MMD2005-00024 MMD2005 00024 TIGARD FIRST BAPTIST CHURCH koglio CITY OF TIGARD OREGON January 6, 2006 MS Architecture Attn: Mark Siemieniec 1001 Water Ave. Suite 200 Portland, OR 97214 Dear Mr. Siemieniec: This letter is in response to your request for Minor Modification (MMD2005-00024) approval to a previous Tigard First Baptist Church Conditional Use (CUP2004-00005) to change the phasing of the project and several site improvements. Phase 1 will include changing several existing parking stalls to accommodate the required ADA spaces. The decommissioning of the current septic field and capping off the septic tank for the accessory building to the west of the main assembly will also occur during Phase 1. The final proposed change is an outfall drain from the water quality swale to the creek bed. This will require a Type I Sensitive Lands Review before being constructed. Phase 2 will include the new church sanctuary building and vehicle turn-around. Changes to the original approval will include shape and orientation. The location is primarily the same with the exception of the building moving to the inside edge of the building setback. Phase 3 will include the demolishing of the existing Bolt Hall and new parking will be added in its place. The existing SW 110th Avenue entry/parking will be reconstructed to connect to the new parking area including an upgraded access drive. The only difference in phase 3 is that the two existing buildings will not be connected by an addition. The applicant has submitted plans with this application that show the proposed changes. The subject property is located at 11075 SW Gaarde Street (WCTM 2S103DC, Tax Lot 01100). The Tigard Community Development Code, Conditional Use Section, states that any modification which is not within the description of a major modification shall be considered a minor modification. Section 18.330.020.B. states that the Director shall determine that a major modification(s) has resulted if one (1) or more of the changes listed below have been proposed: Page 1 of 3 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 TDD (503)684-2772 1. A change in land use. No change in land use is proposed. The site is currently developed as a church. After the modification the site will still be a church. 2. A 10% increase in dwelling unit density. The subject site does not involve a residential use. Therefore, this standard does not apply. 3. A change in the type and/or location of access ways and parking areas where off- site traffic would be affected. The existing southernmost entry on SW 110th Avenue will remain in its current location rather than the proposed shift. All other access drives are located in the originally proposed locations. 4. An increase in the floor area proposed for non-residential use by more than 10% where previously specified. The new footprint of the proposed building will not increase the proposed floor area. 5. A reduction of more than 10% of the area reserved for common open space and/or usable open space. The applicant is proposing 6,674 square feet of additional impervious surface for parking. The amount of open space associated with this project was approved at 82,418 square feet. A 10 percent increase to the approved open space would equal 8,241 square feet. Therefore, the additional impervious surface is below ten percent. This criterion is satisfied. 6. A reduction of specified setback requirements by more than 20%. No setback reduction has been proposed. Therefore, this standard is satisfied. 