Plans 4k"---
1
METHOD OF ATTACHMENT
FOR FASCIA SIGN CABINET
3/16" Iron Profiles
'/%" Lag Bolts �4` tOc,
W'Lag Shield
1//////IUD.►
Fascia
Building Sign ----►
CMU
; '/z"Lag Shield
/
CITYA O/F TIGARD
I riaumo' ; MID Approved
ct--1
Conditionally Approved [ ]
See Letter to: Follow [ ]
• t
Permit Numbcr�� � "� 1*
%/z" Lag Bolts Address: 2- ,O► / W ,1
4 oc."
By: Date:
2
Approved plans
shall be on job site.
OFFICE COPY
Y
•
5, GARRCTT SIGN
811 HARNEY STREET VANCOUVER WASHINGTON 98660•(3601 603.9081.(8001994.1181•FAX(360)8939948
WWW. GAPPSTTSIGN . COM
■ _