Permit CITY OF TIGARD SITE WORK PERMIT
COMMUNITY DEVELOPMENT Permit#: SIT2013-00013
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/08/2013
Parcel: 2S114AA00500
Jurisdiction: Tigard
Site address: 16375 SW 85TH AVE
Project: Clean Water Services Subdivision: 1993-078 PARTITION PLAT Lot: 2
Project Description: Cogeneration and brown grease.Site work associated with construction of new co-generation facility
Contractor: JAMES W FOWLER CO Owner: CLEAN WATER SERVICES
12775 WESTVIEW DR ATTN:ACCOUNTS PAYABLE
DALLAS,OR 97338-9632 2550 SW HILLSBORO HWY
HILLSBORO,OR 97123
PHONE: 503-623-5373 PHONE:
FAX: 503-623-9117
FEES
Description Date Amount
Specifics: Permit Fee-Site Work 08/01/2013 $5,299.42
Plan Review 08/01/2013 $3,444.62
Type of Use: COM 12%State Surcharge-Building 08/01/2013 $635.93
Class of Work: NEW Erosion Control w/Permit-Eng 08/01/2013 $900.00
Project Valuation: $1,100,000.00
Site Specifics:
Excavation Volume: cu.yd.
Fill Volume: cu.yd.
Impervious Surface: sq.ft.
Engineered Fill: Soil Report Required:
Paving: Grading:
Landscaping: Site Prep:
Storn Drains: Retaining Wall:
Fire Underground: No Accessible Parking: No
Fence: No
Total $10,279.97
Required Items and Reports(Conditions)
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules
or direct questions to OU by calling 503.232.1987 or 1.800.332.2344.
Issued By: Permittee Signature: C
Call 503.639.4175 by 7:00 a.m.for the next available ins tion date.
This permit card shall be kept in a conspicuous place on the Job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
, Building Permit Application
Site Work C FUR OFFICE USE ChN'I.V
IN City of Tigard DateB� 5-Aomori,' Permit No.: . ,-i-- 0/3- a)G3
q 13125 SW Hall Blvd.,Tigard,OR `7 A%, 2sD 0 Plan Review � r_7 loll
0 Phone: 503.718.2439 Fax: 503.5':.. ',06+ 2 3 r1 Other Permit:
Date/B
T I G \R D Inspection Line: 503.639.4175 Date Ready/By: kris' ® See Page 2 for
Internet: www.tigard-or.gov CITY OF TIGARD Notified/Method: Supplemental Information
BUILDING DIVISION
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rotnded to the nearest dollar)of all
❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling ❑Commercial/industrial
Valuation: $
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master builder ❑Other: Number of bathrooms:
14 37 6— JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: W vs-r4 4,e_ New dwelling area: square feet
City/State/ZIP: 7 y„ Q? 9) 2 2 y Garage/carport area: square feet
J / ,
Suite/bldg./apt.no.: Project name: W -S Covered porch area square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: Indicate the value(rowded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Valuation: $ I 1 OU OOO
S/tte Wor 4 rbr i1cW Co —G -/ foe,'" its/, ) t
Existing building area square feet
New building area: square feet
❑ PROPERTY OWNER I ❑ TENANT Number of stories:
Name: G /t 4 n V i i e( Se rth to rs Type of construction:
Address: /6 O(, 0 . L/ 9S-0 vi_ Occupancy groups:
City/State/ZIP: 7? I.-,n., d/r 9 7 2 2 L/ Existing:
U i
Phone:(S^a� 5-11 7— 8 f 7 7 Fax:( ) New:
❑ APPLICANT ❑ CONTACT PERSON NOTICE
Business name: All contractors and subcontractors are required to be
Contact name: licensed with the Oregon Construction Contractors Board
under ORS 701 and may be required to be lcensed in the
Address: jurisdiction in which work is being performed.If the
City/State/ZIP: applicant is exempt from licensing,the following reasons
apply:
Phone:( ) Fax: :( )
E-mail:
CONTRACTOR -- 6D
Business name: „re-/tiEs rte( FO-14.1 LE.-4.„ Co BUILDING PERMIT FEES*
Address:
/ef, 725' .4/&—S7 j// f 2:14— (Please refer to fee schedule)
Structural plan review fee(or deposit):
City/State/ZIP: 9--'_2-S t', 973-51-
FLS plan review fee(if applicable):
Phone:(g.9 6,As 5,3 Fax:( )
CCB lic.: 63-707 Total fees due upon application:
Amount received:
Authorized signature: G
This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: .TO e ' C. 3c re A ec.5 Date: .5 /Z 0/2 U 13 * Fee methodology set by Tri-County Building Industry
Service Board.
l:\Building\Permits\SIT-PermitApp.doc 10/01/09 440-4613T(11/02/COM/WEB)
■
City.of Tigard: Site Work Permit Checklist
Page 2-Supplemental Information
Commercial,Multi-Family and One-and Two-Family Dwellings:
No permit is required if fill is less than 50 yards(5 dump truck loads), or less than 3 feet deep and will
not be supporting a structure. If a building will be constructed on the fill, it must be engineered fill. If
fill is in a flood plain,drainage way,or wetland,the applicant must apply for a sensitive lands review
(SLR).
