Report 01 /11 /US 'lUE 11:Ja FAA *U3 564 U854 t:A$LbUL 1talln% vyvu.r
stain once Sadao Office • Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Tigard. Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson Testing, inc. • Phone (503) �
) 584-3460 Phone (503) 589-1252 Phone (541) 330'9155
�1 FAX (503) 654-0954 FAX (503) 5841309 FAX (541) 330-9163
Special Inspection
FINAL SUMMARY LETTER
January 11, 2005
TO406884.A/B/C/D /E/F
City of Tigard
13125 SW Hall Blvd.,
Tigard, OR 97223 -8199
Attn: Building Department
Re: Hawks Beard Townhomes - •
Lot #17: 10920 SW Briarwood Place, Tigard OR - Permit #: MST2003 -00318
Lot #18: 10930 SW Briarwood Place, Tigard OR - Permit #: MST2003 -00319
Lot #19: 10940 SW Briarwood Place, Tigard OR - Permit #: MST2003 -00320
Lot #20: 10950 SW Briarwood Place, Tigard OR -- Permit #: MST2003 -00321
Lot #21: 10960 SW Briarwood Place, Tigard OR - Permit #: MST2003 -00322
Lot #22: 10970 SW Briarwood Place, Tigard OR - Permit #: MST2003 -00323
Dear Sir or Madam:
This is to certify that in accordance with Section 1701 of the Uniform Building Code, Title 24, we have
performed special inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents
and, to the best of our knowledge, the work was in conformance with the approved plans and •
specifications, approved change orders and applicable workmanship provisions of the State Building Code
and Standards, as well as the structural engineer's design changes, approvals and verbal instructions.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be
reproduced, except in full, without prior authorization from this office.
if there are any further que lions regarding this matter, please do not hesitate to contact this office.
Respe ", Ily submi
CARL. TESTIN , 1
••�• each •
Chief ecutive Officer .
mbw •
cc: Derek L Brown & Associates Inc- Bruce Cone Froelich Consulting Engineers — Todd Nagle
Mentrum Architecture - Bayard Mentrum
•
Cron Geotechnical Mein Office " ° Seaffice
P . O . Ba nc 2814 40 60 Hudson Ave.. Ave . NE P.O. P.O
Division of Godson Testing. Inc. 97281 9atam, OR 97301 Bead, OR 07708
A Division Phone ( 81844460 Phone (503) 589.1252 Phone (541) 330.9155 Consulting
Construction Inspection and Related Tests FAX (503) 6704147 FAX (503) 5881309 FAX (541) 3304163
Final Summary Letter
September 10, 2003 - revised November 19, 2003
Mr. Mart Hansen
Derek L. Brown & Associates, Inc.
9500 SW Barbur Blvd., Suite 220
Portland, Oregon 97219
Re: . Final Letter of Geotechnical Observations
Hawks Beard ToWnhomes
SW Hawks Beard Street
Tigard, Oregon
. CGT Project G0202050A
Carlson Geotechnical (COT) served as geotechnical Engineer -of- Record (EOR) for the Hawks
Beard Tcrwnhomes project, located at the intersection of SW 130 Avenue and SW Hawks Beard
Street in Tigard, Oregon. We performed a geotechnical investigation of the site, the results of
which were presented in our report of Geotechnical Engineering Services dated December 10,
2002, and performed geotechnical observation during construction. Our observations were
completed on an on-call, part - time basis between the dates of November 19, 2002 and July 17,
2003.
• Site Stripping: Prior to construction, the site contained surface vegetation in
structural areas. Roadways and lots were stripped of vegetation between
November 19 and 25 2002. Based on our field observations, the site was
stripped of organic topsoil in general accordance with our recommendations.
• Subgrade Conditions: After stripping had been completed, the site subgrade soil
was cement treated for planned construction activities in the winter. Based on our
field observatiwns, the subgrade soil has been prepared in general accordance with
our recommendations.
• Roadway Fii! Placement and Compaction: Up to 2 feet of fill was placed and
compacted on roadways in the southeast corner of the site. CGT conducted 6 in-
place relative compaction tests on the native brown silt fill. Based on our field
observations and in 'place density testing the native silt fill for roadways was placed
and compacted in general accordance with our recommendations (92 percent of
ASTM 0- 1557).
• Roadway Aggregate Base Rock: CGT conducted 12 In -place relative compaction
tests on the roadway aggregate base rock on May 2, 2003. The roadway
aggregate base rock was prepared in general accordance with the
recommendations given by the City of Tigard (95 percent of AASHTO T-99).
•
-
Hawks Beard Townhornes
Tigard, Oregon
September 10, 2003
• Roadway Pavements: Asphalt was placed on the South Alley, North Alley,
Hazelwood, Briarmod, Woodridge, Huntington. and Hawks Beard on May 13,
2003. CGT conducted 17 in -place relative compaction tests on the asphalt Test
results ranged from 91 to 93.1 percent of ASTM D -2950.
• Lots: Based on ow field observations, lots 8 through 13. and lots 1 through 3 were
cut and are on native silt The remaining 53 lots are on structural fill up to 3 feet
deep. Based on ow observations and in -place relative compaction testing, lots 1
through 62 have been prepared in general accordance with our recommendations.
• Foundation Bearing Surfaces: Foundation bearing surfaces were not prepared
at the time of this report; therefore, we have not observed any of the foundation
subgrade soils for the proposed residences.
panringooncrete. We understand that the City of Tigard will not require individual
lot foundation subgrade obsenratirons.
• Utility trench backfill compaction. CGT conducted 28 in -place relative
compaction tests on utility trench backlit! material for the sanitary sewer and storm
sewer trenches. Based on ow density testing, the utility trenches badcfill has been
compacted in general accordance with the recommendations given by City of
Tigard (95 percent of AASHTO T -99).
Based on our observations, as documented in our field reports, and to the best or our knowledge,
within our scope of work, the above geotechnical summaries accurately reflect our observations.
Our services were provided on an on-call basis, in which we relied on the contractor to contact our
office for the scheduling of our services. We cannot be held contractually responsible for those
items. if any, that we did not observe or test.
Sincerely,
CARLSON GEOTECHNICAL
J
.fared tti / _
Geotechnical Staff ► !! •
IA * M.ft J
anne M re , P.E. -- .... -.-
Pn - pal f. vote = nical Engineer t -
. ID: P. OTECMIPROJECTS12002 ProjectslliavAs Beard Townhontes - COS1Fb al Letter,DOC
Carlson Geotec el Page 2 of 2