Loading...
MMD2013-00022 MMD2O1 3 - 00022 THE BIRCHES WASTE EN CLO SURE NOTICE OF TYPE I DECISION MINOR MODIFICATION(MMD) 2013 -00022 I I R THE BIRCHES WASTE ENCLOSURE TIGARD 120 DAYS= I R SECTION I. APPLICATION SUMMARY FILE NAME: THE BIRCHES WASTE ENCLOSURE CASE NOS: Minor Modification Permit (MMD) MMD2013 -00022 APPLICANT: Chris Goettl OWNER: Lou Christ 8396 SW Langtree Street 11485 SW Greenburg Road #14 Tigard, OR 97224 Tigard, OR 97223 PROPOSAL: The owner of the property proposes to install an enclosure around an existing trash dumpster to make the property more pleasing and presentable. LOCATION: The property is located at 11485 SW Greenburg Road; Washington County Tax Assessor's Map 1S135CD, Tax Lot 00300. ZONING: R -12: Medium - Density Residential District. The R -12 zoning district is designed to accommodate a full range of housing types at a minimum lot size of 3,050 square feet. A wide range of civic and institutional uses are also permitted conditionally. APPLICABLE REVIEW CRITERIA: Community Development Code Chapters 18.360, 18.510, and 18.755. SECTION II. DECISION Notice is hereby given that the City of Tigard Community Development Director's designee has APPROVED the above request. The findings and conclusions on which the decision is based are noted in Section IV. THIS APPROVAL SHALL BE VALID FOR 18 MONTHS FROM THE EFFECTIVE DATE OF THIS DECISION. THE BIRCHES WASTE ENCLOSURE. PAGE 1 OF 4 MMD2013 -00022 MINOR MODIFICATION SECTION III. BACKGROUND INFORMATION Proposal: The owner of the property proposes to install an enclosure around an existing trash dumpster to make the property more pleasing and presentable. The existing trash cans and dumpster are located in a parking space without screening to the side of the drive aisle within the 20 -foot building setback from Greenburg Road. Site History: Staff conducted a search of land use records in the City and found no record for The Birches Apartments. It was likely built in the 1970s prior to annexation into the City in 1983. Vicinity Information: The Birches Apartments are located on the south side of Greenburg midway between SW 95t and 98`" Avenues. The properties on either side of the subject property are zoned R -12; properties to the south are zoned R -4.5. Apartments and single - family houses are adjacent to the subject property. SECTION IV. APPLICABLE REVIEW CRITERIA AND FINDINGS MINOR MODIFICATION OF SITE DEVELOPMENT REVIEW: Section 18.360.060.0 states that a minor modification shall be approved, approved with conditions or denied following the Director's review and as follows: 1. The proposed development is in compliance with all applicable requirements of this title; and FINDING: As shown in the applicant's narrative and site plan, and in the analysis below, the site meets the location, design, and access standards for mixed solid waste and recyclable storage. Staff finds that all applicable requirements of this title are satisfied. This criterion is met. 2. The modification is not a major modification. FINDING: Staff finds that the changes listed in TDC18.360.050.B.1 -11 either do not apply or are not proposed. Therefore, the proposed development is not a major modification. This criterion is met. CONCLUSION: As reviewed in this decision, the proposal is in compliance with the applicable requirements of this title and is a minor modification of a site development. Therefore, the proposed mixed solid waste and recyclable storage facility may be approved. Development Standards In Residential Zones (18.510) According to Table 18.510.2, Development Standards In Residential Zones, the front yard setback for multi-family dwellings in the R -12 zone is 20 feet. FINDING: The existing building is setback 20 feet per Table 18.510.2. However, the existing trash storage area is located within the 20 -foot setback, which is nonconforming. In order to approve a new enclosure, its location must be consistent with Location, Design and Access Standards for Storage Areas (18.755.050). THE BIRCHES WASTE ENCLOSURE. PAGE 2 OF 4 MMD2013 -00022 MINOR MODIFICATION Mixed Solid Waste And Recyclable Storage (Chapter 18.755) 18.755.050 Location, Design and Access Standards for Storage Areas A. Applicable standards. The following location, design and access standards for storage areas are apphcable to all four methods of compliance, described in 18.755.040 above. B. Location standards. 