Loading...
Report 01/11/05 TUE 17:36 FAX 503 884 0954 CARLSON TESTING Il 003 • Main Office Salem Offs • Send Mee P.O. Box 23814 4050 Hudson Ave., NE P.O. Box 7918 Carlson Testing, Inc. . 9 0 Phone (5o) 58252 Phi ($�R 330-9155 �1f FAX (503) 684-0954 FAX (503) 669 -1309 FAX (541) 330-9163 Special Inspection FINAL SUMMARY LETTER January 11, 2005 T0406884.A/B/C /D /E/F City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department • Re: Hawks Beard Townhomes - Lot #17: 10920 SW Briarwood Place, Tigard OR — Permit #: MST2003 -00318 Lot #18: 10930 SW Briarwood Place, Tigard OR — Permit #: MST2003 -00319 Lot #19: 10940 SW Briarwood Place, Tigard OR -- Permit #: MST2003- 00320 E Lot #20: 10950 SW Briarwood Place, Tigard OR -- Permit #: MST2003 -00321 Lot #21: 10960 SW Briarwood Place, Tigard OR — Permit #: MST2003 -00322 Lot #22: 10970 SW Briarwood Place, Tigard OR — Permit #: MST2003 -00323 Dear Sir or Madam: This is to certify that in accordance with Section 1701 of the Uniform Building Code, Title 24, we have performed special inspection of the following item(s) per our inspection reports only: • Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and • specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further que lions regarding this matter, please do not hesitate to contact this office. Respe «s ully submi d, CARL .. TESTIN , I (IP • , • a: F 1. each • Chief xecutive Officer . • • mbw cc: Derek L Brown & Associates Inc — Bruce Cone Froelich Consulting Engineers — Todd Nagle Mentrum Architecture — Bayard Mentrum • • • Carlson Geotechnical °" °"�° Bend Office P . O . in 23814 4060 FNdeon Ave.. NE P.O, Box 7918 . Oregon 97281 Salem, OR 97301 Bend. OR 07708 ADM on of Carlson Testing. Phone (503) 8844460 Phone (503) 589.1252 Phone (541) 330.9155 Geotechnical Consulting Construction Inspection and Related Tests FAX (503) 6704147 FAX (503) 588.1309 FAX (541) 3304163 Final Summary Letter September 10, 2003 - revised November 19. 2003 Mr. Mark Hansen Derek L. Brown & Associates, Inc. 9500 SW Barbur Blvd., Suite 220 Portland, Oregon 97219 Re: . Final Letter of Geotechnical Observations Hawks Beard To inhomes SW Hawks Beard Street Tigard, Oregon CGT Project G0202050A Carlson Geotechnical (CGT) served as geotechnical Engineer -of- Record (EOR) for the Hawks Beard Townhomes project, located at the intersection of SW 130 Avenue and SW Hawks Beard Street in Tigard. Oregon. We performed a geotechnical investigation of the site, the results of which were presented in our report of Geotechnical Engineering Services dated December 10, 2002, and performed geotechnical observation during construction. Our observations were completed on an on-call, part-time basis between the dates of November 19, 2002 and July 17, 2003. • Site Stripping: Prior to construction, the site contained surface vegetation in structural areas. Roadways and lots were stripped of vegetation between November 19 and 25'', 2002. Based on our field observations, the site was stripped of organic topsoil in general accordance with our recommendations. • Subgrade Conditions: After stripping had been completed, the site subgrade soil was cement treated for planned construction activities in the winter. Based on our field observations, the subgrade soil has been prepared in general accordance with our reconv nendations. • Roadway Fill Placement and Compaction: Up to 2 feet of fig was placed and compacted on roadways in the southeast corner of the site. CGT conducted 6 in- place relative compaction tests on the native brown silt fill. Based on our field observations and in place density testing the native silt fill for roadways was placed and compacted in general accordance with our recommendations (92 percent of ASTM D- 1557). • Roadway Aggregate Base Rock: CGT conducted 12 hi-place relative compaction tests on the roadway aggregate base rock on May 2, 2003. The roadway aggregate base rock was prepared In general accordance with the recommendations given by the City of Tigard (95 percent of AASHTO T -99). INV • Hawks Beard Townhanes Tigard, Oregon September 10, 2003 • Roadway Pavements: Asphalt was placed on the South Alley, North Alley, Hazelwood, Briarwood, Woodridge, Huntington, and Hawks Beard on May 13, 2003. CGT conducted 17 in -place relative compaction tests on the asphalt. Test results ranged from 91 to 93.1 percent of ASTM D -2950. • Lots: Based on our field observations, lots 8 through 13, and lots 1 through 3 were cut and are on native silt. The remaining 53 lots are on structural ftll up to 3 feet deep. Based on our observations and in -place relative compaction testing, lots 1 through 62 have been prepared in general accordance with our recommendations. • Foundation Bearing Surfaces: Foundation bearing surfaces were not prepared at the time of this report; therefore, we have not observed any of the foundation subgrade soils for the proposed residences. •`_• - ..•.• . -. . I . .. • _ . J- :. •- -, I. • I ••• t • - - • , •. • ,. • powingooncrete. We understand that the City of Tigard will not requite individual lot foundation subgrade observations. • Utility trench backfill compaction. COT conducted 28 in -place relative compaction tests on utility trench backfill material for the sanitary sewer and storm sewer trenches. Based on ow density testing, the utility trenches backfill has been compacted in general accordance with the recommendations given by City of Tigard (95 percent of AASHTO T -99). Based on our observations, as documented in our field reports, and to the best or our knowledge, within our scope of work, the above geotechnical summaries accurately reflect our observations. Our services were provided on an on -call basis, in which we relied on the contractor to contact our • office for the scheduling of our services. We cannot be held contractually responsible for those items, if any. that we did not observe or test. Sincerely. CARLSON GEOTECHNICAL • #1tf�+98 ,* f Jared jet4e4e Geotechnical Staff r!! ... - - anne M , P.E. -- �. ---�. Pn ' al r• eote = nic al Engineer �•�t- • ID: P. OTECMIPROJECTS2002 Profecisiliawks Beard Townharnes - COSTinal Leuer.DOC Carlson Geotechnical Page 2 of 2