Loading...
Permit I CITY OF TIGARD BUILDING PERMIT G1��3 • = COMMUNITY DEVELOPMENT I. %� Permit #: BUP2013 00181 Date issued: 07/18/2013 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 parcel: 2S101AD00800 Jurisdiction: Tigard Site address: 12550 SW 68TH AVE Project: Heintzberger /Payne Subdivision: WEST PORTLAND HEIGHTS Lot: 26 Project Description: TI for new tenant. 7/22/2013: REPRINT permit to change contractor. Contractor: CRAFTSMAN HOMES GROUP LLC Owner: BHKZ LLC 4250 SW 86TH AVE 12600 SW 68TH PKWY PORTLAND, OR 97225 PORTLAND, OR 97223 PHONE: 503 - 292 -0474 PHONE: 503 - 546 -4151 FAX: FEES Specifics: Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB DC Provision Review, COM TI - Ping 07/18/2013 $174.00 Occupancy Grp: B Occupancy Load: 99 DC Provision Review, COM TI - LRP 07/18/2013 $26.00 Permit Fee - Additions, Alterations, 07/18/2013 $917.70 Dwelling Units: 0 Demolition Stories: 1 Height: 0 ft 12% State Surcharge - Building 07/18/2013 $110.12 Bedrooms: 0 Bathrooms: 0 Plan Review 07/18/2013 $596.51 Value: $75,000 Plan Review - Fire Life Safety 07/18/2013 $367.08 Info Process /Archiving - Lg $2.00 (over 07/18/2013 $30.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,221.41 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: DA/ ,9-'i°G /e9-770,\./ Call 503.639.4176 by 7:00 a.m. for the next available Inspection date. This permit card shall be kept In a conspicuous place on the job site until completion of the project. Approved plans are required on the Job site at the time of each Inspection. CITY OF TIGARD BUILDING PERMIT °: COMMUNITY DEVELOPMENT Permit #: BUP2013 -00181 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 07/18/2013 Parcel: 2S 101 AD00800 Jurisdiction: Tigard Site address: 12550 SW 68TH AVE Project: Heintzberger /Payne Subdivision: WEST PORTLAND HEIGHTS Lot: 26 Project Description: TI for new tenant. Contractor: PAYNE CONSTRUCTION INC Owner: BHKZ LLC 5404 NE 112TH AVE 12600 SW 68TH PKWY PORTLAND, OR 97220 PORTLAND, OR 97223 PHONE: 503 - 257 -8221 PHONE: 503 -546 -4151 FAX: 503 - 253 -3247 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Vg DC Provision Review, COM TI - Ping 07/18/2013 $174.00 Occupancy Grp: B Occupancy Load: 99 DC Provision Review, COM TI - LRP 07/18/2013 $26.00 Dwelling Units: 0 Permit Fee - Additions, Alterations, 07/18/2013 8917.70 Demolition Stories: 1 Height: 0 ft 12% State Surcharge - Building 07/18/2013 $110.12 Bedrooms: 0 Bathrooms: 0 Plan Review 07/18/2013 $596.51 Value: $75,000 Plan Review - Fire Life Safety 07/18/2013 $367.08 Info Process /Archiving - Lg $2.00 (over 07/18/2013 $30.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,221.41 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set fort. ' •AR 952- 001 -0010 through OAR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC • • r !ling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signatur-- : Ili .4ZS2Ltak ?..m....... Call 503.639.4175 by 7:00 a.m. for the next available Inspection date. This permit card shall be kept In a conspicuous place on the Job site until completion of the project. Approved plans are required on the Job site at the time of each Inspection. 'Building Permit Application Commercial RECEIVED FOR OFFICE USE ONLY City of Tigard Received L C/ g C 13125 SW Hall Blvd., Tigard, OR 97223 .1 1 8 s 313 Date/B : • Permit No - Plan Review � �. Other Pen �O���/ ��� Phone: 503.718.2439 Fax: 503.598.1960 DateB : V E r a . 1 . t GA It I) Inspection Line: 503.639.4175 CITY OFTIGARD Date Ready/By: ®See Page 2 for Internet: www.tigard or.gov BUILDING DIVISION Notified/Method: 111M Supplemental Information TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. El 1- and 2-family dwelling Valuation: $ y g ❑Commercial /industrial ❑ Accessory building ❑ Multi- family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: ta. 5W uE30-1 New dwelling area: square feet City /State /ZIP: - A t OR c, 223 Garage /carport area: square feet Suite/bldg. /apt. no.: Project name: Ik6 11 ,-t - z. a e / - pa ul Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL - USE CHECKLIST Subdivision: � "5 2 hn h 1).fk t bka3 t k Lot no.: D 00 Permit fees* are based on the value of the work performed. Tax map /parcel no.: �S PCd Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. 'iQPa(iL ���, Valuation: $ " jS,aOO . 11 V CJt, 1 Existing building area: \ \ t v+ I square feet New building area: —, square feet 14 PROPERTY OWNER ❑ TENANT Number of stories: I . Name: NA A K Type of construction: ('G Z Address: als DO SW O ! .1U\ I t,t, Occupancy groups: 1, City /State /ZIP: Pl-)r - IAnc l O l-LZ3 A II Existing: Phone: (� 5 L -4151 Fax: (5� /� r - 4 3 ) 5 (4 ( New: APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: \-te'� n'k v 2 x / Ta \ f l,Q� (Please refer to fee schedule) 1 Structural plan review fee (or deposit): Contact name: b\Y1S CD Detr) Address: (a55 - O sw U awls ` J FLS plan review fee (if applicable): City /State /ZIP: \q2 t Q� et Total fees due upon application: J '^ Amount received: Phone: (�) 2.0 1y - 4o Lo Fax: : ( ) E -mail: `(Yob G@ CJIAr �,fj[k6,1�ti , CO(}� PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof -top mounted Photo Voltaic Solar Panel System. Business name: ,f9),/„.e----i. czAzs"-i,L,7.