Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report
�Aug 16 04 10:47a Froelich Consulting End 503- 624 -9770 p.1 • t k o • • � l 3v: FR - E CONSULTING S! 2 0-0 3 -- 3 y NGINEERS , INC /� �,. MAIN CENTRAL OREGON / r"l9 54/ v Ic 74 - 8969 SW Hampton street 231 SW Scalehouse nowt. Or '�!r'"s 7223 _ Bend. Oregon 97702 Loop. s 101 503 .824- 700&1503. 624 -9770 FAX 541 .383- 1828!541.383 -7888 FAX Memorandum ' , • Date: 13/16/04 • '-�- Ttntltel To: Bruce Cone FAX Number: 503- 521 -8455 Job Name/Number: Hawks Beard 02 -T126C Transmlfttal From: Todd Nagele Total Pages: 4 Comments: Attached is a plan showing the location of a new door. The shear wall will be shortened to 17-0° however, the shear wall / holdown cahoot remains the same as A / O. Also attached is a revised detail 1 /SD. The bird blocking is sloped out and the Simpson A35 clips have been replaced with Simpson LS50 0 24° o.c. The 16d toenails called out on the shear wall schedule are not required for type A shear walls. G'Employcc Foldasrrodd12002102 T126 Hawk's 8eardlm cum 6-24-04.0oe , ,..tnu(t 16 04 10:47a Froelich Consulting Eng 503 - 624 -9770 p•3 ^ • HuC IA U4 U7:4841 p•z so'•a 27.• _ MO' �.v.� 4'.47 44 • nn.dwawoame •!� �7t4" o.naw seam ww•Ressu �1O!' 3J0X ..... �� d am emc cr GAS AIRI4 SBSAICALLY • BRACED SO GAL ' GAS WATER HEATER i. 1 7 � o A Sle2 u� ,� Pas naps ROOF 18 a . ' ,' s.%...1I Off., i • .(..). >� O GARAGE uP . Mr S • av {�; ©� O • sTOR =MU b ` -- BEAM MOW :ice MEN Co ::HMO NM= b QOM Mg MI a w paved FOYER . Sii■ .a, I.....o.m. `p u.evsv Ai MEM 4 �. amnia' �' ' .III,; a g. as * .. .__ _, 11'4' a • s4 • 274' 8'd 4 FIRST FLOOR PLAN FROM GARAGE DOOR UNIT A SCn 1/4'= 1'-o' EXH IBEF "C" x 44 • '.jg 16 04 10:47a Fr - .1 ich Consulting Eng 503- "24 -9770 . p.2 • • 1/2 • PLYWOOD • . ROOF SHEATHING / / 8d NAILS e6' /' (EDGE NAILING) '/ / 2x SOLID BLK'G. ••• W/ SIMPSON L550 , / MANUFACTURED ANGLES TO THE '" `DES INSIDE AT2'S • O.C. / AI' TO CONT. DBL. TOP ,/ ' C . PLATES (A5 I SIMPSON 142.5 CLIP AT EACH TRUSS 'EDGE NAILING' CONTINUOUS DBL. SEE SHEAR WALL 2x TOP PLATE SCHEDULE) 1/2' PLYWOOD WALL SHEATHING 2x STUD WALL STUDS to 16' O.G. UNLESS NOTED OTHERWISE • SCALE: 1'. P-0' SD 100602.olwcg . 0 .i' 03/01/05 TUE 13:11 FAX 503 670 9147 t:AKWVN Lt. 11L" arlson Geotechnical Mai, Office Scion Office Bend O P.O. Boos 23814 4060 Hudson Ave., NE P.O. Boot 7918 A Olvtsron of Carlson Tearing, Inc. Tigard. Oregon 87281 Salem, OR 97301 Bend. OR 97708 Geotectmlcal Consulting Phone (503) 8843460 Phone (503) 589-1252 Phone (541) 330 -9155 Construction Inspection and Rotated Tests FAX (503) 670.9147 FAX (503) 589.1309 FAX (541) 330.9163 Final Summary Letter June 14, 2004 _/l45 7-2C23 - cJ)3 /y Mr. Mark Hansen Derek L. Brown &Associates, Inc. /0 895 9500 SW Barbur Blvd., Suite 220 / ✓" Portland, Oregon 97219 Re: Final Letter of Geotechnical Observations Hawks Beard Tow nhomes SW Hawks Beard Street Tigard, Oregon CGT Project G0202050.A Carlson Geotechnical (CGT) served as geotechnical Engineer -of - Record (EOR) for the Hawks Beard Townhomes project, located at the intersection of SW 130 Avenue and SW Hawks Beard Street in Tigard, Oregon. We performed a geotechnical investigation of the site, the results of which were presented in our report of Geotechnical Engineering Services dated December 10, 2002, and performed geotechnical observation during construction. Our observations were completed on an on-call, part-lime basis between the dates of November 19, 2002 and July 17, 2003. This letter conoems observations and testing