Permit CITY OF TIGARD
,
� SEWER CONNECTION PERMIT
N a ' COMMUNITY DEVELOPMENT Permit#: SWR2013 -00100
T t GA R r) 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 04/25/2013
Parcel: 1 S136CC00100
Jurisdiction: TIGARD
Site address: 8200 SW PFAFFLE ST
Project: Westside Christian High School Subdivision: 2006 -016 PARTITION PLAT Lot: 3
Project Description: Temporary discharge permit for 2.75 DU's for temporary modular unit. Good for 6 months after issuance. 5/1/13,
reprinted to add ASI info. '�
Contractor: Owner: WESTSIDE CHRISTIAN HIGH SCHOOL
4565 CARMEN DRIVE
LAKE OSWEGO, OR 97035
PHONE: PHONE: 503 - 697 -4711
FAX:
FEES
Description Date Amount
Specifics: Sewer Connection 04/25/2013 $320.72
Type of Use: CMS
Class of Work: ALT
Install Type: Line Tap and Building Sewer
Fixture Units:
Number of Dwelling Units: 2.75
. Total $320.72
Required Items and Reports (Conditions)
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable
law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if
work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification
Center. he rule -re set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0090. You may obtain a copy of the rules or direct questions
to OU by calling 503.2 ' .1 • = or 1.800.332.2344.
Is ued By: / �� Permittee Signat 1111111111114, ArfirMr7,__,2
Call 503.639.4175 by 7:00 a.m. for the next available inspectio • •ate.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
CITY OF TIGARD SEWER CONNECTION PERMIT
' COMMUNITY DEVELOPMENT Permit #: SWR2013 -00100
TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 04/25/2013
Parcel: 1 S136CC00100
Jurisdiction: TIGARD
Site address: 8200 SW PFAFFLE ST
Project: Westside Christian High School Subdivision: 2006 -016 PARTITION PLAT Lot: 3
Project Description: Temporary discharge permit for 2.75 DU's for temporary modular unit Good for 6 months after issuance
Contractor: Owner: WESTSIDE CHRISTIAN HIGH SCHOOL
4565 CARMEN DRIVE
LAKE OSWEGO, OR 97035
PHONE: PHONE: 503 - 697 -4711
FAX:
FEES
Description Date Amount
Specifics: Sewer Connection 04 /25/2013 $320.72
Type of Use:
Class of Work:
Install Type:
Fixture Units:
Number of Dwelling Units:
Total $320 72
Required Items and Reports (Conditions)
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable
law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if
work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification
Center. Ti - rue . - set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0090. You may obtain a copy of the rules or direct questions
to OUN •y calling 503.232. • :7 • .: 60 - .2344.
Iss ed By: A / i Permittee Signature
Call 503.639.4175 by 7:00 a.m. for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
4/25/13
Temporary Sewer Connection for Westside Christian High School at 8200 SW Pfaffle St
Per Clean Water Services Rates and Charges:
I. DEFINITIONS
1.44 Temporary Discharge
a. The discharge of domestic wastewater to the sanitary sewer system from a temporary use where there is a
temporary structure requiring sanitary sewer service. This would include construction trailers, facilities for short
term events, or manufactured homes with temporary placement permits. Temporary use of a permanent structure
shall not qualify as a temporary discharge.
III. DEFINITION AND APPLICATION OF FEES AND CHARGES
A. SYSTEM DEVELOPMENT CHARGES (CONNECTION CHARGES)
3) Temporary discharges of wastewater as defined in Section I shall be charged connection and/or discharge fees as
described below.
a) Temporary discharges of domestic wastewater as defined in Section I require a sanitary sewer connection
permit and shall be charged a temporary sanitary sewer connection fee as described in Appendix A, Section
A.1.b. These discharges are subject to Sanitary Sewer Services Charges as defined in Section III.B.I .a.l .
APPENDIX A -FEES AND CHARGES
A. SYSTEM DEVELOPMENT CHARGES
1. Sanitary Sewer System Development Charges
a. Connection fee $4,665.00 Total per DU or DUE
Reimbursement portion $2,879.00 per DU or DUE
Improvement portion $1,786.00 per DU or DUE
b. Temporary Sewer Connection Fee (# of years discharging x (Reimbursement +
Improvement) per DUE) / 20 -year life
Calculation Method:
1 DU = $4,665.00 1 DU = 16 fixture units
Temporary Structure contains (4) water closets, (2) urinals and (4) lays
Water closets = 6 fixture units each, urinals = 6 fixture units each and lays = 2 fixture units
Total number of fixture units = 44
44 fixture units ± 16 = 2.75 DU's
2.75 x $4,665.00 = $12,828.75
Per the calculation in Appendix A, Section 1.b of Clean Water Services Rates and Charges:
.5(6 months) x $12,828.75 ± 20 = $320.72