7. An elimination of project amenities by more than 10% where previously specified provided such as: 1. Recreational facilities 2. Screening; or 3. Landscaping provisions. No project amenities have been proposed to be eliminated. The applicant is adding an additional 6,674 square feet of impervious surface, which will not reduce project amenities. 8. A 10% increase in the approved density. The proposed modification is non-residential. Therefore, this standard does not apply. THIS REQUEST HAS BEEN APPROVED SUBJECT TO THE CONDITIONS BELOW: THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO ISSUANCE OF THE PHASE I SITE PERMIT: Submit to the Engineering Department (Kim McMillan, 639-4171, ext. 2642) for review and approval: 1. The applicant shall provide revised design plans and calculations for the proposed private water quality facility to be submitted to the Engineering Department (Kim McMillan) as a part of the Public Facility Improvement (PFI) permit plans. Included with the plans shall be a proposed landscape plan and maintenance plan. 2. The applicant shall obtain approval from CWS for the proposed piped stormwater outfall. 3. The applicant's Sensitive Land Review application must be approved. Page 2 of 3 This request is determined to be a minor modification to an existing site. The Director's designee has determined that the proposed minor modification of this existing site will continue to promote the general welfare of the City and will not be significantly detrimental or injurious to surrounding properties provided that, development which occurs after this decision complies with all applicable local, state, and federal laws. If you need additional information or have any questions, please feel free to call me at (503) 639-4171, ext. 2437. Sincerely, Cheryl Caines Assistant Planner original: CUP2004-00005 c: MMD2005-00024 I:\curpin\mathew minmodlmmd2005-00024.dec Page 3 of 3 1 cs A■ MINOR MODIFICATIONRECEIVED sittel TYPE I APPLICATION NOV 2 3 2005 CITY OF TIGARD 13125 SW Hall Blvd., Tigard, OR 97223(503) 639-4171 FAX:(503) 684 TIGARD POISIOS.1P".W$lG GENERAL INFORMATION Property Address/Location(s): 110 .5 St,j Gaa,rcle 5trc -1- 1/44/1-8.1.1 oK\ ci 42.43 Tax Map &Tax Lot#(s):M04,0 Z S 4 3PC FOR STAFF USE ONLY 7w,K Lot 11 CO Site Size: 202. 550 SF Case No.(s): MYv1Da0Q5- ooh Applicant*: 115 PC a-t-- tore, Other Case No.(s): Address: i b _ s. Li it- #♦ Receipt No.: a Oa5 - 1003(. City/State: f2Drtla(3_� OR_ Zip: • 1 Application Accepted By: C . La%•-�-- Primary Contact:JY1or-4{ . ic.,ANZCAsi CC Date: 1) ` a3 - vs Phone:503- V15 -Lj/63 Fax: 503.231-5311 Proerty Owner/Deed Holder(s)*: (Attach list if more than one) Date Determined Complete: 7i ctrl, F'r'st / i St C1►I�rc.503-1937;3713�._ Adds: I(D-45 . o Gaas etch ,` Phone: Rev.7/1/05 i:\curpin\rnasters\revised\minormod.mst City/State:"Cgd/ 0 Zip: 91123 * When the owner and the applicant are different people, the applicant must REQUIRED SUBMITTAL ELEMENTS be the purchaser of record or a lessee in possession with written (Note: applications will not be accepted authorization from the owner or an agent of the owner. The owner(s) must without the required submittal elements) sigh this application in the space provided on the back of this form or submit a written authorization with this application. ❑ Application Form PROPOSAL SUMMARY The owners of record of the subject property request permission for a Minor ❑ Owner's Signature/Written Authorization Modification. To review a modification as a Minor Modification, the Director ❑ Title Transfer Instrument or Deed must first find that the expansion does not invoke one or more of the 11 criteria discussed within Section 