Loading...
Permit n CITY OF TIGARD BUILDING PERMIT III 0_ COMMUNITY DEVELOPMENT Permit#: BUP201300184 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/05/2013 Parcel: 1S 135AB01003 Jurisdiction: Tigard Site address: 10330 SW GREENBURG RD Project: Red Lobster Subdivision: METZGER,TOWN OF Lot: 9 Project Description: Major remodel of existing restaurant Contractor: HALEY CONSTRUCTION INC Owner: LINCOLN CENTER LLC 900 ORANGE AVE BY SHORENSTEIN PROPERTIES LLC DAYTONA BEACH, FL 32114 555 CALIFORNIA ST 49TH FL SAN FRANCISCO, CA 94104 PHONE: 386-944-0470 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Vg Permit Fee-Additions,Alterations, 09/05/2013 $5,303.45 Demolition Occupancy Grp: A-2 Occupancy Load: 299 12%State Surcharge-Building 09/05/2013 $636.41 Dwelling Units: 0 Plan Review 07/22/2013 $3,447.24 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 07/22/2013 $2,121.38 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 09/05/2013 $164.00 Value: $850,000 11x17) Metro Const. Excise Tax-Commercial 09/05/2013 $1,020.00 Use Floor Areas: Info Process/Archiving-Sm$0.50(up to 09/05/2013 $67.50 11x17) Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $12,759.98 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. A TION:- Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-00 -0010 through OA- 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issu By: ,j, ��jn�l�y�� n o, p Permittee Signa ure: �~ Call 503.639.4175 by 7:00 a.m.for the next available inspecp date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial RECEIVED FOR OFFICE USE ONLY �a�\11.i 1�/ Received City of Tigard Date/B Permit No.: .,�P� .oolg , . 13125 SW Hall Blvd,Tigard,OR 97223 l " 2 Plan Review _ i C Phone: 503.718.2439 Fax: 503.598.196 4 G 2 J i 3 Date/By: jolt 1 1J�/ 43 Ot1er Permit: TI G A R D Inspection Line: 503.639.4175 Date Ready/By: tom: H See Page 2 for Internet: www.tigard-or.gov CITYOFTIGARD Notified/Method: Supplemental Information BI JWDING DIVISION TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ` , ®New construction ❑Demolition Permit fees*are based on the value of the work performed. `I` Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. r- ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ L ❑Accessory building ❑Multi-family Number of bedrooms: T ❑Master builder ❑Other Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:10330 SW Greenburg Road New dwelling area: square feet City/State/ZIP:Tigard,OR Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Red Lobster Covered porch area: square feet Cross street/directions to job site:Washington Square Road Deck area: square feet q Other structure area: square feet Cet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Major remodel of the existing restaurant building. Valuation: $$850,000.00 Existing building area: 8,584 square feet l New building area: 8,338 square feet QJ1 ❑ PROPERTY OWNER ® TENANT Number of stories: I D) Name:Red Lobster Type of construction: VB T Address:1000 Darden Center Drive Occupancy groups: City/State/ZIP:Orlando,FL 32837 Existing: A2 Phone:(760)707-9124 Fax:(407)241-5825 New: A2 ❑ APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedulee) Business name:Red Lobster Structural plan review fee(or deposit): Contact name:Steve Hale FLS plan review fee(if applicable): Address:1048 Peppertree Drive City/State/ZIP:Fairfield,CA 94533 Total fees due upon application: Phone:(707)427-8671 Fax: :(707)426-9052 Amount received: E-mail:shdevcon@aoLcom PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name:Haley Construction-Gordy Lloyd Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:900 Orange Ave. Solar Installation Specially Code checklist. City/State/ZIP:Daytona Beach,FL 32114 Permit fee(includes plan review $180.00 and administrative fees): Phone:(386)944-0470 Fax:( ) 2 State surcharge(12%of permit fee): $21.60 CCB lic.: ( �(61 J 'Jr/t'//� 1 Total fee due upon application: $201.60 Authorized signature: y ,i4 /_ This permit application expires if a permit is not obtained ���JJJ��tt�MVO, within 180 days after it has been accepted as complete. Print name:Steve Hale Date:7/22/13 ' Fee methodology set by Tri-County Building Industry . Srrvirr Board Building Division Accessibility: Barrier Removal Improvement Plan •TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities un less such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering [1] $ 850,000.00 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL [2] $ 212,500.00 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order. (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2]of Valuation Computation): $ Building-Division . Development Code Provision Review TI G A RE Commercial Projects - With Approved Land Use Building Permit No.:• • t3 tA.P ■0 t 3 - D v C g Y Land Use Case File No.: MT) ,9v i 3-ooao 3 Project Name: Lo hsrf Site Address: /o 5 a&.1_,0 64-t2Cc, et. , Suite/Bldg #: Plans Routed: Original Plan Submittal Date: 749.3/1-7-/ Routed By: 1st Revision Submittal Date: Routed By: 2nd Revision Submittal Date: Routed By: To the Applicant: Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies to the Building Division. Only checked (✓) items are approved. Items not approved and those listed in the notes must be revised prior to re-submittal. For questions please contact the appropriate staff person(s) listed above each section. STAFF: please only mark those items on the lef side that are approved. Planning Review(contact i ' � ,., at(503) 718- ,2 4'3f or A @tigard- or.gov) „El--Land Use Approval ,Building Plans Match Approved Plan: Yeses' No ❑ , rMaximum Building Height LA-"c) ❑ Conditions Met Street Trees ❑ Protected Trees Notes: 69-NO / (OV J S - 1Oc'I9 -lb 514- 42444/T ,77Vw d"'nr 76' 13 y / /-//�. .... ,, , • irf � /�visea 