Report •
3_5 Ce"1 5W/✓1 a,v►,. Sfi
• RECEIVED Bend Office (541)330-9155
�W Geotechnical Office (503)601-8250
Carlson Testing, Eugene Office (541)345-0289 ng, Inc. APR 2 2 2013 Salem Office (503)589-1252
CITY Or TIGARD Tigard Office (503)684-3460
BUILDING DIVISION
Special Inspection
FINAL SUMMARY LETTER
•
Date: April 17, 2013
Job#: T1207318
City of Tigard
13125 SW Hall Blvd •
Tigard, OR 97223-8199
Attn: Building Division •
Re: Project Name: Tigard Cold Storage_ Remodel
Address: 12568 Main Street—Tigard, OR
Permit#: BUP2012-00116
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Screw Anchors &Adhesive Anchors •
Structural Steel •
High Strength Bolts •
The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the.non-compliance
report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the"As-Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by
CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially
generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance
of the non-compliance items and as-built conditions.
•
All requested inspections and tests were performed and reported according to the requirements of project,documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested/inspected only.
P:\Projects\General\2012\T1207318\4-17-13 Final Letter.doc Updated 11/30/11
•
•
•
•
. s
Date: April 17, 2013
Job#: T1207318
Page 2 of 2
•
•
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
• health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
Keith Gauvin
•
Project Manager
KG/jk
cc: Main St. LLC C/O Real Estate Invest Group—G Diamond,/ gdiamond @reig.com
City of Tigard Building Division—Walter'Chip' Barnett,/
Hayden Consulting Engineers Inc-Darron Hayden dhayden @hayden-engineers.com
Landing Design/Construct Inc—Greg Lansing greg.landing@gmail.com
RT &Associates—Rich Tolvstad rt @rtinc.net
•
•
Carlson Testing, Inc.
•
lncompleted Items List (NCL)
Apr 17,2013
T1207318.
Project Name: TIGARD COLD STORAGE - REMODEL
Project Address: 12568 MAIN STREET TIGARD •
Permit No: BUP2012-00116
P.O.No: Project Manager: KEITH R. GAUVIN
Date
Item# Ins p. Date Item Description Compliance CTI Sign-Off
Corrected
1 DDM 03/22/2013 NO ICC/ESR REPORT ONSITE AT TIME OF CTI'S INSTALL CONFORMS KEITH R. GAUVIN 04/16/2013
INSPECTION.
•
•
•
CC:MAIN ST LLC C/O REAL ESTATE INVEST GROUP - G DIAMOND
CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT
HAYDEN CONSULTING ENGINEERS - DARRON HAYDEN
LANSING DESIGN/CONSTRUCT INC - GREG LANSING
RT & ASSOCIATES - RICH TOLVSTAD
Page: 1