Specifications . ' TODD MAURCR P.C.CIVIL TM 13-69 AEL(707)975-2410 lI4 (505)C3G.$2 I S 75"9.'11474:97065 u.o...'e uapoa® Calculations for Foundation Underpinning 12902 5W Hillside Terrace Tigard, Or 97225 9/14/2015 References: OSSC, ICC-ES Report No. E5R-1854 Pg Site Condition,Soils&Calc's 1-4 Installation&Drawing 51-52 CITY OF TIGARD Approved 1)$fc R#J1J1'UG- Conditionally Approved [ j See Letter to:Follow [ I Attached Number.4 6T'2"r-C 7 Ad e : '2-`0?- NiuS 1 l By: Date: Approved plans PRO46, shall be on job site. �5 ��G%NFF,5% cc 8 : 'E OFFICE COPY (y.: .A �,o OR N oab o °07e4iBER 1ti J4� FRNST MP CAW 1 EXPIRATION DATE: ka 3- k3 Sy Todd Maurer P.E. OR Lic No. PE 81862 Exp. 12/51/201+ )175 EDGEMONT RD LAKE OSWEGO,OR 97055 MBL(707)975-2410 tmaurer 62 @hotmail.com • TODD MAURER P.C.CIVIL A y 9/14/2013 L k .(7071,75-24PU wacecazie a�s r�.ssK W.�sw at sacs, DMD Soil & Site Conditions @ 12902 SW Hillside Terrace Tigard, OR 97223 I have completed a geotechnical survey with regards to development of new underpinning design for the above existing residential home repair. Specifically,The settlement we observed was on the rear East side of the structure, there is a thick concrete slab (porch) supporting two levels of exterior wood decks.The concrete slab has subsided causing deflection in decks above.The cause of the settlement is not known with certainty, but our opinion is differential settlement is the result soil consolidation caused by improper soil compaction at the time of construction,also the concrete slab was placed on grade and it should be 18" below grade per OSSC. Subsurface Conditions We found the conditions of the soil consistent with this area of Tigard, the native sub- grade soils consisted of medium stiff silty\clay\loam. See attached soils data from "Soil Survey". Recommendations We are of the opinion that suitable support for the existing exterior footing can be developed by means of the installation of new helical piers such as Ram Jack piling. We are of the opinion that vertical piers advanced to practical end bearing refusal will produce an maximum allowable vertical working load of 20,000 pounds. Refer to ICC- ES Report ESR-1854 4.2.1 for installation procedures. The underpinning piers should be installed in accordance with the manufactures recommendations. The locations & spacing of the piers will be completed under a separate cover. Underpinning Design The underpinning hydraulically driven piles shall be capable of achieving the embedment depths and capacity limitations presented: Bearing Material Silty Clay Loam Minimum Tip Embedment 15 ft below base of footing or approved by engineer Maximum Tip Embedment 30 ft below base of footing or as approved by engineer Pile Capacity(working load max) 20 kips per pier- (see structural plan for calculated working loads for the piers.) Proof Testing 9/14/2013 A minimum of one pier shall be load tested.The test must be based on the maximum design load. The load test(s) shall be performed by loading the pier in (5) equal increments of the design load to the maximum load of 150%. The helical pier movement with respect to an independent fixed reference. At 150% test the load shall be held for (10) minutes. If the pier movement between 1 and 10 minutes is less than 0.04 inches the pier is acceptable. If the pier moves more than 0.04 inches the pier should be deepened and retested or abandoned and a new redesigned replacement pier installed. Sincerely, Todd Maurer PE OR No 81862PE L° t CssF ) C o tv GY-terC t SAJArS 2 1 "MI ZA;C' 1'Y2-on ! = 44t'ti xt sea cg ti n = t4Abnl LA. ` °rn ''r- 3S t too t o .1"p i Kwo ("NI -f..1.1r pt.gm. \ , n0 Engineering Properties—Washington County,Oregon 12902 SW HILLSIDE TERRACE -. Report—Engineering Properties Absence of an entry indicates that the data were not estimated.The asterisk'"'denotes the representative texture; other possible textures follow the dash. Engineering Properties-Washington County,Oregon Map unit symbol and soil Depth USDA texture Classification Fragments Percentage passing sieve number— Liquid Plasticity name - limit Index Unified AASHTO >10 3.10 4 10 40 200 Inches inches In Pct Pct Pct 11C--Comellus and Kinton slit barns,7 to 12 percent slopes Cornelius 0-17 'Silt loam ML A-4 0 0 95-100 85-100 80-100 75-90 30-35 5-10 17-38 *Silty clay loam,Silt loam ML A-S 0 0 100 100 95-100 90-95 35-40 10-15 3840 'Slit loam,Silty clay loam ML A-4 0 0 100 100 95-100 90-95 30-35 5-10 Kklbn 0-1 *Slightly decomposed PT A-8 0 0 100 100 80-100 50-90 — — plant material 1-11 *Silt loam ML A-4,A-0 0 0 100 95-100 90-100 80-90 30-40 6-18 ' 11-31 *Slit loam ML A-4,A4 0 0 100 100 90-100 80-90 30-40 6.15 31.81 *Silt loam,Silty day loam ML A-4 0 0 100 100 95-100 85-95 30-35 5.10 Delena 0-10 'Slit loam ML A-4 .4 0 0 100 100 90-100 70-90 25-35 NP-10 10-22 'Silty day loam,Silt loam CL A-8 0 0 100 100 95-100 85-96 35-40 15-20 22-80 'Silty clay loam CL A-8 0 0 100 100 95-100 86.95 35-40 15-20 t� Natural Resources Web Soil Survey 9/12/2013 Conservation Service National Cooperative Soil Survey Page 3 of 4 , , . .. .... _a _, O -0i- -1 > SW HILLSIDE TERRACE H 4 Z * Ul — — 66 FT — — — - N p �- n co- o 0 I 0 I 70 rn I I I I I I 0 tn 0 20 I o I rn z n _ rn 0 (a1 I I 1 1 I I I I I I I I N=r rnC__ N (p N -0 O x �o I ° I -uc 0 rn 7-1> z zz �� o C7 rn� UAO c 73 ED v 0 G -o $ 0 g gig 1 g 'fi 9 4 rn — 5"�`°"'E"` MARTINEZ RESIDENCE ' , s K ° PLOT PLAN 5 (0 ck PROJECT SITE: CLIENT INFO: FOUNDATION REPAIR 313L(707)975-2410 1 2902 5W IiILL51DE TERRACE RAM JACK Of OREGON 3175 5WeGO,EDGEMONT O RD r �, LAKE OSWCGO,OR 97035 '� _ TIGARD OR 97223 850 8ETHEL DR tmwrer_62 @hoMwl.com `'- W = EUGENE OR 97402 i r P 1 HOUSE NOTES: • 1° 1 1. INSTALL PIERS & LEVEL CONCRETE AS REQUIRED ., 2. TEMPORARY SUPPORT EXIST DECK (LEVEL IF E> REQUIRED) JUNKS 12/31/14 L 3. INSTALL NEW POST BASES & REUSE WOOD N • HELICAL PIER (3) WORKING LOADS FOR PIERS: Qw= 13.3 kips COLUMNS o. 4. ! OF COURSE REMOVE TEMPS 9 m N 02 0 N u' M,S, pAu CONCRETE PORCH (SLAB) --- 2FT THICK 9 6' T DECKS WI (3) T 4 U-- NEW POST BASE EPB44T III W (I) (2) PLACE PIERS IN LINE WITH COLUMNS TYP U —2'-0° Z 24'-6" / W ' PIER PLACEMENT PLAN ( I; SCALE.3/4•= i-p 4 W DC PROOF TESTING: CZ LOAD TEST 20% OF THE PIERS, MINIMUM OF ONE, N o m ARE TO BE PROOF TESTED. THE PROOF TESTING HELICAL PIER 2-3/8"0 W a a SHALL CONSIST OF LOADING THE PIER IN 5 EQUAL Z w INCREMENTS TO 150% OF THE DESIGN LOAD. THE BRACKET #4035 (MOD.) = m 150% LOAD SHALL BE HELD FOR 10 MINUTES. IF �- GUIDE SLEEVE #41 07 o THE TEST PIER HAS MOVEMENT BETWEEN (1) MINUTE CZ v a AND (10) MINUTES IS LESS THAN 0.040 INCHES THE II 5FT EXTENSIONS #43 15 Q o o < SHOP WELD I/2"PL 4"x4"ONTO BRACKET PIER IS ACCEPTABLE. IF THE PIER MOVEMENT IS - HELICAL LEAD 10" #4342 od N CD MORE THAN 0.040 INCHES THE PIER SHOULD BE DEEPENED AND RETESTED OR ABANDONED, AND A NEW REDESIGNED REPLACEMENT PIER INSTALLED. cZ IP Q rr TYPICAL PIER SECTION w SCALE ∎'z I'D' Z � W z p � H O Z n U HELICAL PIER: L D CZ N THE PIER INSTALLATION CONTRACTOR IS RESPONSIBLE O FOR DETERMINING THE REQUIRED TORQUE TO ACHIEVE V- iFt THE CAPACITY LISTED ON THIS DRAWING. JOB N 13-69 DRAWN C7ECKED TEM KM DA'E 9/1 4/1 3 • BRACKET MODIFICATION DETAIL BRACKET#4035 REVL LONS SCALE:3'-r-0. 0 ,p.K I II 9,-42 Steel. PERMIT SET 52 . 2