7-ZZ-/3 cb,n�aSf i•., , inr Al Stj 1.z.) 132-0 G Pi-4w s - E v-A-11 JS °K. Original Plan: Approved ❑ Not Approved g Date: 7'2-4/-(3 / Revision 1: Approved Not Approved ❑ Date: 7 2`t '3 p i. �: GU�C Revision 2: Approved 0 Not Approved ❑ Date: _ L,j/a rt c, v`e U r ,,/u T A,eee.S` 4s cf't.ae441 -, va E:ta 11 il� •. (Review Continues on Page 2) t/ Page 1 of 2 1:\CURPLN\Masters\Development Code Provision Review\DCPR_COM_WithLandUse.doc Rev.01/16/13 i Engineering Review(contact Mike White at(503) 718-2464 or MikeW @tigard-or.gov) 0 Actual Slope:ti % ❑ PFI Permit# 'ems ❑ Conditions Met Notes: Original Plan: Approved Or Not Approved ❑ Date: 1 (2" t Revision 1: Approved ❑ Not Approved ❑ Date: Revision 2: Approved ❑ Not Approved ❑ Date: Permit Coordinator Review(contact Albert Shields at(503) 718-2426 or albeit @ tigard-or.gov) ❑ Planning Okay to Issue Permit ❑ Arborist Okay to Issue Permit ❑ Engineering Okay to Issue Permit Notes: I4Z° ili Original Plan: Date Sent to Applicant: Revision 1: Date Sent to Applicant Revision 2: Date Sent to Applica Okay to Issue Permit: Ye No tic ?'/ �/3 Date Routed to Building: .� �o 3011 Page 2 of 2 1:\CURPLN\Masters\Development Code Provision Review\DCPR_COM WithLandUse.doc Rev.01/16/13 • Transmittal Of Z. DP3 ARCHITECTS Date: 17 July 2013 To: City of Tigard Building Division Attn: Dan Nelson (for Steve Hale) 13125 SW Hall Blvd. Tigard, OR 97223 503-718-2436 Project: Red Lobster—Tigard, OR 11139 Sent Via: Next Day ,� Form Items Action Required 3 30x42 set Demolition plans For Your Use - 2 30x42 set Mechanical Plans For Your Use a 30x42 set Plumbing Plans For Your Use DP3 ARCHITECTS,LTD. 30x42 set Electrical Plans For Your Use 211 East Broad Street 3 30x42 set Site Civil plans For Your Use Greenville,SC 29601 T 864.232.8200 1 30x42 set Erosion Control Plan For Your Use F 864.232 7587 2 30x42 set Site Plan & Vicinity Map For Your Use Message: From: Adam D. Roberts, LEED AP cc: File 1 www.DP3architects.com Transmittal 2 or z DP3 ARCHITECTS Date: 17 July 2013 To: City of Tigard Building Division Attn: Dan Nelson (for Steve Hale) 13125 SW Hall Blvd. Tigard, OR 97223 503-718-2436 Project: Red Lobster—Tigard, OR 11139 Sent Via: Next Day No. Form Items Action Res uired 3 30x42 set Building glans without MEP For Your Use wow 1.11M DP3 ARCHITECTS,LTD. --__-- ��_�:�•-= ��ruR ==�-- --- 211 East Broad Street F' !, — _ Greenville,SC 29601 - Y11'�' ��— - T 864.232.8200 -2.21M •1/�•���•t•���, F 864.232.7587 Message: From: Adam D. Roberts, LEED AP cc: File 1 www.DP3architects.com FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. • City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter e T l o A R D 13125 SW all Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: // DATE ' DEPT: B DING DIVISION r AUG 262013 FROM: -] , ' \i CITY OFTIGARD BUILDING DIVISION COMPANY: PHONE: d' -- RE: /o � t� A).tV:0.,a b & gfl (Site Address) (Permit Number) , 0 Le), 11 ■ ,..LA (Project n= e or subdivision name an' lot number) ATTACHED ARE T FOLLOWING ITEMS: Copies: I Description: Copies: Description: Additional set(s) of plans. Revisions: _ Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. _ oZ Engineer's calculations. kOther(explain): fig 6#1,2___ ,, REMARKS: FOR CUFF CE USE ONLY Routed to Permit Technici Date: C((4-l(' Initials: -6 Fees Due: ❑ Yes [ 10 Fee Description: Amount Due: $ $ $ $ Special Instructions: Reprint Permit(per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: (:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012 • COMcheck Software Version 3.9.2 1 (nil Envelope Compliance Certificate RECEIVED 2010 Oregon Energy Efficiency Specialty Code AUG 2 6 2013 Section 1: Project Information CITY Type:Alteration BUILDING DIVISIIpN Envelope Compliance Method: Prescriptive Project Title :Red Lobster Construction Site: Owner/Agent: Designer/Contractor: 10330 SW Greenburg Road Darden Restaurants,Inc Adam Roberts Tigard,OR 97223 1000 Darden Center Drive Brian S.Thomas,Architect Orlando,FL 32837 211 East Broad Street 407-245-4000 Greenville,SC 29601 864-232-8200 Section 2: General Information *p c fg,,_ Building Location(for weather data): Tigard,Oregon City of Tigard Climate Zone: - • •r•ved Plans Building Space Conditioning Type(s): Nonresidential p 46.,.._Vertical Glazing/Wall Area Pct.: 5% B 4 '46.,.._ Date li.cA�-\ rE, Main Activity Dining TYDeIs) Fi44i 4900 1 O�,,Z�'1 L.t E--r i Main Dining Room(Common Space Types:Dlning Area-Family 4900 -'LJ Restaurant) Kitchen,Bar Service(Common Space Types:Food Preparation) 1750 Restrooms(Common Space Types:Restrooms) 350 OFFICE COPY Mezzanine Dining(Common Space Types:Dining Area-Family 1338 Restaurant) Section 3: Requirements Checklist Envelope PASSES Climate-Specific Requirements: R-Value Proposed Max.Allowed Post-Alteration Assembly Cavity Cont U-Factor SHGC U-Factor SHGC RM root Insulation Entirely Above Deck -- 30.0 0.032 - 0.048 - Attic Roofs:Attic Roof with Wood Joists 0.0 38.0 0.025 -- 0.027 - North Exterior Wall:Wood-Framed, 16'o.c. 0.0 19.0 0.044 •-- 0.064 - Cumulative Windows:Wood Frame:Double Pane with Low-E, --- --- 0.240 0.270 0.350 0.400 Clear East Exterior Wall:Wood-Framed,16"o.c. 0.0 19.0 0.044 -- 0.064 -- Cumulative Windows:Wood Frame:Double Pane with Low-E, --- --- 0.240 0.270 0.350 0.400 Clear Cumulative Doors:Insulated Metal,Swinging --- --- 0.500 -- 0.700 --- South Exterior Wall:Wood-Framed,16"o.c. 0.0 19.0 0.044 - 0.064 - Cumulative Windows:Wood Frame:Double Pane with Low-E, --- -- 0.240 0.270 0.350 0.400 Clear Door:Wood,Swinging -- --- 0.250 -- 0.700 - West Exterior Wall:Wood-Framed,16'o.c. 0.0 19.0 0.044 -- 0.064 - Cumulative Windows:Wood Frame:Double Pane with Low-E, --- --- 0.240 0.270 0.350 0.400 Clear Door:Wood,Swinging --- --- 0.250 -- 0.700 --- Project Title: Red Lobster Report date:08/21/13 Data