Loading...
Report f y .,Sv. 17. 2013 10: 02AM No. 4023 P. 1 • CeoP urn Engineering,Inc. • Real-World Geotechnlcal Solutions •Investigation •Design •Construction Support September 17, 2013 • Project No.03-8449 15 370 5w D.„..k.,0,-v-t° Stonebridge Homes Job No. 1453 Attention:Andy Thomas and Jim Delmore i%Sfao(3-- 0 1 5 ?6 S • tonebridge Homes 4230 SW Galewood St., Ste. 100 Lake Oswego, OR 97035 Fax 503-387-7615 FOUNDATION SUBGRADE REVIEW LOT 82—ARLINGTON HEIGHTS NO.3 15370 SW OAKMONT PLACE CITY OF TIGARD,OREGON GeoPacific Engineering Inc. visited the site this week to review the single family home foundation layout on Lot 82. The foundation excavation was carried to hard rock to avoid surcharging the wall below. In our opinion, the observed subgrade is now generally adequate for support to an allowable bearing pressure of 1,500 psf. The expected maximum anticipated total and differential footing movements (generally from soil expansion and/or settlement) are 1 inch and % inch, respectively, over a span of 20 feet. At the time of our final site visit, the excavation was complete and exposed stiff fill soils on the front and hard rock on the lower footing line. These materials are considered adequate to support the planned foundation loads. Footing-to-slope setbacks are adequate and footing-to-wall setbacks are not an issue. Due to relatively impervious soils encountered throughout the site, all foundations should incorporate appropriate drainage measures in accordance with the International Residential Code. Adequate crawispace drainage is not something that geotechnical consultants can verify; the purpose of our visit is for observations of foundation bearing conditions only. Care should be taken to avoid saturation or disturbance of footing subgrade soils during and after excavation. We observed some placement of crushed aggregate to protect the subgrade from wet weather. If footing bearing soils become saturated or disturbed, any softened soil or slough should be removed and replaced with crushed aggregate or additional concrete. In general, footing excavations should be cleaned such that no more than about 1A inch of loose soils is present prior to pouring concrete. • 14535 SW 72.4 Avenue Tel(503)598-8445 Portland,Oregon 91224 Fax(503)941-9281 • ),:;y0: 17. 2013 10: 02AM No. 4023 P. 2 ‘fff GeoPacific L nglneering, Inc. Job No.03-8449 , Lot 82 Arlington Heights No.3 / , Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. Within the limitations of scope, schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology at the time the report was prepared. No warranty, express or implied, is made. If you have any questions, please call. Sincerely, GeoPaclfic Engineering,Inc. (•Q`r�p PRopES cF?5 GiNe". r ce 147 /if; • OREGON "pro 23 , ' MES D.110 EXPIRES:06/30/20/S James D. imbrie, G.E. Geotechnical Engineer FOUNDATION CERTIFICATION /5-370 slid P "�' LOT 82 OF "ARLINGTON HEIGHTS NO. 3" CITY OF TIGARD, WASHINGTON COUNTY, OR '" aot3_ 00/74, I I I r-- 5.0' SWE LOT 83 I r--8.5' PUE 114 o � S88'16'24"E 100.99' 1 i 25' 1 I I' 1 I W 20.5'--.-- I W V o 49.83'I U I Q O t\■El I I , Q H i o° 6.00' 24.7 CC F-- 1 r ° co Z co FW-- O I z° 5.83' LOT 82 6.00' in Z r\ 0 QI I I� M (i in 0 O i I 4.50' N Z 00 I 1:0 N i N J is) _ o I I , co cp CC c� ^ i I + 11 I , 48.50' , Q I J I ' 1 N88'16'24"W 101.59' I � _ N I I I i 11 "' LOT 81 5.0' WME----1 -- 25' 14' ; I 1 I' I 1 1 ! ! ; 1 PUE = PUBLIC UTILITY EASEMENT SCALE 1" = 20 FEET SWE = PUBLIC PEDESTRIAN ACCESS EASEMENT WME = WALL MAINTENANCE EASEMENT -<::M o O °° 0, co CV CURVE TABLE CURVE RADIUS DELTA LENGTH CHORD PREPARED FOR STONE BRIDGE HOMES NW C 1 164.00' 4'55'11" 14.08' N4'11'11"E 14.08' 16869 SW 65TH AVE #505 LAKE OSWEGO, OR 97086 I, ROB RETTIG, A REGISTERED PROFESSIONAL LAND SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT I HAVE ACCURATELY STAKED THE FOUNDATION FOR LOT 82 OF "ARLINGTON HEIGHTS NO. 3" WITH HUBS AND TACKS. CDc3' —// — /� REGISTERED PROFESSIONAL JOB NAME: ARLINGTON HEIGHTS AKS ENGINEERING AND FORESTRY, LLC LAND Ui YOR 13910 SW GALBREATH DR JOB NUMBER: 2643 SUITE 100 "W.- SH , 97140 PHONE:ONE 5 503.9.9 25.8799 ;, .E ON DRAWN BY: MEB FAX: 503.925.8969 JANUARY 11, 2005 ROBERT D. RETTIG CHECKED BY: RDR ENGINEERING • PLANNING • SURVEYING 60124LS RENEWS: 12/31/14 DWG NO.: 2643CSTK FORESTRY • LANDSCAPE ARCHITECTURE . __- ,-..