1. To encourage its use, the storage area for source - separated recyclable shall be co- located with the storage area for residual mixed solid waste; 2. Indoor and outdoor storage areas shall comply with Uniform Building and Fire Code requirements; 3. Storage area space requirements can be satisfied with a single location or multiple locations, and can combine both interior and exterior locations; 4. Exterior storage areas can be located within interior side yard or rear yard areas. Exterior storage areas shall not be located within a required front yard setback or in a yard adjacent to a public or private street; 5. Exterior storage areas shall be located in central and visible locations on a site to enhance security for users; 6. Exterior storage areas can be located in a parking area, if the proposed use provides at least the minimum number of parking spaces required for the use after deducting the area used for storage. Storage areas shall be appropriately screened according to the provisions in 18.755.050 C, design standards; 7. The storage area shall be accessible for collection vehicles and located so that the storage area will not obstruct pedestrian or vehicle traffic movement on the site or on public streets adjacent to the site. C. Design standards. 1. The dimensions of the storage area shall accommodate containers consistent with current methods of local collection; 2. Storage containers shall meet Uniform Fire Code standards and be made and covered with waterproof materials or situated in a covered area; 3. Exterior storage areas shall be enclosed by a sight - obscuring fence wall, or hedge at least six feet in height. Gate openings which allow access to users and haulers shall be provided. Gate openings for haulers shall be a minimum of 10 feet wide and shall be capable of being secured in a closed and open position; 4. Storage area(s) and containers shall be clearly labeled to indicate the type of materials accepted. D. Access standards. 1. Access to storage areas can be limited for security reasons. However, the storage area shall be accessible to users at convenient times of the day, and to collection service personnel on the day and approximate time they are scheduled to provide collection service; 2. Storage areas shall be designed to be easily accessible to collection trucks and equipment, considering paving, grade and vehicle access. A minimum of 10 feet horizontal clearance and eight feet of vertical clearance is required if the storage area is covered; 3. Storage areas shall be accessible to collection vehicles without requiring backing out of a driveway onto a public street. If only a single access point is available to the storage area, adequate turning radius shall be provided to allow collection vehicles to safety exit the site in a forward motion. FINDING: As shown in the applicant's site plan, the location of the proposed storage area is outside of the 20 -foot setback. The applicant states that changing the location does not impact the existing number of parking spaces. The proposed six -foot high chain link fence with privacy slats for the enclosure meet the sight obscuring design standards. The Pride service provider letter submitted with the application approves the location and access design for servicing the facility. Therefore, the Mixed Solid Waste and Recyclable Storage standards have been met. THE BIRCHES WASTE ENCLOSURE. PAGE 3 OF 4 M MD2013 -00022 NfINOR MODIFICATION SECTION V. PROCEDURE AND APPEAL INFORMATION Notice was posted at City Hall and mailed to: X The applicant and owners X Affected government agencies Final Decision: A Minor Modification is a Type I procedure. As such, the Director's decision is final on the date it is mailed or otherwise provided to the applicant, whichever occurs first. The Director's decision may not be appealed locally and is the final decision of the City. THIS DECISION IS FINAL ON JUNE 19, 2013 AND BECOMES EFFECTIVE ON JUNE 20, 2013. Questions: If you have any questions, please contact Gary Pagenstecher at (503)718 -2434, gar p(a�tigar oror.gov or by mail to the City of Tigard Planning Division, Tigard City Hall, 13125 SW Hall Boulevard, Tigard, Oregon, 97223. June 19, 2013 APPROVED dk: aryf'agenstecher, Associate Planner DATE THE BIRCHES WASTE ENCLOSURE. PAGE 4 OF 4 IVID2013 -00022 MINOR MODIFICATION • a . • 1 140 ,4 1 4, a / ,,, • °Yo g CITY OF TIGARD Approved 1 *)‹ 1 Conditionally Approved 1 1 For only the work as described in: PERMIT NO. h' ' ZED I A — 6 1,02 Z See Letter to: Follow I 1 Attach 1 1 Job Add ....