Loading...
Report II10. 2413 10:47AM; No. 4043 P. 1 . f l . GeoPTa ,.. . • . • Engineering,Inc. Real-World Geotechnical Solutions •Investigation •Design •Construction Support October 3,2013 Project No.03-8449 �S Stonebridge Homes Job No. 1452 1) 5 L 22 q 1' SL. Oc cAo„..4 P/ Attention:Andy Thomas and Jim Delmore r°t 51—.2_013— 60 /64 Stonebridge Homes 4230 SW Galewood St.,Ste. 100 Lake Oswego,OR 97035 Fax 503-387-7815 Email JimD@stonebridgehomesnw.com FOUNDATION SUBGRADE REVIEW LOT 81—ARLINGTON HEIGHTS NO.3 15394 SW OAKMONT PLACE CITY OF TIGARD,OREGON Geopacific Engineering Inc. visited the site this week to review the single family home foundation layout on Lot 81. The foundation excavation reached medium hard rock on the lower half. In our opinion, the observed subgrade is now generally adequate for support to an allowable bearing pressure of 1,500 psf. The expected maximum anticipated total and differential footing movements (generally from soil expansion and/or settlement)are 1 inch and %inch, respectively,over a span of 20 feet. At the time of our final site visit,the excavation was complete and exposed stiff native soils on the front and medium hard rock on the lower footing line. These materials are considered adequate to support the planned foundation loads. Footing-to-slope setbacks are adequate and footing-to-wall setbacks are not an issue. Due to relatively impervious soils encountered throughout the site, all foundations should incorporate appropriate drainage measures in accordance with the International Residential Code. Adequate crawispace drainage is not something that geotechnical consultants can verify; the purpose of our visit is for observations of foundation bearing conditions only. Care should be taken to avoid saturation or disturbance of footing subgrade soils during and after excavation. We observed some placement of crushed aggregate to protect the subgrade from wet weather. If footing bearing soils become saturated or disturbed,any softened soil or slough should be removed and replaced with crushed aggregate or additional concrete. In general,footing excavations should be cleaned such that no more than about 1/2 inch of loose soils is present prior to pouring concrete. 14835 SW 724 Avenue Tel(503)5984445 Portland,Oregon 97224 Fax(503)941-9281 10. 2013 10:08AM No. 4043 P. 2 GeoPacific Engineering, Inc. Job No.03-8449 Lot 81 Arlington Heights No.3 Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. Within the limitations of scope,schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and.engineering geology at the time the report was prepared. No warranty, express or implied, is made. If you have any questions, please call. ,,,q� D4 - P� Sincerely, �'` l 5 .GeoPac�C Engineering,Inc. l��1 �0°1- � � (�j �G N guess/o ,rn � „.1) , " Y . ` 147 _• r OREGON LO .SD.IN EXPIRES:06/30/20) James D.Imbrie,G.E. Geotachnical Engineer /6--3621 s� .'it"'a h.4- p,. FOUNDATION CERTIFICATION •5f2cyl-- Co/5'1 LOT 81 OF "ARLINGTON HEIGHTS NO. 3" CITY OF TIGARD, WASHINGTON COUNTY, OR 14' I 14' i i LOT 82 ' 1 i o i ' 8.00' PUE I I r r! + S88'16'24"E 101.59' i i -- 1-20.0' Q } 45.50' 25'II , ,� ° ° . al r Ni rr N N c:, moo, U/ d i r I c Q / ,' 4.00' LOT 81 I N / � 1/ '/ 0 15.00' I , / Q �/ / 3.00' -CD 1 W i O / / O - ! I i\/ (� ^�' 59.50' Z CO / /i i/^ . 1.9 2' O I • �, 0, / / ;� , i / ,r u �ao Z N / //�T/S pp• S,pp.W 0�9 �r c_, J . / sly BS ' ° l / �/ F tie 6 h o / Q ,/ //i BSp• f ,� i / %%%/1 pUF LOT 79 LOT 80 ,• [ � ;, / ,, 4,.1----4 '' i PUE = PUBLIC UTILITY EASEMENT SCALE 1" = 20 FEET SWE = PUBLIC PEDESTRIAN ACCESS EASEMENT WME = WALL MAINTENANCE EASEMENT CURVE TABLE " " PREPARED FOR CURVE RADIUS DELTA LENGTH CHORD STONE BRIDGE HOMES NW Cl 164.00' 14'25'28" 41.29' N13°51'31"E 41.18' 16869 SW 65TH AVE #505 C2 200.00' 18'39'28" 65.13' S11'O3'2O"W 64.84' LAKE OSWEGO, OR 97086 I, ROB REf11G, A REGISTERED PROFESSIONAL LAND SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT I HAVE ACCU ELYg KED�TIE FOUNDATION FOR LOT 81 OF "ARLINGTON HEIGHTS NO. 3" WITH HUBS AND TACKS. REGISTERED PROFESSIONAL JOB NAME: ARLINGTON HEIGHTS AKS ENGINEERING AND FORESTRY, LLC LAND SURVEYOR 13910 SW GALBREATH DR AK JOB NUMBER: 2643 SUITE 100 SHERWOOD, OR 97140 PHONE: 503.925.8799 4, .- G N DRAWN BY: BDT FAX: 503.925.8969 LJANUARY 1 2005 ROBERT D. RETTIG CHECKED BY: RDR ENGINEERING • PLANNING • SURVEYING 6O124LS J FORESTRY • LANDSCAPE ARCHITECTURE RENEWS: 12/31/14 DWG NO.: 2643CSTK