Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report
0t dole Job No.: CEN-090 Harper Date: 02/05/2013 Hp '. Houf Peterson To: Dave Cady, Pulte Group Righellis Inc. ENGINEERS• PLANNERS LANCSCAPE ARCHITECTS•SURVEVORS From: Steven J Entenman P.E., S.E. -- — -- — Project/Subject: Summer Creek Townhomes— Building 5, Lot 19 ❑ Fax - Number: ; Number of pages (If you did not receive the correct number of pages,please call 503-221-1131) ® E-mail ❑ Mail ❑ Hand Deliver ❑ Interoffice Dave, Per our phone conversations with you, it is our understanding that the type "2' holdown on the main level at the back of the staircase adjacent to the party wall was misplaced and that a new anchor cannot be installed within in the wall due to an existing waterline within the concrete stem wall below. We have reviewed this condition, and take no exception to it provided the following: • A new 4x8, DF-L No. 2, full height post is placed outside the wall adjacent to the existing holdown post with heavy felt on the bottom face. • The new 4x8 post is secured to the existing holdown post with (12) Simpson A35 clips equally spaced. • The new 4x8 post shall be secured to the concrete footing below with a Simpson HDQ8 holdown with 7/8" diameter galvanized threaded rod embedded a minimum of 9" into the footing. The threaded rod shall be secured with Simpson SET-XP epoxy in a dry hole under continuous special inspection. • Any missing anchors bolts required per the shear wall schedule in addition to the holdown anchors shall be replaced with Simpson Titen HD 'h" diameter x 8" long galvanized concrete anchors with periodic special inspection. Please see the attached page for additional clarification. If you have any questions please do not hesitate to contact our office. PROF Sincerely /�`�12I,320 fR HARPER HOUF PETERSON RIGHELLIS INC. t lP\ OREGON y F Y 15,\ 44' CNi. EN"(C-r� Steven J Entenman P.E., S.E. Structural Manager EXPIRES'12-31-2013 205 SE Spokane Street Suite 200 Portland,OR 97202 PHONE 503.221.1131 FAX 503.221.1171 www.hhpr.com MISPLACED (4) MIN REQUIRED ANCHOR BOLTS HOLDOWN (A.B.) IN ADDITION TO HOLDOWN ANCHOR ANCHORS, EQUALLY SPACED, WHERE A.B. HAVE NOT BEEN INSTALLED PROVIDE INSPECTION SIMPSON REQUIRED.TITEN HD 1/2" DIA. • 21 x 8" LONG (5" MIN EMBED) GALV. S7.1 ANCHORS, PERIODIC SPECIAL NEW 4x8 FULL ,N �– • HEIGHT HOLDOWN POST, p SECURE TO EXISTING HOLDOWN POST 0 '' . 0 _____� ®� — W/ (12) SIMP. A35, 0 �J 0 EllIPACE EQUALLY — � O O gi US p© ® 7 B GO 0 7 0 S7.0 t 9 .0 ` S7.0 \ 21 k --- 21 21 SIMP. HDQ8 WITH 7/8" DIA. GALV. THREADED .1 " ROD (9" EMBED INTO O 24 OPEN G 0 CONC. FTG BELOW) S7.1 I %"� O O - 0 -N 1 o . , - S. 0 /11111 co. . 0•) rz? o V ►n - /"-----\ zo BUILDING 5 - UNIT 19, MAIN Northwest Geotech,Inc. 9120 SW Pioneer Cowl.Suite B•Wilsonville.Oregon 97070 503/682-1880 FAX:503/682-2753 EXPANSION/ADHESIVE ANCHOR INSPECTION REPORT PROJECT NO. 2304.2.1 PERMIT NO. Building No. 5 Lot 18 MST2012-00186(11091 SW Sage Terrace) PAGE OF Lot 19 MST2012-00187(11083 SW Sage Terrace) Lot 20 MST2012-00188(11081 SW Sage Terrace) 1 1 PROJECT NAME Summer Creek Town PROJECT REPORT Homes LOCATION Tigard,Oregon SEQUENCE NO. A-10 CLIENT OR • GENERAL INSPECTION OWNER Pulte