Loading...
Permit p CITY OF TIGARD BUILDING PERMIT II -Ill COMMUNITY DEVELOPMENT Permit#: BUP2014-00027 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/05/2014 Parcel: 25101 DB00100 Jurisdiction: Tigard Site address: 7340 SW HUNZIKER RD 200 Project: Gunness Benefits Subdivision: VARNS ACRES Lot: 3 Project Description: TI-tenant moving to smaller space Contractor: ROBINSON CONSTRUCTION Owner: HILLTOP BUSINESS CENTER LLC 21360 NW AMBERWOOD DR HUNZIKER LLC HILLSBORO,OR 97124-9321 9430 NW KAISER RD PORTLAND, OR 97231 PHONE: 503-645-8531 PHONE: FAX: 503-645-5397 Specifics: FEES If Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 02/05/2014 $149.75 Demolition Occupancy Grp: B Occupancy Load: 10 ' 12%State Surcharge-Building 02/05/2014 $17.97 Dwelling Units: 0 Plan Review 02/05/2014 $97.34 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 02/05/2014 $59.90 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 02/05/2014 $4.00 Value: $4,100 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage 0 Mezzanine: 0 Total $328.96 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is riot started within 180 days of issuance, or if work is suspended for more the 180 da - - ' • -.Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 2-001-0010 through OAi2 2-001- 0. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.19: •r 1.800.332.2344. Issued By: ; / ./ , ' Permittee Signature: Ji Call 503.639.4175 by 7:00 a.m.for the next available inspec.'n da =. This permit card shall be kept in a conspicuous place on the job site until co pletio .f the project. Approved plans are required on the job site at the time of each in-.ection Building Permit Application Commercial 1ECE1` FOR OFFICE USE ONLY ill u City of Tigard Received ,y IZEIF /mil --eVing 7 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review Phone: 503.718.2439 Fax: 503.598.1MB J C 2014 Date/B c/: s/'M9- Other Permit: T I G A R D Inspection Line: 503.639.4175 Date Ready/By: Jails: ® See Page 2 for Internet: www.tigard-or.gov Notified/Method. Supplemental Information CITY OF TIGARD TYPE WIRIG DIVISION REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Rf Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling Commercial/industrial Valuation: $ ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: ri t- 0 SI. i1v v 1,D New dwelling area: square feet City/State/ZIP: 7G� p , oe- c772-v$ Garage/carport area: square feet Suite/bldg./apt.no.: 2.00 Project name: w on 5 . ene 4s Covered porch area: square feet Cross street/directions to job site: Deck area: square feet 72.!Rd 14.1( 1 al 217 Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: 25 IM p&p, 100 equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. I� Valuation: $ Lie 100 I ifei-►„r -.rrarvi- ✓uy,en f Existing building area: square feet New building area: 0 square feet ❑ PROPERTY OWNER 'TENANT Number of stories: 2• Name: gu J/4 N 6A75 Type of construction: 1(1—A Address: /ND ) N2.4p2, ? :;• it220 Occupancy groups: roups: ?J City/State/ZIP: I 71XND t Ole— 977.2.5 Existing: Phone:( )( ) l. csli Fax:( ) New: APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* n (Please refer to fee schedule) ���Business name: L Structural plan review fee(or deposit): Contact name: )1A}- p ' Address: if m) 7/fl d FLS plan review fee(if applicable): i Total fees due upon application: City/State/ZIP: 1401A-K0 / 0(. 