Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ROW2009-00031
1 w4.;:1:::>•.' .CITY OF TIGARD RIGHT OF WAY PERMIT Oh`E Permit 11: ROW2009-00031 i I ••• COMMUNITY DEVELOPMENT :TIGARD 13125 SW HaII Blvd.,Tigard OR 97223 603.639.4171 Date Issued: 04/16/2009 Parcel: SEG1670 '' Jurisdiction: Site address: Subdivision: Lot: Project: TN Telecom Project Description: New TW Telecom Pole placement on south side of-SW Bonita Rd.approx-110'east of SW . Sequoia Pkwy between PGE pole#65 to the west and PGE Pole#1093 to the east FEES Owner: Description Date Amount PHONE: • Contractor: I • PHONE: FAX: Applicant: • TW TELECOM 520 SW SIXTH AVE.,STE 400 PORTLAND,OR 97204 • 1 503-416-1546 . • • Total $0.00 r Please sign below to Indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact Information of responsible parties before beginning work. i t Signature: pllcant !,/ I t/ ' `v/J Signature: ��� ,ll (..O /Vr Jt~, 1 issued By: /i���j ) /./... Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY : i 1 L CITY OF TIGARD RECEIPT i q ii.,. H 13125 SW Hall Blvd.,Tigard'OR 97223 5031639.4:171 TIGARD, • Receipt Number: 173277 - 04/20/2009 CASE NO ,FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID R0W2009-00031 ROW'Permit'Fee 100-0000-436000 $300.00 Total: $300.00 PAYMENT METHOD CHECK# CC AUTH.CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT Check • 001493 KPEERMAN .04/20/2009, $300,00• Paour° Commstructure Consulting LLC Totals Payments:. $300.00 Balance Due: $0.00 • Page 1 of 1 CITY OF TIGARD RIGHT OF WAY PERMIT 11111 ' _ COMMUNITY DEVELOPMENT Permit#: ROW2009-00031 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.639.4171 Date Issued: 04/16/2009 Parcel: SEG1870 Jurisdiction: Site address: Subdivision: Lot: Project: TIN Telecom Project Description: New TW Telecom Pole placement on south side of SW Bonita Rd. approx-110'east of SW Sequoia Pkwy between PGE pole#65 to the west and PGE Pole#1093 to the east Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX: Applicant: 1W TELECOM 520 SW SIXTH AVE., STE 400 PORTLAND,OR 97204 503-416-1546 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: Issued By: • / I Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for ROW2009-00031 Type: Condition Name: Status: Severity: ROW Maintaining traffic Flow Applied Notice Work shall not disturb traffic flow on any Arterial(such as 72nd Avenue)or Collector(such as Bonita Road and Sequoia Parkway)between 7:00 and 9:00am nor from 3:00 to 6:00pm. Applicant shall'not close any lanes of traffic without first obtaining City approval of a site-specific traffic control plan for that specific work area. ROW 01-CUSTOM CONDITION Applied Notice <Custom Condition goes here> ROW 02-PERMIT&PLAN REQ ON SITE Applied Notice A copy of the permit and all attachments,and a copy of the approved construction plan and all amendments shall be available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's Standards and Specifications and to these General Conditions.Changes to any of the aforesaid must be approved by the City, in advance of work performance. ROW 03-TRAF CTRL-SPECIF(CITY) Applied Notice The City's standard specification for traffic control is"Manual on Uniform Traffic Control Devices for Streets and Highways", U.S. Dept.of Transportation, F.H.A., 1988 Ed. ROW 04-TRAF CTRL-CONTR RESPON FOR Applied Notice Traffic control shall be provided for by the contractor in accordance with the City's standard specification and,also,in accordance with a City(job specific)approved traffic control plan.A copy of the approved traffic control plan shall be available at the work area. ROW 05-TRAF CTRL-ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without having first obtained written approval from the City Engineer. The permit holder is responsible for provision of timely notification of traffic flow disruptions to area wide Emergency Services (Tigard Police