Loading...
Correspondence PWU ENGINEERING INC. MST. , •2611-3 °C"/ Ph: (503) 810-8309 Email: nwuenaineerina a( comcast.net Field Memo Fix: Job #: MC13134 natA- 1 iI fl/la Client: Fowler Home Design, Timberland Homes Project: Lot 4 Troy Park. Tiaard. OR Dear Steve, Dennis; With reaards to the area on the riaht side of the aaraae . As Der our conversation with Dennis, drypack was installed at fix for chipped out concrete. Concrete was levelled first prior to drypack and added P.T. plate was added and clipped to the wall olate above with an A35. Blockina around the ooenina was added and floor sheathing reattached. Dennis the contractor has assured not gaps or air pockets so that beams on both sides of the wall are properly bearing. At this time the issue aooears resolved. Sincerely, PROpt �GINFc�% I cc r Y22 \ � Expires:06/30/2014