filename-C AUsers'iaroberts'Desktop\Tlgand ComCheck.cck Page 1 of 14 Floor 1:Slab On-Grade:Unheated -- 0.0 1.000 — 0.730 — in the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Fenestration Product Rating: ✓ 1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited, independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame. The temporary label affixed to the fenestration products must not be removed prior to Inspection_ Plans reference page/section: ✓ 2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined In accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined using the Solar Heat Gain Coefficients(SHGC)In Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The overall values must consider type of frame material and operator for the SHGC at normal incidence. Plans reference page/section: _ Air Leakage, Insulation,and Component Certification: ✓ 3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow for expansion and contraction of the construction materials. Plans reference page/section: v 4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope are determined in accordance with AAMA/WDMA/CSA 101/1.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and labeled and certified by the manufacturer. Plans reference page/section: ✓ 5. Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing, the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging entrance doors and revolving doors,the maximum air leakage rate is 1.00 dm/R2 of door area Plans reference page/section: _ ✓ 6. Building thermal envelope Insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12 inches or greater in width.Alternately,the insulation Installers have provided a signed,dated and posted certification listing the type, manufacturer and R-value of insulation Installed.Refer to code section for blown or sprayed insulation installation/settling depths and marker requirements. ✓ 7. Insulation mark installation.Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon inspection. ✓ 8. Insulation product rating.The thermal resistance(R-value)of Insulation has been determined in accordance with the U.S.FTC R-value rule. `/ 9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the International Building Code. ✓ 10.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate of 4 cfm per square foot at 1.0 inch water gauge when tested In accordance with AMCA 500D.Stair and shaft vent dampers shall be capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. Requirement is not applicable. Plans reference page/section: 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict Infiltration when vehicles are parked in the doorway. Requirement is not applicable. Plans reference page/section: — — ✓ 12.Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are sealed with a gasket or caulk between the housing and interior wall or ceiling covering. Plans reference page/section: - Project Title: Red Lobster Report date:08/21/13 Data filename:C:Wsers\aroberts\Desktop\Tigard ComCheolk.cck Page 2 of 14 13.Vestibules.Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously. Plans reference page/section: 14.'Other components have supporting documentation for proposed U-Factors. Requirement is not applicable. Plans reference page/section: _ Section 4: Compliance Statement Compliance Statement The proposed envelope alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application.The proposed envelope alteration project has been designed to meet the 2010 Oregon Energy Efficiency Specialty Code requirements it OMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements Checklist. Name-Title Signature Project Title: Red Lobster Report date: 08/21/13 Data filename:C:1Userslaroberts\Desktop\TIgard ComCheck_cck Page 3 of 14 COMcheck Software Version 3.9.2 11Pil Interior Lighting Compliance Certificate 2010 Oregon Energy Efficiency Specialty Code Section 1: Project Information Project Type:Alteration Envelope Compliance Method: Prescriptive Protect Title:Red Lobster Construction Site: Owner/Agent: Designer/Contractor: 10330 SW Greenburg Road Darden Restaurants,Inc Adam Roberts Tigard,OR 97223 1000 Darden Center Drive Brian S.Thomas,Architect Orlando,FL 32837 211 East Broad Street 407-245-4000 Greenville,SC 29801 864-232-8200 Section 2: Interior Lighting and Power Calculation A B C 0 Area Category Floor Area Allowed Allowed Wafts (02) Watts/112 (BxC) Main Dining Room(Common Space Types:Dining Area-Family Restaurant) 4900 2.14(a) 10486 (Ceiling Height 10 ft.) Kitchen,Bar Service(Common Space Types:Food Preparation)(Ceiling Height 1750 1.07 1$73 8 ft.) Restrooms(Common Space Types:Restrooms)(Ceiling Height 9 ft) 350 0.82 287 Mezzanine Dining(Common Space Types:Dining Area-Family Restaurant) 1338 2.1 2810 (Ceiling Height 8 ft.) Total Allowed Watts= 15455 (a) Allowed watts per sq.ft.adjusted for ceiling height. Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ 4 of Fixture (C X D) Fixture Fixtures Watt. Main Dining Room(Common Space Types:Dining Area-Family Restaurant 4900 sq.ft.) LED 1:LT2:Decor Light:LED MR 7W: 1 29 7 203 LED 2:LT2A:Recessed Downlight:LED MR 7W: 1 5 7 35 LED 3:LT3:Pendant:LED PAR 7W: 1 3 7 21 LED 4:LT4:Recessed Downlight:LED MR 7W: 1 66 7 462 LED 5:LT4A:Table spot:LED PAR 7W: 1 50 7 350 LED 6:LT10:Pendant:LED PAR 7W: 1 5 7 35 LED 10:LT16:Cleat Light:LED A Lamp 8W: 1 2 8 16 Halogen 2:LT19:Puck Light:12V Halogen 20W: 1 8 18 144 LED 11:LT20:Cabinet Lights:LED Linear 10W: 1 9 10 90 linear Fluorescent 9:LT28:Tower Lights:48"T8 28W(Super T8):Electronic: 1 5 28 140 LED 12:LT37A:Chandelier.Other: 4 4 96 384 LED 13:LT37B:Chandelier.Other: 3 3 72 216 LED 14:LT43:Under Counter.LED Linear 20W: 1 10 20 200 Kitchen,Bar Service(Common Space Types:Food Preparation 1750 sq.ft.) Linear Fluorescent 2:LT7:Undercabinet