Please complete all items below, unless otherwise noted.
Excavation Volume: cu.yds.
Grading Volume:
(Soils report required for>5,000 cu.yds.) cu.yds.
Fill Volume:
(Fill exceeding 12" in depth shall be compacted to
90%of maximum density) • cu.yds.
Retaining structure? (Check one) ❑ Rock
❑ CMU
❑ Concrete
❑ Other:
*Total new impervious area including all buildings,
sidewalks,and paving: sq. ft.
Site Utilities Plumbing Work:
Complete the Plumbing Permit Application for site utilities plumbing work.
Plans Required: See"Site Work Permit Application-Plan Submittal Requirements"attached.
The following must accompany this application:
❑ Site Plan with Vicinity Map showing ADA ❑ *Parking(including ADA)and Lighting
compliance Plan
❑ Grading Plan and details ❑ *Landscaping Plan
❑ Erosion Control Plan and details _ ❑ , Soils Report(if required)
❑ Retaining Structures ❑ , Fire Line
•
*Does not apply to One-and Two-family dwellings.
Plan Submittal: Permit Fee:
TYPE OF SUBMITTAL #of Plans Valuation: Permit Fee:
(New,Additions or Required at $.00 to$500.00 $51.09 minimum permit fee
Alterations) Submittal $500.01 to$2,000.00 $51.09 for the first$500.00 and
$2.69 for each additional$100 or fraction
Commercial 3 thereof,to and including$2,000.00.
$2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and
Multi-Family R-1 Occupancy 3 $10.76 for each additional$1,000 or
fraction thereof,to and including
$25,000.00.
One-&Two-Family Dwelling 2 $25,000.01 to$50,000.00 $338.92 for the first$25,000.00 and
$8.06 for each additional$1,000.00 or
fraction thereof,to and including
$50,000.00.
$50,001.00 to$100,000.00 $540.42 for the first$50,000.00 and
$5.38 for each additional$1,000.00 or
fraction thereof to and including
$100,000.00.
$100,000.01 and over $809.42 for the first$100,000.00 and
$4.49 for each additional$1,000.00 or
fraction thereof.
I:\Building\Permits\SIT-PermitApp.doc 05/25/2012 2
1
.
IN o ° Building Division
Development Code Provision Review
T i G'\ii°
r Commercial Projects with Approved Land Use
•
Building Permit No.: I U P I 3-D-D 117 °'" o�iraa 3- �o13
Land Use Casefile No.: N//4'
a(.4-A) Lo/t-Ti2 ai_d_i/i c_ _5
Routed Plans: i
Submittal Date: clicth 3 CO- £x) lea,LI ry
Submittal Date:
Submittal Date:
To the Applicant:
Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies
to the Building Division. Only checked (1) items are approved. Items not approved and those listed in the
notes must be revised prior to re-submittal. For questions please contact the appropriate staff person(s) listed
above each section.
STAFF: please only mark those items on the left side that are approved.
Planning Review(contact TO h1 , at 503-718-21a S or 404419 @tigard-or.gov)
❑ Land Use Approval
❑ Building Plans Match Approved Plan: Yes ❑ No ❑
❑ Maximum Building Height 5?)
❑ Conditions Met
❑ Street Trees
❑ Protected Trees
/.
Notes: rip u.3.....:11111_,:rjAII'jaTvi=r2t•i:. w�! .L:GS6.t:iir:ay:I7,• ,
!'