18.360.050(B) of the Tigard Development ❑ Site Development Plan (3 copies) Code. If the modification exceeds the maximum allowed under any one or more of the following criteria,a Major Modification review is required. ❑ Site/Plot Plan (reduced 8 1/2"x 11") Major Modifications are processed in the same manner as a new Site Development Review. In a separate letter, please address the criteria below ❑ Applicant's Statement(3 copies) contained in Section 18.360.050(B) including a detailed response to each (Addressing Criteria Under Section 18.360.050(B) criteria. ❑ Filing Fee $545.00 1. An Increase in dwelling unit density or lot coverage for residential development. 2. A change in the ratio or number of different types of dwelling units. Jurisdiction: ❑ City ❑ Urb 3. A change that requires additional on-site parking in accordance with Chapter 18.765. In addition, the Director must find that the 4. A change in the type of commercial or industrial structures as defined by the proposed change complies with the underlying Uniform Building Code. standards of the applicable zoning district. To 5. An increase in the height of the building(s)by more than 20%. complete this review, the Applicant's proposal 6. A change in the type and location of accessways and parking areas where off-site must include a discussion indicating how the traffic would be affected. site expansion will continue to comply with the 7. An increase in vehicular traffic to and from the site and increase can be expected minimum setback, building height, parking to exceed 100 vehicles per day. land landscaping standards. Other applicable 8. An increase in the floor area proposed for a non-residential use by more than 10% requirements such as minimum Clear Vision excluding expansions under 5,000 square feet. areas near driveways and street intersections 9. A reduction in the area reserved for common open space and/or usable open may also be applicable depending on where space that reduces the open space area below the minimum required by this code the building expansion is proposed to be or reduces the open space area by more than ten percent. constructed on the site. 10. A reduction of project amenities (recreational facilities, screening, and/or, landscaping provisions) below the minimum established by this code or by more than 10%where specified in the site plan. 11. A modification to the conditions imposed at the time of Site Development Review approval that are not the subject of Criteria 1 through 10 above. APPLICANTS: To consider an application complete, you will need to submit ALL of the REQUIRED SUBMITTAL ELEMENTS as described on the front of this application in the"Required Submittal Elements" box. (Detailed Submittal Requirement Information sheets can be obtained, upon request,for all types of Land Use Applications.) THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan, attachments, and exhibits transmitted herewith, are true; and the applicants so acknowledge that any permit issued, based on this application, and may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application, including the policies and criteria, and understands the requirements for approving or denying the application. SIGNATURES of each owner of the subject property. DATED this day of k.)0v ieek" , 20U� e- Owner's Signature Owner's Signature Owner's Signature Owner's Signature CITY OF TIGARD 11/23/2005 13125 SW Hall Blvd. 3:13:41PM �,. t Tigard,Oregon 97223 - (503) 63 9-4 17 1 _ Receipt #: 27200500000000006036 Date: 11/23/2005 Line Items: Case No Tran Code Description Revenue Account No Amount Paid MMD2005-00024 [LANDUS]Minor Modification 100-0000-438000 475.00 MMD2005-00024 [LRPF]LR Planning Surcharge 100-0000-438050 70.00 Line Item Total: $545.00 Payments: , Method Payer User ID AcctJCheck No.Approval No. How Received Amount Paid Check FIRST BAPTIST CHURCH OF CAC 8491 In Person 545.00 TIGARD Payment Total: $545.00 cReceipt.rpt Page 1 of 1 Matt Scheidegger-minormodRevisedTigardIstBaptist.doc Page 1 1001 SE Water Ave. #200 Mark Siemieniec Architecture Phoned, Ore 03.245.163 Fax 503.231.5319 Revised Proposal Summary For Minor Modification November 23, 2005 Tigard First Baptist Church (CUP 20047-00005) (Revised December 15, 2005) The changes from the original Conditions of Approval 2004-00005 are as follows: The changes from the original CUP involves the phasing of the project (mostly at Phases 2 & 3) and several site improvements. These changes are based on various CUP requirements and the Phasing Changes which were allowed based on the Hearing Officer for the City of Tigard Final Order for CUP 2004-00005 C.Discussion item 6. The current church project phasing is now as follows: Phase 1 - A new 168 space parking lot in the east and south portions of the site, including a new access to SW 110' Avenue and SW Guaarde street will be built. Differences from the original Phase 1 include: • The northeast portion of the site has more parking than the original Phase 1 due to the Occupancy requirements that will come into effect at Phase 2. • Other changes include the conversion of several existing parking spaces to accommodate the required ADAAG spaces. • The Septic field will be decommissioned and the tank will be capped off at Bolt hall to accommodate the new parking. The temporary line shown in the original CUP will not be used. Please refer to Drawings A1.1 and Exhibit A. • Also during Phase 1,an outfall drain from the water quality swale to the creek bed will be constructed(the original CUP submittal only shows sheet flow). Clean Water Services is also being updated. Refer to Drawing C-1 Phase 2 - A new 2-Story Church Sanctuary building and vehicle turn-around will be built. The building shape is preliminary and can change at the time the building permit application is submitted. The original 12,918 s.f. footprint approved in the CUP for the size of the building will not be exceeded and may actually be reduced. The height of the building will not exceed the original submitted in the CUP either. Differences from the original Phase 2 include (this is taking the assumption that the phases are rearranged as approved by the CUP 2004-2005 C Discussion item 6): • Shape and orientation differ from the original building proposed. • The location is primarily the same with the exception of the building moving to the inside edge of the building setback. • Part of the existing southeastern SW 110'entry/parking will remain and a drop-off turn- around will be constructed(we created a smoother,full circle versus the original shape submitted in the CUP). A few new parking spaces will be added and several will be converted to Accessible parking spaces. Refer to Drawing A1.2 and Exhibit B. Phase 3 - The existing Bolt Hall will be demolished and new parking will be added in it's place. The existing southeastern SW 110'^ entry/parking will be reconstructed to connect to the new parking including an upgraded drive. The difference from the original Phase 3 includes: `Matt Scheidegger-miriormodRevisedTigardl stBaptist.doc Page 21 r. Fv `�• • Page 2 • The two existing buildings will not be connected by an addition. Refer to Drawing A1.3 and Exhibit C. Response to project not exceeding