MMD2002-00001 MMD2002 00001 PGE SUBSTATION EXPANSION January 9, 2002 CITY OF TIGARD John Vesik Portland General Electric OREGON 121 SW Salmon Street Portland, OR 97204 Dear Mr. Vesik: This letter is in response to your request for Minor Modification (MMD2002-00001) approval to install new electrical equipment in the existing West Portland Substation. The proposed addition of equipment will take place inside the existing fenced area. The subject property is located at 10955 SW 65th Ave, near the junction of SW Pacific Highway and Interstate 5. The site is an existing electrical substation, which is divided into an upper and lower yard. The modification will occur in the upper yard, which was specifically configured to accommodate the new construction. The Tigard Community Development Code, Site Development Review Section, states; "if the requested modification meets any of the major modification criteria, that the request shall be reviewed as a new Site Development Review application." Section 18.360.050.B. states that the Director shall determine that a major modification(s) has resulted if one (1) or more of the changes listed below have been proposed: 1. An increase in dwelling unit density or lot coverage for residential development. The proposal does not involve residential property. Therefore, this standard does not apply. 2. A change in the ratio or number of different types of dwelling units. This criterion is not applicable, as this request does not involve a residential development. 3. A change that requires additional on-site parking in accordance with Chapter 18.765. The requested modification does not require additional on-site parking. 4. A change in the type of commercial or industrial structures as defined by the Uniform Building Code. No building is associated with this site. Therefore, this standard does not apply. 5. An increase in the height of the building(s) by more than 20 percent. No building is associated with this site. Therefore, this standard does not apply. 6. A change in the type and location of accessways and parking areas where off-site traffic would be affected. This request will not require a change in accessways or parking areas where off-site traffic would be affected. Therefore, this criterion does not apply. 7. An increase in vehicular traffic to and from the site and the increase can be expected to exceed 100 vehicles per day. No change in traffic to and from the site can be expected. Therefore, this standard does not apply. 13125 SW Hall Blvd., Tigard, OR 97223 (503)639-4171 TDD (503)684-2772 -_•- • 8. An increase in the floor areas proposed for a non-residential use by more than ten percent excluding expansions under 5,000 square feet. No building is associated with this site. Therefore, this standard does not apply. 9. A reduction in the area reserved for common open space and/or usable open space that reduces the open space area below the minimum required by the code or reduces the open space areas by more than ten percent. No open space is associated with this site. Therefore, this standard does not apply. 10. A reduction of project amenities (recreational facilities, screening; and/or, landscaping provisions) below the minimum established by the code or by more than ten percent where specified in the site plan. No reduction of project amenities will result from this proposed modification. 11. A modification to the conditions imposed at the time of Site Development Review approval that is not the subject of criteria (B). 1 through 10 above. The proposed modification has not altered the original use of the site. Therefore, this standard has been met. This request is determined to be a minor modification to an existing site. The Director's designee has determined that the proposed minor modification of this existing site will continue to promote the general welfare of the City and will not be significantly detrimental, nor injurious to surrounding properties, provided that development which occurs after this decision complies with all applicable local, state, and federal laws. Therefore, this request for Minor Modification approval is hereby granted. If you need additional information or have any questions, please feel free to call me at (503) 639-4171 ext. 317. Sincerely, M ew Sc -idegger Assistant Planner is\c u rp l\Mathew\m i n m od\20 02-00001 c: M M D2002-00001 PGE Substation Expansion/MMD2002-00001 Page 2 of 2 APPLICANT MATERIALS A MINOR MODIFICATION TYPE I APPLICATION CITY OF TIGARD 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 FAX: (503) 684-7297 GENERAL INFORMATION Property Address/Location(s): iOl cS SW t.Sth AVE TI&ARDI OR FOR STAFF USE ONLY Tax Map &Tax Lot#(s): I S t3bRDd1.300 Site Size: (4.L4 ACMES Case No.(s): AO/ r)r) -2_002_,- 0000) Other Case No.