Loading...
Report (2) GeoPN Engineering,Inc. Real-World Geotechnical Solutions •Investigation •Design •Construction Support August 20, 2013 Project No.03-8449 /4 7771/ 6 Stonebridge Homes Job No. 1426 Attention: Andy Thomas �5 T 2, 13 - a o l 3 7' Stonebridge Homes .»..�t,ti,2✓ 4230 SW Galewood St., Ste. 100 / S/ �� S`" S',, Lake Oswego, OR 97035 Fax 503-387-7615 SEWER CONNECTION BACKFILL LOT 55—ARLINGTON HEIGHTS NO.3 15154 SW SUMMERVIEW DRIVE CITY OF TIGARD,OREGON This brief report presents the results of our density testing for the sewer connection that was too close to the porch pad footing. Density testing achieved 95 percent of the standard Proctor maximum dry density. The porch pad is not adequately laterally supported. Our work scope pertains to a.geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. Within the limitations of scope, schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in. the fields of geotechnical engineering and engineering geology at the time the report was prepared. No warranty, expressed or implied, is made. If you have any questions, please call. Sincerely, GeoPacific Engineering, Inc. ���co PRoppso c`J =GIN S ' . 47• OREGON ZS DA EXPIRES:06/30/M/i • James D. Imbrie, G.E. Geotechnical Engineer 14835 SW 72"d Avenue Tel(503)598-8445 Portland,Oregon 97224 Fax(503)941-9281