Loading...
Permit v CITY OF TIGARD MECHANICAL PERMIT 11/1 COMMUNITY DEVELOPMENT Permit#: MEC2013 00562 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/26/2013 Parcel: 1 S126CA01100 Jurisdiction: Tigard Site address: 9009 SW HALL BLVD 100 Project: Target Subdivision: FAIRVIEW PLACE CONDO Lot: 20 Project Description: Replace generator. Contractor: RH MECHANICAL CO INC Owner: DAYTON HUDSON CORPORATION PO BOX 295 BY TARGET CORP T-0345 BORING,OR 97009-0295 PROPERTY TAX DEPT/TPN-0950 PO BOX 9456 MINNEAPOLIS,MN 55440 PHONE: 503-349-1320 PHONE: FAX: 503-558-9733 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 09/26/2013 $235.31 Class of Work: ALT Type of Const: Plan Review 09/26/2013 $58.83 Occupancy Grp: Occupancy Load: 12%State Surcharge-Mechanical 09/26/2013 $28.24 Stories: Info Process/Archiving-Sm$0.50(up to 09/26/2013 $2.00 Project Valuation: $6,000.00 11x17) Fuel Air Handlers Fuel Types: Units<10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $324.38 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, o - is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility .tification Cente Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or d' -ct questions to OUNC ca/in; ;03.232.1987 or 1.800.332.2344. Iss d By: / �. Permittee Signature: X, Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. • Mechanical Permit Application FOR OFFICE USE ONLY City of Tigard II CEIVED Date/By: do er{� �j_. ' Permit No.: /q�?j—�56� 13125 SW Hall Blvd.,Tigard,OR •,' .'s 9 an Review Phone: 503.718.2439 Fax: 503.598.1960 Date/ By: Other Permit: T I G A R U Inspection Line: 503.639.4175 SF_r� 2 6 2013 13 Date Ready/By: Juris: la See Page 2 for Internet: www.ti ard-or. ov 2 g g Notified/Method: Supplemental Information CITY OFTIGARD HYPE F EWING DIVISION COMMERCIAL FEE* SCHEDULE — USE CHECKLIST Mechanical permit fees*arc based on the value of the work ❑New construction Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. Value:$ . Ito D-0 0-- CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ❑ 1-and 2-family dwelling [Commercial/industrial ❑Accessory building For special information use checklist. ❑Multi-family ❑Master builder ❑Other: Description I Qty. I Ea. Total ' JOB SITE INFORMATION AND LOCATION Heating/cooling: • Air conditioning 46.75 Job site address: 9900 9 , -t_i_ (tJ b Fumace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: /' 044 D C_ - - - _ Furnace_100,000+BTU_(ducts/vents) 54.91 . Heat pump 61.06 y Suite/bldg./apt.no.: "/00 Project name: Tar 1(71 Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic)- - . - - -- 23.32- ---- - Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 Flue vent for water heater or gas /J 10- 0.._ seAr\-12-2 61;1' fireplace 23.32 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 PROPERTY OWNER I ❑ TENANT Other: 23.32 Environmental exhaust and ventilation: Name: Range hood/other kitchen . equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) Fax:( ) • Attic/crawlspace fans 23.32 ❑,APPLICANT ❑ CONTACT PERSON Other: 23.32 Fuel piping: Business name: $14.15 for first four;$4.03 for each additional Contact name: Furnace,etc. Address: Gas heat pump Wall/suspended/unit heater City/State/ZIP: Water heater Phone:( ) Fax: :( ) Fireplace Range E-mail: Barbecue -- --CONTRACTOR ' Clothes dryer(gas) Other: Business name: O A/ �C���,e.a / e� Z�C MECHANICAL PERMIT FEES" Address: p O /�'oev. 9 95 Subtotal v� Minimum permit fee($90.00) ' City/State/ZIP: �Qr,t 0(Z 97cc y_ oa 95 Plan review(25%of permit fee) Phone:(5,33) 3 y q-f, 20 Fax:(geg) 55' _91 33 State surcharge(12%of permit fee) CCB tic.: -1 c p 1 c/ l/�cj//y TOTAL PERMIT FEE This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Authorized signature: • Fee methodology set by Tri-County Building Industry Service Board Print name: t�3 .,�i; /77ae-SAS Date: 9.-au,- 3 • I:\BuildingWermits\MEC PermitApp_040113.doc • 440-4617T(I I/02/COM/WEB) - Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial& Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I:\Building\Permits IEC_PertnitApp_040113.doc 2