____ 4 Date: 4 . /3 t Date: June 13, 2013 8 M Attn: City of Tigard Planning Department Re: Minor Modification — Type I Application Narrative of Improvements Located at: EE1VED The Birches Apartments JUN 13 2013 T 11485 SW Greenburg Road CITY OF TIGARD Tigard, Oregon 97223 PLANNING /ENGINEERING For: Installing an enclosure around current trash dumpsters. The owner of the property is proposing to install an enclosure around the current location of the trash dumpsters to make the property more visually pleasing and presentable. There will be no loss of existing ground cover or landscaping. The area of the new trash enclosure is currently covered with asphalt and is part of the parking lot. One parking space will be relocated to accommodate the 20' front yard set back requirements per 18.755.050 B -4. The enclosure will not impede into or obstruct any drive aisles. The attached design has been approved by the collection provider to this facility and is also compliant with 18.755.050 Part C- Design Standards and Part D- Access Standards. See attached acceptance letter from Pride Disposal who currently services this complex. The enclosure will be comprised of a 6" thick concrete slab on grade surrounded by a 6" tall curb in which the fencing will be mounted except for across the front at the garbage truck access gate. At this point the slab on grade will be flush with existing asphalt. Fencing will be 6' at any given point. All chain link fencing will have privacy slates installed. If you have any questions, please contact: Chris Goettl (503) 941 -6911 Chris @StructureOregon.com Structure Building Solutions W W W.StructureOregon.com /I ZINUl ∎� AO4 Wlu WM S A. •uMNmod ued0 pue peeq.0 le •Nog O 3 VIN. lean e4flu15 ae04Oi9 4 a� , imam i peed eu0....9 .. a . f t t r. 0 =Area of trash enclosure p*R*l*D*E DISPOSAL COMPANY P.O. Box 820 Sherwood, OR 97140 Phone: (503) 625 -6177 Fax: (503) 625 -6179 May 31, 2013 Chris Goettl Structure Building Solutions, Inc 503- 941 -6911 chris @structureoregon.com Re: Revised Enclosure at The Birches Apartments We have reviewed the revised site plan for the enclosure at The Birches Apartments. The enclosure is shown to be at least 13' wide. You show a 7 -8 foot gate with a 5 foot opening to the left. This is fine as long as the gate does not have a pole on the right hand side (next to the walkway). A 7 -8' opening would not be adequate to service the cont5iner, so the full 13' opening must be maintained to ensure our access. The gate should be hinged in front of, not inside, the enclosure walls. This will allow for it to open the full 120 degrees necessary. There should be cane bolts and holes in place for the gate to be held in the open position (at 120 degrees) as well as the closed position (in place of a pole). The depth of the enclosure is shown to vary between 12' and 14' deep with an angle in the back. As it's drawn, this will be acceptable. If you have any questions, feel free to contact me. Sincerely, Kristin Leichner Pride Disposal Co. (503) 625-6177 kristinl @pridedisposal.com Chris Goettl <chrs @structureoregon.com> Thu, Jun 6, 2013 at 10:37 PM Reply -To: chrs @structureoregon.com To: Kristin Leichner <kristinl @pridedisposal.com> Kristin, The city had us make a few adjustments for the trash enclosure at the Birches Apartments in Tigard. They wanted us to move the enclosure 20' in from the street. See attached drawing. Please issue another approval letter for this plan. Let me know if you have any questions. Thanks, Chris Goettl, Owner Structure Building Solutions, Inc. Cell: (503) 941 -6911 Structureoregon.com Chris @structureoregon.corn This message is intended onlyfor the individual or entity to which it is addressed and may contain information that is privileged or confidential. If you are not the intended recipient, you are not authorized to read, print, copy, disclose, or distribute this message or any attachments to it. if you have received this email in error, please contact me bye -mail or phone and delete the original message. [Quoted text hidden] fl Birches Enclosure- Plan C.pdf 17K Kristin Leichner <kristinl @pridedisposal.com> Wed, Jun 12, 2013 at 10:29 AM To: "chris @structureoregon.com" <chris @structureoregon.com> Just to clarify, the design /angle /dimensions of the enclosure have not changed? Just, essentially, which parking spaces it takes up? Kristin Leichner Office Manager Pride Disposal Co. (503) 625 -6177 Front cgoett134 @gmail.com [mailto:cgoett134 @ gmail.com] On Behalf Of Chris Goetti Sent: Thursday, June 06, 2013 10:38 PM [Quoted text hidden] [Quoted text hidden] Chris Goetti <chris @structureoregon.com> Wed, Jun 12, 2013 at 10:30 AM Reply -To: chris @structureoregon.com To: Kristin Leichner <kristinl @pridedisposal.com> Yes that is correct [Quoted text hidden] Kristin Leichner <kristinl @pridedisposal.com> Wed, Jun 12, 2013 at 10:31 AM To: "chris @structureoregon.com" <chris @structureoregon.corn> Ok, then our approval does not change. Kristin Leichner Office Manager Pride Disposal Co. (503) 625 -6177 From cgoettl34 @gmail.com [mailto:cgoettl34 @gmail.com] On Behalf Of Chris Goetti Sent: Wednesday, June 12, 2013 10:31 AM To: Kristin Leichner Subject: RE: The Birches Trash Enclosure Layout [Quoted text hidden] Chris Goettl <chris @structureoregon.com> Wed, Jun 12, 2013 at 10:31 AM Reply -To: chris @structureoregon.com To: Kristin Leichner <kristinl @pridedisposal.com> OK thank you. [Quoted text hidden] RECEIVED JUN 0 3 2013 511 • City of Tigard CITY OF TIGARD PLANNI!' 3 /ENGINEERING Minor Modification — Type I Application TIGARD GENERAL INFORMATION Property Address /Location (s): // 4 ( -S L1,1 In addition, the Director must find that the proposed jv,, re."-' Ltsf, 1Z at /7)-2-3 change is in compliance with all applicable requirements of Tax Map & Tax Lot #(s): Title 18 of the Tigard Development Code. To complete this review, the Applicant's proposal must include a Site Si7e: discussion indicating how the site expansion /change will continue to comply with the maximum setback, building Applicant *: CIA∎*;S e...4 4e- height, parking, and landscaping standards. Other Address: e'S S4.) 4.4.4 requirements of this title such as clear vision, solid waste City/State: TI' 6 Zip: c f 22 Z Y storage, non - conforming situations, signs, and tree Primary Contact Sz 3 - if 9 y/ - removal may also be applicable depending on the type and Phone: Sv3- 1'rl -Gl Fax: location of the proposed modifications. E -Mail: Property Owner /Deed Ilolder(s) *: (Attach list if more than one) LGt.. Ch��sf REQUIRED SUBMITTAL ELEMENTS Address: I! 7 e S ( f s� lo„� 1 on City/State: p Q¢. �7Z 3 (Applications will not be accepted without the C1 ty/ r/,3�i'Y ! J tJ• � Zip: following required submittal elements) * When the owner and the applicant are different people, the [Y pplication Form applicant must be the purchaser of record or a lessee in Owner's Signature /Written Authorization possession with written authorization from the owner or an Title Transfer Instrument or Deed agent of the owner. The owner(s) must sign this application [ -Site Plan (4 Large Plans & One - Reduced to 8W' x 11 ") in the space provided on the back of this form or submit a written authorization with this application. [�Ap li�ant Statement /Narratjve (4 copies) [ - Fil r% Fee $627.00 Mino Modifications: Minor Modifications are processed for permitted uses and conditional uses. To review a modification as a Minor Modification, the Director must first find that the expansion or change does not invoke one or more of the criteria FOR STAFF USE ONLY discussed within Section 18.360.050(B) - Site Development Review or Section 18.330.020(B)(2) - Conditional Use. If the modification exceeds the maximum allowed under any one or Case No.(s): Nt M a U t 3 - Qooa d more of the criteria, a Major Modification review is required. Major Modifications are processed in the same manner as a Other Case No.(s): new Site Development Review or Conditional Use Permit. i' I '0 ` S Receipt No.: Applicant's Statement: Date: V " 3 - 13 The applicant's statement must include a summary of the proposed changes. Criteria in either 18.360.050(B) or Application Accepted By: Ci • t` � 18.330.020(B)(2) must be addressed with a detailed response Date Determined Complete: to each criterion. Failure to provide the information needed Revised: 7/1/12 \cuipin \ma masters use applications modification app.docx to process the application would be reason to consider an application incomplete and delay review of the proposal. City of Tigard I 13125 SW Hall Blvd., Tigard, OR 97223 I 503 718 - 2421 I www.tigard- or.gov Page 1 of 2 To consider an application complete, you will need to submit ALL of the REQUIRED SUBMITTAL ELEMENTS as described on the front of this application in the "Required Submittal Elements" box. (Detailed Submittal Requirement Information sheets can be obtained, upon request, for all types of Land Use Applications.) THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the site plan, attachments, and exhibits transmitted herewith, are true; and the applicants so acknowledge that any permit issued, based on this application, and may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application, including the policies and criteria, and understands the requirements for approving or denying the application. SIGNATURES of cad' owner of the subject property. DATED this ` 7 day of A,, . 