Loading...
Report f KLEINFELDER Bright People.Right Solutions. 3OCZ 10- 13000 March 22, 2013 Kleinfelder Project No: 130448 Mr. Dominic Barresi Senior Project Manager Engineered Structures, Inc. (ESI) 3330 E. Louise Drive, Suite 300 Meridian, ID 83642 Subject: Summary of Foundation Excavation Observations Orchard Supply Hardware 10031 SW Cascade Avenue Tigard, Oregon References: (1) Project Plans and Specifications prepared by Ware Malcomb, dated 12/07/12 for Oregon Supply Store at 10031 SW Cascade Avenue, Tigard, Oregon. (2) Geotechnical Report No. 130448 by Kleinfelder, dated November 15, 2012 Dear Mr. Barresi, We are pleased to provide this summary of foundation excavation observations for the Orchard Hardware Store at 10031 SW Cascade Avenue in Tigard, Oregon. This summary report documents that foundation observation services were performed as required by the project plans, project geotechnical report, and 2009 International Building Code (IBC). FOUNDATION EXCAVATIONS We observed soil conditions within the foundation excavations of the building addition to evaluate their suitability for foundation support, and to check their consistency with the soil conditions assumed in our geotechnical report (Reference 2). Based on our field observations, we observed the following; • The soil conditions observed at the bottom of the foundation excavations were in conformance with the recommendations of our geotechnical report. • The footing excavation depths were in general accordance with the project plans and geotechnical report. In summary, based on our observations, the subgrade soils observed in the footing excavations were consistent with those assumed in the geotechnical report for the project and are considered suitable for support of the maximum anticipated bearing capacity of 1,500 pounds per square foot. 130448/POR13L0177 Page 1 of 2 March 22, 2013 Copyright 2013 Kleinfelder 9200 SW Nimbus Avenue,Suite A, Beaverton,OR 97008 p 1 503.644.9447 f 1 503.643.1905 LIMITATIONS The same limitations contained in Kleinfelder's November 12, 2012 geotechnical report for the project apply to this summary letter. CLOSURE We appreciate this opportunity to provide our services. If you have questions regarding our professional services or need additional information, please contact our office at (503) 644-9447. Respectfully submitted, AEp PROFf KLEINFELDER, INC. a�y' Ohei EZI sip Pr OREGON !: MVT 'RENEWAL DATE; 6-zo-1J. Noom T. Aksharadananda, P.E. Kevin R. Wells, P.E. Staff Professional II Professional Engineer CC: Travis Knutson, Project Manager Joe Oram, Superintendent 130448/POR13L0177 Page 2 of 2 March 22,2013 Copyright 2013 Kleinfelder KLEINFELDER 9200 SW Nimbus Avenue,Suite A, Beaverton,OR 97008 p 1 503.644.9447 f 1 503.643.1905 n,.u., 7409 SW Tech Center Dr,Ste. 145 = 8�r' Tigard,OR 97223 Ph:503-443-3799 Fax:503-620-2748 /HL, 503.443.3799 Special Inspection Final Report Date: April 2,2013 Job# 12-4242-S00 Permit#BUP2012-00150 Mail To: Project: KLEINFELDER ORCHARD HARDWARE-TIGARD 14710 NE 87TH STREET STE 100 10031 SW CASCADE AVE REDMOND,WA 98052 TIGARD,OR 97223 JOB#130448 To Whom It May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following: Structural Steel Reinforced Concrete Structural Masonry Proprietary Anchors-Adhesive Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. -ta‘C)0(311 al/kik-- Approved by: Bob Brown/President BB/sa Proud to be Nationally Accredited by International Accrediting Service ACCREDITED