Original Plan: Approved ❑ Not Approved lg.. Date: 5 0
Revision 1: Approved Not Approved ❑ Date:
Revision 2: Approved ❑ Not Approved ❑ Date:
(Review Continues on Page 2)
Page 1 of 2
Engineering Review(contact Mike White at 503-718-2464 or MikeW @tigard-or.gov)
Actual Slope: V C %
❑ PFI Permit# kr0 - - 'r bir TH5 T1r'4 6--
❑ Conditions Met
Notes: W I LL N E41) Mari G IJ 4- T1,04.L. GsRem/L
COP Nec TI MP-- I'}vt'HCOL I LA-'710---
Original Plan: Approved Not Approved 0 Date: l i 1
Revision 1: Approved ❑ Not Approved ❑ Date:
Revision 2: Approved ❑ Not Approved ❑ Date:
Permit Coordinator Review(contact Albert Shields at 503-718-2426 or albert @tigard-or.gov)
❑ Planning Okay to Issue Permit ❑ Arborist Okay to Issue Permit
❑ Engineering Okay to Issue Permit
Notes:
Original Plan: Date Sent to Applicant:
Revision 1: Date Sent to Applicant
Revision 2: Date Sent to Applicant
Okay to Issue Permit: Yes No ❑
Date Routed to Building: �/� 3 4,,,e---
•
•
Page 2 of 2
MEMO CH2MHILL®
Clean Water Services - Durham Cogeneration and Brown
Grease Receiving Facilities Project - Tigard Planning Dept. -
Off-Site Impact Standards Documentation
PREPARED FOR: Randy Naef/Clean Water Services
FROM: Lynne Chicoine/CH2M HILL
PREPARED BY: Brett Reistad/CH2M HILL, Ryan Harbert/CH2M HILL
REVIEWD BY: Lynne Chicoine/CH2M HILL
DATE: June 18, 2013
PROJECT NUMBER: 6471 (Clean Water Services);422389/240211 (CH2M HILL)
Purpose
This memo serves to meet the requirement of Chapter 18.650.070, Item G,for documentation that the proposed
development will be in compliance with the Off-Site Impact Standards specified in Chapter 18.650.070. All
facilities are located in the Operations Sub-District.
18.650.070, Item D - Noise Standards
Noise levels were modeled by CH2M HILL using CadnaA, (by DataKustik)and by Sparling in Lynnwood,WA.
Brown Grease Receiving Facility
Sources: Brown Grease Mixers and Air Conditioning Unit
Mitigation: Equipment selection criteria and facility roof parapet wall are provided so that sound levels at the
Plan District Boundary meet standards defined in Table 18.650.2.
Cogeneration Facility
Sources: Engine Radiators,Supply Air Fans,Air Conditioning Unit, Engine Switchgear,Transformer,Cogeneration
Engines(indoors), and engine exhaust pipes.
Mitigation: Facility construction includes features to contain the noise from the cogeneration engines and reduce
noise transmission outside of the facility. These features include fully grouted exterior concrete masonry unit
(CMU)walls,sound control masonry unit(SCMU)veneer on the interior side of engine room walls, concrete roof,
and acoustical doors. The facility air supply fans are provided with intake sound attenuators, insulated ductwork,
and duct sound attenuators at each engine room. The facility exhaust air fans are provided with duct sound
attenuators and acoustical louvers. Engine exhaust noise for each engine is reduced by a heat exchanger silencer
(indoors) and muffler(outdoors). The above facility construction features together with equipment selection
criteria provide sound levels at the Plan District Boundary that meet standards defined in Table 18.650.2.
Gas Purification Facility
Sources: Gas Blower and Glycol Chiller
Mitigation: The gas blowers are housed within an acoustical enclosure. The glycol chiller is provided with slow
speed fans and two cooling circuits.The acoustical enclosure for the gas blowers together with equipment
selection criteria provide sound levels at the Plan District Boundary that meet standards defined in Table
18.650.2.
1
TIGARD PLANNING OEPT MEMO 06182013
CLEAN WATER SERVICES-DURHAM COGENERATION AND BROWN GREASE RECEIVING FACILITIES PROJECT-TIGARD PLANNING DEPT.-OFF-SITE IMPACT STANDARDS
DOCUMENTATION
18.650.070, Item E - Odor Standards
Sources: Brown grease waste receiving tanks at the Brown Grease Receiving Facility
Mitigation: Tanks are enclosed and the free air space is ventilated. Air withdrawn from the tanks is routed to an
existing odor control biofilter. Tank enclosure, air ventilation,and odor control system are such that detectable
off-site odors will not be generated from the brown grease receiving tanks.
18.650.070, Item F - Glare Standards
Sources: Exterior building and site roadway lighting
Mitigation: Lighting will be controlled via photocell and time switch so that lights are not on during the day.
Luminaires are LED with full cutoff optics. Luminaires are located far enough from the Plan District Boundary and
are of low enough wattage,such that light levels at the boundary meet specified Glare Standards. The lighting
design was modeled by CH2M HILL using AGI32 software.
2 TIGARD PLANNING DEPT MEMO 06182013
C
Location:
Record Type:
Inspection Type:
Result:
Comments:
Inspection Date:
Record ID:
Inspector:
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
16375 SW 85TH AVE, TIGARD, OR, 97224
Commercial - Site Work
499 Final inspection
PASS - No C of O
SIT2013-00013
Chip Barnett
Violation Summary:
Inspector Contractor