Loading...
Permit CITY OF TIGARD REROOF PERMIT III �° COMMUNITY DEVELOPMENT Permit#: RER2013 00022 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/29/2013 T( 9 Parcel: 2S112BA90131 Jurisdiction: Tigard Site address: 7950 SW FANNO CREEK DR 1 Project: BONITA FIRS CONDOMINIUMS Subdivision:)NITA FIRS VILLAGE CONDO(PHASE Lot: 13 Project Description: Reroof-remove and replace for all units: 1-3. Contractor: HOMEMASTERS Owner: YUN-TUNG,YU 8859 SW COMMERCIAL ST BY INTERWEST PROPERTIES INC TIGARD, OR 97223 2323 SE 122ND AVE PORTLAND,OR 97233 PHONE: 503-949-6325 PHONE: FAX: FEES Description Date Amount Permit Fee 08/29/2013 $134.54 Specifics: 12%State Surcharge-Building 08/29/2013 $16.14 Type of Use: COM Class of Work: ALT Type of Const: Occupancy Load: Stories: Height: 0 ft Project Valuation: $3,810.00 General Information Building Area: 0 • Re-Roof Area: 0 Roof Class: Tear Off: Overlay: Existing Roof Layers: • Parapets: Total $150.68 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of 0- =-- odes -•d all ether applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 1:1 days of issua =, or ' w• k is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utili Notification Ce•ter. •se rules ar- - forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by•-Ili •503.232.1'87 or 1.:`•.332. . r Issued By `r �`_ _ _� ' e Signature: 111rO39.4175 by 7:00 a.m.for the next available inspectio This permit card shall be kept In a conspicuous place on the Job site until corn.lotion of the project. Approved plans are required on the job site at the time of each Inspection. I: _ - Building Permit Application Commercial FOR OFFICE USE ONLY City of Tigard � Received Permit No.: h' g �� DateB : ..� / 13 r.,rj a 13125 SW Hall Blvd.,Tigard,OR 9 'VI ``� Plan Review C Phone: 503-718-2439 Fax: 503-598 4'i:':1 t�,� Other Permit: v DateB T'I G A it 6 Inspection Line: 503-639-4175 �C) 4.5 `O Date ReadyBy: -Juris: 61 See Page 2 for Internet: www.tigard-or.gov ;t��. Notified/Method: �yCO Supplemental Information ' TYPE OF WO ��� REQUIRED•DATA:1-AND 2-FAMILY°•DWELLING • ❑New construction ❑'Derhition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling Commercial/industrial Valuation: $ 3 G ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: _Number of bathrooms: JOB SITE ,INFORMATION AND LOCATION Total number of floors: Job site address: qs 5,A) 1--4,4 i. S Goa K bp. New dwelling area: square feet City/State/ZIP: -1-,..5,,t,f 0 k 9 ')2-Z Garage/carport area: square feet Suite/bldg./apt.no.: _ it3 - 4.roject name: '*4 • c. — i/1/ , Covered porch area square feet Cross street/diredions to job site: Deck area: square feet &54iNtC,,At Other structure area: square feet REQUI RED DATA:CCOMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(romded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the • . DESCRIPTION OF WORK work indicated on this application. RA if;;; )-P-"4 Valuation: $ Existing building area square feet New building area: square feet I'PROPERTY OWNER ' I ❑ TENANT Number of stories: Name: l �, a • ■r Type of construction: [i'.I. tt t .�_. Address: I 1 7� �l► 56. i ,IF Q.". Occupancy groups: City/State/ZIP:7r■it 1 e,-J ( C$ ,--,-2,3 Existing: Phone:( ) ""° Fax:( ) New: '. APPLICANT ' ❑'CONTACT PERSON 'BUILDING PERMITIFEES* - (Please refer.to feeschedul� Business name: �/K 9 c✓ �s Structural plan review fee(or deposit): Contact name: ?'5' it / _ to Address: FLS plan review fee(if applicable):• Total fees due upon application: City/State/ZIP: f c A 0-D q---.7 a 2 2 (51)3) W/Llb 6 3�� I ( ) Amount received: Phone: "L' Fax:: E-mail: 'PHOTOVOLTAIC SOLAR.PANEL!SYSTEM FEES* ' Commercial and residential prescriptive installation of • CONTRACT R roof-top mounted Photo Voltaic Solar Panel System. Business name: ea4-4 MAX9 5 Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 1P li► (,3 L. _.. Y4,. Solar Installation Specialty Code checklist. City/State/ZIP: . l - Q a_ 4 ) 7-2.3 Permit fee(includes plan review $180.00 //`` and administrative fees): Phone:( • 0 . _ _ �' Fax: 3) ' —1457° State surcharge(12%of permit fee): $21.60 _ Total fee due upon application: $201.60 Authorized si_ ature: I.1�. This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: ` .! Date: 0— —/ * Fee methodology set by Tri-County Buildin .�,�. . _ Service Board. I:\BuildingWermi ts\BUP_COM_PermitApp.doc Rev. 12/11/2012 440-4613T(l l/02/COM/WEB) 4 60,0.-B' Building Division Q Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2]of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/11/2012 Building Division Plan Submittal Requirements T►G A R D Commercial&Multi-Family-New,Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey,and full set of architecture drawings. I:\Building\Pemrits\BUP_COM_PermitApp.doc Rev.12/11/2012 Building Division Plan Submittal Requirement Matrix T G A R D Commercial& Multi-Family-New,Additions or Alterations Type of Submittal # of Plans (Includes new,additions and alterations.) Required at Submittal Demolition Permit 3 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County,and Tualatin Valley Fire&Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/11/2012