Permit p CITY OF TIGARD BUILDING PERMIT
II -Ill COMMUNITY DEVELOPMENT Permit#: BUP2014-00027
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/05/2014
Parcel: 25101 DB00100
Jurisdiction: Tigard
Site address: 7340 SW HUNZIKER RD 200
Project: Gunness Benefits Subdivision: VARNS ACRES Lot: 3
Project Description: TI-tenant moving to smaller space
Contractor: ROBINSON CONSTRUCTION Owner: HILLTOP BUSINESS CENTER LLC
21360 NW AMBERWOOD DR HUNZIKER LLC
HILLSBORO,OR 97124-9321 9430 NW KAISER RD
PORTLAND, OR 97231
PHONE: 503-645-8531 PHONE:
FAX: 503-645-5397
Specifics: FEES
If Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 02/05/2014 $149.75
Demolition
Occupancy Grp: B Occupancy Load: 10 ' 12%State Surcharge-Building 02/05/2014 $17.97
Dwelling Units: 0 Plan Review 02/05/2014 $97.34
Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 02/05/2014 $59.90
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 02/05/2014 $4.00
Value: $4,100 11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage 0
Mezzanine: 0
Total $328.96
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is riot started within 180 days of issuance, or if work is suspended for more the 180
da - - ' • -.Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
2-001-0010 through OAi2 2-001- 0. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.19: •r 1.800.332.2344.
Issued By: ; / ./ , ' Permittee Signature: Ji
Call 503.639.4175 by 7:00 a.m.for the next available inspec.'n da =.
This permit card shall be kept in a conspicuous place on the job site until co pletio .f the project.
Approved plans are required on the job site at the time of each in-.ection
Building Permit Application
Commercial 1ECE1` FOR OFFICE USE ONLY
ill u City of Tigard Received ,y IZEIF /mil --eVing 7
13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review
Phone: 503.718.2439 Fax: 503.598.1MB J C 2014 Date/B c/: s/'M9- Other Permit:
T I G A R D Inspection Line: 503.639.4175 Date Ready/By: Jails: ® See Page 2 for
Internet: www.tigard-or.gov Notified/Method. Supplemental Information
CITY OF TIGARD
TYPE WIRIG DIVISION REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Rf Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling Commercial/industrial Valuation: $
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: ri t- 0 SI. i1v v 1,D New dwelling area: square feet
City/State/ZIP: 7G� p , oe- c772-v$ Garage/carport area: square feet
Suite/bldg./apt.no.: 2.00 Project name: w on 5 . ene 4s Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
72.!Rd 14.1( 1 al 217 Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel no.: 25 IM p&p, 100 equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
I� Valuation: $ Lie 100
I ifei-►„r -.rrarvi- ✓uy,en f
Existing building area: square feet
New building area: 0 square feet
❑ PROPERTY OWNER 'TENANT Number of stories: 2•
Name: gu J/4 N 6A75 Type of construction: 1(1—A
Address: /ND ) N2.4p2, ? :;• it220 Occupancy groups:
roups: ?J
City/State/ZIP: I 71XND t Ole— 977.2.5 Existing:
Phone:( )( )
l. csli Fax:( ) New:
APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
n (Please refer to fee schedule)
���Business name: L Structural plan review fee(or deposit):
Contact name: )1A}- p '
Address: if m) 7/fl d FLS plan review fee(if applicable):
i Total fees due upon application:
City/State/ZIP: 1401A-K0 / 0(. 97221 .
Phone:( //3 214,• /7,. q.. Fax: :(3) VI", !0 Amount received:
E-mail: � �� (�+ aa�iraC ��r1't PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
�
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name: N564.1 ONSTAI 7 ON Submit two(2)sets of roof plan with connection details
I r and fire department access,along with the 2010 Oregon
Address: 243fiCi ad A Z �D . Solar Installation Specialty Code checklist.
City/State/ZIP:✓' (,6 , t 0— '7124 Permit fee(includes plan review $180.00
"r and administrative fees):
Phone:(9;/),) / O%3, Fax:(L,�3) �• �3�7 State surcharge(12%of permit fee): $21.60
CCB lic.: ee / 1/9/ //--
'7 � Total fee due upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
n^ , /e within 180 days after it has been accepted as complete.
Print name: �yA, •f/ l Date: 21 !��'Li * Fee methodology set by Tri-County Building Industry
/ 1� Service Board.
