Loading...
Report 7650 SW Beveland Street,Suite 100 rr TM RIPPEY Tigard,OR 97223 YY Phone:(503)443-3900 CONSULTING ENGINEERS Fax:(503)443-3700 July 23, 2013 Mainlander Investments Attention: Jack Krueger l 582"d Drive, Suite 210 1-./1�J l , Z013 - O6 r 84 Gladstone, Oregon 97027 Re: 7100 SW Hampton—Wall Openings Project Number: 13257 Dear Jack: At your request, a representative of T.M. Rippey Consulting Engineers performed a limited visual structural observation of the 8" thick CMU wall at the north side of the 7100 SW Hampton building. This is a solid 8" CMU wall that is reinforced with a combination of horizontal mesh and horizontal bars. At the time of our site visit two openings were cut through the wall, one 18" x 18" and the other 24" wide by 16" high. The two openings do not align vertically and are located several feet away from one another. Based on the wall being reinforced and the two openings being spaced widely apart, it is our opinion that there is no reinforcement of the openings needed. Additionally, the wall length measures approximately 34', and the code requires wall reinforcement if more than 10% of the lateral force resistance is removed. The largest opening is 24", or 2' out of the 34', or 6% of the lateral capacity, and therefore, the wall with the openings is not required to be upgraded. If you have any questions or require any additional information,please do not hesitate to call. Sincerely, (•,F U i i, •1 [ td 6/ •Timotl M. Rippey, P.E., S.E. ° E�'y Principal TMR/mdf .l,oaa:aorli ,tf•l RA\-ti •