performed on Lots 1-6 since the final summary letter dated November 19, 2003 was sent out • Site Stripping: Prior to construction, the site contained surface vegetation in structural areas. Roadways and lots were stripped of vegetation between November 19 and 2e. 2002. Based on our field observations, the site was stripped of organic topsoil in general accordance with our recommendations. • Subgrade Conditions: After stripping had been completed, the site subgrade soil was cement treated for planned construction activities in the winter. Based on our field observations, the subgrade soli has been prepared in general accordance with our recommendations. • Roadway Fill Placement and Compaction: Up to 2 feet of fill was placed and compacted on roadways in the southeast corner of the site. CGT conducted 6 in- p lace relative compaction tests on the native brown sift fill. Based on our field observations and in place density testing the native silt fill for roadways was placed and compacted in general accordance with our recommendations (92 percent of ASTM D- 1557). • Roadway Aggregate Base Rock: CGT conducted 12 in -place relative compaction tests on the roadway aggregate base ruck on May Z 2003_ The roadway 11 :1/05 TUE 13:12 FAX 503 670 9147 t;ArtLbuly 1t,11t'; - _ Hawks Beard Townhomes Tigard, Oregon June 14. 2004 aggregate base rock was prepared in general accordance with the recommendations given by the City of Tigard (95 percent of AASHTO T -99). • Roadway Pavements: Asphalt was placed on the South Alley, North Alley, Hazelwood, Briarwood, Woodridge, Huntington, and Hawks Beard on May 13, 2003. CGT conducted 17 in -place relative compaction tests on the asphalt. Test results ranged from 91 to 93.1 percent of ASTM D - 2950. • Lots: Based on our field observations, lots 8 through 13, and lots 1 through 3 were cut and are on native silt. The remaining 53 lots are on structural fill up to 3 feet deep. Based on our observations and in-place relative compaction testing. lots 1 through 62 have been prepared in general accordance with our recommendations. • Foundation Bearing Surfaces: Foundation bearing surfaces were not prepared at the time of this report; therefore, we have not observed any of the foundation subgrade soils for the proposed residences- ... ;i . -- - -- - ..... - . - - pouiing— eonerete. We understand that the City of Tigard will not require individual lot foundation subgrade observations. • Utility trench backfill compaction. CGT conducted 28 in -place relative compaction tests on utility trench backfill material for the sanitary sewer and storm sewer trenches. Based on our density testing, the utility trenches backfill has been compacted in general accordance with the recommendations given by City of Tigard (95 percent of AASHTO T -99). Based on our observations, as documented in our field reports, and to the best or our knowledge, within our scope of work, the above geotechnical summaries accurately reflect our observations. Our services were provided on an on -call basis, in which we relied on the contractor to contact our office for the scheduling of our services. We cannot be held contractually responsible for those items, if any. that we did not observe or test. Sincerely, ! ° -- r:� CARLSON GEOTECHNICAL ,...:-,', 7. :::' :.: ` "' 'r tio �nel:rl6tti u �o 'technical Staff l r. • - nne M. erne , P.E. 1 .� M. oce . ,� pal G : ethnical Engineer Doc ID: P:IGEOTECH PROJECTS12002 ProjedsWBwks Beard Townnomes - COSFFinal Letter.DOC Carlson Geotechnical Page 2 of 2