(s): N/i9 Applicant*: PORTLRND bENERRL FLECTRc� I ZI SW SALh10N STR�ET Receipt No.: "Z,3 - - Quo T/ Address: City/State: 76RTLRNI) OR. Zip: "172-04 Application Accepted By:/«p Primary Contact: Sohn Vasil( Date: /3/or Phone: OD 3 - U 6+4-2-2-'72_ Fax: Property Owner/Deed Holder(s)*: (Attach list if more than one) Date Determined Complete: Rev.3/5/2001 i:\curpin\masters\revised\minormod.mst (70 T N ERA L 6LFCTRI'L` Address: 111 5W SALJ10N STREET Phone: 563'46 (-1� 1L City/State: PART LQN D OR. Zip: `1) 2.OLI * When the owner and the applicant are different people, the applicant must be the purchaser of record or a lessee in possession with written REQUIRED SUBMITTAL ELEMENTS authorization from the owner or an agent of the owner. The owner(s) (Note: applications will not be accepted must sign this application in the space provided on the back of this without the required submittal elements) form or submit a written authorization with this application. PROPOSAL SUMMARY [ ,Application Form The owners of record of the subject property request permission for a Minor Modification. To review a modification as a Minor Ef Owner's Signature/Written Authorization Modification, the Director must first find that the expansion does not Title Transfer Instrument or Deed invoke one or more of the 11 criteria discussed within Section 18.120.070(B) of the Tigard Development Code. If the modification 0 Site Development Plan (3 copies) exceeds the maximum allowed under any one or more of the �,/ following criteria, a Major Modification review is required. Major L� Site/Plot Plan (reduced 8'h"x 11") Modifications are processed in the same manner as a new Site Development Review. In a separate letter, please address the Applicant's Statement (3 copies) criteria below contained in Section 18.360.050(B) including a detailed (Addressing Criteria Under Section 18.360.050(B) response to each criteria. [j Filing Fee (City) $100.00 I. An Increase in dwelling unit density or lot coverage for residential development. (Urban) $236.00 2. A change in the ratio or number of different types of dwelling units. 3. A change that requires additional on-site parking in accordance with Chapter 18.765. 4. A change in the type of commercial or industrial structures as defined by the Uniform Building Code. 5. An increase in the height of the building(s)by more than 20%. In addition, the Director must find that the 6. A change in the type and location of accessways and parking areas where off-site traffic would be proposed change complies with the underlying affected. standards of the applicable zoning district. To 7. An increase in vehicular traffic to and from the site and increase can be expected to exceed 100 complete this review, the Applicant's proposal vehides per day. must include a discussion indicating how the 8. An increase in the floor area proposed for a non-residential use by more than 10% exduding site expansion will continue to comply with the expansions under 5,000 square feet. minimum setback, building height, parking land 9. A reduction in the area reserved for common open space and/or usable open space that reduces the landscaping standards. Other applicable open space area below the minimum required by this code or reduces the open space area by more requirements such as minimum Clear Vision than ten percent. areas near driveways and street intersections 10. A reduction of project amenities (recreational facilities, screening, and/or, landscaping provisions) may also be applicable depending on where below the minimum established by this code or by more than 10%where specified in the site plan. the building expansion is proposed to be I I. A modification to the conditions imposed at the time of Site Development Review approval that are not constructed on the site. the subject of Criteria 1 through 10 above. APPLICANTS: To consider an application complete, you will need to submit ALL of the REQUIRED SUBMITTAL ELEMENTS as described on the front of this application in the "Required Submittal Elements" box. (Detailed Submittal Requirement Information sheets can be obtained, upon request, for all types of Land Use Applications.) THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan, attachments, and exhibits transmitted herewith, are true; and the applicants so acknowledge that any permit issued, based on this application, may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application, including the policies and criteria, and understands the requirements for approving or denying the application. SIGNATURES of each owner of the subject property. DATED this c day of D �� Y 20 c p1�nti PEE r ,1 Own s Signature V r Owner's Signature Owner's Signature Owner's Signature Receipt #: 27200200000000000041 ,/�__ ./� Date: 01/04/2002 \Of TIDEMARK COMPUTER SYSTEMS, INC Line Items: Case No Tran Code Description Revenue Account No. Amount Due MMD2002-00001 [MISC] Misc Fee 100-0000-451000 $100.00 Payments: Method Payer Bank No Acct Check No Confirm No. Amount Paid Check PORTLAND GENERAL ELECTRIC CO 0 1090 5100.00 TOTAL AMOUNT PAID: $100.00 I' InSM_naS6-OPTION,WITH COMMISSION TO ' 'F.R.