Major Modification criteria based on Section 18.330.020(B) 2. a. A change in land use; There is no change in land use b. An 10% increase in dwelling unit density; This is not a residential development. c. A change in the type and/or location of access ways and parking areas where off-site traffic would be affected; The existing Southernmost entry on SW 110`h Ave will remain in its current existing location (rather than slightly shifting it South as indicated in the original CUP drawings). It is therefore not a change in location but a re-use of an existing location. All other drives are located in the original proposed CUP locations. d. An increase in the floor area proposed for non-residential use by more than 10% where previously specified; The new footprint of the building did not increase the proposed floor area e. A reduction of more than 10% of the area reserved for common open space and/or usable open space; There is not a 10% or greater reduction in open space: 6674 sq ft more parking original non-open space = 82,418 sq ft therefore 6674 is less than 8241.8 (10%) f. A reduction of specified setback requirements by more than 20% There is no reduction in setbacks. g. An elimination of project amenities by more than 10% where previously specified provided such as: (1) Recreational facilities; (2) Screening; or (3) Landscaping provisions; There is not a 10% reduction in project amenities. h. A 10% increase in approved density; As per 18.120.030.A.54 "density" definition, this is not a residential land use project. R3.5 R4. R4.5 R7 W R7 % oon_ \ oo_ . ? ��A 4 0 Y k2 Y t 'NEC NEw CURB AND GUTTER i, t1 d NEW PLANTER STRIP N d \ / /■_______.9 Z NEW S' CONCRETE SIDEWALK p7 ,r O`` y� ��0 SW MOTH AVE (LOCAL) ------_� rEX1871N4 !MEW'P — — — — — — ProJSCtNumber.0182003 — _ / 2I4'-0" I �' s'' I 6 �� I Additions and Renovations to the o rte.. ' - ' — ' — — — - -- :• 1 __ I t . _ ._ 2 _ "� Tigard- .1 _ 7 "��' -_—STREET c.,,, -, -_ -_- 'I - --- Vii_ I - .�. , -o" apt 'N-120...0, P First Baptist EXISTING ROPERTY LINE r 1 II' •5 PARKING ES,.111111 '- Church EXISTING EXISTING I 11075 SW Gaarde Street "`vr AL 0 k 73 SPACES MINISTRY BUILDING o i` " T h CHURCH BUILDING , Tigard,OR 97223 —�— \\ h FF. 25717' FF. 294.93'4061.w S.r. n S New PROPERTY LINE T `7 iA EXISTING III u'w.SS•.P. illi DEDICATION R ts `� 4 I,,���\ I1 •.p -' `. DRIVE -.LT HAL �J • I S �,_ \ �rlav% I •os , •• TEMPORART BARRIER i J— i 4 : f , 11 3 P >• �. ///_��i, 1/ i TO BE REMOVED L G —G T -- w -t>✓� j AT PHASE 2 PARKING _r G —G I •rte ��� ■1 I DEMOLITION yr N 24'-0"Jr 43'-0" 24'-0"Jr ' 96'-5' 10 b J AAN AAA CAP�4� I I 4 to • --r- -EPTIC TANK A EXISTING t NEW PARKING - 73 5 G' / I b a R3.5 OUTFLOW. 6 s O ';' 9 DECOMMISSION / • /1.1.... 5 F-w -�, it ' SEPTIC FIELD. TANK RE-STRIPE AS I TEMPORE RT UPPER 1 / -- Ii NEEDED -TAR TO BE REMOVED ,, Mark••�..�— TO BE REGULARLY AT PHASE 2 4 - _ PUMPED uh i / �\ m\ o 9 14 I R�2 Fil o Siemieniec I \ou LITT SWA E� 4 �� i / _ 1 / Architecture � � fihwTh W rD• fi _ HN.L TO SE R IGNADED -� \ 4,7 f • -•C 1 ■I ATV+119 V t I f] ��--- --. sa •M PA 111 ' __�_�_ LI „ PNASE I PARK NG I 2R3 - •,� BD SPACES �/ 4 c5I , LOGKA DLE 212 - 't -_� , i5 SPACES ,, tt — ' SWIN GATE 1-- DA -- ..., iNW f�A, 20' D E PATH ril 'I� 1 EASE ENT I _ _ BRF.m ` 14 Co anlet za ai Sr "`�� �I IlbAk _ k N S O- 0 — — ter— - _ wLTL ND Buff ER _ --� BOON ART W VEGIT TEA __ "~ `�r �`. 'C�_ _ p- 1 COMMUNITY 1 1 _ _ = °� g° BouN IARY Suite 200 star Avenue •20' BIKE PATH �-?� EASEMENT i '� -.,~' = _ _ "'—�_� -��_� 1- ' m -_,rte —'"� - Portland, OR 97214 ` _ , 1 ` ` 'I WETLAND BOUNDARY p 503. 