Loading...
Plans . - • . OFFICE COPY' 1 2 7S 5 (.,A1 1-7L.- ' - ..... - rvi i,,,,,.,,,,, ,_',7—"'7,7 --":=7" ,---, -,,,— ,„ - „ . , ,,,,,,, ,, ; .. - —._..a. fsIV K.. , t -,. 5 / '(; 1? i .- -1— bou-F 56o 5fr ( inihit's,) 0 e i — .... CITY OF TIGARD Approved ./Z2Q 1.4,P/A.)4 [><1 Conditionally Approved [ ] eer to: Follow ____4 See Ltt [ ] Ao c.<1 1.140-0 __ _ _ _ _ _ Vv s i n SO tAl I 1 B Pe y nnt : ; a. N tk umb e j Number: a atte0.0.?.1::::-/ Address: / -2-3 - 11 A1/4.) Si 5 , , n&k otoo)f , ni eiat I , ..,.- AFL StAy -coati 1 . i ! , Mar 10 07 12:44p shattuck 1- 503 -663 -2260 p.2 Jim Shattuck Construction 30631 SE Jackson Rd • Gresham, Or. 97030 Oregon Contractors Lie # 71048 Tele: 503 - 663 -5085 Fax: 503- 663 -2260 Cell: 503- 816 -4474 BID PROPOSEL TO: Wei Li Acupuncture Date: March 7t 2007 10303 NE Weilder St. Portland, Or 97230 Tele: 503 -254 -8418 Page 1 of 2 REFERENCE: Work to be done on Tigard Building, per meeting on 3/5107 11:00Am. The following is a list and cost for the items requested: Item 1. Add insulation ( 2 inch thick) to the inside of 3 windows of future office on the North West side of the building. Scope: Add 2 inch insulation, painted white on the side to the glass, add drywall to the inside of the room glued to the insulation, add '/. quarter round as the trim from the drywall to the window casing and paint to closely match the existing trim. (White.) Casts for the throe (s) windows will be $ 260.00. t S 7 = # 3 47 Item 2. Add a 2x4 wall finished to match existing walls, with a 3 ft wide x 6 ft 8 inch high 6 panel door with a passage door handle. Note: this type of hardware is not lockable. Scope: Supply materials for the framing of a two x four wall finished to match existing walls vitkp 3068 door, all trim to match existing painted walls. Wall will be constructed over existing carpet. Note: No Electrical for any switches for lights are included in this proposal. Note: No Plumbing or carpet are included in this proposal. Costs for the new wall finished as stated in scope: $ 1,226.00.4- 8 7= ° 13/ 3 Item 3. Alternate 1: Entry Floor We discussed 4 ft wide and 4 ft deep. Costs allotted for the entry floor in which to be decided is $ 400.00 Item 4. Alternate 2: Eliminate double dhar to future waiting room. Mar 10 07 12:44p shattuck 1- 503 -663 -2260 p. 3 i Page 2 of 2 Scope: Remove 2- 3068 doors, patch areas where hinges were, patch any holes in bead jamb of door frame, paint existing jambs and head to closely match existing trim & dispose of doors. Cost allotted for Alternate #2 is 180.00. Thank you for the chance to costs of the work to be done. Note: This quote is good for 10 days. If you ark satisfied with the cost and either accept or decline the alternates a contract agreement will be drawn up with the work in this proposal to be done. If any permits are required for this project , they will be added to the cost of the proposed amount including drawing up of any plans, printing of plans and time involved in getting the permits. Jimmie Sh O ,'ih arts u n