___� _ ' 1 KNOW ALL MEN BY THESE PRESENTS, That -DAVID M. and ELIZABETH L, W D R, WOOD ROW WILSON..ANT .LOLA-L. BAILEY..................... ...... ,hereinafter called the owner,in consideration }j of 0.00_- to him paid by-_.F._.H....Andrews ,hereinafter called the second party the receipt of which hereby is acknowledged by the owner, has given and granted and does hereby give and grant unto the second party, his executors, administrators, successors and assigns, the sole, exclusive and irre- Ivocable right and option for a period commencing this date and ending the 12th day of_.Septemher , 19-57-_, to purchase the following described real property in Washington_. i County, Oregon, to-wit: A portion of Tax Lot Two (2) in the Southeast Quarter of the Northeast Quarter of Section 36 Township 2 South Range 1 West of Willamette Meridian, 4 said tract being outlined in red on the print attached hereto and by reference made a part hereof. I i I at and for a price of$.30,000..00........,payable at the time and in the manner following: ��II Fifty and no/100 - - - -Dollars ($50.00) as herein above receipted for; two thousand 1 nine hundred fifty and no/100 - - - -Dollars ($2,950.00) at such time as the second ff party elects to exercise this Option; the balance of twenty-seven thousand and no/100 - Dollars ($27,000.00) upon acceptance of title and delivery of warranty deed as here- ; nafter provided. ti i If the owner is unable to convey title in a manner satisfactory to the second party { any moneys paid to the owner by the second party shall be returned. Should the second ' party fail to exercise the Option as provided above, the $50.00 receipted for shall ' be forfeited to the owners. Notices provided for herein shall be delivered to the owner at 11500 S. W. Barbur Boulevard, Portland, Oregon. ' If second party elects to exercise this option, then upon the payment of the sums above required to be i+ paid at said time and upon the execution and delivery of such writings as may be above required to be delivered 'i by the second ,1 y party, the owner agrees promptly to furnish unto the second party a policy of title insurance issued by a reputable title insurance company authorized to do business within the State of Oregon, insuring (in a sum equal to said option price) owner's marketable title in and to said real estate,and to deliver his good 1 and sufficient deed conveying said described property to the order of the second party,free of all incumbrances Iexcept i iThe owner covenants and agrees to and with the second party that he is the owner of said property and has a valid right to sell and convey the same and to contract so to do. This document is an option and nothing more than an option and does not pass to or vest in the second party any right, title or interest whatsoever in or to the said described real estate. In the event that the second party does not so elect to purchase said real estate on or before the date last above mentioned, time being of the iessence hereof, this option forthwith shall become null and void and of no further force or effect. The owner understands that the second party is a real estate broker and that the latter is taking this option for the account of an undisclosed buyer; in this connection, the owner agrees that upon the exercise hereof by the second party or by his assigns he will pay to the second party out of the price received for said property,for his services, the sum of$1,500.00. _-_ .; further in this connection, the second party agrees to and with the owner that the amount last stated shall be the only compensation second party shall have or re- ceive on the transaction and that the second party shall not have or retain any other profit or benefit therefrom, except in the event that if the owner agrees to accept any property or trade in part payment of the option price, the second party shall have the right to accept a commission or compensation from the other party to the trade. This contract shall bind and inure to the benefit of, as the circumstances may require, not only the im- mediate parties hereto but their respective heirs, administrators, executors,successors and assigns as well. It is understood that the owner herein may be more than one individual or a husband and wife or a corporation; also, that the second party may be more than one person or a corporation; therefore, the parties hereto agree that if the context and the circumstances so require, the singular as used herein shall include the plural, the masculine pronoun shall mean and include the feminine and neuter as well as a husband and wife, and that generally all grammatical changes shall be assumed, made or implied so that the provisions of this agreement shall apply equally to individuals and to corporations. �, x PK. IN WITNESS WHEREOF, the owner has hereunto set his hand and seal on this, the . v day of August , 19.57.---. ( ' ' ." ■ S °•�.. H.. -/L - - / '�. :4,x:.6.-. (SEAL) (% fc ! --- �.,'� L. Z"-C-, �`1.44." -..4L (SEAL) ' „ - 4/ -- f! 4,_ ••- ,. hc....-.(`4.—. (SEAL) / F LJ"Jr • 4 C (SEAL) f • C I I-36 WASHINGTON N.E.1/4 er 36 1 SOUTH I WEST 100 3w hh 11'7,W ••r' A, — — 5 W-E-AWTet. td1/x 1111 -175' It / \ / I`o w ie , / "k% Oe- • 1 O . 1 II e -0D De Ep ! 1 1I / 9a el I o h u 1;i1 J ti b T 43 NOTE- . SEE OREGON STATE HWY. 14.