Loading...
Report • 3_5 Ce"1 5W/✓1 a,v►,. Sfi • RECEIVED Bend Office (541)330-9155 �W Geotechnical Office (503)601-8250 Carlson Testing, Eugene Office (541)345-0289 ng, Inc. APR 2 2 2013 Salem Office (503)589-1252 CITY Or TIGARD Tigard Office (503)684-3460 BUILDING DIVISION Special Inspection FINAL SUMMARY LETTER • Date: April 17, 2013 Job#: T1207318 City of Tigard 13125 SW Hall Blvd • Tigard, OR 97223-8199 Attn: Building Division • Re: Project Name: Tigard Cold Storage_ Remodel Address: 12568 Main Street—Tigard, OR Permit#: BUP2012-00116 Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the following item(s) per our inspection reports only: Screw Anchors &Adhesive Anchors • Structural Steel • High Strength Bolts • The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the.non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the"As-Built Condition" or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance of the non-compliance items and as-built conditions. • All requested inspections and tests were performed and reported according to the requirements of project,documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. P:\Projects\General\2012\T1207318\4-17-13 Final Letter.doc Updated 11/30/11 • • • • . s Date: April 17, 2013 Job#: T1207318 Page 2 of 2 • • CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to • health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. Keith Gauvin • Project Manager KG/jk cc: Main St. LLC C/O Real Estate Invest Group—G Diamond,/ gdiamond @reig.com City of Tigard Building Division—Walter'Chip' Barnett,/ Hayden Consulting Engineers Inc-Darron Hayden dhayden @hayden-engineers.com Landing Design/Construct Inc—Greg Lansing greg.landing@gmail.com RT &Associates—Rich Tolvstad rt @rtinc.net • • Carlson Testing, Inc. • lncompleted Items List (NCL) Apr 17,2013 T1207318. Project Name: TIGARD COLD STORAGE - REMODEL Project Address: 12568 MAIN STREET TIGARD • Permit No: BUP2012-00116 P.O.No: Project Manager: KEITH R. GAUVIN Date Item# Ins p. Date Item Description Compliance CTI Sign-Off Corrected 1 DDM 03/22/2013 NO ICC/ESR REPORT ONSITE AT TIME OF CTI'S INSTALL CONFORMS KEITH R. GAUVIN 04/16/2013 INSPECTION. • • • CC:MAIN ST LLC C/O REAL ESTATE INVEST GROUP - G DIAMOND CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT HAYDEN CONSULTING ENGINEERS - DARRON HAYDEN LANSING DESIGN/CONSTRUCT INC - GREG LANSING RT & ASSOCIATES - RICH TOLVSTAD Page: 1