2() (3 (1/4 Owner's Signature v,Z L u_ Owner's Signature Pfribpe—u1-1 D om. R LLG u l' Lo I 1- fF -( sr, t ar Owner's Signature Owner's Signature Owner's Signature Owner's Signature • City of Tigard I 13125 SW Hall Blvd., Tigard, OR 97223 I 503 - 718 -2421 I www.tigard - or.gov I Page 2 of 2 Phi CITY OF TIGARD RECEIPT fi 1 3125 SW Hall Blvd., Tigard OR 97223 503.639.4171 TIGARD Receipt Number: 191615 - 06/03/2013 CASE NO. FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID MMD2013 -00022 Minor Modification to an Approved Plan - 100 - 0000 -43117 $81.00 LRP MMD2013 -00022 Minor Modification to an Approved Plan 100-0000-43116 $546.00 Total: $627.00 PAYMENT METHOD CHECK # CC AUTH. CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT Credit Card 155866 CCAINES 06/03/2013 $627.00 Payor: Christopher Goettl Total Payments: $627.00 Balance Due: $0.00 Page 1 of 1 Date: June 3, 2013 Attn: City of Tigard Planning Department Re: Minor Modification —Type I Application RECEI\JED Narrative of Improvements Located at: JUN 0 3 2013 The Birches Apartments CITY OF TIGARD 11485 SW Greenburg Road PLANNING /ENGINEERING Tigard, Oregon 97223 For: Installing an enclosure around current trash dumpsters. The owner of the property is proposing to install an enclosure around the current location of the trash dumpsters to make the property more visually pleasing and presentable. There will be no loss of parking space with the new enclosure. Approximately 8 x 10 sqft of existing ground cover will be removed to accommodate the enclosure with the placement of concrete. The remaining area of trash enclosure currently is covered with asphalt and is part of the parking lot. The enclosure will not impede into or obstruct any drive aisles. Contrary to 18.755.050 B -4 the current trash bin location is within the 20 foot front yard but per line 6 in the same section the trash bin location will be part of the existing parking lot and will be screened off with a chain link fence with privacy slats. The attached design has been approved by the collection provider to this facility and is also compliant with 18.755.050 Part C- Design Standards and Part D- Access Standards. See attached acceptance letter from Pride Disposal who currently services this complex. The enclosure will be comprised of a 6" concrete slab on grade surrounded by a 2' 6" wall across the back side of the enclosure and a few feet down one side of the enclosure. At this point the wall will drop to a 6" wall /curb the rest of the way around except for across the front at the garbage truck access gate. Mounted to top of concrete wall /curb will be a 4' chain link fence on the 2' 6" wall and a 6' chain link fence on top of the 6" curb. Fencing will be 6' at any given point. All chain link fencing will have privacy slates installed. If you have any questions, please contact: Chris Goettl (503) 941 -6911 Chris @StructureOregon.com Structure Building Solutions W W W.StructureOregon.com • Sl 0 a i . i 0 =Area of trash enclosure a • Green*, Road Sidewalk /ft ei } H'll 7 17 �a 9NIsM1afl With CMG mew at Gonad and Opan Positions s' Wlda Openin lot Foot Traffic Ci.1r1i:a�Y�1 p*R*I*D*E DISPOSAL COMPANY P.O. Box 820 Sherwood, OR 97140 Phone: (503) 625 -6177 Fax: (503) 625 -6179 May 31, 2013 Chris Goettl Structure Building Solutions, Inc 503- 941 -6911 chris @structureoregon.com Re: Revised Enclosure at The Birches Apartments We have reviewed the revised site plan for the enclosure at The Birches Apartments. The enclosure is shown to be at least 13' wide. You show a 7 -8 foot gate with a 5 foot opening to the left. This is fine as long as the gate does not have a pole on the right hand side (next to the walkway). A 7 -8' opening would not be adequate to service the container, so the full 13' opening must be maintained to ensure our access. The gate should be hinged in front of, not inside, the enclosure walls. This will allow for it to open the full 120 degrees necessary. There should be cane bolts and holes in place for the gate to be held in the open position (at 120 degrees) as well as the closed position (in place of a pole). The depth of the enclosure is shown to vary between 12' and 14' deep with an angle in the back. As it's drawn, this will be acceptable. If you have any questions, feel free to contact me. Sincerely, Kristin Leichner Pride Disposal Co. (503) 625 -6177 kristinl @pridedisposal.com