``/ 1 DEPT. DRAWING NO.56 24-2. DATED inGdE IAA i a, SEPT 1939 FOR DETAIL OF PACIFIC HWY.W.a iE Y 6.49 t Acre, 15 O C)/ raafh M EST PORT = 1 � g • Id ;1 6 1, 1 >< 1 16 =i 17''- °N89.41"50'W•41 4.50'------. adr Reference : C II-36 n meet 6/I 0 U o oL's ti 1 I a s ea via 10-80-S8-it.- < Rewiaw4 11.W.6. � ' E.C.PRATT 11.1E-57 Ls 1666E4666 powCOw+,uoa'e101u NO m PORTLAND wok ELECTRIC0W.DEED 9-26-57 wleixeprowtc.It. NONE CONVEYS 5.6IACRE,AdIEse Las,mNV- 1666846661EIiBERTHIJLIDY DCASS stw°"1„om.owl`=w°i°e:1 arc)• QGDCED 9-2557°yltact:.oam NONE omens au Awwrortu,Aro einem ie nww A4iiuw men_ 16665 4666 wreoes W rs°so`I�am°,wrc`r"sir le POREWID GENERAL ELECTRIC a QC.DEED 9-2657 1a57 6aier°,e.DM NONE 17519 4701 PORTLAND Gomm ELEc.E5 STn a or°Rawl. 94504.8.9938 YES Reserves easement for electric power line wine.CONVEYS o.etAc. a,,,At.remam m A. ........ /1793 47/o AMA4n 4 A1aat H�a. STAIR rt a&#o,/ 64.vew1 4.-/fS9 Zwt4 ASE 54505057 ro?AW[5'T/4M'sue(SW,HIS.wo.sfoz/) 2 Z S7 re, Agga S - WASHINGTON N.E.c/a or 36 1 SOUTH WEST W CD — Pn K7 U v W W €-C)1Lc) y'{ /�f 0.~ n. r hl . ' til �i D•n�cc•.+ �",- - ��,_` s-W-CAw+�- H 1Y Plir \,� ti —a 175' ' '---- •� ti 0.Z7i AC...I N Z ♦y. / • \l')?:L. 1 'y0, _''. I • I, ■ o /�� / �,i ,1../ Abu."1. .w TR00 R Y N 1 \ 1!IPQ 5�7' ST.HWY.R/w V 1 1 •\1.0.00 I i' ___ES 1E / \ 7 i In A\... \ 90. 1 / J \ OQ- o f' J)� AO., _ I.P. I p / 'O ly , \ I 1--Nip'so'di•W/75'— ,• rn 1 00. o r I j °N 0 CP - y, AI I I to L7 0w.l i.. O/ t N tiP I co h Al NOTE SEE OREGON STATE HWY. - 1 / tn DEPT DRAWING NO.5B-24 2 . DATED E s 1 .1 5 o tr) SEPT 1939 FOR DETAIL OF PACIFIC HWY W. I..; cy 6.49 t Ares / 6 N I �•. 10/ O 0 j c) 15 I EST PORTLAND 5)1Alk : r Iii.:-.L 1 J / !IP 0l9 ✓V/ I 1 r L�r.• / 66.06•;. 50 I I g a t 1 s •: , %///y/!/!/!!////.////lU//!/!/////!/,!!!/!J { ..•{•'• 2.1 N89"41.50"W • 414.50'----- —; ° t°— Referent )<EOR. CON.MON. a U o U Z S ° a GD Z o = I. V7 J DWI WIU0N ISG LETA fiT ux PORTLAND GENERAL ELECTRICt6W.DEED 9-2657 L'Ll.c oN co.DEEDS♦ NONE CONVEYS G.6I ACRE,Mora Oa 1.155,PARCEL. DAVID NI WICOCA Ei Ux AN 0. Q.C.DEED 9-25-57 10 2-57 D K.3 DR PG 4O fe6 w') 160.oi'1 :RT H.tJUDY D.CA55►LA WOODROW WI:SOW RLILCY ci Ur WASHINGTON CO.DCCOS NONE QINTCLAVlS ALL R16MT TITLE,AND INTt1EST IM 91 LINKS Y 91 LINKS PARCEL. ow oEwDEilsow ow icvl'ET ux PORTLAND GENERAL ELECTRIC C.Q C.DEED 9-2.6-57 IWASHING1ON3CD.DEEDS NONE taro GENERAL.EIEc.CQ STATE or OREGON 1345 Dd. 8-25.58 '(E5 Reserves easement for elactrtc power 11ne xin9. CONVEYS c Project Development Plan for West Portland Substation Expansion. Minor Modification to Existing Conditional Use Approval. Owner: Portland General Electric Address: 10955 SW 65th Ave, Tigard, Or 97223 Tax Lot: 1 S 136AD06300 Project Description: To improve reliability and provide for growth of electrical utility services in the Tigard area, Portland General Electric would like to install one new transformer, new capacitor banks, new circuit switchers, new SCADA monitoring and control equipment, and related circuits, in the existing West Portland Substation. This expansion will take place inside the existing fence, in space established for this purpose when the current site was last modified. Site Description: This property is located at 10955 SW 65th Ave,near the junction of HW 99 and Interstate 5. The site is an existing electrical substation which is divided into an upper and lower yard. The lower yard is a 115kV bulk power station, and the upper yard is the local substation. The new construction will take place mainly in the upper yard. The upper yard currently contains one transformer, a capacitor bank, control house, and associated circuits and controls. The yard was specifically configured to accommodate the planned new construction. New Construction: The new construction will consist of placing concrete footings and slabs for the new equipment and equipment installation. Approximately 70 cubic yards of concrete will be placed for this project. Table 1 provides a breakdown by footing detail. The existing plastic lined/rock filled oil spill containment system will be modified as needed to support the installation of the new transformer. No new occupied structures are being constructed in this project. The existing fence and lighting were designed to meet the needs of this expansion and will not need to be modified. No new water, storm drainage, or sewer connections are required. The site is located off of the main roads, down in a natural depression, shielding it from casual observers driving by. No existing trees or landscaping are being modified. Some existing wild blackberry bushes and brush may need to be removed to support installation of power poles in the right-of-way or easements leading from the substation. Impact of Proposed Use. This site was purchased in 1957 by PGE for use as a substation site. The site will continue in this capacity without significant impact in that: - no new surface area will be converted to this use beyond what is already established, - the site is out of the normal line of site of most of the community due to its physical location, - reliable power, in sufficient supply, is required by the neighborhood to support households and businesses. Increasing