Permit CITY OF TIGARD BUILDING PERMIT
1,
'' ._ COMMUNITY DEVELOPMENT _ Permit BUP2013-00182
Date Issued: 07/18/2013
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 t en Parcel: 2S112ACO2000
gra Jurisdiction: Tigard
Site address: 14915 SW 72ND AVE
Project: Portland Construction Solutions • Subdivision: FANNO CREEK ACRE TRACTS Lot: 47
Project Description: Enlarge front entry,ADA bathrooms and partitions for new offices. 8/7/13,reprinted to correct address from 14945
to 14915 SW 72nd Ave.
Contractor: PORTLAND CONSTRUCTION SOLUTIONS Owner: GLASS HOUSE INVESTMENTS
14915 SW 72ND AVE 1662 WORTHINGTON ST
TIGARD, OR 97224 LAKE OSWEGO, OR 97034
PHONE: 503-908-9822 PHONE: 503-329-2141
FAX: 503-336-6557
Specifics: FEES - --
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: Vg Permit Fee-Additions,Alterations, 08/06/2013 $564.15
Demolition
Occupancy Grp: B Occupancy Load: 80 12%State Surcharge-Building 08/06/2013 $67.70
Dwelling Units: 0 Plan Review 07/18/2013 $366.70
Stories: 2 Height: 0 ft Plan Review-Fire Life Safety 07/18/2013 $225.66
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 08/06/2013 $70.00
Value: $35,000 DC Provision Review,COM TI-LRP 08/06/2013 $10.00
Info Process/Archiving-Lg$2.00(over 08/06/2013 $12.00
11x17)
Floor Areas: Info Process/Archiving-Sm$0.50(up to 08/06/2013 $4.00
11x17)
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,320.21
Required: Required Items and Reports(Conditions)
1 Special Inspection(see plans)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to•-• •• -_ .232.1987 or 1.800.332.2344.
Issu:. By: t / Permittee Sig re: eter
Call 503.639.4175 by 7:00 a.m.for the next available ins. •n date. (J
This permit card shall be kept In a conspicuous place on the job site until completion of the project.
Approved plans are required on the Job site at the time of each inspection.
CITY OF TIGARD BUILDING PERMIT
I COMMUNITY DEVELOPMENT Permit#: BUP2013 00182
Date Issued: 07/18/2013
T f GARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S112ACO2000
Jurisdiction: Tigard
Site address: 14945 SW 72ND AVE
Project: Portland Construction Solutions Subdivision: FANNO CREEK ACRE TRACTS Lot: 47
Project Description: Enlarge front entry,ADA bathrooms and partitions for new offices
Contractor: PORTLAND CONSTRUCTION SOLUTIONS Owner: GLASS HOUSE INVESTMENTS
14915 SW 72ND AVE 1662 WORTHINGTON ST
TIGARD,OR 97224 LAKE OSWEGO,OR 97034
PHONE: 503-908-9822 PHONE: 503-329-2141
FAX: 503-336-6557
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 08/06/2013 $564.15
Demolition
Occupancy Grp: B Occupancy Load: 80 12%State Surcharge-Building 08/06/2013 $67.70
Dwelling Units: 0 Plan Review 07/18/2013 $366.70
Stories: 2 Height: 0 ft Plan Review-Fire Life Safety 07/18/2013 $225.66
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 08/06/2013 $70.00
Value: $35,000 DC Provision Review,COM TI-LRP 08/06/2013 $10.00
Info Process/Archiving-Lg$2.00(over 08/06/2013 $12.00
11x17)
Floor Areas: Info Process/Archiving-Sm$0.50(up to 08/06/2013 $4.00
11x17)
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,320.21
Required: Required Items and Reports(Conditions)
1 Special Inspection(see plans)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.19:7 or 1.800.332.2344.
Issued By: /c791 Permittee Signal re: *Of
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial
RECEIVED F012 OFFICE USE ONLI'City of Tigard Date/Bea �jy�rem Permit No.: ` 1 /3--00/?3_,
v 13125 SW Hall Blvd.,Tigard,OR 97223''LLII II Plan Review 1� �}i/n���D�.2
' Phone: 503.718.2439 Fax: 503.598.196W L 1 8 2013 Date/B :- AL mi. � Other Permit: / f f t1/ cJ
T[G A R D Inspection Line: 503.639.4175 Date Re. y: p ,OW luris ® See Page 2 for
Internet: www.tigard-or.gov CITY OF TIGARD Notified/Method: if v Supplemental Information
BUILDING DIVISION ay • a
TYPE OF WORK • QUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
V:Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
Valuation: $
❑ I-and 2-family dwelling -Commercial/industrial
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: /CitG1¢4 5 '�� 0/ he New dwelling area: square feet
City/State/ZIP: T• l l2/C C a-t f Garage/carport area: square feet
Suite/bldg./apt.no.: Project name: o 2-rL f Asp Cp 0.5-—4 CT02) Covered porch area: square feet
Cross street/directions to job site: 'Ssol..3-erioZ5 Deck area: square feet
874/1 G/ ?geld a Leff voi Other structure area: square feet
/// REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: I Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: 413//aA C09.000 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK /� work indicated on this application.