245.4165 I I ♦ e- — _. �,� — -- ' - 1_ ��' / f 503. 231.5319 1 r _ % CENTERLINE Of CR MK gT GRAVEL _ NO. ISSUE/REVISON DATE I R3.5 I R3.5 — — — — — — ,� Prelm�ry ; IJ I L I --- l Ill �� R3.5 SITE AREAS: T — — — — — — — I - EXISTING PI-1.1 PI-1.2 P1-1.3 - BUILDING 12,910 S.F. - 6% 12,410 S.F. • 6% 22,700 S.F. • 11% 20,371 S.F. • 10% R3• . i I PARKING 27,460 S.F. • 14% 76,792 S.F. • 38% 72,466 S.F. • 36% 79,946 S.F. • 39% I LANDSCAPE 162,449 S.F. • 60% 113,117 S.F. ' 36% 108,156 S.F. • 53% 103,025 S.F. • 5I% I I TOTALS 202,702 S.F. • 100% 202,702 S.F. • 100% 202,702 S.F. • 100% 202,702 S.F. • 100% I I SHEET NAME S NUMBER PARKING PHASE I BICYCLE PARKING PHASE 1 3' OVERHANG SPACES: 8'-6'XI5'-6'' 109 EXISTING BICYCLE PARKING SPACES _q L _J 3' OVERHANG COMPACT SPACES: 7'-6'XI3'-6" 46 PHASE 1 PARALLEL SPACES: 8'-6'X22'-6" 5 SITE PLAN EXISTING SPACES 66 EXISTING ACCESSIBLE SPACES 4 _ NEW ACCESSIBLE SPACES 3 233 TOTAL TEMPORARY 3' OVERHANG COMPACT SPACES: 7'-6"X13'-6'` 15 Al ■1 OPHASE 1 SITE PLAN • 1 4 i Gj� /Z CD / 07 /•R��r, I •IEC n \\\*)/ ) \N / , N S — $ Protect Numb@r.0152005 ——————-- - T i - Additions and Renovations to the �' _ _ .: _ .�� Tigard II 1- First Baptist 1 r % /7 - --- - �- -- -- -- Church Ii !!:;IIIIII4 11075 SW Gearde Street / I Tigard OR 9rQj 49 i . ,/ //',, �� Item III ''7 1 � � :14___________ _______ _ 1 Mark. / ` \ ■ 14 ► , „ , t Siem�enlec i � `� c� ,m 1 / * �J I Architecture r 1 -- -- : _ _ ----� – 2,, �_ I I 2.% ............_ _____.1 illrillillillilkillilll `� – ` _ — — _ _ l — _ — — _ _ � ---� 1001 SE Water Avenue 1` .,•.. -- 1 -:-...7.-.=_:--_-_,___-__ `= — — — — — — — — — f� — 1129-- Suite 200 ` ' _ — — — f Portland, OR 97214 ` ` _ 1 —�— ��—_+-4 ( �`'�— p 503. 245.4163 _ �- ` f 503. 231. 5319 I I ` ' f �. _ . _ ._ . _ --- . r ■ NO. ISSUE/REVISION DATE I '� — mnary a, I L I _ . Imo_ L . 1 . _ . _ _ _ I — - - 4— • — — ØPASE 1 SITE PLAN i r • WY-0' 1 SHEET NAME d NUMBER A CUP 2004 00 0 05 VNAALNGAC. DISCUSSION ITEM i ITIONS — — — — — — — — — — J L PHASE 1 EXHIBIT A — I AVM3Afaa'dOMd — — — 8W c -I • ,: d 4 . / i N }-----1 •, ' .; -- � -1 ' • 7i---/-7-4 / 1 1 1 / � .0--.0111 1 '1 I —.7.. _ f 11 / I. I 124' �16't�' 1 I �.. l3AVtD•R — :ill � ( � / / I H I' I4 1} N�V i i �,�„ � 1 ., oc o c1 oc I i II I i lb I i (— _i I: �j� ��! \ / 1 lh Q Y I I t -:1 , I 1 /, 01 . 4, I 1 i I I° . I I I 11 I r . >r i t / ii4 • I I /, I [� / I I is•• Hiti-\' fC 1 ;fir_•. - • 1 1 t \ 1 11 _j i _I I �1� // 1I I I• —� I; L Y --I t 1 1 t\ \1 -- —— I �+ ' I I eti.� -4 I'. I 1 \ , \ \ \ '` SW GARDEN I I 1 1 I .o-.,, Ib -I ' ' 1 i ' \\I PARK PL (8) 1. 1 .1 _ i :! ,�•`. )- ' • If - Il 1 1 I +5�� I _ss \ i 7111-111* 1 I�i I / f ! i�// ,( i j` f r �f d ! V /I / ,) 1 II� 1 I �� l_j 11 f ► 1L :i // I. /I n X1 I I.1 _I I .pm , / I 1 : _ / / f \, / 11 �MJ &L P /1 LçJ //I1// f I).' rl� Sfi"! 1 :1.: s f 1 f / A Ill - I , HYS GI ' r / 1,i� �11w I n NiSYBH3lY3•�•1 i �5 I I� I'I /�\ a::f 1 l�i— I n 'A'�, ;w**-''.. .-,- -L Stir,;:""` / �/\ f e ` i SWQ�RDEN T� ' . . a , �f / / 1 PARK PL OS 1.I " , r ; / , ' / 1// ,,..7/ /i�I I I Th, I ' I / e /1 ',► I, ' /// 1 1 'id.; - ' / ; -. - .11,11( / ; + _ I du p-� , o r// 4/ .- • 1 �' Yd �HL Me II I ;;Qt 4 -.- - ___L. '.. __L '..4- - 1!.-a_l / n 9979141110 NISY:HW.° ilif, ']NO] •X11 A 11414 I,\..... II 1 X11 II on, i re,,, ,.,I MSVB4Oiv] mm,,7„o6T0 N1sVYo /� Iln LA1-'"P, -—' \-i 11 g` 2r__ 8W FARFHAVEN _ \I el, =`�2g_:.g WAY m I g2g2._, A _d015-, amo Z'1 0 1.-, . :lii g m, MG"'1 15 :, 11-14-ae Kwscie ^ ^ I OA1[�..