I:\Building\Permits\BUP-CO •-rmitApp.doc 02/24/2011 440-4613T(ll/02/COM/WEB)
Building Permit Number: t i Pip/�--eOtoa7
IN Building Permit Review
Commercial Project —No Associated Land Use Case
TIGARD
Sit ddress: 73 LID oft) ) kl-u vLx; S) • 02,0•0
rwserify site address is valid.
Project Name : a Ni n)z-“, ---6E��Fi r-5
Planning Review
Proposal: //1,lei-2,4-,71- 7/ - 5/111 - TE'ofN
Zoning: C-P
ea-Permitted Use ❑ Yes ❑ No ❑ Spec Space —('
❑ Land Use Required ❑ Yes .eNo
Notes:
Approved by: �(,j Date: 6-- ��
Revisions (after Building Submittal only) Reviewer Date
Revision 1 Approved ❑ Not Approved ❑
Revision 2 Approved ❑ Not Approved ❑
Revision 3 Approved ❑ Not Approved ❑
Building Permit Submittal
Original Plan Submittal: Date: eff _5 By: C/■_17).4)
Site Plans: #
Building Plans: #
Create Case Record#: enter case#above for Building Permit Number. __.., �
Workflow Routing: 42"-Planning ❑ Engineering ❑ Permit Coordinator Ii2" ilding
Workflow Sign-off: ii -off for Planning staff,including notes from planning review(page 1)
Route Application Documents: Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Reviewed By: 41 ,4 / Date: 01 k%
Notes:
1:\Building\Forms\BldgPermitRvw_COM_NoLandUse_123013.docx
P P . ' Building Division
Over-The-Counter (OTC) Building Permit
T i n lz D Check List
i 1 Project Description: �. - i€N 6„.,—; Mo J=�c, To 5MA LLEc b prict-,-
1
APPLICATION SPECIFIC INFORMATION
GENERAL INFORMATION
Class of Work*: AL.T Occupancy Group: B Type of Construction: ///-3
Type of Use**: Cc.,A Occupancy Load: j 0 Oregon Specialty Code: ;01n
SPECIFICS
Number of Stories: Building Height: Mixed Use:
Number of Dw Units: Number of Bathrooms: Number of Bedrooms: _
BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES
Story Square Footage: Accessory Structure: Covered Porch:
Basement: Garage: Deck:
Total Square Footage: Carport: Mezzanine:
SETBACKS
Sideyard Setback-Left Sideyard Setback-Front
Sideyard Setback-Right _ Sideyard Setback-Back
CONSTRUCTION
Exterior Walls: Openings Protected: Firewall Separation:
N: S: N: S: Occupancy Separation:
E: W: _ E: W: Access.Parking Spaces:
REQUIRED ITEMS
Fire Sprinklers: Fire Alarms: Smoke Detectors:
Parapet: Manual Pull Stations: Protected Corridors:
Total Project Valuation: $ 1)/1 Vo FEES DUE
$ N/A DC Prov Rvw,COM TI-Ping
$ /JON DC Prov Rvw,COM TI-LRP
DC Provision Review Fee for COM TI(effective 7/1/2013) $ j t)i,75- Permit Fee-Add,Alt,Demo
Project Valuation Planning LRP $ 7. 9 7 12%State Surcharge
Up to$4,999 $0.00 $0.00 $ 47 34 Plan Review,Structural
$5,000-$74,999 $70.00 $10.00 $ S�•90 Plan Review,Fire Life Safety
$75,000-$149,999 $174.00 $26.00 $ :, it Li ay Info Proc/Arch,Lg(over 11x17$2.00)
$150,000 and over $278.00 $41.00 $ Info Proc/Arch,Sm(up to 11x17$0.50)
$ Metro Construction Excise Tax
$ School Construction Excise Tax
$ Hourly Rate Fee
Planning Staff: $ Hourly Rate State Surcharge
$ Misc.Admin Fee
Permit Coordinator: $ Other:
$ Other:
Building Staff: $ Other:
Date/Time: $ TOTAL FEES DUE
* TYPE OF USE: COM=commercial;CMS=commercial manufactured structure.
**CLASS OF WORK ACS=accessory;ADD=addition;ADU=accessory dwelling unit;ALT=alteration;DEM=demo;NEW=new;
OTR=other(use for fences,decks,retaining walls,signs,awnings or canopies).
I:\Building\Forms\OTC-BUP.docx 07/01/2013
Location:
Record Type:
Inspection Type:
Comments:
Inspection Date:
Record ID:
Result:
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
7340 SW HUNZIKER RD 200, TIGARD, OR,
97223
Commercial - Building
299 Final inspection
2014-03-10 00:00:00
BUP2014-00027
PASS - C of O
Violation Summary:
Inspector Contractor