Dept.,Tualatin Fire&Rescue)and to Tri-Met and Tigard School District. ROW 06-TRAF CTRL-ADVANCE WARNING Applied Notice Advance warning of imminent traffic disruption shall be provided to the general motoring public by placement of an advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. ROW 07-TRAF CTRL-PRIV PROP ACCESS Applied Notice Access to existing properties shall be maintained at all times,including normal delivery service and mail service and if not, shall be cause for work stoppage until effective access is established. ROW 08-TRAF CTRL-DEVICES IN PLACE Applied Notice Traffic control devices, flagpersons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. ROW 09-TRAF/NOISE CTRL-WORK HRS Applied Notice No work will be permitted during the hours of darkness, nor between 9:00 p.m.to 7:00 a.m.Monday through Friday, nor between 9:00 p.m.to 8:00 a.m.Saturday, nor between 9:00 p.m.to 9:00 a.m.Sunday. ROW 10-TRAF CTRL-MIN LANE WIDTH Applied Notice Minimum travel lane width shall be eleven(11)feet;pedestrian travel shall also be provided for. ROW 11-TRAF CTRL-CITY CAN MODIFY Applied Notice The City reserves the right to add to or modify traffic control requirements as may be necessary to effectively control traffic and to assure public safety. ROW 12-INSP 24 HR NOTICE REQUIRED Applied The permit holder or his contractor shall notify the City's inspector Mike White,at 503-718-2464 or email at mikew @tigard-or.gov, twenty-four(24)hours prior to commencing work,twenty-four(24)hours prior to any staged inspection, and after completing work covered by the permit. ROW 13-HAZARDS-CERT OF INS Applied Notice Maintenance of the work area and approach roads is the responsibility of the permit holder.The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards.A copy of the permit holders Certificate of Insurance shall be available at the work area. ROW 14-DEBRIS-MATERIALS Applied Notice The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit.The City may at any time order immediate cleanup and stoppage of work to accomplish cleanup. ROW 15-EROSION CTRL REQ Applied Notice Effective erosion control is required. Erosion control devices must be installed and maintained meeting D.E.Q.requirements. The City may at any time order corrective action and stoppage of work to accomplish effective erosion control. ROW 16-REPAIRS-LIKE MATERIALS REQ Applied Notice Property disturbed by construction activity shall be seeded with a standard grass mix;shrubs,flowers,barkdust,existing signs,pavement markings,mailboxes,etc.,shall be reestablished,reinstalled or replaced,with like kind and material. ROW 17-DRAINAGE CONTROL REQ Applied Notice Effective drainage control is required. Drainage shall be controlled within the work site and shall be so routed that adjacent private property,public property and the receiving system is not adversely impacted.The City may,at any time,order corrective action and stoppage of work to accomplish effective drainage control. ROW 18-UTILITIES PRELOCATION REQ Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0010 through OAR 952-001-0080.Copies of the rules may be obtained from the Center by calling(503)232-1987.If you have questions about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holders expense. ROW 19-UTILITY LOCATIONAL CONFLICT Applied Notice Contractor must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary,it shall be done at the permit holders expense.Changes must be approved by the City in advance of work performance.Contractor shall coordinate the work with affected utility agencies. ROW 20-TRENCH-PATCH/SAFETY/LBILITY Applied Notice A temporary hard-surface patch(Cold mix A.C.or Hot mix A.C.base paving) shall be placed on trenches within roadways at the end of each day's work. No trench,on site or off site,shall be left at any time in an unsafe condition.The permit holder is responsible