Loading...
Permit n CITY OF TIGARD MEM BUILDING PERMIT IN . _ -- COMMUNITY DEVELOPMENT Permit #: BUP2013 -00103 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 05/07/2013 Parcel: 2S113BA00400 Jurisdiction: Tigard Site address: 7632 SW DURHAM RD 350 Project: Logs Network Subdivision: ROSEWOOD ACRE TRACTS Lot: D Project Description: Remove walls, doors and relites. Install new walls, doors and relites. 6/24/2013: REPRINTED to correct suite address. Contractor: BNK CONSTRUCTION INC Owner: PORTLAND SW CENTER LLC 45 82ND DR, SUITE 53B BY FELTON PROPERTIES INC GLADSTONE, OR 97027 ATTN: FELTON, MATT 520 SW 6TH AVE, STE 610 PORTLAND, OR 97204 PHONE: 503 - 557 -0866 PHONE: FAX: 503 - 557 -1085 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB Permit Fee - Additions, Alterations, 05/07/2013 $1,053.24 Occupancy Grp: B Occupancy Load: 60 1 St 12 /o State Surcharge - Building 05/07/2013 $126.39 Dwelling Units: 0 Plan Review 05/07/2013 $684.61 Stories: 3 Height: 0 ft Plan Review - Fire Life Safety 05/07/2013 $421.30 Bedrooms: 0 Bathrooms: 0 DC Provision Review, COM TI - Ping 05/07/2013 $167.00 Value: $93,000 DC Provision Review, COM TI - LRP 05/07/2013 $25.00 Info Process/Archiving - Lg $2.00 (over 05/07/2013 $8.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,485.54 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952- 001 -0010 through OAR 952 - 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: o� O,I / ,L "CO Call 603.639.4176 by 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the Job site until completion of the project. Approved plans are required on the job site at the time of each inspection. .14 y CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit #: BUP2013 -00103 • T f GARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 05/07/2013 Parcel: 2S113BA00400 Jurisdiction: Tigard Site address: 7632 SW DURHAM RD 300 Project: Logs Network Subdivision: ROSEWOOD ACRE TRACTS Lot: D Project Description: Remove walls, doors and relites. Install new walls, doors and relites. Contractor: BNK CONSTRUCTION INC Owner: PORTLAND SW CENTER LLC • 45 82ND DR, SUITE 53B BY FELTON PROPERTIES INC GLADSTONE, OR 97027 ATTN: FELTON, MATT 520 SW 6TH AVE, STE 610 PORTLAND, OR 97204 PHONE: 503 - 557 -0866 PHONE: FAX: 503 - 557 -1085 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB Permit Fee - Additions, Alterations, 05/07/2013 $1,053.24 Demolition 'Occupancy Grp: B Occupancy Load: 60 12% State Surcharge - Building 05/07/2013 $126.39 Dwelling Units: 0 Plan Review 05/07/2013 $684.61 Stories: 3 Height: 0 ft Plan Review - Fire Life Safety 05/07/2013 $421.30 Bedrooms: 0 Bathrooms: 0 DC Provision Review, COM TI - Ping 05/07/2013 $167.00 Value: $93,000 DC Provision Review, COM TI - LRP 05/07/2013 $25.00 Info Process /Archiving - Lg $2.00 (over 05/07/2013 $8.00 • 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 • Carport: 0 Covered Porch: 0 • -, Deck: 0 Garage: 0 Mezzanine: 0 Total $2,485.54 • Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. A TION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 9 - 001 -0010 throug •AR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. sued By: / Permittee Signature: Call 503.639.4175 by 7:00 a.m. for the next available inspection date. This permit card shall be kept In a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each Inspection. Building Permit Application Commercial R E C E "/ED • • FOR OFFICE U SE O NL. l - City of Tigard 6 gum= PermPermit No . P�j/3 -OQ lt7 ° 13125 SW Hall Blvd., Tigard, OR 97 F7 Received Date /B 2013 Plan Review ° _ ' Phone: 503.718.2439 Fax: 503.598!Y960 t Date /B � , L Other Permit: T I G A D Inspection Line: 503.639.4175 Date Read 77 Jun RI See Page 2 for • . Internet: www.tigard- or.gov CITY OF TIGARD Notified /Method: Supplemental Information BUILDING DIVISION TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling ® Commercial /industrial Valuation: $ ❑ Accessory building ❑ Multi- family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 7632 SW Durham Rd New dwelling area: square feet City/State/ZIP: Tigard, Oregon 97224 Garage/carport area: square feet Suite/bldg. /apt. no.: 300 Project name: Logs Network TI _. Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: I Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Remove walls, doors and relites and install new walls, doors, relites, Valuation: $93,000.00 cabinetry and plumbing for tenant improvement. Existing building area: 4,758 square feet New building area: square feet ® PROPERTY OWNER I ❑ TENANT Number of stories: 3 Name: Felton Properties - Type of construction: IIB Address: 520 SW Sixth Ave, Ste 610 Occupancy groups: City/State/ZIP: Portland, Oregon 97204 Existing: B Phone: ( ) Fax:( ) New: B ® APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* hr Business name: Mildren Design Group (Pfents fees srAadal<) Structural plan review fee (or deposit): Contact name: Curt Trolan FLS plan review fee (if applicable): Address: 7650 SW Beveland St, Ste 120 City/ State/ZIP: Tigard, Oregon 97223 Total fees due upon application: Phone: (503) 244 -0552 I Fax: : (503) 244 -0417 Amount received: E -mail: curt @mdgpc.