December II, 2013
Mike Bricker
Design and Construction
Darden Restaurants, Inc.
1000 Darden Center Drive
Orlando, Florida 32837
Subject: Final Summary Report
10330 SW Greenburg Road, Tigard, Oregon
PSI Report No. 07021186-28 Complete Final Letter
Dear Mr. Bricker:
Professional Service Industries, Inc. (PSI) is writing this letter to document that, in accordance with Section
1704.1.2 of the State Building Code representatives from our firm performed special inspection during construction
for the following project:
Permit No: BUP2013 -0184
Project Address: 10330 SW Greenburg Road, Tigard, Oregon
Project Description: Red Lobster #457
Our project files indicate that PSI special inspection activities listed below were conducted as scheduled from
August 27, 2013 through October 17, 2013. This letter represents a summary of work observed and reported by PSI
representatives and the resolution of any documented noncompliance.
• Compaction of Fill Material
• Structural Steel: Shop Fabrication and Field Welding
♦ Adhesive Anchors
• Reinforced Concrete
To the best of our knowledge, the periodic special inspections referenced herein were performed by our firm in general
accordance with the requirements, approved plans and specifications, provided change orders that impacted plans
and/or specifications, and applicable workmanship provisions of the State Building Code and Standards.
If you have any questions or we can be of further assistance, please do not hesitate to call.
Sincerely,
Professional Service Industries, Inc. Ar"—PL-N
J ohn Eak edhanie Tecle, P.E.
Project Manager Department Manager
PSI Construction Services Department PSI Construction Services Department
Professional Service Industries, Inc. • 6032 N. Cutter Circle, #480 • Portland, OR 97217 • Phone 5031289.1778 • Fax 503/289 -1918 • CCB #176269
//�'�''''''c'''''''•'''� Information
1tII�'"'— .To Build On
Engm«dng • Consulting • 7bating
December 11, 2011
Mike Bricker
Design and Construction
Darden Restaurants, Inc.
1000 Darden Center Drive
Orlando, Florida 32837
Subject: Final Summary Report
10330 SW Greenburg Road, Tigard, Oregon
PSI Report No. 07021186-28 PARTIAL FINAL SUMMARY LETTER
Dear Mr. Bricker:
Professional Service Industries, Inc. (PSI) is writing this letter to document that, in accordance with Section
1704.1.2 of the State Building Code representatives from our firm performed special inspection during construction
for the following project:
Permit No: BUP2013.0184
Project Address: 10330 SW Greenburg Road, Tigard, Oregon
Project Description: Red Lobster #457
Our project files indicate that PSI special inspection activities listed below were conducted as scheduled from
August 27, 2013 through October 17, 2013. This letter represents a summary of work observed and reported by PSI
representatives and the resolution of any documented noncompliance.
♦ Compaction of Fill Material
♦ Structural Steel: Shop Fabrication and Field Welding
♦ Adhesive Anchors
• Reinforced Concrete*
(With the exception of the concrete placed for the continuous footing and pier column
footing at approximately gridlines 5-6 /south of A -line, and the two front columns and
trash enclosure slab -on -grade. Waiting on Engineer of Record's approval of the mix
placed.)
To the best of our knowledge, the periodic special inspections referenced herein were performed by our firm in general
accordance with the requirements, approved plans and specifications, provided change orders that impacted plans
and/or specifications, and applicable workmanship provisions of the State Building Code and Standards.
If you have any questions or we can be of further assistance, please do not hesitate to call.
Sincerely,
Professional Service Industries, Inc.
John Eakman
Medhan c Tec P.E.
Project Manager Department Manager
PSI Construction Services Department PSI Construction Services Department