for and is liable for hazards or damage resulting from the work. ROW 21-REPAIRS REQ-INSPTR OPINION Applied Notice Work provided for under the permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary,in the City Inspectors opinion,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.Corrective work shall be done at the permit holders expense. ROW 22-AS-BUILT/ENGR CERTIF REQ Applied Notice At the end of each year,or an a mutually agreeable yearly date,any entity making changes to its facilities in the public right-of-way shall submit complete"as-built"drawings showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineers certification of installation compliance(form attached). ROW 23-DAILY INSP REPORTS REQ Applied Notice The permit holders Engineer/Inspector shall submit daily inspection reports,on a weekly basis,to the City's Inspector.(see Developer-Engineer Agreement note#5). ROW 24-TESTS/REPTS TO VALIDT CLMS Applied Notice The City's Inspector may,at their discretion, require provision of tests and or reports from the permit holder,permit holder's engineer or contractor to validate claims of material or construction adequacy/compliance.Such tests/reports shall be provided at the permit holder's expense. ROW 25-RELEASE-WAIVER REQ Applied Notice The permit holder shall provide a copy of a properly executed Release&Waiver document to the City for each ownership disturbed by construction activity,as evidence of disturbance resolution and owner satisfaction. ROW 26-MONUMENT PROTECTION REQ Applied Notice Existing monuments,property corners,and survey markers shall be protected. Replacement shall be at the permit holders expense. ROW 27-PROB SOLVING-RESPON PARTY Applied Notice The permit holder shall provide to the City Inspector,in writing,the names and 24-hour emergency telephone number of two(2) persons who have authority to resolve problems,take corrective action and,in general,will be responsible in case of an emergency.The permit holder shall notify the City Inspector,in writing,of any/all assignment changes. ROW 28-CONSTR SAFETY-RESPON PARTY Applied Notice The permit holder shall cause his contractor to provide to the City Inspector,in writing,the name and 24 hr emergency telephone number of a designated"Competent Person"responsible for construction safety as per OR-OSHA,Chap.437, Div. 3 Construction,Subdivision P-Excavations.The contractor shall notify the City Inspector of any/all assignment changes. ROW 29-ESMT/RT OF ENTRY-RESPON Applied Notice It is the sole responsibility of the permit holder to provide for proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry,or properly executed easements,shall be provided to the City.The City shall in no way be construed to be liable for the permit holder's failure to obtain or provide for proof of right-of-entry or easements. APPLICATION FOR PUBLIC FACILITY IMPROVEMENT (PFI) PERMIT I = Development Engineering TIGARD /3125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 FAX: (503)624-0752 FOR STAFF USE ONLY General Information: Engineering Property Address/Location(s): South side of SW Bonita Case No.: Fv `I Q,033/ Rd approx 110 ' east of SW Sequoia Pwky Receipt No.: Date: *Applicant's Name: TW TELECOM Application Accepted By: r--5 e Address: 520 SW Sixth Ave , Suite 400 Posted 1/4/08 City/State: Portland, OR Zip: 97204 Primary Contact: Kevin O' Connor REQUIRED SUBMITTAL INFORMATION Phone: (503) 416-1546 Fax: (503) 416-1555 Professional Engineered Plans are required for: Contractor's Name: Standard Utility Contractors, Inc . • Street Widening CCB# 66948 Expiration: 5/29/09 • Subdivision Infrastructure Address: PO Box 1008 • Main utility line extension: Oregon Salem, Ore 97308 0 Storm Drain, Sanitary-Tigard City/State: g zip: Water-Tigard Water Service Area Phone: 503-364-6611 Fax: 503-364-8844 (includes Durham, King City and a portion of unincorporated