the stations capacity and ability to offset storm outages improves the overall system reliability. Schedule. This schedule is based on the information available at the time of submittal and may be impacted by major equipment deliveries, weather conditions, and labor availability. -Installation of the 115kV transmission capacitors: Start Feb 2002 -Installation of the new transformer and related circuits: Start April 2002 -Installation of new relays and SCADA monitoring: Start Sept 2002 Estimate of New Non-Electrical Construction. -Installation of gabion wall and backfill- $10,000 -Installation of footings and pads- $40,000 Total for non-electrical construction $50,000 • Table 1 Estimate of Concrete Volumes Item Equipment Number of Drawing Detail Cubic Notes Number concrete Yards of bases being Concrete added. 1 1 each 115-13kV,28MVA,Transformer 1 pad Detail#2 on 11 cy yds FNDSGDBO 2 2 each 13 kV Capacitor Bank 6 footings Detail#5 on 6 cu yds 3 footing per structure. FNDSGDBO 3 3 each 13kV Capacitors 3 pads Detail#5 on 3 cu yds FNDSFDAO 4 1 each Capacitor Cable Termination Rack 1 pad Detail#7 on 2 cu yds FNDSGDBO 5 3 each 115kV Circuit Switchers 3 pads Detail#1 on 12 cu yds FNDSGDAO 6 2 each 115kV Line Tower Structures 6 footings Detail#2 on 12 cu yds 3 footing per structure. FNDSFDAO 7 1 each 115kV Transformer Switch 1 pad Detail#9 on 3 cu yds Support FNDSFDAO 8 2 each 115kV Potential Device Supports 2 footings Detail#2 on 3 cu yds FNDDRDAO 9 3 bays of 13kV Buss Structure 12 footings Detail#2 on 18 cu yds Misc small footing for buss FNDDRDAO supports and minor equipment. Total Concrete° 70 cu yds. Applicant's Statement Addressing Criteria Under Section 18.360.050(B). Minor Modification to Conditional Use Permit. Owner: Portland General Electric Project: West Portland Substation Expansion Address: 10955 SW 65th Ave, Tigard, Oregon. Tax Lot : 1S136AD06300 1. An increase in dwelling density or lot coverage for residential development. This is a modification to an existing unmanned substation aimed at providing improved electrical reliability and to cover growth of the customer base in the Tigard area. No increase in residential dwelling density or lot coverage will be created by this project. 2. A change in the ratio or number of different dwelling units. This modification to an existing unmanned substation will not add, modify, or remove any dwelling units of any type. The modification will take place within the exiting site with no site area expansion. 3. A change that requires additional on-site parking in accordance with Chapter 18.765. This modification to an existing unmanned substation will require no additional parking spaces. Adequate space will remain inside the existing fence for vehicles. After construction, the substation is normally accessed only once or twice a month for inspection and maintenance. 4. A change in the type of commercial or industrial structures as defined by the Uniform Building Code. The site was originally planned as an electrical substation. The new equipment being added is of the same type and construction and would therefore not be defined as a change under the UBC. 5. An increase in the height of the building(s) by more than 20%. There are no modifications to any buildings planned by this project. The new equipment being installed is similar in height to the existing equipment. 6. A change in the type and location of accessways and parking areas where off-site traffic would be affected. There will be no modification to the accessways or parking areas in this project. The equipment is being placed in an existing gravel yard area planned for expansion of this substation during original construction. This location is isolated from off-site traffic by being at the end of a dead end road. 7. An increase in vehicular traffic to and from the site and increase can be expected to exceed 100 vehicles per day. After construction, the substation is normally accessed only once or twice a month for inspection and maintenance. This will not increase significantly as a result of these modifications and in no way will approach 100 vehicles per day. 8. An increase in the floor area proposed for a non-residential use by more than 10% excluding expansion under 5,000 square feet. This modification to an unmanned substation will not add any floor area. Only free standing equipment, buss support structures, and utility poles are being installed. None of this equipment has internal floor space. 9. A reduction in the area reserved for common open space and/or usable open space that reduces the open space area below the minimum required by this code or reduces the open space area by more than ten percent. This modification is taking place in an existing graveled yard that was prepared for this expansion during original construction. The site area will not be expanded beyond the existing fence. This space is not currently open to common use due to the hazardous nature of electrical substations. 