Loading...
Report (2) Aug. 22. 2013 6: 12PM No. 3989 P. 1/1 Good , f Engineering,Inc. Real-World Geotechnical Solutions IV 1 •Investigation •Design •Construction Support August 22, 2013 (76-° 144. Project No 03-8449 +1 _7 LA-- Stonebridge Homes Job No. 1490 ,,-',5TL0 i 3—o 007 2 Attention:Andy Thomas Stonebridge Homes 4230 SW Galewood St., Ste. 100 Lake Oswego, OR 97035 U 1 S7--p )(3 -00 0 7.2 Fax 503-387-7615 _ SEWER CONNECTION BACKFILL i°c.? 91 S' c4-ivy°N f1/D (11-L LOT 119—ARLINGTON HEIGHTS NO.3 C 12641 SW CANYONRIDGE COURT CITY OF TIGARD,OREGON This brief report presents the results of our density testing for the sewer connection that was too close to the foundation. Density testing achieved 95 percent of the standard Proctor maximum dry density. The foundation is now adequately laterally supported. Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. Within the limitations of scope, schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechnical engineering and engineering geology at the time the report was prepared. No warranty, expressed or implied, is made. If you have any questions, please call. Sincerely, GeoPacific Engineering, Inc. D PR OFFS y�� GIN 4 `10 147 �A Arr V OREGON ti *' EXPIRES:06130120jS James D. Imbrie,G.E. Geotechnical Engineer 14835 SW 72e°Avenue Tel(503)598-8445 Portland,Oregon 97224 Fax(503)941-9281 1