Washington County) Plans By: Commstructure Consulting, LLC **Note: See Engineer Plan Address: 16348 Wittke Court Submittal Checklist attached. City/State: Oregon City, OR Zip: 97045 Phone: (503) 343 4134 Fax: For all other work: Submit scaled sketch of the work to be done. (see attached minimum sketch requirements and New TW Telecom Pole placement provided sketch area). Description of work: P on south side of SW Bonita Rd approx-110 ' east of SW Sequoia Pwky between PGE pole# 65 to the west and PGE Pole # 1093 to the east - See Attached Drawings Estimated value of work (within the public right-of-way): $ 500 . 00 Is work related to a LAND-USE DECISION? YES NO El If so, please specify (MLP, SDR, SUB, etc.)case#: Is the work related to a BUILDING PERMIT? YES NO X If so, please specify (BUILDING PERMIT)case#: *NOTE: Person specified as "Applicant" shall be designated "Permitee" and shall provide financial assurance for the work. CONSTRUCTION SET 9SF ARMORED CABLE SEE SEGMENT 3-99W SEPARATE E COPE E� m o PLACED UNDER SEPARATE PCOPE 1 PL NEW 6.6M STRAND Ro W A e 1 -. 8.376' '°a L 11, �3 0 aoaki u�WO _ _ — — • oi LASH NEW 96F ARMORED CABLE TO W a a\o o e — — W SPAN NEW 6.6M STRAND a n a a Cl.M; W 2,776' r 600' SLACK NEW POLE PLACEMENT PLAN = CONSTRUCT NEW CROSS-OVER — _ - — — ____ ____ ..c--; SEE SHEET 2.1 41 W SW BONITA RD _ 2B © — _ _ISO— -__ SW BONITA RD W c.• — 209'r 1L` _ D - T J e• 3 nh I ` I B�" _A U OVERLASH NEW 96F ARMORED CABLE •• �- P1.1 \J __—�----2I0'-�-- TO EXISTING 96F CABLE&STAND ■ Q o�c' N a SLACK SPAN .. - — 2J0 o SPLICE LOCATION H iK `" o `" m "r--;‘ N 96F DIELECTRIC CABLE(EAST) 1 2. L. 2 o w - - o 96F ARMORED CABLE(NORTH) o; o a = '.,14'. i G A m$ 96F ARMORED CABLE(SOUTH) 41�' h I "I I I Q a e Z o w N 1 LEAVE 200'SLACK IN 96F ARMORED CAB 1 o �o N i'_! '°o 0 0 ` �o- m n¢ ozz wa- I wa- co I 0. O 3`, a1 N 11Z �2Un2N� p2Umh i— = W W 't I ki m Ie< aotle-o n I.° aoa�u II 3Q3 0l o I a o� "a ul SEESEGOREDCABLE 1'1 �N I'ON u'¢hZ¢oo 'n-11c?.:).: WD)d h���plll °N 1.3 w�'a\<¢ SEE SEGMENT 3-DOW TO JOHNSTON ° n u 3` a�E o�o i a °qn, u 11 a- I. 0. 0.0. PLACED UNDER SEPARATE SCOPE <d°'o w- \n aoii a naaa§ a�s�aa w <Ni�O a�\p II Wm a <cz.c U1ui c::a�oiaa.`I AERIAL PLAN SW BONITA RD el SCALE:i'-WO' DESIGNED BY.0S.BUTLER/E.ORTON APPROVED BY: E. ORTON TUALATIN - LAKE OS WEGO EXPANSION �'` CHECKED BY: E.ORTON DRAWN BY. A.MEUUS SEGMENT 4 - SW 72ND TO SW MEADOWS TO BODY IMAGING C--�T.v n "Ltc�l��E REVISIONS `/A\' AERIAL PLAN REV DESCRIPTION DATE BY APP �t . telecom SW BONITA RD 1 NEW POLE PLACEMENT PLAN 3-24-09 APM - IN'LLg WiOke Court Office:507311/111 CITY:PGARD COUNTY:WASHINGTON Oregon Cil0•Oregon 97045 Mobile..501.7108340 DATE: SCALE: PROJECT f• FILENAME: SHEET www.comm.nncwncrnuwlmg com _ 03-24-09 AS SHOWN _ TUALATIN_LO SEGMENT 4_APO I.DWG 2.0 or 26 • • CONSTRUCTION SET -___-_-- - _ - • . , ._--------- ._ _- . , . , • D/w I . . ■ . , - - --- - - _ - -- • -- - -- — SW BONITA RD SW BONITA RD -- - 5/W __ _ --DO _ 1 Cs7 ■ r /.---'' . •--. . . . .0 41-64 POA=24.=& POA. PL NEW 3/4-SCREW ANCHOR&6.6M DG W/12'LEAD(EAST) . • I 1 „------. . . , . . ,---L. • • - L.., . I i`-'1 ; 1 1, ! . ..x , • 1 ! . r • . . • , . 0 - Fr• .. .) IC' i • . .. 0 1 1 • . 'r;r1 : 1 I ,,,:' , . 1 I n ( 1 I I 1 > I NEW POLE PLACEMENT PLAN SW BONITA RD WALE:i'm 20' • _ _ — - - TUALATIN - LAKE OSWEGO EXPANSION , DESIGNED EirS BUTLER/E.ORION APPROVED Br E.ORION-- : , D ■ SEGMENT 4 - SW 72ND-_-TO7SW MEADOWS TO BODY IMAGING CHECKED Br, E.ORION DRAWN BY A.maluS NEW POLE PLACEMENT PLAN RE SONS '4LN telecom SW BONITA' RD' comm,sLaw.c. ,E 7,„--- DESCRIPTION DATE BY APP ___:..7......_.,. •-•••c--7-.-- 7 NEW POLE PLACEMENT ' 3-24-09 APN CITY TIGARD COUNTY:wASHINCTON 163-18 Mike Court OW.:SO3341415 i DATE: SCALE: PROJECT! FILENAME: SHEET Oregon Chy.OnNon 97045 Mobile:503.3 MEW "wivw.fammatructurecomullms.cont I AS SHOWN TUAL A TIN_TO SEGMENT 4_AP01.DWG 2.1 or 28 .. _____