10. A reduction of project amenities (recreational facilities, screening, and/or, landscaping provisions) below the minimum established by this code or by more than 10%where specified in the site plan. This electrical substation contains no amenities due to the nature of the facility. The existing screening and landscaping are not being modified because the existing yard and fence were originally designed to accommodate this expansion. No expansion of the fence or yard area are being made. The site is located in a natural depression that shields it from most views. 11. A modification to the conditions imposed at the time of Site Development Review approval that are not the subject of Criteria 1 through 10 above. The modifications being proposed in this project are for the installation of additional equipment of the same type and use as originally approved in the site development review. No modifications are being made to the site area, fence, or screening. The area to be occupied by the new equipment was established as part of the original review of the site to ensure that the space would be available when needed to support growth in the Tigard area. , ■ ■ I I • ■ ■ ■ • ■ I lilt: luilkill • • ,t.......ft,' kilagrjiwriair >, • . . . i . c..... _ aric:a cad %,t ; � G1iw JIM 'F .F • t" ■ +r••t t■ • I ■Mliggrupi. .. im mil as 41 •roi I 1�11�. �.��gf.•. 1117t.�..t■ BFI viii ►� �Gr 1I'Mil I on WWII 1 1.:::•;;:fi:JA,..-.== .7'_,..„ illIalediliti r-- I • t iii= !l �M 1 g.,, _�Gis.i::r.:ai:.■ I t I c ��u.r'�'..s..t t..t■ • .r w ■ ('� '� w w�■■ ■ • ' gill 144 � —M , M�Ig l ■I • 1 L \uct- •err rI►pwhtl!!— ..E.104. It , • ■ PROJECT NAME : WEST PORTLAND SUBSTATION EXPANSION TAX LOT : 1S136AD 06300 ADDRESS : 10955 SW 65TH AVE . , TIGARD , OR 97224 ZONING : PLAN CLASS CG - COMMERCIAL APPLICANT NAME : PORTLAND GENERAL ELECTRIC CONTACT : JOHN VESIK PHONE : ( 503 ) 464 -2272 PORTLAND GENERAL ELECTRIC CO PORTLAND. OREGON WEST PORTLAND PROPOSED SITE PLAN DRAWN BY MN DATE 12/21 /01 DESIGN ENG' R YRP ENGR' MGR GHL SCALE : 1 "=100 ' DESIGN P -000q o SUPERVISOR WEL FILENAME : P00040 . DGN . r `,;,l :1, „y Wit' t apt;. - y,.�i -•.rw __ _ --- A AX, ` 71117- yY ,. • ` L __�1�1� ra` !�'! '''I'+- 4 ... .._ --...4111111-3 f gyp. t 4 444 fir^ .__ tF r i a ! • . .„„,, ill . ' .. . ... . ,t ,, w + � 4 x t •e rte' 7. :c: �ti 7 c f• . --_ ADD SECOND TRANSFORMER West Portland Sub. Looking South • _To! • 4 1 } ...: _ 41491. 156 .' ... II Ile IL: • �o tp A dd Second Transformer 17, � Y .,* _L �'w - . a h..• . RF,�, • z ia ' f Y 71 i. ,y A ] : x f c J„. s 1.1 f gli iii s ...IL... • . .. r, , 3 i Fsi _fs.Yr' jam. A- ., ' �~ 1 r. '• a il `ir �, VIM `:”.I i Add Ne w / .... -r i- 2 •.P Capacitor Bank - lir: • ... ss Add Ca .0 ►a :a.k'r ; „. It 0 . PGE'is Vilid Poikincl ' ....,, . . . ,. . orl . p` _ ,,,_o,,..,.• , , i. ..y.. ' zR TWA' „ ., ., II 4 1;f.r ..... ..... ... 4... 3.17.... I .. '■- ” . 1, _. : . .-iair. - . — , - ...h-, .. , #.,..:A. . m Pig 0 Ili . 4. . CC MS. ID aF� Re,.:^Li rt .r a f l ue�` ,• 4-7TX)r ANCHOR 3•-0• )'-3' BOLTS-STOCK NMHR 1111111176-MA 76-n ITEM TO RE MT DIPPED 2 .•.' 2' AK i GALvMVIZED AFTER .-3/4.xIr ANCHOR DOLT FIIDRIF/1TION. -STOCK NWRER BNl). EIBECOEO•PRgV 3• I i i' 2•i• ON BOTTOM P SOLT.HOT 4-3/A•XIr ACMgR DOLT —I.• I v. 1'J••. 1•-E4j DIP GALVANIZE AFTER •STOCX HAWSER 5.17•'545 I I I i FAMICATIO•. 3•-0• 3.-0- EMEOOEO•PROYIOE r I I I I� ON SOTTON OF BOLT IC I r-lo• r-lo- �y 1 DIP GALVANIZE AFTER • .., I I 7—. ___+____.;.+1 faMICAr104 t1 I I _ - -t------• Ii-------1--I• �" -1----.-•-•-'t•-•-•-•-.-.+. ! I I I II∎1————T•——— T—r i i i i I I T , •1 ._i_._._._.j_._._._._i_.�. i _ I I i i i 1 - I j i j 1 ' •Y P 1 _• _ I — — — -._._.j.�. i i i 1 -, aa I I 1 1 't tl i 1 i I I T 1 i i i 1 _IIIL- i- - - - � -- Y -- a I �- i -rt-• = . T8 1 I5• O-E E RA T X -6••10• S• AI.• 5.5 STRAIGHT X WAIII .� II —r -----: 4. . .. )• I-A6 SIN r T X T'i••12 CENTERS 1• II•GALVANIZED DOLT-- YNZED B0.T- S I TOP OR LAVERS I GALVANIZED THREADED �MCTH A5 REQUIRED - Mx SLEEVE GALVANIZED TNREADEO LE H AS REWIRE° K E �� NE0 SLEEVE• 0 r, if:F., u5 b • . ° b -, 4n! A r. .. .._. .s• s g'III 1 m W I W ELEY4TIQ1j =.1411.- : _ ELEVAB TION CLEM 6'-6• 13 KV CIRCO]LAMMED FOLD RATION-iE1AJ. scum 0 13 KV F1 FVATIMI ISC.LE,K..1'-n -- - • BEOID CIRCl11T RREAIEER FOIIOATION 6CALE,K.•r-n 141TS11B1SH1 115101 SF-3 • BEDAUBED 5 CIRCUIT BREAKER F0LR1 ATI0N SCALE,II••1'46 • REOIIIREO •-E•2r ANCIa L .•r A-r Dais•ALL ITEM II TO DE NOT DIPPED !•-0• !•-0' r-2!<' 6-21{' FAMRAZEEO ASTER Ai I 4' 1 4.-6 4'f •-= I 11'-6• I 6= I I I f I r —} GENERAL NOTES 4- .1 a - I I I I L ALL CONCRETE Sou.NAYS A MOWN CCNPRESSIIE STREAT• r 1 ' Y I I I I 2. ALL COMMIE REIKONCEIENT SIMLL COKIY WITH CURRENT I I I ASTN SPECIFIOATICI 4415.GAME M. j m 24 AEg11 RE0 N snows X t�'i' -- I 3. ALL EXCAVATIONS CCCLMING UCCR CONCRETE SLABS SHALL ---•-•-•- •- -•--i--- -� BE BACK FILLED WITH DCIIRESSCLE MATERIAL CONSISTING P PIVEALY CC WCTEO RIVER 101 RMTLEMLIMIXTURE OF q I a .- I I I I SAND MO GRAVEL. • I • S I !';• I 1 I 1 I _ A. ALL GROUND GRID AM CONDUITS TO BE IN PLACE BEFORE I W s b a _ CONCIEEE IS PLACED. Al I I I I 5. SET 11 CI MILTS TO TEI•LATE.CHECK LOCATIOM AND ELEVATIO6 WITH DCTINRENTS BEFORE CONCRETE IS POURED. SEE DETAIL b• ` V • ._. _-_._._._ 1._ _. _ 6. SLABS TO BE BROOM Fp1yEO AND SLOPED FOR SIFFICENT `� Y • 6` .....GE M POBOINGlEWFER ALL EXPOSED EDGES. I N.ja I I I I 7. TOP P COCRETE SHALL BE SET PER FOMOITION PLML w w 54• I I I I >1 ._ r._._._._._. _._._._._. ._._._._._.