Loading...
Permit n CITY OF TIGARD ELECTRICAL PERMIT 111111 ID COMMUNITY DEVELOPMENT Permit#: ELC2013 00690 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 11/19/2013 Parcel: 1 S134CC00600 Jurisdiction: Tigard Site address: 12175 SW MERESTONE CT Project: Blazer Subdivision: MERESTONE Lot: 5 Project Description: (5)branch circuits for misc items,220 in garage,landscape lighting,misc plugs and lights Contractor: OWNER Owner: BLAZER,JENNA STAR JENNA BLAZER 12175 SW MERESTONE CT 12175 SW MERESTONE CT TIGARD,OR 97223 TIGARD, OR 97223 PHONE: 503-701-6973 PHONE: 503-701-6973 FAX: FEES Quantity Description Date Amount 5 crt Branch Circuits wo/Purchase 11/19/2013 $85.86 Specifics: Service or Feeder 1 ea 12%State Surcharge- 11/19/2013 $10.30 Type of Use: SF Electrical Class of Work: ALT Type of Const: Occupancy Grp: Total $96.16 Required Items and Reports(Conditions) This permit is ' ed su•I- to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done ' accordance with ap• •ved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. TENTION: Oregon law =:•fires •ou to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR •952- 1-0010 through OAR 952-00 '090. yo obtain a copy of the rules or direct questions to OUNC by calling 503.232. or 1.800.332.2344. Is ued By: .� 1it�1i`I .`1 Permittee Signature: /` OWNER INSTALLATION ONLY The installation is being made on property I ich is not intended for sale,lease nt. OWNER'S SIGNATURE t ■ Date: /�X 94 CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR.ELEC' Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the Job site until completion of the project. Approved plans are required on the job site at the time of each Inspection. Electrical Permit Applicat' FOR:OFFICEUSE-ONLY- -- -CI of Ti and Received / PermitNo.:`J g DateB :13125 SW Hall Blvd.,Tigard0 J ' CEVED 9 Plan Review i p Phone: 503.718.2439 Fax: 503.598. n Date/By: Other Permit: Inspection Line: 503.639.4175 � 2013 Date Ready/By: Judo: El See Page 2 for I l c'A h U Internet: www.tigard-or.gov Notified/Method: Supplemental Information F TIGARD TYPE 0 ^DIVISION PLAN REVIEW • • ❑New construction Addition/a t r on/replacement [� Please check all that apply(submit 2 sets of plans w/items checked below): ❑Service or feeder 400 amps or more ❑Building over three stories. ❑Demolition ❑Other: where the available fault current ❑Marinas and boatyards. CATEGORY OF CONSTRUCTION exceeds 10,000 amps at 150 volts or ❑Floating buildings. less to ground,or exceeds 14,000 ❑Commercial-use agricultural ❑ i-and 2-family dwelling ❑Commercial/industrial ❑Accessory building amps for all other installations. buildings. ❑Multi-family ❑Master builder ❑Other: ❑Fire pump. ❑Installation of 150 KVA or -JOB SITE.INFORMATION AND LOCATION ❑Emergency system. larger separately derived system. ❑Addition of new motor load of ❑"A","E","1-2","1-3", Job no.: I Job site address: (� IOOHP or more. occupancy. 2' 5 W Val eve S Q Ovs'e d- 0 Six or more residential units. ❑Recreational vehicle parks. City/State/ZIP: p ❑Health-care facilities. ❑Supply voltage for more than Jq ✓a (b r— 91 ZZ 3 ❑Hazardous locations. 600 volts nominal. Suite/bldg./apt.no.: I Project name: ❑Service or feeder 600 amps or more. • FEE,SCHEDULE Cross street/directions to job site: \ 2 \ t-,„....,A y , cA, C\•- Description I Qty. I Fee. I Total I • New residential single-or multi-family dwelling unit. Includes attached garage. Subdivision: Lot no.: 1,000 sq.ft.or less 168.54 4 Ea.add'I 500 sq.ft.or portion 33.92 1 Tax map/parcel no.: Limited energy,residential 75.00 2 ' DESCRIPTION OF WORK plc/ hoc,/Se / (3 ki (with above sq.ft.) . / �./ p� 41--..' Limited energy,multi-family 75.00 2 �d 01 C I`r G Li. r A✓ p e,..1�G1'Op✓ (v,mac, e /t S residential(with above sq.ft.) �` t Renewable Energy I ❑ See Page 2 14 n/fr,c ,�p.✓ �k/ Add e G-r�4- 7''0 r- 2.20 /r1 Services or feeders installation,alteration,and/or relocation f arct .