� TIGARD FIRST BAPTIST " " y PLAN VIEW C E S N W CASE FXE NO. CUP 2004-00005 I 1 MARK SEMIENIEC ARCHITECTURE ■ STORM DRAIN 19571 SW RANGY ROAD.SI3i71M1 1001 SE WATER AVENUE At:503.968.6655 ,oaec�xa ro3s PORTLAND. OR. 97214 503.966.6655 vw.mwv.com 11149941191E-090 PH 503.245.4163 FAX 503.231.5319 • I r, R3.5 R4.5 R4.5 R7 R7 �c�/Rfl �� IN/Y/ 3 } )> _ \ N r S 5W 110T 4 AVE z Project Number.0132003 ' — ..,- - - - T- - I- - - Additions and Renovations to the ,?1., s0 II— - �. l– _ _ _ — — — — 40... Tigard • 7 .. 3 Q .`_� - J :- - 76' 21 0 �. First Baptist GM • --I - STREET CENTERLINE If ' - 25 ,• EXISTING PROPERTY Church• I 11075 SW Gaarde Street I,J I PHASE I EXISTING �y::::111111 L. EXISTING '10'-O" fJ PARKING PARKING MINISTRY BUILDING -ETBAC' I Tigard OR 97223 'PER LEVEL F.F. 257.17 �'_'" 73 SPACES 26 EXISTING a' I SPAIN" �- LOWER LEVEL F.F. 248' CHURCH BUILDING $ 13°- . NEW PROPERTY LINE —14o FF. 254.93' '� AFTER 8' ROW +a w e� III ' 45.S.F. DEDICATION 1 C II 1pcIBTING s Ke BOLT HALL JJJ .43 1 DRIVE ssee.w SF- ID P� 0) Anmiramm —r MAINTAIN EXST 1 ✓ '~ -, r rAT KEEP DRIVE 4ND _l 4 II 3 GAS LINE �v,#I \ vim° wrAIII■G 1" - ACCESSIBLE PARKING I -4 G —p G -Ga---IF,kit � =///I i W DURING PHASE 2 —I-L- PHASE 2 Il.i —L- PARKING _ APACE' ~ E I CONSTRUCTION PARKING IS 9 SPACES \ lW COMPLETED •-T +3 LOADI . ,■ I 1 R3.5 a. , u c utaLDAD m PHASE 2 $ p /� �y 24'_0. ADDITION -- 11.1 Mark / \ 5 GONG. ,' _ - s. o �.�,'0 3 �`,� SANCTUARY FCF.SANCTUARY - -- I� �y ^ a MEZZANINE LEVEL 254.93' \ ' LOWEaRi�LEVEL F.. 233' 1 Q Ce Siemieniec wATEI� I _ -/ f1�� sTM'TEw / TO OEOlre�INEO I 4 ` Architecture ETBA \\ \TY SWAL�\` a - C Q ,IIr 'I \ G -•G E `` jii• 1 nEwte gn..l�`I` 0,- ; I LEI A� - I 215 `` �\ / 10 G• G •M A ��� pro E r 21e \ O _`tea,` PHASE KING 2 4 ' I I • LOCK�.DLE IN 215 ��� �.-� t0 77 SPACES I a , SWINN66 GATE 2∎1 �i _�� y`` 15 TEMPORARY i I- ,t �„�` SPACES _/ _ + �''��. ?D' D E PATH (^ 1. .'� ^`��� _ 14 G iii - C 4- a 5_ E � � -� �I�'. , EAS MENT I _ � _ C-__ -�� — I 1 WETL ND BUFFER _ ��'- _ yn EOUN ARY 'er ' ` — _ —_ a ' VEGIT TED 1001 SE Water Avenue ,,�.`�� J. _ 'iii,- — I \ GoMMUNITY Suite 200 ___...z.,........ — — — 0. _ — 1 g"o I BOUNDARY � . \ - - - - - - � � P 4 _ o Portland, OR 9721 alr altos PATH !i- N —�-`` �� o t f P 503.245.4163 lAaEMENT _1 `� �, �-- �� 1 f 503. 231. 5319 r - 1 / WET D BOUNDARY' r J iCENT LINE NO •SSUE/REVISION DATE OF CR EK R3.5 I R3.5 2�� I ST GRAVEL `I - , i I� I I L . — L 1 - I J� I R3.5 PARKING PHASE 2 BICYCLE PARKING PHASE 2 123.5 I EXISTING 3' OVERHANG SPACES: S'-6"X15'-6' 121 EXISTING BICYCLE PARKING SPACES .q EXISTING 3' OVERHANG COMPACT SPACES: 7'-6"X13'-6' 46 NEW BICYCLE PARKING SPACES 22 EXISTING PARALLEL SPACES: 8'-6'X22'-6' 5 31 TOTAL I NEW 3' OVERHANG COMPACT SPACES: 7'-6'X13'-6" 6 NEW ACCESSIBLE SPACES 7 I SHEET NAME 8 NUMBER 185 TOTAL TEMPORARY 3' OVERHANG SPACES: 8'-6'`XIS'-6'' 'IS L J PHASE 2 SITE PLAN QPASE 2 SITE PLAN o Al .2 I 0R __ / •Y , I, 'IEC 'A 1PORT r 'r E�rN, ' Z Prolsct Number.0152005 — — — — — — — — — T I— — — 1` Additions and Renovations to the 'II All l' I L> _-_=_ '!/!/����fige — — — -7 — --IL: _ — _ 1� Tigard I //� 4M1 First Baptist Il-iI-k-I -l-I t llllllll/ill� �C7hurch TN:N ! t I//////////I/ III P 1 1 //////////, 1 ,- - — Air ��/IIII T"- -� �a. ,�/��i�iiil��%llfll l f yinl,,.; ,,i,,,;,a alkaM � -...� I l ill A � ! �.���'�i ,nun /alai�� l 1 `!��i� iii a��t �l f,} •Aft / II ifill i / - - Mark ❑ 4044�,/,/I,''. / �' l t Siemieniec _ r p ,,, . .4,/ l/ ' �/ //I Architecture \ \ / . 1 Il yll';�1�1�i i ll�����1���1/l, l!lllJ l /Mk ... pi _ ,.„. _ .,_ T ��-!s \ / / n , ��ti sArr�,i 1/ ////// /l �4,lol m��/� �llfl�all I —%— — ——r/ on I_ — _ ` ~V``'im-R / _ — --6 IffrAtiL `- - - �' = 1001 SE Water Avenue 1—I .., — `� `-'= . — I Suite 200 _ — Portland, OR 97214 4_ _ _ _ _ _ I_ � � p 503.245.4163 " �""�� M..00.