Strip:48"T8 28W(Super T8):Electronic: 2 2 56 112 Linear Fluorescent 1:LT13:2x4 Troffer:48'T8 28W(Super T8):Electronic: 3 24 96 2304 Linear Fluorescent 1 copy 1:LT138:1x4 Troffer:48"T8 28W(Super T8):Electronic: 3 2 96 192 Linear Fluorescent 4:LT14:Strip:48'T8 28W(Super T8):Electronic: 2 2 56 112 Project Titte: Red Lobster Report date:08/21/13 Data filename:C:\Users\aroberts\Desktop\Tigard ComCheck.cck Page 4 of 14 Linear Fluorescent 5:LT15A:Cooler Lights:48'T8 28W(Super T8):Electronic: 2 3 56 168 Linear Fluorescent 6:LT15C:Freezer Lights:46'T5 54W:Electronic: 2 2 108 216 Linear Fluorescent 7:LT21:48'18 28W(Super T8):Electronic: 2 2 56 112 Linear Fluorescent 8:LT25:2x4 Dlr/Ind Trotter.48'T8 28W(Super T8):Electronic: 4 1 112 112 Compact Fluorescent 1:LT40:Hood Lights:Spiral 20W:Electronic: 1 10 20 200 Restrooms(Common Space Types:Restrooms 350 sq.ft.) LED 4 copy 1:LT4:Recessed Downlight:LED MR 7W: 1 17 7 119 Mezzanine Dining(Common Space Types:Dining Area-Family Restaurant 1338 sq.ft.) Halogen 1:LT4H:Recessed Downlight: 12V Halogen 50W: 1 19 50 950 LED 4 copy 2:LT4:Recessed Downlight:LED MR 7W: 1 9 7 63 LED 5 copy 1:LT4A:Table spot:LED PAR 7W: _ - 1 10 7 70 Total Proposed Watts= 7026 Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the piens✓specs the requirement can be verified as being satisfied. Lighting Wattage: v 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage:15455 Proposed Wattage:7026 Compiles:YES Mandatory Requirements: ✓ 2. Exit signs.Internally illuminated exit signs shall not exceed 5 watts per side. Plans reference page/section: a I t/ 3. Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non-daylight zone.In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic OFF control, while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations(I.e.,north,east, south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. Exception applies:Display,exhibition and specialty lighting Plans reference page/section: ✓ 4. Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are a remote switch that identifies the lights served and indicates their status. Exception applies:Lighting in public areas such as concourses,stairways or corridors that are elements of the means of egress with switches that are accessible only to authorized personnel. Plans reference page/section: O 5. Sleeping unit controls.Master switch at entry to hotel/motel guest room. Plans reference page/section. _ _ - - - --- 6/ 6. Egress lighting.Egress illumination is controlled by a combination ol listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied. Plans reference page/section: — 4/ 7. Additional controls.Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. Plans reference page/section: 6/ 8. Light reduction controls.Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 1)controlling(dimming or multi-level switching)all luminaires;or 2)dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps;or 3)switching the middle lamp luminaires independently of other lamps:or 4)switching each luminaire or each lamp. Plans reference page/section: Protect Title: Red Lobster Report date:08/21/13 Data filename:C:\Users\aroberts'Desktop\Tigard ComCheck.cck Page 5 of 14 ✓ 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic control device shall function on either. 1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor;or 2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or 3)a signal from another control or alarm system that indicates the area Is unoccupied. Plans reference page/section: ✓ 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Plans reference page/section: -- ---- ✓ 11 An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. Plans reference page/section: ✓ 12.Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is Installed in all storage and supply rooms up to 1000 square feet. Plans reference page/section: v I3.Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device that:1)Is readily accessible,2)Is located so that a person using the device can see the lights or the area controlled by that switch,or so that the area being it is annunciated,3)is manually operated,4)allows the lighting to remain on for no more than 2 hours when an override is initiated,and 5)controls an area not exceeding 2,000 square feet. Plans reference page/section: 14.Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours,then resumes the normally scheduled operation. Plans reference page/section: - — ✓ 15.Exterior lighting controls.Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a photosensor and a time switch,or an astronomical time switch.Lighting designated for dusk-to-dawn operation shall be controlled by an astronomical time switch or photosensor. Plans reference page/section: - t✓ 16.Tandem wiring.The following luminaires located within the same area shall be tandem wired: 1.Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet center-to-center of each other. 2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted within 1 foot edge-to-edge of each other. Plans reference page/section: O 17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Plans reference page/section: • 18.Each dwelling unit in a building is metered separately. Plans reference page/section: -- Interior Lighting PASSES Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2010 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements Checklist / p c 1 p. ..