Report 1 -Lt70 stiv I�7-' A Ve_
.,,II, 7409 SW Tech Center Dr,Ste.145
�+ Tigard,OR 97223
""" Ph:503-443-3799 Fax:503-620-2748
rrSTIA..SAC
nIL
503.443.3799 Special Inspection p p S1 7ol3- ZZ
Final Report
• Date: Job# 13-4451-S00
Permit#PROJECT#92022
Mail To: Project:
CITY OF TIGARD ACK PARK IMPROVEMENT PHASE I
13125 SW HALL BLVD. ON 128TH NORTH OF MARIE CT
TIGARD,OR 97223 TIGARD,OR 97223
PO#P130078
To Whom It May Concern:
ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or
Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed
For the following:
Steel Construction
Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf
of ACS that work was performed to the best of my knowledge, in accordance with approved plans,
specifications,and the applicable codes and standards for the jurisdiction.
Approved by:
I pr -
Bob Brown/President
BB/sa
CIA
Proud to be Nationally Accredited by International Accrediting Service
ACCREDITED
•
Bend Office (541)330-9155
• GeotechnicalOflice (503)601-6250
Carlson Testing Inc. Eugene Office (541)345-0289
�} Salem Office (503)589-1252 •
Tigard Office (503)684-3460
Special Inspection
FINAL SUMMARY LETTER . •
Date: November 19,2013
• Job#: T1309039
City.of Tigard
13125 SW Hall Blvd
Tigard,OR 97223-8199
Attn: Building Division
Re: Project Name: Jack Park Improvements Pedestrian Bridge(Phase 1)
Address: Various Locations-Tigard,OR
Permit#: SIT2013-00022
Per Chapter 17,Section 1704.1.2 ofthe International Building Code(IBC),we have performed special inspection of the following
item(s)per our inspection reports only:
Reinforced Concrete
Adhesive Anchors
All requested inspections;and tests were performed and reported according to the requirements of project documents and to the best of
our knowledge; the work was in conformance with the approved.plans and specifications, approved change orders and applicable
workmanship, provisions,of the State Building Code and Standards;.as':wiell as the structural engineer's design changes,approvals and
verballnetructions: ' , •
-Our''construction inspection and testing services were provided and intended to help reduce.the risk of construction defects,
deficiencies or omissions that arose during and:after construction. Our services do not constitute a:warranty or guarantee of any type.
Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may
exist. It is the contractor's responsibility to perforrn"their-work in accordance with the approved construction documents. -
CTI has provided its professional=services with the degree of care andskill currently exercised under similar circumstancesby members
of its profession in the same locale. Statements made in our reports are,based on technical judgments and-should not be construed to
be conclusive representations of fact. Our reports pertain to the meteriaftestedAnspectedyon/y.
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods,
techniques,sequences or-procedures ofthe construction or evaluating or reporting job conditions related to health,safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further
questions regarding this matter please do not hesitate to contact this office.
Respectfully,submitted,
CARLS a T' STI IN
Neil Shannon
Project`Manager •
NS/vp
cc: City Of Tigard Engineering Dept—Kim Mcillan kiri tgard-or.gov
. ,City.Of Tigard Engineering Dept—Zen Dutson zenOtigard-or.gov
KPFF=-Stuart:Finney stuart.fi nney@kpff.corn
Laura Herbon Landscape.Architect LLC—Laura Herbon
Conservation Technix Inc-Steve Duh • steveOconseriiationtechnix.corn
City of Tigard.Engineering Dept--Kenny Fischer Kenny@tigard-or.gov
Green Thumb Landscaping(Salem)—Stephanie Wiltsey, stephaniesyttminc.com
P:\Projects\Final Letter Forms\New Final Letter TempiateslCity of Tigard.doo, Updated 11/30/11
•
•
•
•
•