Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2013-00283 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 11/27/2013 Parcel: 25101 DA00102 Jurisdiction: Tigard Site address: 13221 SW 68TH PKWY 410 Project: NWCUA Subdivision: VARNS ACRES Lot: 9 Project Description: TI for existing tenant on fourth and fifth floor. Contractor: PACIFIC CREST STRUCTURES INC Owner: GK TRIANGLE CORPORATE PARK III L 17750 SW UPPER BOONES FERRY RD SUITE BY THOMSON REUTERS INC 190 ATTN:MEGAN DOWLING DURHAM,OR 97224 PO BOX 130174 CARLSBAD,CA 92013 PHONE: 503-968-8949 PHONE: FAX: 503-598-6658 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: MB Permit Fee-Additions,Alterations, 11/27/2013 $1,105.95 Demolition Occupancy Grp: B Occupancy Load: 33 Plan Review 11/18/2013 $718.87 Dwelling Units: 0 Plan Review-Fire Life Safety 11/18/2013 $442.38 Stories: 0 Height: 0 ft 12%State Surcharge-Building 11/27/2013 $132.71 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 11/27/2013 $10.00 Value: $100,000 11x17) Metro Const.Excise Tax-Commercial 11/27/2013 $120.00 Use Floor Areas: DC Provision Review,COM TI-PIng 11/27/2013 $174.00 DC Provision Review,COM TI-LRP 11/27/2013 $26.00 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,729.91 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors: Yes Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in ac • •- .= 'th approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. AT -'TION: Oregon -w requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-00 -0010 through OAR 952-0,‘ 1::0: You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344, Is-ued By: �II Permittee Signature: /lc au6ack Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the Job site at the time of each Inspection. ii,, ding Permit Application ii 4f 'Commercial FOR OFFICE USE ONLY Received City of Tigard ` '\� Date/B : ( f Permit No.. / ,( p _.,. L ° 13125 SW Hall Blvd.,Tigard,OR _r �. Plan Review( 'ran Phone: 503.718.2439 Fax: 503.59x1"..c' �r ii Other Permit: Inspection Line: 503.639.4175 w\0�� ('���Q \ DateB : t�/�� 1( ,� T I G A R D v ( .(\G \O Date Ready :y: ® See Page 2 for Internet: www.tigard-or.gov V' `e�l�\�� Notified/Method: I I Lis Supplemental Information TYPE OF WORK REQUIRED Vim'C.v``1 Spv ., �'QUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling • ®Commercial/industrial Valuation: $ ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:13221 SW 68th Pkwy New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:410 -Project name:-NWCUA-TI Covered porch area: square feet • - Cross street/directions to job site:SW 68th Pkwy and SW 66th Ave Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision:2S101DA Lot no.:102 Permit fees*are based on the value of the work performed. Tax map/parcel no.:R2064147 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Interior TI for a tenant on the 4th of 5 floors.Includes demolition,new doors, Valuation: $$100,000.00 relites,and cabinetry. Existing building area: 3,214 square feet New building area: 3,214 square feet ® PROPERTY OWNER ® TENANT Number of stories: 5 Name:CBRE Type of construction: I-B Address: 1300 SW 5th Avenue,Ste 3000 Occupancy groups: City/State/ZIP:Portland,OR 97201 Existing: B Phone:(503)221-4836 Fax:( ) New: B ® APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name:Mackenzie Structural plan review fee(or deposit): Contact name:Lindsey Carpenter Address: 1515 SE Water Ave Ste 100 FLS plan review fee(if applicable): 443 City/State/ZIP:Portland,OR 97214 Total fees due upon application: $1,161 Phone:(503)224-9560 Fax::( ) Amount received: Si//4, 015— E-mail:lcarpenter@mcknze.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: II . -r ����' . Submit two(2)sets of roof plan with connection details / ' and fire department access,along with the 2010 Oregon Address: I �7 S(] 0, f r:t$v%�A Jul ` `9 Solar Installation Specialty Code checklist. City/State/ZIP:���Qwt„, 0� 9 7 Permit fee(includes plan review $180.00 I and administrative fees): Phone:(5(,3) 9/,4 -- Q y q9 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lie.: 64,9, S it f4// Total fee due upon application: $201.60 4' di Authorized signature: 0 0/› ,� ` This permit application expires if a permit is not obtained ' within 180 days after it has been accepted as complete. Print name:Lindsey Carpenter �J Date:11/19/13 Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) . • Building Division Accessibility: Barrier Removal Improvement Plan • TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 100,000 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 25,000 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ • (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: .$ TOTAL(shall equal line [2] of Valuation Computation): $ 1:\Building\Permits\BUP-COM PcrmitApp.doc 03/03/2011 • Building Division Development Code Provision Review TIGARD Commercial Projects - No Associated Land Use Case Building Permit No: 6.1/ O/3--00a?? ❑ Expedited Review Project Name: /V/L,J C it Site Address: /3aa-1 s 6,51> pkwy , Suite/Bldg #: Plans Routed: Original Plan Submittal Date: //1,0 Routed By: 3 1st Revision Submittal Date: Routed By: 2nd Revision Submittal Date: Routed By: To the Applicant: ➢ If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718-2439. ➢ If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. Staff: please check items along left only if approved. a142-, Planning Review (contact )f>�r at (503) 718- or _ __@tigard or.gov) Proposal: 'olio ise-- 717 %o rift". ee we. Zoning 4U/•_ —/ Permitted Use Yes Ld' No ❑ Land Use Required: Yes ❑ No Notes: Approved ❑ Not*Ire Ap roved ❑ DCPR Not Required–No DCPR Fees Due Date Routed to Building: I:\CURPLN\Masters\Development Code Provision Revie \DCPR_COM_NoLandUse.doc Rev.01/16/13 Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 13221 SW 68TH PKWY 410, TIGARD, OR, 97223 Commercial - Building 299 Final inspection 2014-01-31 00:00:00 BUP2013-00283 PASS - C of O Violation Summary: Inspector Contractor