`►• S `2o13 Name-Title Signature Date Project Title: Fled Lobster Report date:08/21/13 Data filename:C:\Users\arobertslOesktop\Tigard ComCheck.cck Page 6 of 14 COMcheck Software Version 3.9.2 1111;(11:4 Exterior Lighting Compliance Certificate 2010 Oregon Energy Efficiency Specialty Code Section 1: Project Information Project Type:Alteration Envelope Compliance Method: Prescriptive Project Title : Red Lobster Exterior Lighting Zone: 2(Neighborhood business district) Construction Site: Owner/Agent: Designer/Contractor: 10330 SW Greenburg Road Darden Restaurants,Inc Adam Roberts Tigard,OR 97223 1000 Darden Center Drive Brian S.Thomas,Architect Orlando,FL 32837 211 East Broad Street 407-245-4000 Greenville,SC 29601 864432-8200 Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Watts /Unit (B x C) Main entry 6 ft of door width 20 Yes 120 44 Illuminated length of facade well or surface 425 ft 2.5 No 1063 1532 Other door(not main entry) 6 ft of door width 20 Yes 120 320 Total Tradable Watts'= 240 364 Total Allowed Watts= 1303 Total Allowed Supplemental Watts"= 600 •Wattage tradeoffs are only allowed between tradable areas/surfaces. A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ I of Fixture (C X D) Fixture Fixtures Watt. Main entry(6 ft of door width):Tradable Wattage LED 1:LT29:Recessed Spotlight:LED PAR 7W: 1 4 7 28 LED 2:LT11:Entry Sconce:LED A Lamp 8W: 1 2 8 18 Illuminated length of facade wall or surface(425 ft):Non-tradable Wattage LED 1 copy 1:LT29:Recessed Spotlight:LED PAR 7W: 1 6 7 42 LED 2 copy 1:LT1:Wall Sconce:LED A Lamp 8W: 1 10 8 80 HID 1:LT35:Flood:Metal Halide:Pulse start 1 11 85 935 HID 2:LT23:Flagpole light:Metal Halide:Pulse start: 1 1 85 85 HID 3:LT22:Gooseneck:Metal Halide:Pulse start: 1 6 65 390 Other door(not main entry)(6 ft of door width):Tradable Wattage HID 4:LT24:Wall pack:Metal Halide:Pulse start: 1 3 85 255 HID 5:LT22:Gooseneck:Metal Halide:Pulse start: 1 1 65 65 Total Tradable Proposed Watts= 364 Section 4: Requirements Checklist Project Title: Red Lobster Report date: 08/21/13 Data filename: C:\Users\aroberts\Desktop\Tigard CornCheck.cck Page 7 of 14 In the following requirements,blank checkboxes Identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. Plans reference page/section'identifies where In the plans/specs the requirement can be verified as being satisfied. Controls, Switching,and Wiring: `/ 1. Lighting designated to operate more than 2000 hours per year for Uncovered Parking Areas shall be equipped with motion sensors that will reduce the luminaire power by thirty-three percent or turn off one-third the luminaires when no activity is detected. Plans reference page/section: Exterior Lighting Restrictions and Exceptions: 6/ 2. Mercury vapor and incandescent lighting is not permitted for use as exterior lighting. 6/ 3. Exempt lighting fixtures are equipped with a control device Independent of the control of the nonexempt lighting and are Identified in Section 3 table above. Plans reference page/section: Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2010 Oregon Energy Efficiency Specialty Code requirements In COMcheck Version 3.9. and to comply with the mandatory requirements in the Requirements Checklist. ��?► — fa.1 zo-'3 Name-Title Signature Date Project Title: Red Lobster Report date: 08/21/13 Data filename:C:\Userslaroberts\Desktop\Tigard ComCheck.cck Page 8 of 14 COMcheck Software Version 3.9.2 (IIA Mechanical Compliance Certificate 2010 Oregon Energy Efficiency Specialty Code Section 1: Project Information Project Type:Alteration Envelope Compliance Method: Prescriptive Project Title:Red Lobster Construction Site: Owner/Agent: Designer/Contractor: 10330 SW Greenburg Road Darden Restaurants,Inc Adam Roberts Tigard,OR 97223 1000 Darden Center Drive Brian S.Thomas,Architect Orlando,FL 32837 211 East Broad Street 407-245-4000 Greenville,SC 29601 864-232-8200 Section 2: General Information Building Location(for weather data): Tigard,Oregon Climate Zone: 4c Section 3: Mechanical Systems List Quantity System Tym./_Qascrlption 3 HVAC System 1 (Single Zone): Heating: 1 each-Central Furnace,Gas,Capacity=250 kBtu/h Proposed Efficiency=80.00%Ec,Required Efficiency=80.00%Ec Coding:1 each-Rooftop Package Unit,Capacity=180 kBtulh,Air-Cooled Condenser,Air Economizer Proposed Efficiency=12.00 EER,Required Efficiency=10.80 EER Fan System: None 1 RRU-1 (Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=407 kBtu/h Proposed Efficiency=80.00%Ec,Required Efficiency=80.00%Ec Cooling:1 each-Rooftop Package Unit,Capacity=140 kBtuth,Air-Cooled Condenser,Air Economizer Proposed Efficiency=12.50 EER,Required Efficiency=10.80 EER Fan System: None 1 HVAC System 3(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=651 kBtu/h Proposed Efficiency=80.00%Ec,Required Efficiency=80.00%Ec Cooling:1 each-Rooftop Package Unit,Capacity=312 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=11.00 EER,Required Efficiency=9.80 EER Fan System: None 2 Water Heater 1: Gas Storage Water Heater,Capacity:100 gallons.Input Rating:75 Btu/h w/Circulation Pump Proposed Efficiency:0.95 EF,Required Efficiency:0.48 EF Section 4: Requirements Checklist in the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks Identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Requirements Specific To: HVAC System 1 : I,/ 1. Equipment meets minimum efficiency: Central Furnace(Gas): 80.00%Ec ii/ 2. Equipment meets minimum efficiency: Rooftop Package Unit: 10.80 EER(11.0 IEER) Project Title: Red Lobster Report date: 08/21/13 Data filename:C:',Userslaroberts■DaskloplT gard ComCheck.cck Page 9 of 14 ❑ 3. Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. Exception(s): ❑ Where energy recovery systems are prohibited by the International Mechanical Code. ❑ Systems serving spaces that are not cooled and are heated to less than 60°F. ❑ Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. (3 Type 1 kitchen exhaust hoods. ❑ Cooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64°F(18°C). ❑ Systems requiring dehumidification that employ series-style energy recovery coils wrapped around the cooling coil when the evaporative coil is located upstream of the exhaust air stream. ❑ Systems exhausting toxic,flammable,paint exhaust,corrosive fumes,or dust. ❑ Laboratory fume hood systems that Include qualifying features. Plans reference page/section: - - ❑ 4. Hot Gas Bypass Limitation.Cooling systems does not use hot gas bypass or other evaporator pressure control unless the equipment is designed with multiple steps(or continuous)capacity modulation. Plans reference page/section: 6/ 5. Supply air economizers shall be provided on each cooling system and are capable of providing 100-percent outdoor air,even if additional mechanical cooling is required to meet the cooling load of the building.Systems provide a means to relieve excess outdoor air during economizer operation to prevent overpressurizing the building. Plans reference page/section: _-- Requirements Specific To: RRU-1 : 6/ 1. Equipment meets minimum efficiency: Central Furnace(Gas): 80.00%Ec 6/ 2. Equipment meets minimum efficiency: Rooftop Package Unit: 10.80 EER(11.0 IEER) ❑ 3. Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a minimum outside air suppty of 70 percent or greater of the design supply air quantity have an energy recovery system. Exception(s): ❑ Where energy recovery systems are prohibited by the International Mechanical Code. ❑ Systems serving spaces that are not cooled and are heated to less than 60°F. ❑ Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. ❑ Type 1 kitchen exhaust hoods. ❑ Cooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64°F(18°C). (3 Systems requiring dehumidification that employ series-style energy recovery coils wrapped around the cooling coil when the evaporative coil is located upstream of the exhaust air stream. ❑ Systems exhausting toxic,flammable,paint exhaust,corrosive fumes,or dust. ❑ Laboratory fume hood systems that include qualifying features. Plans reference page/section: ❑ 4. Hot Gas Bypass limitation.Cooling systems does not use hot gas bypass or other evaporator pressure control unless the equipment is designed with multiple steps(or continuous)capacity modulation. Plans reference page/section: `/ 5. Supply air economizers shall be provided on each cooling system and are capable of providing 100-percent outdoor air,even if additional mechanical cooling is required to meet the cooling load of the building.Systems provide a means to relieve excess outdoor air during economizer operation to prevent overpressurizing the building. Plans reference page/section: Requirements Specific To: HVAC System 3 : ❑ 1. Equipment meets minimum efficiency: Central Furnace(Gas): 80.00%Ec `/ 2. Equipment meets minimum efficiency: Rooftop Package Unit: 9.80 EER(9.9 IPLV) ❑ 3. Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. Exceptfon(s): ❑ Where energy recovery systems are prohibited by the International Mechanical Code. ❑ Systems serving spaces that are not cooled and are heated to less than 60°F. Project Title: Red Lobster Report date: 08/21/13 Data filename:C:1Users\aroberts1Desktop\Tigard ComCheck.cck Page 10 of 14 Q Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. ❑ Type 1 kitchen exhaust hoods. ❑ Cooling systems In climates with a 1-percent cooling design wet-bulb temperature less than 84°F(18°C). Q Systems requiring dehumidification that employ series-style energy recovery coils wrapped around the cooling coil when the evaporative coil is located upstream of the exhaust air stream. Q Systems exhausting toxic,flammable,paint exhaust,corrosive fumes,or dust. Q Laboratory fume hood systems that include qualifying features. Plans reference page/section: ❑ 4. Hot Gas Bypass Limitation.Cooling systems does not use hot gas bypass or other evaporator pressure control unless the equipment is designed with multiple steps(or continuous)capacity modulation. Plans reference page/section: — ✓ 5. Supply air economizers shall be provided on each cooing system and are capable of providing 100-percent outdoor air,even if additional mechanical cooling is required to meet the cooling load of the building.Systems provide a means to relieve excess outdoor air during economizer operation to prevent overpressurizing the building. Plans reference page/section: Requirements Specific To: Water Heater 1 : ✓ 1. Newly purchased equipment meets the efficiency requirements. Gas Storage Water Heater efficiency: 0.48 EF ✓ 2. Service water-heating equipment performance efficiency.Water heating equipment efficiency has been verified through data furnished by the manufacturer or through certification under an approved certification program. v 3. Temperature controls.Service water-heating equipment have controls to allow a setpoint of 110°F for equipment serving dwelling units and 90°F for equipment serving other occupancies.The outlet temperature of lavatories in public facility rest rooms is limited to 110°F. Plans reference page/section: ❑ 4. Heat traps.Water-heating equipment not supplied with integral heat traps and serving noncirculating systems have heat traps on the supply and discharge piping associated with the equipment. Plans reference page/section: - — ti# 5. Pipe Insulation.For automatic-circulating hot water and externally heated(such as heat trace or impedance heating)systems,piping is Insulated in accordance with the specifications of this section. ❑ 6. Hot Water System Controls.Systems designed to maintain usage temperatures In hot water pipes Is turned off automatically when the hot water system Is not in operation and has demand sensing controls that turn off the system when there is no demand when the system is operational.A check valve or similar device is installed per requirement details. Exception(s): ❑ Where public health standards require 24 hours per day operation of pumps for uses such as swimming pools,spas and hospitals. ❑ Service