Plans (j S c1-' i,(1 .5 • /o( /1 Z c/z) 2 C0 Z
� U �� o13-
p RECEIVED
CE COP IP
EXHIBIT D OCT 2 8 2013
Washington Square CITY OF TIGARD
Li 0 �
rn
Q BUIL DING DIVISION
til 18 2 3 3
x CO Z Cn
05 9 a
W@iii t 1 4 r •ainYiarJrzT213 ! f• •
TWIN a3 1 ,, J ;
KQ * ' I ' '
ll illgrimi B . . - LiNi---
nu -4.. 111 ago
Milt'
w 7
- * • ;274:12gaz Lino
umiallIS ... .
WW RI I .
IiMiiiii; ;,
C. .212. MdIIIII:9 y i d lili15 1
a 0 - sualuuo
$!A t
4 1 t: I A El
IP"
Ea Premises
in l (not to scale)
I SII
l al nie
s
211,837 sr
Page 15 of 18
■ .
WACERICH
•
WASHINGTON
Y12 SQUARE
400 S.F.
•
•
LEASE LINE Y12
S.F.: 400
DATE: 10.24.13
SCALE: 1"= 10'
•
i7
0
Z
KEY PLAN
NORTH
PROPOSED
SPACE
NOTE: Required doors and frames shall
be provided and installed by each tenant (any
J01 doors shown in plans are suggested only.
M AC Y' C V final determination tr by tenant). It s required
that the tenant, t, contrector, r, architect or
representative must visit the site and
famrlianze and verify all dimensions and
sizes of major items such as structural
elements, electrical runs, plumbing locations
and items not covered by this drawing. This
shall be done at Tenant's expense. When
exit passageways are present to provide a
secondary exit from a Tenant's space, doors
shall be one -hour fire doors. Such doors
shall be self-closing and be so maintained or
shall be automatic dosing by smoke detector
actuation. Pnor to finalizing terns and
❑ conditions, Leasing and Center Management
must resolve exiting per applicable codes.
J02 J02 Service area, empty electrical conduit,
sewer, water, and empty telephone conduit
located within the lease line. Tenant must
‘1144 field verify all dimensions and conditions.
Drawn by. MR T.C.: AP
NINTENDO
2013 HOLIDAY MALL EXPERIENCE 4 _,11. _
FINAL ENVIRONMENT RENDERINGS
It - , . ti-ialii. - ' .
0
s i _ 11,11
ZU
1 I
, : gli ' : 4i!
r
r
:11- I g - «
.1111 JC
I MICTGINC
NINTENDO
2013 HOLIDAY MALL EXPERIENCE
FINAL ENVIRONMENT RENDERINGS
1 1,4
F w
I .
f. } \
( r
411r4
MKTGINC
NINTENDO
2013 HOLIDAY MALL EXPERIENCE
STRUCTURE DIMENSIONS & MATERIALS
30 weari.
� w 1 s
BASE: GURU TABLE
LIVE DEMO STATION 60 "W X 34 "H Wii U KISOK
72 "W X 84 "H PLYWOOD STRUCTURE WITH HIGH PRESSURE 30 "W X 60 "H
PLYWOOD STRUCTURE WITH HIGH PRESSURE LAMINATE SURROUND BUILT OUT WITH METAL FRAMING, HPL AND
LAMINATE SURROUND TOP: RETAIL DISPLAY CASE ELECTRICAL WIRING
42 "W X 35 "H
ACRYLIC STRUCTURE
MKTGINC I 3
1
•
NINTENDO
2013 HOLIDAY MALL EXPERIENCE
16.
STRUCTURE DIMENSIONS & MATERIALS
a
O Wl+'
•
PRIZE WHEEL BASE PRIZE WHEEL WITH CANOPY
32 "H X 44 "W OVERALL 8'6' TO THE HIGHEST POINT
LAMINATE WITH VINYL GRAPHIC OVERLAY 7'8" AT THE WIDEST POINT
LAMINATE WITH VINYL GRAPHIC OVERLAY
FLAME RETARDENT MESH TOP
MKTGINC I 4