-e 200 amps or less 100.70 2 P OPERTY OWNER I ❑ TENANT 9 S 201 amps to 400 amps 133.56 2 Name:j.e Y) fl r -Z\ ,(-- V `` 401 amps to 600 amps 200.34 2 Address: 1 Z\ , S� G✓T 601 amps to 1,000 amps 301.04 2 5 5w �z�� Over 1,000 amps or volts 552.26 2 City/State/ZIP: --C' 1 rj T1�, Z-2-3 Temporary services or feeders installation,alteration,and/or Phone:(53 ) "7 1 - (7c7 3 Fax:( ) relocation 200 amps or less 59.36 1 Owner installation:This installation is being made on property that I own which is not 201 amps to 400 amps 125.08 2 intended for sale,leas- •r exchange,according to ORS 447,449,670,((and 7 401 amps to 599 amps 168.54 2—- Owner signature: Date: 1 - 3 Branch circuits-new,alteration,or extension,per panel • ❑ AP' •NT' . I ❑ CONTACT PERSON A.Fee for branch circuits with above service or feeder fee, 7.42 2 Business name: each branch circuit B.Fee for branch circuits without 1 /_ Contact name: service or feeder fee,first 56.18 5W' U 2 branch circuit Address: Each add'I branch circuit '"1" 7.42 2 City/Blatt/ZIP: Miscellaneous(service or feeder not included) Each manufactured or modular 67.84 2 Phone:( ) I Fax: :( ) dwelling,service and/or feeder Reconnect only 67.84 2 E-mail: Pump or irrigation circle 67.84 2 CONTRACTOR .. ' Sign or outline lighting 67.84 2 Business name: "-- (D(r) Al)e 2 -- Signal circuit(s)or limited-energy See panel,alteration,or extension. Page 2 2 Address: Each additional inspection over allowable in any of the above City/State/ZIP: Additional inspection(I hr min) 66.25/hr Investigation(I hr min) 66.25/hr Phone:( ) I Fax:( ) Industrial plant(1 hr min) 78.18/hr , Inspections for which no fee is CCB Lie.: I Electrical Lie.: I Suprv.Lie.: specifically hr fically listed(%1 hr min) ELECTRICAL',PERMIT FEES Suprv.Electrician signature,required: Subtotal: g; ' "a Print name: Date: Plan review(25%of permit fee): State surcharge(12%of permit fee): Q• Authorized signature: TOTAL PERMIT FEE: �b e /4 This permit application expires if a permit is not obtained within 180 Print name: Date: days after it has been accepted as complete. • Number of inspections allowed per permit. I:'Building\Permits\ELC_PermitApp_ELR_ERE.doc Rev 05/21/2013 440-4615T(11/05/COM/WEB Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: RESIDENTIAL WORK ONLY: FEE SCHEDULE Fee for all residential systems combined ... $75.00 Description I Qty. I Fee I Total I • Renewable electrical energy systems: Check Type of Work Involved: 5 kva or less 100.70 2 5.01 to 15 kva 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 ❑ Burglar Alarm Wind generation systems in excess of 25 kva: 25.01 to 50 kva 301.04 2 El Garage Door Opener* 50.01 to 100 kva 552.26 2 >100 kva(fee in accordance with 552.26 2 ❑ Heating, Ventilation and Air Conditioning • OAR918-309-0040) System* Solar generation systems in excess of 25 kva: Each additional kva over 25 7.42 3 ❑ Vacuum Systems* >100 kva—no additional charge 0.0 3 ❑ Each additional inspection over allowable in any of the above: Other: Each additional inspection is charged at an hourly(1 hr min) 66.25/hr 1 Inspections for which no fee is 90.00/hr specifically listed(/2 hr min) COMMERCIAL WORK ONLY: ELECTRICAL PERMIT FEES Fee for each commercial system $75.00 Subtotal: (SEE OAR 918-309-0000) Plan review,if required(25%of permit fee): State surcharge(12%of permit fee): Check Type of Work Involved: TOTAL PERMIT FEE: This permit application expires if a permit is not obtained within 180 ElAudio and Stereo Systems days after it has been accepted as complete. Number of inspections allowed per permit. El Boiler Controls • El Clock Systems El Data Telecommunication Installation El Fire Alarm Installation ❑ HVAC El Instrumentation El Intercom and Paging Systems El Landscape Irrigation Control* ❑ Medical El Nurse Calls El Outdoor Landscape Lighting* El Protective Signaling ❑ Other Total number of commercial systems: *No licenses are required. Licenses are required for all other installations t:\Buiiding\Permhs\ELC_Penni Wpp_ELR_ERE.doc Rev 05/21/2013