-joA/ Submit two (2) sets of roof plan with connection details and fire department access, along with the 2010 Oregon Address: 5 1x0 L/ /`lam /02 41- lEvE-- Solar Installation Specialty Code checklist. City /State /ZIP: i004 -n/ e� 9 7 � Permit fee (includes plan review $180.00 / and administrative fees): Phone: ? 57— ,P 2 2. / I Fax: ( ) State surcharge (12% of permit fee): $21.60 CCB lie.: iii' /j ` / /eP / /!/ Total fee due upon application: $201.60 Autho ' .tt�� : ture: / This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: e 'w '' is ,. odpAbg Aal I Date: L / i f D � 1 5 * Fee methodology set by Tri -County Building Industry p Service Board. 1: \Building \Permits\BUP -COM PermitApp.doc 02/24/2011 440- 4613T(1 I /02 /COM/WEB) Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) When possible, additional accessible elements such as storage and alarms: $ TOTAL (shall equal line [2] of Valuation Computation): $ L: \Building\ Permits\ BUP -COM PermitApp.doc 03 /03/2011 7 a Building Division v . Plan Submittal Requirements T G A R D Commercial & Multi- Family - New, Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking, including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape -ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit - based on valuation of projcct. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. 1: \Building \ Permits \BUP -CON1 PermitApp.doc 03/03/2011 Building Division Plan Submittal Requirement Matrix T I G A R D Commercial & Multi- Family - New, Additions or Alterations Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington County, and Tualatin Valley Fire & Rescue), if applicable. 1: \ Building \ Permits \BUP -COM PermitApp.doc 03/03/2011 IN Building Division Development Code Provision Review T I GA RD Commercial Projects - No Associated Land Use Case 0 Building Permit No: ti c.2D /3 — 0 13 Expedited Review 07 Project Name: / 7 Z/ 7 /A/E Site Address: /02 5.5 SA..) 66e /°.& J/ , Suite /Bldg #: Plans Routed: Original Plan Submittal Date: 7/ / /A3 Routed By: 1st Revision Submittal Date: Routed By: 2nd Revision Submittal Date: Routed By: To the Applicant: ➢ If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718 -2439. ➢ If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. Staff: please check items along left .' ly if approved. Planning Review (contact thiG , / at (503) 71 8 - ,)' W r / @ tigard- or.gov) Proposal: -/A.14 ( i 2- { rtaf- Zoning t/ Permitted Use Yes Lu • No ❑ / Land Use Required: Yes ❑ No Er Notes: YZw Approved 0 Not Approved ❑ DCPR Not Required - No DCPR Fees Due Datc Routed to Building: ? r [= / 1 1: \CURPLN\Masters\Development Code Provision RevievkDCPR COM NoLandUse.doc Rev. 01/16/13 • ;� Building Division Over- The - Counter (OTC) Building Permit T I G A R D Check List Project Description: APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION Class of Work*: T" Occupancy Group: Type of Construction: Type of Use * *: COM Occupancy Load: Oregon Specialty Code: ?�« SPECIFICS Number of Stories: '1. Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT - SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback - Left Sideyard Setback - Front Sideyard Setback - Right Sideyard Setback - Back CONSTRUCTION - Exterior Walls: — - Openings Protected: — - Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access. Parking Spaces: REQUIRED ITEMS Fire Sprinklers: j Fire Alarms: Smoke Detectors: Sprinkler Type: Alarm Type: Protected Corridors: Standpipe Required: Pull Stations Required: Parapet: Hazard Group: Battery Calcs Provided: Density: Cut Sheets Provided: Design Area: K Factor: Total Project Valuation: $ 5 ) M' FEES DUE $ 174 , (D DC Prov Rvw, COM TI - Ping $ DC Prov Rvw, COM TI - LRP DC Provision Review Fee for COM TI (effective 7/1/2013) $ ' (7,7(7 Permit Fee - Add, Alt, Demo Project Valuation Planning LRP $ 110.12— (2— 12% State Surcharge Up to $4,999 $0.00 $0.00 $ C .' ) Plan Review, Structural $5,000 - $74,999 $70.00 $10.00 $ ?)e,7,QC3 Plan Review, Fire Life Safety $75,000 - $149,999 $174.00 $26.00 $ 15,0,06 Info Proc /Arch, Lg (over 11x17 $2.00) $150,000 and over $278.00 $41.00 $ Info Proc /Arch, Sm (up to 11x17 $0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee $ Hourly Rate State Surcharge $ Misc. Admin Fcc $ Other: $ Other: Building Staff: $ Other: Date /Time: $ -1°z 1 ,O FEES DUE 2 ' 2 , ' 9 � *TYPE OF USE: COM = commercial; CMS = commercial manufactured structure. **CLASS OF WORK ACS = accessory; ADD = addition; ADU = accessory dwelling unit; ALT = alteration; DEM = demo; NEW = new; OTR = other (use for fences, decks, retaining walls, signs, awnings or canopies). I: \ Building \Forms \OTC - BUP.docx 07/01/2013