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES' CONTRACTOR Commercial and residential prescriptive installation of roof -top mounted Photo Voltaic Solar Panel System. Business name: Bolt Construction Submit two (2) sets of roof plan with connection details and fire department access, along with the 2010 Oregon Address: 45 82nd Drive, Suite 53B Solar Installation Specialty Code checklist. City/State/ZIP: Gladstone, Oregon 97027 Permit fee (includes plan review $ I80.00 and administrative fees): Phone: (503) 557 -0866 Fax: (503) 557 -1085 State surcharge (I 2% of permit fee): $21.60 CCB lic.: 107555 `� Total fee due upon application: $201.60 Authorized signature / 7`� This permit application expires if a permit is not obtained within ISO days after it has been accepted as complete. I Print name: Curt Trolan I Date: 5/7/2013 " Fee methodology set by Tri-County Building Industry Service Board. I: \Building\Permits \BUP -COM PermitApp.doc 02/24/2011 440- 4613T( /02 /COM /WEB) _ ° Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ 93,000 MULTIPLIER (2.5% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL [2] $ 23,250 ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) When possible, additional accessible elements such as storage and alarms: 8 TOTAL (shall equal line [2] of Valuation Computation): $ l: \Building \Pemuts \BUP -COM PermitApp.doc 03/03/2011 o Building Division Development Code Provision Review T I G A R D Commercial Projects - No Associated Land Use Case Building Permit No: p tab 0d I (-) a Expedited Review Project Name: X ! Site Address: ~1 /0 3 l � kl,,._...,- , Suite /Bldg #: AO Plans Routed: Original Plan Submittal Date: 517// 3 Routed By: 1" Revision Submittal Date: Routed By: 2n Revision Submittal Date: Routed By: To the Applicant: ➢ If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718 -2439. > If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. Staff: please check items along left only if approved. Planning Review (contact ...\-.), vt 1 _110>1 at (503) 718- or �/ @tigard- or.gov) 1t• Proposal: /, IAA: — Ci SIMn 641,41.i 4r+UI A� ru, Zoning 3 Permitted Use Yes 'Er No ❑ Land Use Required: Yes ❑ No Notes: • X Approved ❑ No Ap ❑ DCPR Not Required — No DCPR Fees Due Date Routed to Building: I:\CURPLMMasters\Development Code Provision RevievADCPR COM NoLandUse.doc Rev. 01/16/13 14 Building Division Over- The - Counter (OTC) Building Permit TIGARD Check List Project Description: - ri APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION � *Class of Work: AUT— Occupancy Group: "f'. Type of Construction: P( ✓ *Type of Use: (TM Occupancy Load: Oregon Specialty Code: Win SPECIFICS Number of Stories: ?� Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT - SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback — Left Sideyard Setback — Front Sideyard Setback — Right Sideyard Setback — Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: , N: S: N: S: Occupancy Separation: E: W: E: W: Access. Parking Spaces: REQUIRED ITEMS Fire Sprinklers: 1-?` j Fire Alarms: Smoke Detectors: Parapet: Manual Pull Stations: Protected Corridors: Total Project Valuation: $ 6: ?3) FEES DUE $ ;�,CC) DC Prov Rvw, COM TI — Ping $ Zrj,( DC Prov Rvw, COM TI — LRP DC Provision Review Fee for COM TI $ 1 Q 55, Permit Fee — Add, Alt, Demo Project Valuation Planning LRP $ \ 12% State Surcharge Up to $4,999 $0.00 $0.00 $ mac Plan'Review, Structural $5,000 - $74,999 $67.00 $10.00 $ • Z . ' • Plan Review, Fire Life Safety $75,000 - $149,999 $167.00 $25.00 $ Ara l ' Info Proc /Arch, Lg (over 11x17 $2.00) $150,000 and over $268.00 $39.00 $ Info Proc /Arch, Sm (up to 11x17 $0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee Planning Staff: $ Hourly Rate State Surcharge $ Misc. Admin Fee Permit Coordinator: $ Other: $ Other: Building Staff: $ Other: Date /Time: $ 2- FEES DUE *OPTIONS: TYPE OF USE: COM = commercial; CMS = commercial manufactured structure. CLASS OF WORK ACS = accessory; ADD = addition; ALT = alteration; FND = foundation; DIM = demo; FND = foundation; FPS = fire protection system; NEW = new; OTR = other (use for fences, decks, retaining walls, signs, awnings or canopies); REP = repair. I: \ Building \Forms \OTC - BUP.docx 07/01/2012 Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 7632 SW DURHAM RD 350, TIGARD, OR, 97224 Commercial - Building 299 Final inspection 06/28/2013 00:00 BUP2013-00103 FAIL Not Ready Open permits need prior approval before building final inspection Violation Summary: Inspector Contractor Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 7632 SW DURHAM RD 350, TIGARD, OR, 97224 Commercial - Building 299 Final inspection 06/28/2013 00:00 BUP2013-00103 FAIL Not Ready Open permits need prior approval before building final inspection Violation Summary: Inspector Contractor Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: City of Tigard 13125 SW Hal Blvd. Tigard, OR 97223 Tel: 503.718.2439 7632 SW DURHAM RD 300, TIGARD, OR, 97224 Commercial - Building 275 Framing 05/16/2013 00:00 BUP2013-00103 PART Ok to cover with electrical approval Violation Summary: Inspector Contractor