Loading...
Report -ul. 26. 2( 12 9: 1190 ti:, 3952 GeoP Engineering,Inc. Real-World Geotechnical Solutions •Investigation •Design •Construotion Support July 17, 2013 Project No. 03-8449 J �`� S`� S'(two/a-iv/el.,- Stonebridge Homes Job No. 1428 L' _ Attention: Andy Thomas 729( 3` Stonebridge Homes 6 1 S-7 4230 SW Galewood St., Ste. 100 Lake Oswego, OR 97035 Fax 503-387-7615 FOUNDATION SUBGRADE REVIEW LOT 55—ARLINGTON HEIGHTS NO.3 15154 SW SUMMERVIEW DRIVE CITY OF TIGARD, OREGON GeoPacific Engineering inc. visited the site this week to review the single family home foundation layout on Lot 55. Some soft and organic fill was encountered in the rear footing fine of the home. This material was removed. In our opinion, the observed subgrade is now generally adequate for support to an allowable bearing pressure of 1,500 psf. The expected maximum anticipated total and differential footing movements (generally from soil expansion and/or settlement) are 1 inch and Y4 inch, respectively, over a span of 20 feet. At the time of our final site visit, the excavation was complete and exposed medium stiff to stiff fill soils on the front and very stiff native soils on the lower footing line. These materials are considered adequate to support the planned foundation loads. Footing- to-slope setbacks are adequate and footing-to-wall setbacks are also adequate. Due to relatively impervious soils encountered throughout the site, all foundations should incorporate appropriate drainage measures in accordance with the International Residential Code. Adequate crawlspace drainage is not something that geotechnical consultants can verify; the purpose of our visit is for observations of foundation bearing conditions only. Care should be taken to avoid saturation or disturbance of footing subgrade soils during and after excavation. We observed some placement of crushed aggregate to protect the subgrade from wet weather. If footing bearing soils become saturated or disturbed, any softened soil or slough should be removed and replaced with crushed aggregate or additional concrete. In general, footing excavations should be cleaned such that no more than about Y2 inch of loose soils is present prior to pouring concrete. 14835 SW 7200 avenue Tel(503)5984445 Portland,Oregon 97224 fax(503)941-9281 u 1. 26. 2013 9: 20AM GeoPacific°tn95 neerin 2 Inc. • 9 9� Job No.03-8449 Lot 55 Arlington Heights No 3 Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. Within the limitations of scope, schedule and budget, GeoPacific attempted to execute these services in accordance with generally accepted professional principles and practices in the fields of geotechni3al engineering and engineering geology at the time the report was prepared. No warranty, express or implied, is made. If you have any questions, please call. Sincerely, GeoPacific Engineering, Inc. ��, PRO/ 5 147 7 OREGON 444 AlPka e1 SD, M#I EXPIRES:06/30/20/5 James D. Inibrie, G.E. Geotechnic;,l Engineer 157s2 sw J (w# i; li-5+-Cdr—s---5.---,--m-----br. !AS?")-of 3--0013 7 PREPARED FOR FOUNDATION CERTIFICATION STONE BRIDGE HOMES NW ■ 16869 SW 65TH AVE #505 ',, LOT 55 OF "ARLINGTON HEIGHTS NO. 3" LAKE OSWEGO, OR 97086 ■ CITY OF TIGARD, WASHINGTON COUNTY, OR 3 25' c\ \ TRACT 'I' r- �3 \\ N38'24'32 57. , �\ \\ 96 N51.5619W 36.22 Lil W cnuj \ \ U \ W=-_,L \ d \\(---'6.6 \ �� 45.50' 5.0' U \ \ m ■\ n� \t LP � \\ G ■ n n II II ,n 61 \ CR p 3 \ G s, \\\ �' LOT 55 0 rn in Pj LOT 56 la ■ ■ N \\ 4.50' (a z \�j °'" \\\ M ° 20.33' 5.0' f \ 4 \ \ !,i 7.67' w w \ N n \'� \`\13 .00' o in cNi� 15 \ _:e? --- -- \ r c_., 1 z �, L7n \ 'L5 C2(� C3 L=41.54' of \ ID a In \ N < Lo -.4- Ln \ V) W co M to 0 j O Co it-) \ C sUM '� - - — = oog 7 \ sw \ / SCALE 1" = 20 FEET Lg U U U I, ROBERT RETTIG, A REGISTERED PROFESSIONAL LAND SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT I HAVE ACCURATELY STAKED THE FOUNDATION FOR LOT 55 OF "ARLINGTON HEIGHTS NO. 3" WITH HUBS AND TACKS. o7-ZS- l3 REGISTERED ENGINEERING • PLANNING • LANDSCAPE ARCHITECTURE PROFESSIONAL JOB NAME: ARLINGTON HEIGHTS FORESTRY • SURVEYING LANK U ' YOR _ 4 -91. LICENSED IN OR & WA JOB NUMBER: :::3 13910 SW GALBREATH - Ar DRAWN BY: DRIVE, SUITE 100 ORE ON SHERWOOD, OR 97140 JANUARY 11, 2005 ' PHONE. (503) 925-8799 ROBERT D. RETTIG CHECKED BY: RDR ,Iv„yr�rr�►.�ifrsr�,rlclrvr 60124LS FAX FAX: (503) 925-8969 RENEWS: 12/31/14 DWG NO.: 2643CSTK OFFICES LOCATED IN SALEM, OR ∎* VANCOUVER, WA