� _ • • 32 REOUIREO N 90 moats X 11'-0- I _ I I i s I • 1 I I I 1 I t �— 1 I I I I I I / I I I I In 65465 tO�z �--_y---- A----T--•r 1 I I - 61.X 15 x Ir-r • t. L M J w srPoQ �= �- – / JI�- [:: T U C1/•r: –• .-- s••sSr. xr-r•1rIRN �ERS./- Ir / ��•-� Sub I TOP I BOTTOM LAYERS MIN. OH-M SE IRRP•I4-4 •7•CENTERS TOP LAYER I T••t I 1.-I'.$H0.ES DRILLED.PWCHEO OR 1 71.7 6 2/y6 STRAIGHT X 11•-6-•B•CENTERS BOTTOM LAYER 6• SLANT TNTy NEB ON!"C[NTER! A ELM MIN. MIN. I`^` 1B'-0• .la i 5 2l.Atl IBAtlS AtlLtgB flg -4. .. .'.C— -1.—.- '1=—T-- ---I. '.��::.•:,.. b� .. 54,,.. EA/E00ED ANCHOR VIDE FLANGES 6CALE 1••1•-r. to �i> r - Q 'i .` A �':A '�:!. ....I I ••• I••1°'.1•••••Iw•lw• M•!•EACH 54.'1 2 REIMPEO _ A 1.j' o' Q Q .•' Q Q Q •3: REVISIONS 61-+ .;ii ' '.2'--.741 .1... .—.. — —.• - PORTLAND GENERAL ELECTRIC CO. r I ; ,.,r�.w s — �t.b.s ....----....4 g p 3 y;; 491 RwKr.as . .•_ � •Q�r ......a---t..—'—TTTT �.� —42:�r:...PI �� X11 X11 A. .1 IlE lltw .�' 6.11¢..0- 6i.ua7i 6..116..2 6..116.2 W 611h1 II T Y DESIGN MASTER K•5•EACH MAY I pJ s r B• MIN11W ARDLAQ M ARDUIM PERIMETER aq ELEYATIIN FOUNDAT ION DETAILS i R1IETER FIEVATIEYI 2-+•STRAIGHT%11'i' _ -M 2-•A STRAIGHT X 17'i• SIEPEBIS 72 kV N.l AS sND.N •1 "` CIRCUIT BREAKER FOlR ATION 1 G. GL.SKR me.. G. GLASIER 115-13KY TRABBFdUER TM£ 11-02-2001 2 SCALEIK•r-r IA,.m.. I. L.RON .w.. 54.. FQI�ATION OF x REOIIIREO FNBSGDBO ISCKE.I}••1'-n a.r. C.H. LINDL AND U • BEDAUBED M+ _ AM.. SHEET 2 P 5 f PIA.IM.IM IKIA..yM 54.MIAs.I A. Ar.M Mt WK.s..100.00. PAW UAW. rte• *` Tal,i ,„ ____ :. rive......... i ...fp ,.....4,1;co,,„43t,„ .. i 74 , ........,....., , ,,,.. ., r / ` error ci a0 r- •, am sr*a 'tits `/mil `'•L� �: / "°-/r's,s °•/- . (( s' f / •i err p •� '4.;;;,.,.... �� , ♦ ? ! I.4 11.0.. r,•11 A 1 1 LHCr tro I '-,•'�r a. •A//%/ // U %�� ,�♦ "s Rtau ...„..., .. fry ;� �/ -1�V c / 7 44 4 if ` `� "; r , f C^, �CE�gti,, p aorr r rc l ... "yq °"°Rwr /rf�r�rror 1 A�s r,l�,`� ��, YTr4f •• �1•x ra 1 C.•y • /,h rrC a ft r•Ne °°r r7 lot rs_t7 auto .} 1 A i N A 48 N •O. / Ig•ERx rp;a•N r. ,. �I ••_ or- or caas �'f•/•.4,4. !! ,.+. : •"`fY: iI: 7 "0:t e�l� �� !��/ $i 6. t r""...*ft . . I 4 i .47 1 �...+ „... .1 •'.4.,• &krN RS rr°as r. • •r a /.� Rf°y "/' lam/ v . i • ~�� Itliel p L.a L ti ter, GY �tYrr ' 'p7- "W aQlt�+.. f'fit fE Sfr"Kop.„..--,.EprE 15 .'' "� °t.F Asvk RE0, °uwrto*„ttMt /sctit;*•'r•h Or i lA M Phi/ GtvEAL I. 4�®©® +•..LECia/ C CO. ,„ SCAB N MA r R UNaA r%g, DEN; pE 4 e.,,,;;. IygsGpep hffr her.,,er,�rro2 c 0 ut A',rr •- ' 1-1.x Ir ANCHOR MTS.-ALL ITEMS 1'-0• 1'-0' TO BE MDT DIPPED GALVANIZED AFTER 1.11 x urACHOR FAMRICATId. {.-0• {'-0. BOLTS ALL ITEMS r1•-7 •I•-3 TO BE MDT DIPPED {'-0- 0•-0• 1.1'• x 22'ANCHOR GN.VAMIZEO AFTER I h z TO IC ALL ITEM{ l•-1• 1'-1•y� FABRICATION. 1 TO BE NOT DIPPED 1 r-- ■ _— FABRICATED AF TER J. L ■• FABRICATION. I 1 I -r—r- I i- + I I n 1 I I C 4.111, 1 I I '•kLa : �•h1' j •►;L;�ihai r$ -•-•-----•-•-t-•-+---� ,D-,D'I I ' �I I I I I •_�. _._._._. -- --- j$ , - - -- - I J._ 1_._._ ._. • 1. _ __ _ _ i- j r _ 4 a -c •-•i 7» ° i i----- i i- i � 4• 1 1 - - -- - - --J- -� _ ____4__.1... I •• . I I I i I j • .F r —F' ........16 6.1 .1 --- -- 12-NS STRAIGHT S S'-0•••12•CENTERS TOP L BOTTOM 7• _ 1-R S GHT X 1•-/'•II'• TEAS•/• h z f 12+5 STRAIGHT x 'i••li•CENTERS • L BOTTOM { �� u YIN. E BOTTOM R RIM. a In i S ti _ 'j...0•4---.. 1=. I N.IL. r t• 73 L tr-0 ELEVATION - D .• p D • • E 'IC ELEVATION AFC-116 KY C1 TIT SWIT R III .1• II 11=, •1 5 i C-116 KY CIRCUIT SNITCHER FOl1BnATiE�/q.OCTAL', E it 'I FOUNDATION DETAIL ISCALE•fy•1.-IN w 7•-AAA� SACINC ERE ISCALE, IV•1.101 •'-0• • REDUIREO ELEVATION 1 y� S i C-11'� KY CIRCUIT SNITCHER ✓- � " FOUNDATION fFTAIt, i. . NEOt1111ED F STEM S GENERAL NOTES I. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH 4.1.11 X 22• CO AOR OF 3I0I PSI AFTER DI DAYS. T'-0• V • 1.1'R x22' • ••-0• {•-O• BOLTS ALL ITEMS 2. ALL CONCRETE REINFORCEMENT SHALL COMPLY YITM CIKNREAT BATS ALL I TO RE ICY DIPPED ASTM SPECIFICATION A-615.GRADE SR. TO RE MDT ■ 0 GALVANIZED AFTER 3. ALL EXCAVATIONS OCCIAING UNDER CONCRETE SLAMS SHALL . . . . CACVANID AFTER 1•-0• 1•-0• FR/RICATION BE BACK FILLED WITH INCOMPRESSIBLE MATERUL CONSI5TIW FAIR • OF AOl CT TEL. TED RIVER RUN NATURAL/MIXTURE OF SAID MD GRAVEL. 1. ALL GROIRD GRID AND WNOIITS TO BE IN PLACE BEFORE I T B. SET AMANCrDR BOLTS TO TEMPLATE.CHECK LOCAT 1014 AID I I 1 P +— 1 T ELEVATIONS WITH INST1•RENTS BEFORE CPCRETE IS POURED. Y ^ .I I 11T 11 I . 1 .- S- j - 1 S. SLAMS TO BE BROOM FINISHED MO SLOPED FOR SUFFICEMT n II. I I I I I T. TOPAZ F CON RETE SSH LL BE SEET PER FOLK.?OION LAN.• 1 I 1 I j _ 1 i I • 1 i -• Al • 12-03 STRAIGHT x -V•12•CEMTE-AEI { 11+3 STRAIGHT X 0 ••,2'CEMTE CPA BOTTOM aa z d A • r-I•n -•e- •-•••i- 'E"' ., ueue i 0. _. jr 1- _i. w•� 'tu u ° wESr PORTL AND 3uRcThTXOK S 11'-0' �d 12•-0• '• ELEVATION ELEVATION 5 L C-115 KV CIRCUIT SWITCI.cR SIEMENS-II6 KY CIRCUIT SMITCI€ ...1 n• I 1 w 1«•1+•-4•'.