/ace /�0.�7/ (�,e, /r�// ./ s ycic /O�t, Valuation: $ -�j� Qi
p1. p�N� ,f � S n/ Existing building area: "'=i' square feet
Q / 46-es/ /'-/Qa,r a .Grn/ New building area: square feet
�F-�' gPROPPEERTY OWNER ❑ TENANT Number of stories: ia
Name: 6/4s_3 1_. /it .7 , ,H �,s Type of construction: ` er..t0JQ/
Address: G� -/t Occupancy groups:
l6 ct/`f�i�rS7`-a-r
City/State/ZIP: 1 G ke. Q ue I n O24( Existing:
—
Phone:53) 3q—,`(( Fax:( ) New:
g APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
Business name: �/ �� ` l (Please refer to fee schedule)
G(, �� /F4) NS Structural plan review fee(or deposit):
Contact nam- —
A' " 'A '�'� FLS plan review fee(if applicable):
Address: _ Mr v -
City/State/ZIP: 7 -<�U t�2,3 o q'7 a al Total fees due upon application:
Phone: Fax: °! (, Amount received:
So3� 9 -Q�a a 1^)� p PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
E-mail: PAJei/doff 0 PDy6_5. C0l/1
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mo.• ed PhotoVoltaic Solar Panel System.
Business name: / r 6�. Submit two(2)s- .of roof plan with connection det,' :
/ i'` I X0'1 I " -.f I i and fire department a ess,along with the 21 1 I regon
Address: /GL / /5- � "7 AR/�1 ,yt Solar Installation Specia Code the st.
City/State/ZIP: /- . or '/ ` L Permit fee(includes p eview $180.00
and ad ' .five -es):
Phone:No )03) (7s 4. 0 ag.. Fax: ) 33 -•G..57 State su ge(12%of permit fee • $21.60
CCB lic.: !-) 5q)_ oZ oZ g//s Total fee due upon application: 11 $201.60
Authorized si a -•. .. j gai■VF This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name j�c� 4b. Date:6/a * Fee methodology set by Tri-County Building Industry
7! Service Board.
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
III Building Division
Development Code Provision Review
r,ie AR° Commercial Projects - With Approved Land Use
Building Permit No.: -LA ozv ( — 0 0 f V---
Land Use Case Fil�o No,: H M 2TL � t 3 —000 3 /
Project Name: A-1,.)7 Co,J T2(,LeTan) .,oz_e_e_TjonJS
Site Address: 114cc 1 S '3(.0 ^Z a -'r-c�E— , Suite/Bldg #:
Plans Routed:
Original Plan Submittal Date: _ Routed By:
1st Revision Submittal Date: Routed By:
2nd Revision Submittal Date: Routed By:
To the Applicant:
Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies
to the Building Division. Only checked (1.)-items are approved. Items not approved and those listed in the
notes must be revised prior to re-submittal. For questions please contact the appropriate staff person(s) listed
above each section.
STAFF: please only mark those items o the left side that are approved. /,.
Planning Review(contact vl at(503) 7182 ND or @tigard-
or.gov
Land Use Approval
❑ Building Plans Match Approved Plan: Yes ❑ No ❑
❑ Maximum Building Height
❑ Conditions Met
❑ Street Trees
❑ Protected Trees 1 9, '/, -7
Notes: I'd, �6'E P, P/ P�v eide'`� / y � 5
q/divf-i-LP // �/,
Original Plan: Approved Not Approved ❑ Date:
-,7V// /3
Revision 1: Approved ❑ Not Approved ❑ Date:
Revision 2: Approved ❑ Not Approved ❑ Date:
(Review Continues on Page 2)
Page 1 of 2
I:\CURPLN\Masters\Development Code Provision RevievADCPR_COM_WithLandUse.doc Rev.01/16/13
Engineering Review(contact Mike White at(503) 718-2464 or MikeW @tigard-or.gov)
❑ Actual Slope:
❑ PFI Permit#
❑ Conditions Met
Notes:
Original Plan: Approved • Not Approved ❑
Revision 1: Appro •d ❑ Not Approved ❑ Date:
Revision 2: Approved ❑ Not Approved ❑ Date:
Permit Coordinator Review(contact Albert Shields at(503) 718-2426 or albert@ •o .gov)
❑ Planning Okay to Issue Permit ❑ Arbo .y to Issue Permit
❑ Engineering Okay to Issue Permit
Notes:
Original Plan: Date Sent to Applic. • :
Revision 1: Date Sent to A.. cant
Revision 2: Date Sent e 'pplicant
Okay to Issue Permit: Yes ❑ No ❑
Date Routed to Building:
Page 2 of 2
I:\CURPLN\Masters\Development Code Provision RevievJ0CPR_COM_WithLandUse.doc Rev.01/16/13
Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done, e*-
excluding painting and wallpapering: [1] $ ��j,0�
MULTIPLIER(25%barrier removal requirement): x °^°'� .25
0
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 8750'
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
00.
(a) Parking $ 550
00
(b) An accessible entrance: $ 2fig0
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex Q 0
restroom: $ (IVO
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
90
TOTAL(shall equal line [2] of Valuation Computation): $ .5159
•
I:\Building\Permits\BUP-COM PemvtApp.doc 03/03/2011
Building Division
Plan Submittal Requirements
TI G A RD Commercial&Multi-Family-New,Additions or Alterations
1. SITE PLAN (fully dimensional, drawn to scale) labeled with:
A. a map& tax lot# E'project name Ersite address ❑ suite number
[zoning [a applicant name [►phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey, and full set of architecture drawings.
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
1,1 2 ,
° Building Division
Plan Submittal Requirement Matrix
T I GA R D Commercial&Multi-Family-New,Additions or Alterations
Type of Submittal #of Plans
(Includes new, additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County,and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
14915 SW 72ND AVE, TIGARD, OR, 97224 2013 - 12 - 02 00:00:00
Record Type: Record ID:
Commercial - Building BUP2013 - 00182
Inspection Type: Result:
299 Final inspection PASS - C of 0
Comments:
Violation Summary:
Inspector Contractor