■ f 503.231.5319 I _ �\ NO. ISSUE/REVISION DATE II I 1 Prelm ery 11/17A6 I I_J I i L I i I_ 1 _ _ _ _ . - - I . - _ . _ - - - - - - - - OPI-IASE 2 SITE PLAN I �� AREA OF CHANGE FROM ORIGINAL CONDITIONS I( SHEETNAME&NUMBER �V�/Ik CUP 2004-000005 C. DISCUSSION R i T E M R 6 L E X H I B I T BIT B 1� 07 • H K 511 0 y PORT • i I•, sN, . :,, // / 5W I IOTH,AVE z Protect Number.0752005 Y T— — I Additions and Renovations to the 1 — — 21f�'s s — — I I — - -�M. - o — _ r _ _ _ �- Tigard ; I - — • t 76'-0" 21'-O � j 0-6' First Baptist 7 32._6.. ,-- - - - - -1 - , - to `° la l- rr Church . 11075 SW Gaarde Street I 1 I 5'_b" T�YP EXISTING 20'_On PNg5E 1 DEMO EXST, o PHASE 31 im"I;IIIIII� b Tiperd OR 97223 MINISTRY BUILDING ETBACI� I PARKING _ JPPER LEVEL F.F. 257.17' EXISTING I I BOLT HALL PARKIN �� ' 35'-0" `T 73 SPACES I E SEPTIC I rr 43 SPA '." LOWER LEVEL F.F. 245' CFIURCH BUILDING OI 30'-0' / —I— 4. FF. 254.93' s I / 9 �■N.N S.F. 111 WKS&S.F. —.;4 II I I J+ III II E `"- n a K �d I- u1 -�• I I P+JASE 2 �� r __ I ILI L b I PARKING I 9 SPAC S T I ci ci _ (0 .11 ENCLOSURE PHASE 2 5 0 5 . c vAn.1 2 ® reef .. n} ADDITION w ark 0 fa'4 606 SEAT SANCTUARY �� Fu SANCTUARY F.F. 245' • ----- - - - -- -- I '.R.L.---- e '/I�® .OI `s MEZZANINE LEVEL 254.83' ce Siemieniec IRI 1 LOWER LEVEL F.F. 233' fefefffffefefe., ■u LDINC OUTL■N! WgTER I ..\ 414 . •e e• 20'_0 QUALITY 9WALE <.. • ;11P, TO St DETERMINED Qtr Architecture ETBAC a C. -.C. _ I V =1 illea■ El Ilan -- MI Ills AM. ill. I r17-� .���_ ^ �,. C. G ♦M A _ \�I` ate ' _` 214 �!L if_ ■ PHASE I 1 2 '_'' MANN� ril I O , f PARKING 213 _-+ � _ 77 SPACES I a I I Zt2 `_ , ha 15 TEMPORARY — L I_ ' /���L_.' SPACES — 1� \/ I C— �'•'1 - ................. _ — 1".• till _ �� �' J,4 — -p --- � �I` 1001 SE Water Avenue t _. `' `1—_ �____ �--. - - - - - -� - - - - - = = `Zj� 1 � — 4� � �� � Suite 200 �_~ 1�` o — — — - - - _ -- - xT° I Portland,OR 97214—�' l = ---- �'-- �\ l p 503.245.4163 I f 503. 231. 5319 i� _ I I I �` I NO. ISSUE 7 REVISION - DATE I i� I 1 Prefmrery '�vti.c I R I I, I_ 1 _ _ _ I _ . _ _ - - . _ . _lo PARKING PHASE 3 BICYCLE PARKING PHASE 2 R5.5 I EXISTING 3' OVERHANG SPACES: 6'-6"X15'-6' 95 EXISTING BICYCLE PARKING SPACES 9 I EXISTING 3' OVERHANG COMPACT SPACES: 7'-6"X13'-6" 52 NEW BICYCLE PARKING SPACES _ 22 EXISTING PARALLEL SPACES: 5'-6"X22'-6" 5 $L TOTAL I EXISTING ACCESSIBLE SPACES 7 SHEET NAME B NUMBER NEW 3' OVERHANG SPACES: 8'-6"X15'-6" 43 I 202 TOTAL TEMPORARY 3' OVERHANG SPACES: B'-6'X15'-6" 15 L - - _ - _ _ _ _ _ _ _ J PHASE 3 SITE PLAN OPASE 3 SITE PLAN I. Al .3 `S`' cY g., 251 � • ��IEC y PO' rREGON . \ / gj(, OF 0 Project Number:0152005 TI — Additions and Renovations loth. t------ — _ — _ — — — _ — - _ �, �� Tigard �Q - + + �� :; 1 • First Baptist --- 1i14 E? r L/IIIIihlihI//////II//i, Church —� — .j� � , 11075 SW Gesrde Street — l;.;h;'I IIII� I Tigard,OR 97123 T I 1_I_LI_r 1 0 II I ff I I I I littlieffirerw,r4� I� � N �. `J I J L � ly /T r 4:::::1111_.!°' • � � 1 I I i Mark/ i � N., --- -- �I Siemieniec enlec■ Architecture- ,:t, L__-7,-_,f ' ■ ::.:i::.: / ` 411 ® ® 4® — ili- ' r til ..-• a _` — _ �_ I c' 13Vicit.. e x.":121-7 _ — _ _ _ _ _ _ --. 1001 SE Water Avenue . -� 1 —� _ Suite 200 - - _ _ _ _ I lli ——` — _ _ Portland.OR 07214 - —!z_`_ _� --� p 503.245.4165 1 1 �� r \ f 503.231.5310 .40.11L-- = _:— — .-11,— - - I — I �- �\ NO. ISSUE f REVISION DATE I _ I — 1 Prtimnery 1711786 °PHASE 3 SITE PLAN I 1• - 30'-0• AEA F CHANGE FROI1 ORIGINDITIONS I �� OOF R A2004-00005 O NGD ISGUSSIONRTEM COR6 I SHEET NAL L J PHASE 3 EXHIBIT C