Permit CITY OF TIGARD REROOF PERMIT
111 5 : -- COMMUNITY DEVELOPMENT Permit#: RER2013 00020
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/29/2013
Parcel: 2S112BA90121
Jurisdiction: Tigard
Site address: 7930 SW FANNO CREEK DR 1
Project: BONITA FIRS CONDOMINIUMS Subdivision:)NITA FIRS VILLAGE CONDO(PHASE Lot: 12
Project Description: Reroof-remove and replace for all units: 1-6.
Contractor: HOMEMASTERS Owner: ACKELSON, NORMA M TRUST
8859 SW COMMERCIAL ST 7930 SW FANNO CREEK DR#1
TIGARD,OR 97223 TIGARD,OR 97224
PHONE: 503-949-6325 PHONE:
FAX:
FEES
Description Date Amount
Permit Fee 08/29/2013 $164.96
Specifics: 12%State Surcharge-Building 08/29/2013 $19.80
Type of Use: COM
Class of Work: ALT Type of Const:
Occupancy Load:
Stories: Height: 0 ft
Project Valuation: $5,200.00
General Information
Building Area: 0
Re-Roof Area: 0
Roof Class:
Tear Off:
Overlay:
Existing Roof Layers:
Parapets:
Total $184.76
Required Items and Reports(Conditions)
I
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. •ect- Codes and =ll oth= applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 day of iss - ce, or i work • suspended for m• e the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Nob' ation •nter. Thos rules are set • h in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 03. 32.1• •r 1.800. 32.2344.
1 /Issued By: ` `_ Permittee Signature:
ilyt�.639.4175 by 7:00 a.m.for the next available Inspection date. '7
This permit card shall be kept in a conspicuous place on the job site until completione project
Approved plans are required on the Job site at the time of each Inspection.
Building Permit Application '`L/,
Commercial FOR OFFICE USE ONLY
City of Tigard Received permit No.: R, •
a 13125 SW Hall Blvd.,Tigard,OR 97223 Plaan Review , G / 1I • —• % .4
' ® Phone: 503-718-2439 F. t., 1p Other Permit:
Date/By:
I I C A R D Inspection Line: 503-t : �rE. \ L Date Ready/By: Juris. ® See Page 2 for
G Internet: www.tigard-oil.'.•' pt�ied/Method: �6 Supplemental Information
nn,,,'�(",, 925 /�.
irt4ov WO. , / REQUIRED�DATA:1-AND.2-FAMILY DWELLING
❑New construction ��+r ■ gi- , ,•I Permit fees*are based on the value of the work performed.
N.' f Indicate the value(rotnded to the nearest dollar)of all
Addition/alteration/replacement Bj%j)I i I ther: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling Commercial/industrial
Valuation: $S
El Accessory building El Multi-family Number of bedrooms:
El Master builder 12 Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 7 S ?30 si..0 7'�'s14 ktO 1✓i L 4t�., ( j' New dwelling area: square feet
City/State/ZIP:`T; i (5 R __C+`` 7 2 2 („4 Garage/carport area: square feet
Suite/bldg./apt.no.: k.0 13 Project name: 'WN Y.3 .L/Ir1: � ( , , Covered porch area square feet
Cross street/directions to job site: � Deck area: square feet
Other structure area: square feet
a 0 hici, RE QUIRED DATA:�COMMERCIAL-USE,CHECKLIST
Subdivision. I Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: Indicate the value(romded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Valuation: $
Ra riC9C501
Existing building area square feet
New building area: square feet
AfistROPERTY OWNER I 0 TENANT Number of stories:
Name: ' I•.l i ,kb _ ), i.A _ Type of construction:
Address: [ i ..r .. A Occupancy groups:
City/State/ZIP: �I�t1 4.1.4"p4 ® i 7 2-2 3 Existing:
Phone:( ) Fax:( ) New:
❑ APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
(Please refer to fee schedule)
Business name: dalA Structural plan review fee(or deposit):
Contact name: Q -- t
^` �� 5 ' "\ �� FLS plan review fee(if applicable):
Address: 4,526 ; 'L,LT Co+N�✓�Q V.G tt 4, [S /.
Li-7 Total fees due upon application:
City/State/ZIP:�T- 0� 1.") 2 3
Phone:�63) , ` q_c 3 .2,� Fax: :([� Z) 35 z- al Amount received:
E-mail: �`�1 ` PHOTOVOLTAIC SOLAR,PANEL`SYSTEM FEES*
Commercial and residential prescriptive installation of
' r ,CONTRA TOR , roof-top mounted Photovoltaic Solar Panel System.
Business name: -M 6 BAs �Y` ^ Submit two(2)sets of roof plan with connection details
Address: 1 1, and fire department access,along with the 2010 Oregon
�� ! (.4) N4 414 t`L-' 5 i 0 Solar Installation Specialty Code checklist.
City/State/ZIP: T� l�.� 6 .°7.1 Z Permit fee(includes plan review $180.00
�j �! and administrative fees):
Phone: �jj�al L 6 Z�/ Fax:�'?�) 397 —�7'�I State surcharge(12%of permit fee): $21.60
CCB lie.: ``�� ��
�d 5 , _ Total fee due upon application: $201.60
Authorized signature: / This permit application expires if a permit is not obtained
t, -tv.=ow within 180 days after it has been accepted as complete.
Print name:4 MATIAPIAMMIT w� Date:-�Ct— `l ' Fee methodology set by Tri-County Building Industry
Service Board.
I:i BuildinggPermi tsiBUP_COM_PermitApp.doc Rev.12/11/2012 4404613T(11/02/COM/WEB) '11:76--
Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2]of Valuation Computation): $
1:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/11/2012
Building Division
Plan Submittal Requirements
T I G A R D Commercial& Multi-Family-New,Additions or Alterations
1. SITE PLAN (fully dimensional, drawn to scale) labeled with:
A. El map&tax lot# El project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit- based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey, and full set of architecture drawings.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/11/2012
e .
Building Division
Plan Submittal Requirement Matrix
T G A R D Commercial&Multi-Family-New,Additions or Alterations
Type of Submittal # of Plans
(Includes new,additions and alterations.) Required at
Submittal
Demolition Permit 3
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County,and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/11/2012