Homes CONTRACTOR Pulte Homes DATE 02/05/13 INSTALLATION STRUCTURE CONTRACTOR Northstar Remodel _ Building No. 5, Hold-downs in Footings and Screw Anchors in Stemwalls CLIENT OR OWNER ADDRESS 16520 SW Upper Boones Ferry Road, Suite 200, Portland,Oregon 97224 ANCHOR OPERATIONS Met Project Requirements ICC Evaluation Services Report N/A Urn NO NOTED: ESR-2508, ESR-2713 Anchor Type/Size N/A NO NOTED. All-thread 1"and 1/4"; '/i'x 8"Simpson Titen HD Adhesive Type N/A NO NOTED: Simpson Set XP Adhesive Expiration Date N/A U` - NO NOTED: 03/31/2014 Base Material N/A '57gD NO NOTED: Normal weight concrete Hole Diameter/Drill Bit Diameter N/A u NO NOTED: 1%"and 1"for all-thread; '/i'for Titen Embedment/Hole Depth N/A GL NO NOTED: 6"into footing for all-thread,except for No. 3(9"into footing);5" into stemwall for Titen HD Hole Condition/Cleanliness N/A NO NO NOTED: Blown, brushed,blown Abandoned Holes ` YES NO NOTED. Anchor Installation/Placement N/A VaD•• NO NOTED. Temperature/Curing Requirements N/A NO NOTED: 53°F,72 hour cure time Tightening Torque N/A YES NO, NOTED: Exceeded maximum installation torque on(7)Titen HD screw anchors Tension/Pull Testing IM YES NO NOTED: THE FOLLOWING WAS NOTED: NGI arrived on-site,as requested,to observe the installation of(4) 1"and(2)'/B'diameter all-thread anchors. The 1"all-thread anchors were installed in the ground level wall at the rear of the staircase. (2)Anchors were installed in each lot,through the 24"tall stemwall into the footing except for the southern hold-down in lot No. 19(hold-down No. 3),where it was installed directly into the footing on the east side of the stemwall. The(2)3/4"diameter anchors were installed in lot No. 19 and the(4) 1"anchors were installed in lot No.'s 18 and 20. The anchors were installed utilizing Simpson Set XP epoxy. The holes for lot No. 18 and 20, hold-down holes were drilled to 1'/:"diameter, not 1%"diameter as required by the ICC report. After conversing by phone with the structural engineer, Dave Cady, Pulte Homes, informed NGI that the 1W hole diameter is acceptable to the engineer. Hold-down No. 3 was installed approximately 6"from the footing edge. The contractor also installed (8)%"x 8"Simpson Titen HD screw anchors in the same walls,(3)in lot No. 18, (2)in lot No. 19,and(3) in lot No. 20. Final installation torques from south to north in ft./lbs. are as follows: 50,70, 115,80,70, 105,95, and 75, however, per ICC ESR-2713 the maximum installation torque for these anchors is 65 ft./lbs. The anchors were installed between 2"and 3"from the stemwall face. To the best of NGI's knowledge,with the noted exception,the anchor installations were in general conformance with the structural memos, ICC reports ESR-2508 and ESR-2713,and pertinent codes. NGI informed Dave Cady, Pulte Homes,of all observations. Of FIELD REPRESENTATIVE: Ethan Donahue REVIEWED BY: Michael A.Ginsbach t_ COPIES TO: Bill Waggoner, Pulte Homes Carolyn Peterson, Pulte Homes REVISION(S)TO PREVIOUS DOCUMENT NOTED IN ITALICS This document shall not be reproduced, except in full, without written approval of NGI/NTI O-5a \\NGI-FS2\Daily Reports\2300-2399\2304-21\Anchor Reports\2304-21al0.doc Effective Date: 12/03/2005