREEMENT
(MERCHANT AGREEMENT IF CREDIT VOUCHER)
Page 1 of 1