water heating systems used to provide multiple functions as part of an integrated system. Q Where coupled with water heating capacity less than 100 kBtu/h. Plans reference page/section: Generic Requirements: Must be met by all systems to which the requirement is applicable: ✓ 1. Calculation of heating and cooling loads.Design loads are determined in accordance with the procedures described In the ASHRAE/ACCA Standard 183.Alternatively,design loads have been determined by an approved equivalent computation procedure. ❑ 2. Packaged Electric Equipment.Specified packaged electrical equipment has a heat pump as the primary heating source. Exception(s): (3 Unstaffed equipment shelters or cabinets used solely for personal wireless service facilities. ❑ Requirement is not applicable. Plans reference page/section: v 3. Equipment and system sizing.Heating and cooling equipment and systems capacity do not exceed the loads calculated in accordance with Section 503.2.1. Plans reference page/section: ✓ 4. HVAC Equipment Performance Requirements.Reported efficiencies have been tested and rated in accordance with the applicable test procedure.The efficiency has been verified through certification under an approved certification program or,if no certification program exists,the equipment efficiency ratings are supported by data furnished by the manufacturer. Project Title: Red Lobster Report date: 06/21/13 Data filename:C:\Users\aroberts\Desktop\Tigard ComCheck_cck Page 11 of 14 ✓ 5. Thermostatic Controls.The supply of heating and cooling energy to each zone Is controlled by individual thermostatic controls that respond to temperature within the zone. Plans reference page/section: j 6. Heat pump supplementary heat.Heat pumps having supplementary electric resistance heat have controls that,except during defrost, prevent supplementary heat operation when the heat pump can meet the heating load. Plans reference page/section: — t✓ 7. Set point overlap restriction.Where used to control both heating and cooling,zone thermostatic controls provide a temperature range or deadband of at least 5°F(2.8°C)within which the supply of heating and cooling energy to the zone is capable of being shut off or reduced to a minimum. Plans reference page/section: —_—.—— `/ 8. Optimum Start Controls.Each HVAC system has controls that vary the start-up time of the system to just meet the temperature set point at time of occupancy. Plans reference page/section: -- - - V 9. Off-hour controls.Each zone is provided with thermostatic setback controls that are controlled by either an automatic time clock or programmable control system. Plans reference page/section: v 10.Shutoff damper controls.Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers. Plans reference page/section: - ✓ 11.Freeze Protection and Snow melt system controls.Freeze protection systems,such as heat tracing of outdoor piping and heat exchangers,including self-regulating heat tracing,include automatic controls capable of shutting off the systems when outdoor air temperatures meet code criteria. Plans reference page/section: - • 12.Zone Isolation Controls.A system serving multiple occupancies or floors in the same building is independently zoned and equipped with isolation devices. Plans reference page/section: - - �/ 13.Separate air distribution systems.Zones with special process temperature requirements and/or humidity requirements are served by separate air distribution systems from those serving zones requiring only comfort conditions;or shall include supplementary control provisions so that the primary systems may be specifically controlled for comfort purposes only. Plans reference page/section: --- - -- O 14.Humidity control.If a system is equipped with a means to add or remove moisture to maintain specific humidity levels in a zone or zones,a humidity control device is provided. Plans reference page/section: • 15.Humidity control.Where a humidity control device exists it is set to prevent the use of fossil fuel or electricity to produce relative humidity in excess of 30 percent.Where a humidity control device is used for dehumidification,it is set to prevent the use of fossil fuel or electricity to reduce relative humidity below 60 percent. Exceptlon(s): Hospitals,process needs,archives,museums,critical equipment,and other non-comfort situations with specific humidity requirements outside this range_ Plans reference page/section: D 16.Humidity control.Where a humidity control device exists It is set to maintain a deadband of at least 10%relative humidity where no active humidification or dehumidification takes place. Exception(s): Heating for dehumidification is provided with heat recovery or heat pumping and the mechanical cooling system efficiency is t0 percent higher than required in section 503.2.3,HVAC equipment performance requirements. Plans reference page/section: _ ✓ 17.Ventilation.Ventilation,either natural or mechanical,Is provided In accordance with Chapter 4 of the International Mechanical Code. Where mechanical ventilation is provided,the system has the capability to reduce the outdoor air supply to the minimum required by Chapter 4 of the International Mechanical Code. Plans reference page/section: O 18.Demand controlled ventilation(DCV).DCV Is required for spaces larger than 500 ft2 for simple systems and spaces larger than 150 ft2 for multiple zone systems. Project Title: Red Lobster Report date: 08/21/13 Data filename:C:1Users\aroberts\Desktop\Tigard ComCheck.cck Page 12 of 14 Exception(s): ❑ Systems with energy recovery complying with Section 503.2.6 ❑ Spaces less than 750 ft2(69.7 m2)where an occupancy sensor turns the fan off,closes the ventilation damper,or closes the zone damper when the space is unoccupied. Plans reference page/section: 