97221 . Phone:( //3 214,• /7,. q.. Fax: :(3) VI", !0 Amount received: E-mail: � �� (�+ aa�iraC ��r1't PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* � Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: N564.1 ONSTAI 7 ON Submit two(2)sets of roof plan with connection details I r and fire department access,along with the 2010 Oregon Address: 243fiCi ad A Z �D . Solar Installation Specialty Code checklist. City/State/ZIP:✓' (,6 , t 0— '7124 Permit fee(includes plan review $180.00 "r and administrative fees): Phone:(9;/),) / O%3, Fax:(L,�3) �• �3�7 State surcharge(12%of permit fee): $21.60 CCB lic.: ee / 1/9/ //-- '7 � Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained n^ , /e within 180 days after it has been accepted as complete. Print name: �yA, •f/ l Date: 21 !��'Li * Fee methodology set by Tri-County Building Industry / 1� Service Board. I:\Building\Permits\BUP-CO •-rmitApp.doc 02/24/2011 440-4613T(ll/02/COM/WEB) Building Permit Number: t i Pip/�--eOtoa7 IN Building Permit Review Commercial Project —No Associated Land Use Case TIGARD Sit ddress: 73 LID oft) ) kl-u vLx; S) • 02,0•0 rwserify site address is valid. Project Name : a Ni n)z-“, ---6E��Fi r-5 Planning Review Proposal: //1,lei-2,4-,71- 7/ - 5/111 - TE'ofN Zoning: C-P ea-Permitted Use ❑ Yes ❑ No ❑ Spec Space —(' ❑ Land Use Required ❑ Yes .eNo Notes: Approved by: �(,j Date: 6-- �� Revisions (after Building Submittal only) Reviewer Date Revision 1 Approved ❑ Not Approved ❑ Revision 2 Approved ❑ Not Approved ❑ Revision 3 Approved ❑ Not Approved ❑ Building Permit Submittal Original Plan Submittal: Date: eff _5 By: C/■_17).4) Site Plans: # Building Plans: # Create Case Record#: enter case#above for Building Permit Number. __.., � Workflow Routing: 42"-Planning ❑ Engineering ❑ Permit Coordinator Ii2" ilding Workflow Sign-off: ii -off for Planning staff,including notes from planning review(page 1) Route Application Documents: Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Reviewed By: 41 ,4 / Date: 01 k% Notes: 1:\Building\Forms\BldgPermitRvw_COM_NoLandUse_123013.docx P P . ' Building Division Over-The-Counter (OTC) Building Permit T i n lz D Check List i 1 Project Description: �. - i€N 6„.,—; Mo J=�c, To 5MA LLEc b prict-,- 1 APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION Class of Work*: AL.T Occupancy Group: B Type of Construction: ///-3 Type of Use**: Cc.,A Occupancy Load: j 0 Oregon Specialty Code: ;01n SPECIFICS Number of Stories: Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: _ BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback-Left Sideyard Setback-Front Sideyard Setback-Right _ Sideyard Setback-Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: _ E: W: Access.Parking Spaces: REQUIRED ITEMS Fire Sprinklers: Fire Alarms: Smoke Detectors: Parapet: Manual Pull Stations: Protected Corridors: Total Project Valuation: $ 1)/1 Vo FEES DUE $ N/A DC Prov Rvw,COM TI-Ping $ /JON DC Prov Rvw,COM TI-LRP DC Provision Review Fee for COM TI(effective 7/1/2013) $ j t)i,75- Permit Fee-Add,Alt,Demo Project Valuation Planning LRP $ 7. 9 7 12%State Surcharge Up to$4,999 $0.00 $0.00 $ 47 34 Plan Review,Structural $5,000-$74,999 $70.00 $10.00 $ S�•90 Plan Review,Fire Life Safety $75,000-$149,999 $174.00 $26.00 $ :, it Li ay Info Proc/Arch,Lg(over 11x17$2.00) $150,000 and over $278.00 $41.00 $ Info Proc/Arch,Sm(up to 11x17$0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee Planning Staff: $ Hourly Rate State Surcharge $ Misc.Admin Fee Permit Coordinator: $ Other: $ Other: Building Staff: $ Other: Date/Time: $ TOTAL FEES DUE * TYPE OF USE: COM=commercial;CMS=commercial manufactured structure. **CLASS OF WORK ACS=accessory;ADD=addition;ADU=accessory dwelling unit;ALT=alteration;DEM=demo;NEW=new; OTR=other(use for fences,decks,retaining walls,signs,awnings or canopies). I:\Building\Forms\OTC-BUP.docx 07/01/2013 Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 7340 SW HUNZIKER RD 200, TIGARD, OR, 97223 Commercial - Building 299 Final inspection 2014-03-10 00:00:00 BUP2014-00027 PASS - C of O Violation Summary: Inspector Contractor