Report 03/01/05 TUE 13:11 FAA 503 670 9147 CAXL,Ur 1'! 11Nb �VV1
Ca rlson Geotec. Maio Office Warn Office Rend Offh:e
P.O. Box 23814 4.,,..► Hudson Ave., NE PA. Box 7818
A Division of Carlson Testing, Inc. Tigard. Oregon 97281 Salem, OR 97301 Bend, OR 97708
Geotechnical conaumng Phone (503) 6843460 Phone (503) 589 Phone (541) 330
Construction Inspection end Related Tests FAX (503) 6709147 FAX (503) 589-1308 FAX (541) 3309169
Final Summary Letter
June 14, 2004 A4 S y2_ a 3 - 4 3 3 7
Mr. Mark Hansen
Derek L. Brown & Associates, Inc. /p 95C e $irv/ / ` vzt
9500 SW Barbur Blvd.. Suite 220
Portland, Oregon 97219
Re: Final Letter of Geotechnical Observations
Hawks Beard Townhomes
SW Hawks Beard Street
Tigard, Oregon
CGT Project G0202050.A
Carlson Geotechnical (COT) served as geotechnical Engineer -of- Record (EOR) for the Hawks
Beard Townhomes projec located at the intersection of SW 130 Avenue and SW Hawks Beard
Street in Tigard, Oregon. We performed a geotechnical investigation of the site, the results of
which were presented in our report of Geotechnical Engineering Services dated December 10,
2002, and performed geotechnical observation during construction. Our observations were
completed on an on -call, part-time basis between the dates of November 19, 2002 and July 17,
2003. This letter concerns observations and testing performed on Lots 1-6 since the final
summary letter dated November 19, 2003 was sent out
• Site Stripping: Prior to construction, the site contained surface vegetation in
structural areas. Roadways and lots were stripped of vegetation between
November 19 and 25 2002. Based on our field observations, the site was
stripped of organic topsoil in general accordance with our recommendations.
• Subgrade Conditions: After stripping had been completed, the site subgrade soil
was cement treated for planned construction activities in the winter. Based on our
field observations, the subgrade soil has been prepared in general accordance
with our recommendations.
• Roadway Fill Placement and Compaction: Up to 2 feet of fill was placed and
compacted on roadways in the southeast corner of the site. COT conducted 6 in-
place relative compaction tests on the native brown silt fill. Based on our field
observations and in place density testing the native silt fill for roadways was placed
and compacted in general accordance with our recommendations (92 percent of
ASTM D- 1557).
• Roadway Aggregate Base Rock: CGT conducted 12 in -place relative compaction
tests on the roadway aggregate base rock on May 2, 2003. The roadway
03/01/05 TUE 13:1Z FAA SU3 Uiu x141 I.A1U. Ury 1LJ111`ib �+"��
J
Hawks Beard Townhones
Tigard, Oregon
June 14, 2004
aggregate base rock was prepared in general accordance with the
recommendations given by the City of Tigard (95 percent of AASHTO T -99).
• Roadway pavements: Asphalt was placed on the South Alley, North Alley,
Hazelwood, Briarwood, Woodridge, Huntington, and Hawks Beard on May 13,
2003. CGT conducted 17 in -place relative compaction tests on the asphalt Test
results ranged from 91 to 93.1 percent of ASTM D -2950.
• Lots: Based on our field observations, lots 8 through 13, and lots 1 through 3 were
cut and are on native silt The remaining 53 lots are on structural fill up to 3 feet
deep. Based on our observations and in-place relative compaction testing. lots 1
through 62 have been prepared in general accordance with our recommendations.
• Foundation Bearing Surfaces: Foundation bearing surfaces were not prepared
at the time of this report; therefore, we have not observed any of the foundation
subgrade soils for the proposed residences.
We understand that the City of Tigard will not require
individual lot foundation subgrade observations. .
• Utility trench backfill compaction, CGT conducted 28 in -place relative
compaction tests on utility trench backfill material for the sanitary sewer and storm
sewer trenches. Based on our density testing, the utility trenches backfill has been
compacted in general accordance with the recommendations given by City of
Tigard (95 percent of AASHTO T -99).
Based on our observations, as documented in our field reports, and to the best or our knowledge,
within our scope of work, the above geotechnical summaries accurately reflect our observations.
Our services were provided on an on -call basis, in which we relied on the contractor to contact our
office for the scheduling of our services. We cannot be held contractually responsible for those
items, if any, that we did not observe or test.
Sincerely,
CARLSON GEOTECHNICAL • .- ' ; - - %` -1 :
i r
- • AVM IGitl `' _J . � L l` ,:Ah
• - chnlcal Staff ` `;'
6 i - -nne M. •'eme , P.E.
::�J:rS: t2- ^
-'pal G: • ethnical Engineer 3Lt
Doc ID: P :IGEOTECHIPROJECTS12002 Projects Hawks Beard Townhornes - COSW Inal Lattar.DOC
Carlson Geotechnical Page 2 of 2