19.Kttchen hoods.Kitchen makeup Is provided as required by the Oregon Mechanical Specialty Code. Plans reference page/section: ---- ❑ 20-Enclosed parking garage ventilation controls.In Group S-2,enclosed parking garages used for storing or handling automobiles employs automatic carbon monoxide sensing devices. Plans reference page/section: ❑ 21.Duct and plenum insulation and sealing.All supply and return air ducts and plenums are insulated with the specified insulation.When located within a building envelope assembly,the duct or plenum is separated from the building exterior or unconditioned or exempt spaces by a minimum of R-8 insulation.All ducts,air handlers and filter boxes are sealed.Joints and seams comply with Section 603.9 of the International Mechanical Code. Excepton(s). ❑ When located within equipment. ❑ When the design temperature difference between the interior and exterior of the duct or plenum does not exceed 15°F(8°C). ✓ 22.Low-pressure duct systems.All longitudinal and transverse joints,seams and connections of low-pressure supply and return ducts are securely fastened and sealed with welds,gaskets,mastics(adhesives),mastic-plus-embedded-fabric systems or tapes installed in accordance with the manufacturer's installation instructions. Plans reference page/section: -- - ❑ 23.Medlum-pressure duct systems.All ducts and plenums designed to operate medium-pressure are insulated and sealed In accordance with Section 503.2.7.Pressure classifications specific to the duct system are clearly indicated on the construction documents. Plans reference page/section. -- ❑ 24.High-pressure duct systems.Ducts designed to operate at high-pressure are insulated and sealed in accordance with Section 5032.7. In addition,ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual. Plans reference page/section: ✓ 25Air system balancing.Each supply air outlet and zone terminal device is equipped with means for air balancing in accordance with the requirements of IMC 603.17.Discharge dampers intended to modulate airflow are prohibited on constant volume fans and variable volume fans with motors 10 horsepower. Plans reference page/section: --- ❑ 26.Manuals.The construction documents require that an operating and maintenance manual be provided to the building owner by the mechanical contractor.See long description for specifications. Plans reference page/section: --- -- ❑ 27.Air System Design and Control.Each HVAC system having a total fan system motor nameplate hp exceeding 5 hp meets the provisions of Sections 503.2.10.1 through 503.2.10.2. Plans reference page/section. ✓ 28.Allowable fan floor horsepower.Each HVAC system at fan system design conditions does not exceed the allowable fan system motor nameplate hp(Option 1)or fan system bhp(Option 2)as shown and calulated In requirement details. Exception applies: Individual exhaust tans with motor nameplate horsepower of 1 hp or less. Plans reference page/section: 29.Motor nameplate horsepower.For each fan,the selected fan motor is no larger than the first available motor size greater than the brake horsepower(bhp). Plans reference page/section: _ ❑ 30.Large Volume Fan Systems.Fan systems over 8,000(7 m3/s)cfm without direct expansion cooling coils that serve single zones reduce airflow based on space thermostat heating and cooling demand.A two-speed motor or variable frequency drive reduces airflow to a maximum 60 percent of peak airflow or minimum ventilation air requirement as required by Chapter 4 of the international Mechanical Code,whichever is greater. Exception(s): ❑ Systems where the function of the supply air is for purposes other than temperature control,such as maintaining specific humidity levels or supplying an exhaust system. Project Title: Red Lobster Report date:08/21/13 Data filename: C:\Users\aroberts\Desktop\Tigard ComCheck.cck Page 13 of 14 Plans reference page/section: - 31 All air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI conditions greater than or equal to 110,000 Btu/h that serve single zones have their supply fan operation controlled according to code specific requirements. Plans reference page/section: 32.Series fan-powered terminal unit fan motors.Fan motors for series fan-powered terminal units are electronically-commutated motors and have a minimum motor efficiency of 70 percent when rated In accordance with NEMA Standard MG 1-2006 at full load rating conditions. Plans reference page/section: • 33.Hot Gas Bypass Limitation.For cooling systems<=240 kBtu/h,maximum hot gas bypass capacity is no more than 50%total cooling capacity. Plans reference page/section: ❑ 34.Hot Gas Bypass Limitation.For cooling systems>240 kBtu/h,maximum hot gas bypass capacity Is no more than 25%of total cooling capacity. Plans reference page/section: 6/ 35.M service water heating requirements are listed in requirements section specific to the system. Section 5: Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application.The proposed mechanical alteration project has been designed to meet the 2010 Oregon Energy Efficiency Specialty Code,Chapter 8,r uirements in COMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements Checklist. Name-Title Signature Date Section 6: Post Construction Compliance Statement • HVAC record drawings of the actual installation,system capacities,calibration Information,and performance data for each equipment provided to the owner. • HVAC 0&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. o Written HVAC balancing and operations report provided to the owner. The above post construction requirements have been completed. Principal Mechanical Designer-Name Signature Date Project Title: Red Lobster Report date: 08/21/13 Data filename:C:\Users\aroberts\Desktop\Tigard ComCheck.cck Page 14 of 14