Loading...
Permit CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT _ .�- . COMMUNITY DEVELOPMENT Permit /I: FPS2013 -00072 Date Issued: 06/04/2013 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 parcel: 1S 135DA03500 Jurisdiction: Tigard Site address: 11481 SW HALL BLVD 200 Project: Serenity Subdivision: METZGER ACRE TRACTS Lot: 19 Project Description: Relocate (3) sprinkler heads, add (3) and demo (2) for TI for new tenant. Contractor: DELTA FIRE INC Owner. BECKAL LLC 14795 SW 72ND AVE 7100 SW GABLE PKWY PORTLAND, OR 97224 PORTLAND, OR 97225 PHONE: 503 - 620 -4020 PHONE: FAX: 503 -620 -1058 FEES Description Date Amount Specifics: Permit Fee - COM 06/04/2013 $91.44 12% State Surcharge - Building 06/04/2013 $10.97 Type of Use: COM Plan Review - Fire Life Safety - COM 06/04/2013 $36.58 Class of Work: ALT Type of Const: VB Occupancy Grp: B Height: ft Stories: 2 Commercial Sprinkler System: Sprinkler Required: Yes Sprinkler Type: Standpipe Required: Hazard: Density: 0 Design Area: 0 K Factor: 0 Commercial Fire Alarm System: Fire Alarm Required: Alarm Type: Pull Station Required: Smoke Detectors Req: Battery Calcs Provided: Cut Sheets Required: Total $138.99 Valuations: Required items and Reports (Conditions) Sprinkler Valuation: $0.00 Residential Square Footage: 0 Fire Alarm Valuation: $0.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 -001 -0010 through OAR 952 -001 -0090. You may obtain a copy o the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. r • Issued By: Permutes Signature: 1 l JJ / "' I Call 503.639.4175 by 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the Job site until completion of the project. Approved plans are required on the Job site at the time of each inspection. Fire Protection System Building Permit Application R ECEIV ,f FOR OFFICE USE ONLY � City of Tigard ,: ceived Date /B : 6 y ' - � Permit No 5.20i3 —pt 72 • 13125 SW Hall Blvd., Tigard, OR 97223 JUN - 4 2013 Plan Review Other Pertr�,(���3—DO�aS Phone: 503.639.4171 Fax: 503.598.1960 Date /B Ti G A R D Inspection Line: 503.639 CITY OF TIGARD Date Ready /By Jurss El See Page 2 for Internet: www.tigard- or.gov Notified/Method: Supplemental Information BUILDING DIVISIO' TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling ® Commercial /industrial Valuation: $ ❑ Accessory building ❑ Multi- family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 11481 SW Hall Blvd. New dwelling area: square feet City/State/ZIP: Tigard, OR 97223 Garage/carport area: square feet Suite/bldg. /apt. no.: Unit 200 Project name: Hall Park Office Center .c .e - Covered porch area: square feet Cross street/directions to job site: // Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Relocate 3 sprinkler heads, add 3 sprinkler heads and demo 2 heads for new TI Valuation: $2,000.00 Existing building area: square feet New building area: square feet ❑ PROPERTY OWNER l 0 TENANT Number of stories: Name: Type of construction: v 1 2, Address: Occupancy groups: [J City/State/ZIP: Existing: Phone: ( ) Fax: ( ) New: ® APPLICANT ❑ CONTACT PERSON NOTICE Business name: Delta Fire, Inc. All contractors and subcontractors are required to be Contact name: Heidi Scarbrough licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: 14795 SW 72 Ave. jurisdiction in which work is being performed. If the City/State/ZIP: Portland, OR 97224 applicant is exempt from licensing, the following reasons apply: Phone: (503) 620 -4020 Fax: : (503) 620 -1058 E -mail: heidis @deltafire.com CONTRACTOR BUILDING PERMIT FEES* Business name: Delta Fire, Inc. (Please refer to fee schedule) Permit fee: Address: 14795 SW 72 Ave. City/State/ZIP: Portland, OR 97224 State surcharge (8% of permit fee): FLS plan review (40% of permit fee): Phone: (503) 620 -4020 Fax: (503) 620 -1058 (Due upon application.) CCB lic.: 64174 a l II II Total permit fees: Authorized signature: I Amount received: . This permit application expires if a permit is not obtained Print name: Heidi Scarbrough late: 6/4/2013 within 180 days after it has been accepted as complete. • Fee methodology set by Tri -County Building Industry Service Board. I: \Budding\Permns \FPS- PermuApp.doc 03 /23/06 440- 4613T(II /02 /COM/WEB) City of Tigard: Fire Protection Permit Checklist Page 2 - Supplemental Information Describe work to be do ne: 1.) ❑ New 2.) Modification to sprinkler heads only. ® Addition ® 1 -10 heads: No plan review required. ® Alteration ❑ 11+ heads: Plan review required. ❑ Repair Number of sprinkler heads: 8 Additional description of work Type of System (Complete A, B, C or D as applicable): A.) Commercial Sprinkler Z Wet ❑ Dry Additional Standpipes N/A Information: Hazard Group Light Density 0.10 Design Area 1500 K. Factor 5.62 Sprinkler Project Valuation: $ 2,000.00 B.) Type I - Hood Fire Suppression System Hood Project Valuation: $ C.) Fire Alarm Submittal shall Battery Calculations ❑ Yes include: Individual Component ❑ Yes Cut Sheets Fire Alarm Project Valuation: $ D.) Residential Sprinkler (Stand Alone System) Square Footage: Permit Fee: 0 to 2,000 $187.50 2,001 to 3,600 $232.50 3,601 to 7,200 $292.50 7,201 and greater $381.50 Sprinkler Project Square Footage: sq. ft. Fire Protection Permit Fees Project valuation subtotal (see A, B & C above): $ Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (8% of permit fee): $ FLS Plan Review (40% of permit fee): $ TOTAL: $ Plan review requires a completed application and 2 sets of plans at submittal. Plan review fees are required at submittal. "New" fire protection systems require that plans bear the original seal of an Oregon licensed fire suppression engineer, or NICET level "3" technicians. 1 \ Budding \ Permits \FPS- PamitApp doc 03/23/06 440-4613T( 1 1 /02 /COM/WEB) Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 11481 SW HALL BLVD 200, TIGARD, OR, 97223 Commercial - Fire Protection System 999 Sprinkler Final 06/19/2013 FPS2013-00072 FAIL Head with in 6' of each other at rear offices next to conference room Violation Summary: Inspector Contractor