•I•+• FOUNOATION DETAIL FOLH ATION MTAIL REVISIONS 8'-6•PW15E SPACIIC ISCALE•11••i•-rN - PORTLAND GENERAL ELECTRIC CO. SCALE SS'•r-•1 • RE_OUI?EO i • PIMA.um REDUIREO • �, 7 QESIGN MASTER L! I SLAB ON GRADE FOUNDATION DETAILS M.. AS SHORN N INA G.A.O. sum in G.A.O. •M•. D.B.M. .. OT-211-2000 N u..... 11.VI. w.».11. .V. FNBSGDAO 0 a.•.. SHEET 1 OF I M1Niwr,r mu R•u•.rm.VS ... r,u .rrw».ar w•, I• •-T/•'K 22 NKM]I 4-1'%24•ANCHOR ROO-THREAD i .-i/r%� � .•-0' ••-0• BOLTS-STOCK NUlER TM 6 pTTOM.USE TWO NUTS BM46.0-All ITEMS TOP 6 OK NUT WITH RATE • BOLTS-STOCK MUlER 1'i' 1.-6' TO T DINED ••-0' •-0' K r r-r wing III,'CEA 0 eM17i-ALL ITEMS 2•i' 2'i' GALVANIEO RATER HOLD BOTTO,t MX •a TO V NOT DIMEO 6.1. 6, 1 i' 1 i' GALVAMIEO RATER 1'-0' 1'-0' F/.1I:ATION. TIE RATE TO BOTTOM BEFORE ZE FABRICATION.LMON I t�i • 10' 10' RACING CONCRETE RI i11SSELR ASRICTIL : : ' I L — — g Y • " 'P Ir rtZl r1 —� F I. 1r 4 4 4 -A -j—•4•-4—�-- . . a 1 1 11. 1._.,_.1_,_._ , . . r 1 " - t,-1•_U .AA .. .. 1 .4- 1 1 V y - 6• S $TM 16MT K•'i•• 6'1 ' Ih•B STRAIGHT K 1'{••If CENTERS.TOP LAYER I ^ n 1•-9 STRAIGH ••-i••Ir CENTERS.T• AYER ON TfR 3• 10-•6 STRAIGHT K Pi••IF CENTERS BOTTOM LATER >• Ilr ��,A• d .-.6 STRAIGHT K A' •W CENTERS •TTOM LAYER 3' 1•• 4" 111 ELAN b • •SETS••TIES• 404;•••• „� .SETS••71F5• i n 7 TIES• R T•/-CENTERS g K T•/-CENTERS _I •CENTERS ” • _ -%•'7 11 fi !'° %%iii.. r w i 7?... ,�� �'� -y , •T i_L I�tl •t •$'.'•t.� ,�� 1-,: 1 a ,,• -4-.7,-...1t-� t ii•--•7i i i i _ I�IIII EE III E Y �: ° ° 1�0 II 11 II "E b 311 11 l2 VIT _4 311TH . " 3•-11 ' I u❑ L IR ' pl n A• 1•'3 10'%2 KEYWAY I ' .•z rKEYWAY 7Il • Q 011 MONILITHIC-.-. 13• p ` B-•e'NDOItS 011 • ITMC POIAI B �,'-7�. •e' + — 1�•X r-61k' • • W 7 ■ ° • • z %mil = W =3•CLEAR la. �� ° t D • TIW ,� ••q i�l.�l1� ∎Am, rii.i , �—∎ �IW •3•-0• 11 II�II IIW II I it Mi= " • ELEVATION ❑UGH1 _ - —... FOUNOA TAIL =aural ISCALEI -01 aural= J S_ t C -116 KV ION SVITC6ER 6gLB1L F°MOATION OE TALL Q (SCALE,1{••T'-n LBRLSWI� EO lR • REdmIREO ••-0• •'-0- 3'-3. 1'-3• T •-1+'1 DRAM. K 36•ANCHOR 1 ILTS IGALVANIIEDI SEE 1 -.•'I, DETAIL RELOR Yr • I ^ -I{I 13-M STRAIGHT K 4:-6'•1$'CENTERS-TO 6 BOTTOM LAYERS 6 If'-0' i eLeu IFF 36. i3' K 1 23.P1 S+6 HOOKS-EACH SIDE SSS 4 fir• 3r-0 Y SS il�•�i.-,u, •.1},ii'•n•n T r11REA0E• e• 5 PoATLAIV SuBST Tkloil Y ■ D•����a�- I .I �`-. = — r•u IL DIML e.R z 3•-0•-THREAD■ ^ Q • • D •i 1 `I 1 • .p .0 • .D••p r-: AS SNO•M.-USE NIT A RATE 11/2 1„ D • _ •i I••I 0'-•••ITH 1.5,E HOLE I Cm • • CENTER,-USE GALVANIIEO HUTS �. • �.�.■— GALVANIZE ROD AFTER THREADING. KW •g �D3o'gi o�n'$1 Ill I s3i •'$nffi °' 'ZI 7 C a nu HUTEI USE S NUTS ON TOP-ONE FOR CONCRETE a•.I ~N I M w,^N. I n I C.I••T.1R.,.IN,.. USE•36 WITERIAL ENBEDMEAT AND DID ABOVE BASE PLATE REV 1510115 ELEVATION MATERIAL. IUSIN6 ONE AS JAN,MUTI QE TAIL W-ANCHOR BOLT PORTLAND GENERAL ELECTRIC CO.Pella NM I1SICV I ME TOVFR FOUNOAT(QN FOR ARRAN LINE TOWER DESIGN GN MASTER ISCALE•14'•1'•s, 16CALE:1W•1'-Ui • REOUIREO • REOUI n SPREAD FOOTING FOUNDATION DETAILS As SHO.N 1 2 M,H.• G. Gt./k '. Has AS GLASMR w®n •~•w D. 11-02-2001 TU M G- .. .•LA•SW OMNI�� •, .-M. G.N. L,NDL.w FNBSFDAO 0 SHEET 1 RA I _ •ISI.Ia1.IX. as MIL,11nin, FT,UT Flu.1•.T.R•R.M. not T•n+• • 4.7•A P 22•ANCHOR BOLTS•STOCE wimp 1'-- I'-2• 5•I7.O50-All ITEM =TEM 1P11- r TO VA K NOT DIFTER FABRICATION. .-S/A'B 10'GALL, ZED 4'•- ANCHOR BOL TS-ST.• NO. /'..... Pill 5-1T-34T WN / — "/--t-1•-+ \ /".-...N • I i. I 2. v_ I a Pletl L�.foN CM. Paw Pp1 C»l PALO . aANE ROUND•SPARE ni = :'r1 -r rl o I1cT m11Pi1 I "I�I�p 711 • lfl1=r 61 1 .1 d;11 _ , ;u . r1', _h r I I• -PaR CONCRETE '. CLEAR . Q p _ AGAINST UNOISTUBBED LAP E.y OAllS ' 4'•5 STMT 1 j,� 1O.OIAMETER ~ i %-fi STRAIGHT 1_.1 '14, E{ 3' 1 D—~ • CENTERS •10'N-IA CLEAR • I -1 /-•7 TIES•If./- , R CT IJNOiE Q CENTERS g II�II� •I�IIF AµNSi UNDISTURBED ✓ hi-p r1 DTI DTI�IIT 1 1^ I .1 1 .0 Z.•DIAMETER �fl- 61-t-ro •' T Fl FYATION niML l I 1 1.1 u m --I -J- 31 DIAMETER ZA'DIAMETER ELEVATION GABLE TERMINAL RACK FOOTING ..4s ■SCALE. ••1•-R1 FDI,IPMFNT FOOTING DETAIL '$ - • RF1IIIRFQ ∎SCALE1 I<••r-r, • REOI,IRFQ V - urEsr PQRrc 4HD s uBs r4TrO W ., REV IS IONS GENERAL NOTES PORTLAND GENERAL ELECTRIC CO. I. ALL CONCRETE SWILL HAVE A HINIML..COMPRESSIVE STRENGTH •E.IIM.ORBS OF 3•00 PSI AFTER ZR OATS. ' 2. ALL CONCRETE REIKORCEMENT SHALL COMPLY WITH CURRENT OES I GN MASTER ASTM SPECIFICATION A-615.GRADE 66. 3. ALL EECAYATIONS WITH II NG NICER CONCRETE SLABS SHALL BE BACK OF PROPERLYLCOMPIACTED RIVER REASPI INATuRAL∎HIBTLRE`yOFNG DRILLED SAND ARCGRAVEL. FOUNDATION DETAILS AND CONOLIITS TO BE IN P A. ALL GROUNO GRID LACE BEFORE CU{RETE IS PLACED. .44444.41 AS SMOISHOWN 5. SET ANCHOR BOLTS TO TEMPLATE.CHECK LOCATIONS ANO ELEVATIONS WITH INSTR111[NTS BEFORE CONCRETE IS POURED. NUM. C.R.C. Imam A. G.R.G. 6. SLABS TO BE BROOM FINISHED AND SLOPED FOR SUFFICENT ......•M 0.O.N. OR 07-211-2000 DRAINAGE 1N0 POLNOINW.CNAIKER ALL EXPOSED EDGES. R TB . 1. TOP OF CONCRETE SHALL BE SET PER FOUNDATION PLAN. •`��o-"�• •.w.•r. N' °"".. C.L. FNBOROAO Q ..r. SHEET 1 OF 1R PIS.Illulle•GM. IIIN 0.1. rot .1.. .Nl Wati..AM.C.RG N.R.K4.µ